Loading...
00 Cover900 King Street Redevelopment preliminary Final Environmental Impact Statement (pFEIS) DEIS Acceptance Date: September 12, 2018 DEIS Public Hearings: October 22, 2018 November 8, 2018 December 11, 2018 January 8, 2019 DEIS Comments Accepted Through: January 23, 2019 pFEIS Submission: May 14, 2019 Lead Agency: Village of Rye Brook Board of Trustees Applicant/Petitioner: 900 King Street Owner, LLC Prepared by: AKRF, Inc. Electronic files of pFEIS documents can be downloaded from: http://bit.ly/900KingpFEIS Volume 1 - FEIS Chapters 900 KING STREET REDEVELOPMENT Preliminary Final Environmental Impact Statement (pFEIS) May 14, 2019 Lead Agency: Village of Rye Brook Board of Trustees 938 King Street Rye Brook, New York 10573 Contact: Christopher Bradbury, Village Administrator Phone: 914-939-1121 SEQRA Classification: Type I Action Project Location: 900 King Street, Rye Brook, New York (SBL: 129.68-1-13) Applicant/Petitioner: 900 King Street Owner, LLC c/o George Comfort & Sons, Inc. 200 Madison Avenue New York, New York 10016 Contact: Peter Duncan Phone: 212-481-1137 Prepared by: AKRF, Inc. 34 South Broadway White Plains, New York 10601 Contact: Peter Feroe, AICP Phone: 914-922-2350 DEIS Acceptance Date: September 12, 2018 DEIS Public Hearing: October 22, 2018, November 8, 2018, December 11, 2018, January 8, 2019 DEIS Comments Accepted Through: January 23, 2019 pFEIS Submissions: May 14, 2019 Electronic copies of pFEIS documents can be downloaded from: http://bit.ly/900KingpFEIS This document is a preliminary Final Environmental Impact Statement (pFEIS) for the 900 King Redevelopment project. DEIS Preparer: AKRF, Inc. 34 South Broadway White Plains, New York 10601 Contact: Peter Feroe, AICP Phone: 914-922-2350 Legal Counsel: Veneziano & Associates 84 Business Park Drive, Suite 200 Armonk, New York 10504 Contact: Anthony Veneziano, Esq. Phone: 914-273-1300 Architect: Perkins Eastman 422 Summer Street Stamford, Connecticut 06901 Contact: Richard Rosen, AIA, LEED AP Phone: 212-353-7650 Site/Civil Engineer: JMC Engineering 120 Bedford Road Armonk, New York 10504 Contact: James Ryan, RLA Phone: 914-273-5225 Traffic Engineer: Maser Consulting, P.A. 400 Columbus Avenue, Suite 180E Valhalla, New York 10595 Contact: John Collins, Ph.D., P.E. Phone: 914-347-7500 This FEIS will be sent to the following Involved and Interested Agencies: Involved Agencies Village of Rye Brook Board of Trustees, Lead Agency Village of Rye Brook Building Department Village of Rye Brook Department of Public Works Village of Rye Brook Planning Board Village of Rye Brook Architectural Review Board Westchester County Department of Health New York State Department of Environmental Conservation, Region 3 New York State Department of Environmental Conservation, Division of Environmental Permits New York State Department of Health New York State Department of Transportation, Region 8 New York State Office of Parks, Recreation and Historic Preservation Interested Agencies Blind Brook-Rye Union Free School District Rye Brook Emergency Services Task Force Town of Greenwich Planning and Zoning Department Westchester County Planning Board Village of Port Chester The Arbors Homeowner’s Associations Rye King Associates, LLP, Applicant DRAFT TOC-1 5/14/2019 Table of Contents VOLUME 1—FEIS CHAPTERS AND FIGURES Introduction ...................................................................................................................... 1 Procedural Context ....................................................................................................... 1 Purpose of the FEIS ..................................................................................................... 1 FEIS Structure .............................................................................................................. 2 1: Revised Proposed Project ........................................................................................ 1-1 1.1. Summary Description of Revised Proposed Action ....................................... 1-1 1.2. Project Site ..................................................................................................... 1-2 1.3. Revised Proposed Zoning ............................................................................... 1-3 1.4. Revised Proposed Project ............................................................................... 1-4 1.4.1. Buildings and Uses ................................................................................... 1-4 1.4.1.1. Independent Living .......................................................................... 1-5 1.4.1.2. Assisted Living ................................................................................ 1-6 1.4.1.3. Townhouses ..................................................................................... 1-7 1.4.1.4. Affordable Housing ......................................................................... 1-7 1.4.2. Site Operation ........................................................................................... 1-7 1.4.3. Parking and Circulation ............................................................................ 1-8 1.4.3.1. Vehicular Circulation ...................................................................... 1-8 1.4.3.2. Parking ............................................................................................. 1-8 1.4.3.3. Pedestrian Circulation ..................................................................... 1-9 1.4.4. Landscaping.............................................................................................. 1-9 1.4.5. Grading, Drainage, and Stormwater Management ................................. 1-10 1.4.5.1. Grading .......................................................................................... 1-10 1.4.5.2. Proposed Stormwater Management ............................................... 1-11 900 King Street Redevelopment 5/14/2019 TOC-2 DRAFT 1.4.6. Improvements to On-Site Water and Sewer Infrastructure ................... 1-12 1.5. Purpose and Need ........................................................................................ 1-12 2: Environmental Analysis .......................................................................................... 2-1 2.1. Procedural Context ........................................................................................ 2-1 2.2. Summary of Environmental Analysis ............................................................ 2-2 2.3. Land Use, Public Policy, and Zoning ............................................................ 2-2 2.3.1 Land Use .................................................................................................. 2-2 2.3.2 Proposed Density ..................................................................................... 2-3 2.3.3 Zoning ...................................................................................................... 2-4 2.3.4 Public Policy ............................................................................................ 2-8 2.3.4.1. Comprehensive Plan ....................................................................... 2-8 2.3.4.2. Village’s Affordable Housing Policies ......................................... 2-10 2.3.4.3. Applicable Documents of Westchester County ............................ 2-10 2.4. Geology, Soils, and Topography ................................................................. 2-11 2.4.1 Soils ....................................................................................................... 2-11 2.4.2 Topography ............................................................................................ 2-13 2.4.3 Construction of Subsurface Structure .................................................... 2-14 2.5. Waters and Wetlands ................................................................................... 2-14 2.5.1 Direct Impacts to Wetlands and Waterbodies ........................................ 2-15 2.5.2 Direct Impacts to Wetland and Waterbody Buffer Areas ...................... 2-15 2.5.3 Indirect Impacts to Wetland and Waterbody Hydrology ....................... 2-20 2.5.4 Wetland Buffer Mitigation ..................................................................... 2-20 2.5.4.1. Wetland Buffer Mitigation Plan .................................................... 2-20 2.5.4.2. Applicant’s Interpretation of Village’s Wetland Buffer Ordinance 2-21 2.6. Stormwater Management ............................................................................. 2-22 2.6.1 On-Site Storwmater Management ......................................................... 2-23 2.6.2 Off-Site Stormwater Management Facilities ......................................... 2-25 2.6.3 Mitigation Measures .............................................................................. 2-25 2.7. Vegetation and Wildlife ............................................................................... 2-25 2.7.1 Habitat .................................................................................................... 2-25 Table of Contents DRAFT TOC-3 5/14/2019 2.7.2 Wildlife ................................................................................................... 2-26 2.7.3 Threatened and Endangered Species ...................................................... 2-26 2.7.4 Trees ....................................................................................................... 2-26 2.7.5 Mitigation Measures ............................................................................... 2-27 2.8. Visual Resources and Community Character ............................................... 2-28 2.8.1 On-Site Visual Character........................................................................ 2-28 2.8.2 Visibility of Project Site ......................................................................... 2-29 2.8.3 Consistency of the Revised Proposed Project With the Existing Visual and Community Character ............................................................................ 2-29 2.9. Socioeconomic and Fiscal Impacts ...............................................................2-32 2.9.1 Demographics ......................................................................................... 2-32 2.9.2 Fiscal Conditions .................................................................................... 2-33 2.10. Community Facilities ....................................................................................2-35 2.10.1 Emergency Services ............................................................................... 2-35 2.10.1.1.EMS—Municipal Contribution to Budget ......................................... 2-35 2.10.1.2.EMS—Increase in Call Volume ................................................... 2-36 2.10.1.3 Police Services ............................................................................... 2-37 2.10.1.4Fire Services................................................................................... 2-38 2.10.1.5.Emergency Service Site Access .................................................... 2-38 2.10.2 Schools ................................................................................................... 2-39 2.10.3 Open Space ............................................................................................. 2-39 2.10.4 Solid Waste and Recycling..................................................................... 2-41 2.10.5 Senior Services ....................................................................................... 2-42 2.11. Infrastructure and Utilities ............................................................................2-43 2.11.1 Water Supply .......................................................................................... 2-43 2.11.2 Sanitary Sewer ........................................................................................ 2-44 2.11.3 Energy Usage (Electricity and Natural Gas) .......................................... 2-45 2.12. Traffic and Transportation ............................................................................2-46 2.12.1 Site-Generated Traffic ............................................................................ 2-46 2.12.2 Traffic and Capacity Analsysis for the Revised Proposed Project ......... 2-46 2.12.3 No-Build Sensitivity Analysis ................................................................ 2-48 900 King Street Redevelopment 5/14/2019 TOC-4 DRAFT 2.12.4 Signal Retimings .................................................................................... 2-49 2.12.5 Public Transportation ............................................................................. 2-49 2.12.6 Pedestrian Circulation ............................................................................ 2-50 2.12.7 Accident Patterns ................................................................................... 2-50 2.12.8 Parking ................................................................................................... 2-50 2.12.9 Mitigation ............................................................................................... 2-51 2.13. Air Quality .................................................................................................... 2-51 2.13.1 Stationary Sources ................................................................................. 2-51 2.13.2 Mobile Sources ...................................................................................... 2-53 2.13.3 Parking Analysis .................................................................................... 2-53 2.14. Noise ............................................................................................................. 2-55 2.14.1 Mobile Sources ...................................................................................... 2-55 2.14.2 Stationary Sources ................................................................................. 2-56 2.15. Hazardous Materials ..................................................................................... 2-56 2.16. Construction ................................................................................................. 2-59 2.16.1 Construction Phasing ............................................................................. 2-59 2.16.2 Construction Period Impacts and Mitigation ......................................... 2-59 2.16.2.1. Erosion and Sediment Control ............................................................ 2-60 2.16.2.2. Traffic and Transportation ................................................................... 2-62 2.16.2.3. Air Quality ........................................................................................... 2-65 2.16.2.4. Noise .................................................................................................... 2-67 2.16.2.5. Vibration .............................................................................................. 2-75 3: Response to Comments ............................................................................................ 3-1 3.1. Introduction .................................................................................................... 3-1 3.2. Project Description ......................................................................................... 3-1 Age Restriction ................................................................................................... 3-1 Site Plan Details ................................................................................................. 3-3 Proposed Program .............................................................................................. 3-6 Purpose and Need ............................................................................................... 3-8 3.3. Land Use, Public Policy, and Zoning ........................................................... 3-12 Table of Contents DRAFT TOC-5 5/14/2019 Land Use ........................................................................................................... 3-12 Zoning ............................................................................................................... 3-18 General .............................................................................................................. 3-18 Prior Approvals and Resolutions ....................................................................... 3-21 Proposed Zoning ................................................................................................ 3-24 Comprehensive Plan ......................................................................................... 3-29 3.4. Geology, Soils, and Topography ..................................................................3-31 3.5. Waters and Wetlands ....................................................................................3-36 3.6. Stormwater Management ..............................................................................3-43 Stormwater ........................................................................................................ 3-43 Erosion and Sediment Control .......................................................................... 3-46 3.7. Vegetation and Wildlife ................................................................................3-48 3.8. Visual Resources and Community Character ...............................................3-50 Visual Character of Project Site ........................................................................ 3-50 Consistency of Proposed Project With Community Character ......................... 3-54 3.9. Socioeconomic and Fiscal Impacts ...............................................................3-58 Demographics ................................................................................................... 3-58 Fiscal .............................................................................................................. 3-59 General .............................................................................................................. 3-59 Property Assessment and Property Taxes ......................................................... 3-60 Off-Site Impacts ............................................................................................................... 3-63 3.10. Community Facilities ....................................................................................3-63 General .............................................................................................................. 3-63 EMS .............................................................................................................. 3-64 Police .............................................................................................................. 3-67 Fire Services...................................................................................................... 3-67 Schools .............................................................................................................. 3-69 Open Space ....................................................................................................... 3-71 Solid Waste and Recycling ............................................................................... 3-73 Senior Services .................................................................................................. 3-74 3.11. Infrastructure and Utilities ............................................................................3-75 900 King Street Redevelopment 5/14/2019 TOC-6 DRAFT Water Supply .................................................................................................... 3-75 Sanitary Sewer .................................................................................................. 3-77 Energy Usage (Electricity and Gas) ................................................................. 3-78 3.12. Traffic and Transportation ............................................................................ 3-79 Methodology .................................................................................................... 3-79 Traffic Impacts ................................................................................................. 3-85 Traffic Mitigation ............................................................................................. 3-91 Pedestrians ........................................................................................................ 3-93 Parking .............................................................................................................. 3-94 3.13. Air Quality .................................................................................................... 3-96 General ............................................................................................................. 3-96 Existing Conditions—Methodology ................................................................. 3-96 Analysis ............................................................................................................ 3-99 Mitigation ....................................................................................................... 3-102 3.14. Noise ........................................................................................................... 3-103 Existing Conditions—Methodology ............................................................... 3-103 Impacts and Analysis ...................................................................................... 3-104 Mitigation ....................................................................................................... 3-106 3.15. Hazardous Materials ................................................................................... 3-106 3.16. Construction ............................................................................................... 3-110 General ............................................................................................................... 3-110 Traffic and Transportation .................................................................................. 3-112 Air Quality .......................................................................................................... 3-117 Noise and Vibration ............................................................................................ 3-119 3.17. Alternatives ................................................................................................ 3-129 General ............................................................................................................... 3-129 Comments On Specific DEIS Alternatives ........................................................ 3-133 3.18. Unavoidable Adverse Impacts .................................................................... 3-137 3.19. Irretrievable and Irreversible Impacts ........................................................ 3-138 3.20. Growth-Inducing Impacts ........................................................................... 3-138 3.21. Cumulative Impacts .................................................................................... 3-138 Table of Contents DRAFT TOC-7 5/14/2019 3.22. Comments Not Requiring Response ...........................................................3-139 Duplicate ......................................................................................................... 3-139 Not Substantive ................................................................................................ 3-140 900 King Street Redevelopment 5/14/2019 TOC-8 DRAFT List of Figures Figures follow end of chapter text 1-1 Project Location 1-2 Project Site Aerial 1-3 Wetlands and Waterbodies 1-4 Revised Proposed Project 1-5 Independent Living and Assisted Living—First Floor Plan 1-6 Independent Living and Assisted Living—Typical Floor Plan 1-7 Independent Living and Assisted Living—Fourth Floor Plan 1-8 Proposed Building Height 1-9 IL/AL Typical Sections 1-10 Site Plan Comparison 1-11 Site Section 1-12 Site Section 1-13 Townhouse Floorplans 1-14 Townhouse Elevations 1-15 Proposed Vehicular Circulation 1-16 Truck Turning Template 1-17 Existing and Proposed Pedestrian Paths 2-1 Soil and Steep Slope Disturbance 2-2 Proposed Steep Slope Condition 2-3 Wetland Buffer Disturbance 2-4 Potential Wetland Buffer Mitigation Areas 2-5 Proposed Drainage Areas 2-6 Setback Comparisons - Revised Proposed Project 2-7 Setback Comparisons - Doral Arrowwood 2-8 Setback Comparisons - Hilton Westchester 2-9 Setback Comparisons - 800 Westchester Avenue 2-10 Setback Comparisons - Atria/ Belle Fair 2-11 On-Site Recreation Areas Table of Contents DRAFT TOC-9 5/14/2019 List of Tables 1.4-1 Proposed Building Sizes ................................................................................................ 1-5 1.4-2 Independent Living Building Size Reduction ................................................................ 1-5 1.4-3 Assisted Living Building Size Reduction ...................................................................... 1-7 1.4-4 Proposed Parking for the Revised Proposed Project ...................................................... 1-9 2.2-1 Changes in Environmental Impacts With the Revised Proposed Project ...................... 2-2 2.3-1 Comparative Project Density ......................................................................................... 2-3 2.3-2 Zoning Comparison ....................................................................................................... 2-6 2.4-1 Proposed Disturbance By Soil Type ............................................................................ 2-12 2.4-2 Cut-and-Fill Analysis ................................................................................................... 2-12 2.4-3 Steep Slope Analysis ................................................................................................... 2-13 2.4-4 Proposed Steep Slopes ................................................................................................. 2-14 2.5-1 Cumulative Changes to Wetland Buffers By Wetland Area ........................................ 2-15 2.5-2 Impacts to Wetland Buffers By Current Coverage Type ............................................. 2-16 2.6-1 Proposed Peak Runoff Rate ......................................................................................... 2-24 2.6-2 Proposed Peak Runoff Volume .................................................................................... 2-24 2.7-1 Habitats of the Project Site .......................................................................................... 2-26 2.7-2 Tree Removal ............................................................................................................... 2-27 2.7-3 Tree Removal Mitigation ............................................................................................. 2-27 2.8-1 Setback Comparison .................................................................................................... 2-30 2.8-2 Parcel Coverage Comparison ....................................................................................... 2-31 2.9-1 Projected Property Tax Revenue of the Revised Proposed Project ............................. 2-34 2.10-1 2019 EMS Municipal Contribution ............................................................................. 2-35 2.10-2 Potential Increase in EMS Municipal Contributions ................................................... 2-37 2.10-3 New York State Recommended Available Open Space .............................................. 2-40 2.10-4 On-Site Recreation Areas ............................................................................................ 2-40 2.10-5 Revised Proposed Project Solid Waste Generation ..................................................... 2-41 2.11-1 Estimated Water/Sanitary Generation .......................................................................... 2-43 2.12-1 Anticipated Site-Generated Traffic .............................................................................. 2-46 2.12-2 Level of Service Summary........................................................................................... 2-47 2.12-3 Sensitivity Analysis—Level of Service Summary....................................................... 2-49 2.12-4 Comparison of Parking Spaces for the Revised Proposed Project ............................... 2-51 2.13-1 Maximum Modeled Pollutant Concentrations HVAC Systems: Original (DEIS) Project ... 2-52 2.13-2 Maximum Modeled Pollutant Concentrations HVAC Systems: Townhouses ............ 2-53 2.16-1 Construction Noise Receptor Areas ............................................................................. 2-68 2.16-2 Estimated Maximum Construction Noise Summary (in dBA) .................................... 2-70 3.3-1 Comparative Project Density ....................................................................................... 3-16 3.3-2 Parcel Coverage Comparison ....................................................................................... 3-28 3.4-1 Cut-and-Fill Analysis ................................................................................................... 3-34 3.5-1 Cumulative Changes to Wetland Buffers By Wetland Area ........................................ 3-37 3.5-2 Impacts to Wetland Buffers By Current Coverage Type ............................................. 3-37 3.7-1 Tree Removal ............................................................................................................... 3-49 3.8-1 Setback Comparison .................................................................................................... 3-55 3.9-1 Independent Living Building Size Reduction .............................................................. 3-59 3.10-1 On-Site Recreation Areas ............................................................................................ 3-73 3.12-1 Comparison of Parking Spaces for the Revised Proposed Project ............................... 3-95 900 King Street Redevelopment 5/14/2019 TOC-10 DRAFT 3.13-1 Representative Monitored Ambient Air Quality Data.................................................. 3-97 3.13-2 Maximum Modeled Pollutant Concentrations from Townhouses .............................. 3-101 3.16-1 BBRUFSD Construction Noise Receptor Areas ........................................................ 3-122 3.16-2 BBRUFSD Estimated Maximum Construction Noise Summary (in dBA) ............... 3-123 3.17-1 Parcel Coverage Comparison ..................................................................................... 3-131 Table of Contents DRAFT TOC-11 5/14/2019 VOLUME 2—FEIS APPENDICES Appendix A ................Revised Proposed Zoning Appendix B ................Site Plan for Current Office Building Appendix C ................JLL Market Study Appendix D ................Stormwater Pollution Prevention Plan (SWPPP) and Erosion and Sediment Control Plan (ESCP) Appendix E ................Emergency Services Appendix E-1 – 2018 EMS Service Agreement Extension Appendix E-2 – Fire Services Agreement Appendix E-3 – Rye Brook Fire Department Response Times to Project Site Appendix F.................NYS OPRHP Open Space Guidelines Appendix G ................Water System Capacity Analysis from Suez Appendix H ................Correspondence from Con Edison Appendix I .................Revised Traffic Analysis Appendix I-1 – Attachment A: Revised Traffic Impact Analysis Appendix I-2 – Attachment B: Sensitivity Analysis Without the Re-occupancy of the Existing Office Building Appendix J .................Construction Period Noise Analysis VOLUME 3—PUBLIC COMMENTS ON THE DEIS (provided in electronic copy only) VOLUME 4 —ENGINEERING AND ARCHITECTURAL PLANS (provided in full size, half size, or electronic copy)