Loading...
2017.10.26 Tech Memo Appendix A-2 Submission Checklists900 King Street List of Plans Required Pg 1 10/26/2017 Required For Code Section Requirement Location In Submission PUD Concept Plan 250-7E(4)(a)[1][a][i]Location of Site in relation to surrounding community C-000 PUD Concept Plan 250-7E(4)(a)[1][a][ii]Property Lines, street names, zoning C-000 PUD Concept Plan 250-7E(4)(a)[1][a][ii]Names of adjoining property owners C-100 PUD Concept Plan 250-7E(4)(a)[1][a][iii]Existing conditions, including topography and woods C-100 PUD Concept Plan 250-7E(4)(a)[1][a][iv]Location witdths of proposed streets and pedestrian ways C-300 PUD Concept Plan 250-7E(4)(a)[1][a][v]Land Use Plan, showing open space, buffers, recreation areas C-300; Tech Memo Secs. 3.1, 3.8 PUD Concept Plan 250-7E(4)(a)[1][a][vi]Parking Plans C-300; A-100 PUD Concept Plan 250-7E(4)(a)[1][a][vii]Utilities C-500 PUD Concept Plan 250-7E(4)(a)[1][a][viii]Zoning Comparison Chart for Existing and Proposed Zoning C-000 PUD Concept Plan 250-7E(4)(a)[1][b][i]Text Description of Plan Tech Memo, Secs. 2, 3.1 PUD Concept Plan 250-7E(4)(a)[1][b][ii]Name and address of Applicant and professionals C-000 PUD Concept Plan 250-7E(4)(a)[1][b][iii]Proposed methods of ownership, control and future operation Tech Memo Sec. 2.2.2 PUD Concept Plan 250-7E(4)(a)[1][b][iv]Construction Schedule Tech Memo, Sec. 3.14 PUD Concept Plan 250-7E(4)(a)[1][b][v]List of Approvals Tech Memo, Sec 1.5 Preliminary Site Plan 209-3C(1)(a)SBL C-000 Preliminary Site Plan 209-3C(1)(a)Property Card Tech Memo, Appendix B-1 Preliminary Site Plan 209-3C(1)(b)Location Map C-000 Preliminary Site Plan 209-3C(1)(d)Survey Map, topography, setback of existing structures C-100 Preliminary Site Plan 209-3C(1)(e)Adjacent street: location, name, width, curblines C-100 Preliminary Site Plan 209-3C(1)(f)Location and owners of all adjoining lands C-100 Preliminary Site Plan 209-3C(1)(g)[1]Deed to Property Tech Memo, Appendix B-3 Preliminary Site Plan 209-3C(1)(g)[2]All Easements Tech Memo, Appendix B-3 Preliminary Site Plan 209-3C(1)(g)[3]Existing and Proposed Deed restrictions or coveneants Existing-Tech Memo Appendix B- 3; Proposed-None Preliminary Site Plan 209-3C(1)(h)Existing Zoning C-000 Preliminary Site Plan 209-3C(1)(i)Prior Land Use Approvals Tech Memo, Sec. 3.1 Preliminary Site Plan 209-3C(1)(j)Other legal agreements required by PB or BoT N/A Preliminary Site Plan 209-3C(2)(a)Location of watercourses, streams, wetlands C-100; Tech Memo 3.3 Preliminary Site Plan 209-3C(2)(b)2-foot contours C-100 Preliminary Site Plan 209-3C(2)(c)Boundaries of areas subject to flooding N/A Preliminary Site Plan 209-3C(2)(d)Rock Outcroppings and Steep Slopes C-120 900 King Street List of Plans Required Pg 2 10/26/2017 Required For Code Section Requirement Location In Submission Preliminary Site Plan 209-3C(2)(e)Tree Survey C-130, C-131 and Tech Memo Sec. 3.5, Appendix D-4 Preliminary Site Plan 209-3C(2)(f)Aquifers N/A Preliminary Site Plan 209-3C(3)(a)Location of existing building on- and off-site C-100 Preliminary Site Plan 209-3C(3)(b)Location of existing roods and sidewalks C-100 Preliminary Site Plan 209-3C(3)(c) Location, dimension, grade, flow direction of existing sewer, culverts, waterlines and other underground utilities C-100 Preliminary Site Plan 209-3C(3)(d)Other Site improvements C-100 Preliminary Site Plan 209-3C(4)(a) Grading and drainage plan, showing existing and proposed contours, new grades indicating clearly how such grades will meet existing grades of adjacent properties or the street and calculations of expected storm drain loads to be accommodated by the proposed drainage system.C-400; SWPPP Preliminary Site Plan 209-3C(4)(b) Location, design, type of construction, proposed use and exterior dimensions, including length, width, ground floor elevation and height, of all buildings.C-400; A-series Preliminary Site Plan 209-3C(4)(c) Location, design and type of construction of all parking and truck loading areas, showing access and egress.C-300; A-100 Preliminary Site Plan 209-3C(4)(d)Provision for pedestrian access.C-300 Preliminary Site Plan 209-3C(4)(e) Location, size and proposed screening of outdoor storage areas, if any.N/A Preliminary Site Plan 209-3C(4)(f) Location, design and construction material of all existing or proposed site improvements, including drains, culverts, retaining walls, landscape walls and fences. C-300; C9xx; Specifications during Site Plan Approval Preliminary Site Plan 209-3C(4)(g) Description of the method of sewage disposal and storm drainage location, design and construction material of such facilities.C-500, Tech Memo Sec. 3.9 Preliminary Site Plan 209-3C(4)(h) Description of the method of securing public water and location, design and construction material of such facilities.C-500, Tech Memo Sec. 3.9 Preliminary Site Plan 209-3C(4)(i) Location of fire and other emergency zones, including the location of fire hydrants.C-320; C-500 Preliminary Site Plan 209-3C(4)(j) Location, design and construction materials of all energy distribution facilities, including electrical, gas and solar energy. C-500; specifications during Site Plan Approval Preliminary Site Plan 209-3C(4)(k) Location, size, wording, design, color, illumination and type of construction of all proposed signs. C-300; specifications during Site Plan Approval 900 King Street List of Plans Required Pg 3 10/26/2017 Required For Code Section Requirement Location In Submission Preliminary Site Plan 209-3C(4)(l) Location and proposed development of all buffer areas, including existing vegetative cover.L-100 Preliminary Site Plan 209-3C(4)(m) Location, type, design, shielding and hours of operation of outdoor lighting facilities. C-600; specifications during Site Plan Approval Preliminary Site Plan 209-3C(4)(n) Identification of the location and amount of building area proposed for retail sales or similar commercial activity.N/A Preliminary Site Plan 209-3C(4)(o) Landscape plan with a plant schedule that includes the common name, scientific name, height and/or spread, nursery condition, and quantities of all plant material proposed and specifications and details for plant installation and postplanting maintenance. L-100; specifications during Site Plan Approval Preliminary Site Plan 209-3C(4)(p) Estimate of earthwork showing the quantity of any material to be imported to and/or removed from the site.C-400; Tech Memo 3.2 Preliminary Site Plan 209-3C(4)(q) Description of measures planned to assure proper erosion and sedimentation control in accordance with the requirements of Chapter 118 entitled "Erosion and Sediment Control," of the Code of the Village of Rye Brook.C-200 Preliminary Site Plan 209-3C(4)(r)An estimated project construction schedule.Tech Memo Sec. 3.14 Preliminary Site Plan 209-3C(4)(s) Record of application for and approval status of all necessary permits from state and county officials and local utility companies.During Site Plan Approval Preliminary Site Plan 209-3C(4)(t) Identification of any federal, state or county permits required for the project's execution, including project referrals, if any, and environmental review procedures mandated by Article 8, Environmental Quality Review, of the Environmental Conservation Law (SEQRA).Tech Memo Sec. 1.5 Preliminary Site Plan 209-3C(4)(u) The outlines of any proposed easements, deed restrictions or covenants.N/A - None Proposed Preliminary Site Plan 209-3C(4)(v) For a change of use in an existing shopping center...parking study N/A Preliminary Site Plan 209-3C(4)(w) For a change of use in an existing shopping center...traffic study N/A Preliminary Site Plan 209-3C(5)Other elements deemed necessary by BoT or PB Tech Memo Preliminary Site Plan 209-3D Storwmater management plan consistent with Chapter 217 SWPPP; Tech Memo 3.4 Preliminary Site Plan 209-3F Required Affordable Housing Tech Memo Secs. 2 and 3.1 Preliminary Site Plan 235-9A Tree Removal Map C-130, C-131 and Tech Memo 3.5 900 King Street List of Plans Required Pg 4 10/26/2017 Required For Code Section Requirement Location In Submission Preliminary Site Plan 235-18A Tree Restoration Plan L-100; Tech Memo 3.5; specifications during site plan approval Final Site Plan 209-14 Parks Required Tech Memo 3.8 Final Site Plan 235-9B Tree Preservation Map Tech Memo 3.5; Specifications during Site Plan Approval