HomeMy WebLinkAbout2015-03-03 DRE Report on stormwater:flolph Rotfeld Engineering, P.C.
CONSULTANTS & DESIGNERS
200 White Plains Road, Tarrytown, NY 10591 • (914) 531 -8600
M E M 0
TO: MICHAL NOWAK, Village Engineer
GARY ZUCKERMAN, Chairman, Planning Board
FROM: DOLPH ROTFELD, P.E., BCEE�
SUBJECT: Sun Homes
Reckson Executive Park
Village of Rye Brook
DATE: March 3, 2015
As per your request, we have reviewed the following submission materials with
regard to the Sun Homes Conceptual Site Plan Amendment, Reckson Executive
Park:
• Plan entitled "Conceptual Site Plan" prepared by Divney - Tung - Schwalbe
dated 219115;
• Plan entitled "Conceptual Grading and Utility Plan" prepared by Divney-
Dolph Rotleld Engineering, P.C.
Mr. Michal Nowak
Page 2 -- March 3, 2015
5. An analysis of sewage flows and existing capacity should be submitted
for review.
6. It is unclear if the roadways proposed will be public or private; at any
rate these should be designed to Village standards, including adequate
turning radius and turn- arounds for fire apparatus.
7. Please note that this office has not reviewed the conceptual site plan
for zoning compliance.
We will be happy to continue our review once additional information is provided.
DR Z6
C: G. Schwalbe