Loading...
Appendix HAppendix H Correspondence from Con Edison Consolidated Edison Company of New York, Inc. Customer's Gas Service Layout (2-80) Equipment to be installed by the Customer's Contractor Case ID MC-399695 Layout/Ticket # Customer Service Date Service Address 900 King Street Unit/Suite# City State Zip Rye Brook, NY 10573 Project Name George Comfort & Sons Inc. Created By/Date Mariscal, Cristina/ March 11, 2019 Customer Steven Ketchabaw Contractor Robert Spina CompanyName George Comfort & Sons Inc.CompanyName OLA Consulting Engineers Address 2 MANHATTANVILLE ROAD Address 50 BROADWAY Unit/Suite# Unit/Suite# City State Zip PURCHASE NY 10577 City State Zip HAWTHORNE NY 10532 E-mail sketchabaw@gcomfort.com E-mail rspina@olace.com Phone (914)694-1090 Phone 9147145601 Con Edison Service Determination INSTALL/REPLACE SERVICE/MAIN EXTENSION Con Edison will install a new 4 inch medium pressure plastic gas service from the main to the property line. Con Edison recommends the installation of 4 inch medium pressure plastic gas service behind the property line. The customer is responsible for all costs associated with work done behind the property line including the head of service valve. Main Reinforcement Required: Replace 945 ft of 4" & 6" MPSTL main on Mohegan La & Latonia Rd w/ 12" medium pressure plastic and Install 1,775 ft of 12" medium pressure plastic tie on Kng St from Arbor Dr & N Ridge St. Gas main extension & replacement is required at a cost to the customer. The cost to install 2,720' of 12" medium pressure plastic gas main is a one time payment of $1,648,329, or 60 monthly installments of $41,670. This cost is good for 6 months. The company has declared a temporary moratorium for most of Westchester County. This service determination is valid for 60 days. Please advise if you intend to proceed, and we will provide you an invoice for the amount of $1,648,329 to be refunded to you when the gas meter is set, less depreciation at three (3) percent per year for every year the service is not used, not to exceed two years in the temporary moratorium area. Customer Cost Estimate&Account Deposit ***Customer Cost Account Deposit **Firm Gas **Dual Fuel Firm Gas **Dual Fuel Interruptible Gas Advance of Need Please Review the following Items This Service Layout is subject to revision based on field conditions and customer or Con Edison needs. Modification of this Layout may only be done by an authorized Con Edison representative. Please contact your representative if you need a written revision. Please review the specifications referenced in this document to ensure any new equipment is compliant with the Gas codes of the local authorities having jurisdiction and Con Edison specifications. This Layout is good for 6 months. Please check back with your representative for the most recent specifications prior to starting your work. Final Inspections are completed by Con Edison representatives at no cost to the customer. Any changes to existing joints, fittings, pipes etc. must be filed with the local authorities having jurisdiction and be authorized for service by said authorities prior to Con Edison inspection and your service being energized. If you have any questions prior to starting your work, please contact your representative. Gas services de-energized for any reason may require authorization by the local authorities having jurisdiction prior to service restoration. All certificates of inspection must be approved by the authorities having jurisdiction prior to energizing services. If you have any questions prior to starting your work, please contact your representative. Representatives require 48 hours of notice to schedule Inspections. Services installations that require permits for working on state roads, generally require more time to coordinate permit issuance with the NY State Department of Transportation. When the contractor's work is completed, the customer or contractor must arrange for an inspection with a representative and submit a Pressure Test Affidavit Any individual (contractor or licensed plumber) who is working on below grade pipelines and service lines must adhere to all federal, state and Con Edison requirements for any new construction work. This includes all requirements for Gas Operator Qualification (OQ). Individuals performing below grade gas work must have a Northeast Gas Association (NGA) OQ Certification Card prior to the project start date and readily available throughout to verify OQ task compliance. The following work cannot be performed by non-operator qualified plumbers and/or contractors: Installation and/or joining of a plastic pipeline, below grade. Installation and/or joining of a steel pipeline, below grade. Page 1 The following work is restricted and cannot be performed by customer plumbers/contractors, unless they are operator qualified and participating in a Drug & Alcohol program: Any “repair” work on a pipeline. Operation of a valve on a pipeline (i.e. operation of a curb valve and/or head of service valve) Any operations and maintenance (O&M) tasks performed on a pipeline. Outdoor Meter Set Assembly work will remain with the plumbers/customer contractors. If a customer’s contractor or licensed plumber does not have individuals available with the necessary operator qualifications to perform the above described work, the following options will be available: A Customer contractor can provide (excavate)the trench,and Con Edison will perform the below grade gas work (Con Edison will charge the customer an accommodation cost for this work). Backfill of trench must be supervised by someone Operator Qualified for Covered Task 71. Customer licensed plumbers will continue to install associated outdoor gas meter assemblies. Operator Qualification (OQ) Requirements When working on buried gas service pipe,a Customers’Licensed Master Plumber is required to be Operator Qualified per Subpart N in 49 CFR Part 192. Con Edison is advising those customer contractors or licensed plumbers seeking Operator Qualifications to use Northeast Gas Association (NGA)OQ Program. For information on becoming Operator Qualified please visit the Northeast Gas Association web site located at: http://www.northeastgas.org/tql- operator.php .The NGA can also be contacted via the following email: oq@northeastgas.org to request new Operator Qualification, to schedule changes,cancellations or when scheduling a “hands on”evaluator for Operator Qualification. Please note that all cancellations require 72 business hours. Welding and assembly of new "outdoor" above-ground meter-sets and/or new inside gas service piping between the foundation wall and the gas meter outlet does not require a Customer’s Licensed Master Plumber to be operator qualified. Equipment&Specifications Equipment Type Qty Equipment Description Specification Regulator Equipment Regulator Peck Vent Installation EO-17118 Regulator Equipment Installation of Gas Regulators Indoor (1" to 2") G-413 Prerequisites for Construction The Customer's/Contractor's responsibilities prior to service construction are to:Customer to complete by: Prerequisites for Final Inspection The Customer's/Contractor's responsibilities prior to requesting a Final Inspection are to:Customer to complete by: * Inability to meet the deadlines outlined above will jeopardize Con Edison’s ability to meet the Customer Service Date. Page 2 Consolidated Edison Company of New York, Inc.Customer's Electric Service Layout (2-80)Equipment to be installed by the Customer's Contractor Case ID  MC-346975Layout/Ticket # Customer Service Date6/25/20 * See Explanation Below Service Address  900 King Street Unit/Suite#  City State Zip  Rye Brook, NY 10573Project Name  George Comfort & SonsCreated By/Date   Bell, Steven/ June 29, 2018 Customer  George Comfort Contractor  Joseph FierroCompanyName  George Comfort & Sons CompanyName  OLA Consulting EngineersAddress  900 KING ST Address  50 BROADWAYUnit/Suite#   Unit/Suite#  City State Zip   RYE BROOK NY 10573 City State Zip  HAWTHORNE NY 10532E-mail   RBohlander@jmcpllc.com E-mail  jfierro@olace.com Phone  (914)273-5225212 Phone   9145849641 Con Edison Service DeterminationEXISTING 1500KVA 13KV 460V RADIALPADMOUNT TRANSFORMER ON V3126 LOCATEDIN CUSTOMER PROPERTY IS ADEQUATE FORNEW LOADS  Work DescriptionA demo case will need to be entered for the existing 1500kva service if you want to utilize a different POE for the newconstruction.  Customer Cost Estimate & Account Deposit  **Customer Cost  Account Deposit  Advance of Need Please Review the following Items Equipment&Specifications  Equipment Type  Qty  Equipment Description  Specification Prerequisites for Construction Customer to complete by: Prerequisites for Final Inspection The Customer's/Contractor's responsibilities prior to requesting a Final Inspection are to:Customer to complete by: * Inability to meet the deadlines outlined above will jeopardize Con Edison’s ability to meet the Customer Service Date. Page 1