HomeMy WebLinkAbout1998-09-03 - Board of Trustees Meeting Minutes AGENDA
i
VILLAGE OF RYE BROOK
BOARD OF TRUSTEES SPECIAL MEETING
VILLAGE HALL, 938 KING STREET
THURSDAY, SEPTEMBER 3, 1998— 8:30 A.M.
PLEDGE OF ALLEGIANCE ACTION:
RESOLUTION:
12. CONSIDERING THE FINAL SITE PLAN APPROVAL FOR THE
RED ROOF FARM SUBDIVISION AND WETLAND PERMIT
APPLICATION.
NOTE: Resolution on 26 Rockinghorse Trail cannot be passed. Village Attorney has
advised that defect correction must go through the Court with the issuance of a
violation by the Building Inspector.
NEXT TRUSTEES MEETINGS:
SEPTEMBER 8, 1998 AT THE POSILLIPO CENTER, GARIBALDI PLACE
SEPTEMBER 22, 1998
`Village Hall is fully accessible to the handicapped.
Those who need special arrangements should contact
the Village Administrator's Office
ONE WEEK IN ADVANCE OF A MEETING
at (914) 939-1121.
9
MINUTES OF A SPECIAL MEETING
VILLAGE OF RYE BROOK,BOARD OF TRUSTEES
VILLAGE HALL, 938 KING STREET
RYE BROOK, NEW YORK
SEPTEMBER 3, 1998
CONVENE MEETING:
The meeting was convened at 8:30 a.m, by Mayor Filipowski.
The following members of the Board of Trustees were present:
Mayor Francis L. Filipowski
Trustee Donald E. Degling
Trustee Gary J. Zuckerman
Village staff attending the meeting were:
Village Administrator, Christopher J. Russo
Village Attorney, Kenneth E. Powell
Village Engineer, Victor Carosi
Building Inspector, William Gerety
Village Planning Consultant, Christian Miller
Assistant to the Administrator, Richard Slingerland
Representing the Applicant, Red Roof Farm:
Jason Green
Kip Konigsberg, Esq.
RESOLUTIONS:
I. CONSIDERING THE FINAL SITE PLAN APPROVAL FOR THE RED ROOF FARM
SUBDIVISION AND WETLAND PERMIT APPLICATION.
On the motion of Trustee Degling, seconded by Trustee Zuckerman, the following Resolution
was adopted as amended.
RESOLUTION
RED ROOF FARM FINAL SUBDIVISION PLAT
AND WETLANDS PERMIT APPROVAL
TAX LOT 14 OF BLOCK 5, SECTION 1 IN THE VILLAGE OF RYE BROOK
WHEREAS, the Village of Rye Brook Board of Trustees received an application of Kip
Konigsberg on behalf Red Roof Farm, LLC (hereinafter referred to as the "applicant") for final
subdivision plat and wetlands permit approval for the subdivision of a 22.25-acre parcel of land
located in the R-15 One-Family Residential District into 40 building lots;
WHEREAS, the Village Board of Trustees adopted a Conditioned Negative Declaration
of significance in accordance with the State Environmental Quality Review Act (SEQRA) and
granted Preliminary Plat approval by resolution dated June 23, 1998; and
WHEREAS, the applicant has submitted twenty (20) drawings generally entitled Red
Roof Farm Subdivision, 200-202 North Ridge Street, Village of Rye Brook, New York, prepared
by John Meyer Consulting and having the following sheet numbers, sheet titles and revision dates:
1. Plat drawing entitled, Subdivision Plat, Red Roof Farm, Village of Rye Brook,
Westchester County, New York, progress print dated 8/18/98.
2. Sheet CS entitled, Cover Sheet, dated 7/24/98 and last revised 8/3/98.
3. Sheet DM-1 entitled, Demolition Plan, dated 9/24/97 and last revised 8/3/98.
4. Sheet SP-1 entitled, Layout Plan, dated 7/26/98 and last revised 8/17/98.
5. Sheet SP-2 entitled, Grading Plan, dated 7/2/98 and last revised 8/17/98.
6. Sheet SP-3 entitled, Utilities Plan, dated 7/2/98 and last revised 8/17/98.
7. Sheet SP-4 entitled, Sediment &Erosion Control Plan, dated 7/2/98 and last revised
8/3/98.
8. Sheet SP-5 entitled, Landscape Plan, dated 7/2/98 and last revised 8/3/98.
9. Sheet SP-6 entitled, Construction Details, dated 7/2/98 and last revised 7/24/98.
10. Sheet SP-7 entitled, Construction Details, dated 7/2/98 and last revised 8/7/98.
11. Sheet SP-8 entitled, Construction Details, dated 8/3/98 and last revised 8/17/98.
12. Sheet RP-1 entitled, Road Profiles, dated 7/2/97 and last revised 7/24/98.
13. Sheet SS-1 entitled, Sanitary Sewer Profiles, dated 7/2/98 and last revised 8/17/98.
14. Sheet SS-2 entitled, Storm Sewer Profiles, dated 7/2/98 and last revised 8/12/98.
15. Sheet PG-1 entitled, Lot Grading Plan, dated 11/24/97 and last revised 7/24/98.
16. Sheet PL-1 entitled, Limit of Disturbance Plan, dated 11/24/97.
17. Plan V-I entitled, Visual Impact Analysis Plan, dated 10/30/97 and last revised 7/24/98.
18. Sheet WM-1 entitled, Wetland Mitigation Plan, dated 7/2/98 and last revised 7/24/98.
19. Sheet OS-1 entitled, Off-Site Drainage Improvement Plan, dated 8/5/98 and last revised
8/20/98.
20. Sheet OS-2 entitled, Off-Site Drainage Improvement Plan, dated 8/5/98 and last revised
8/20/98; and
WHEREAS, the plans have been revised to address the conditions of preliminary
subdivision plat approval; and
WHEREAS, the Village Board of Trustees re-affirms its preliminary subdivision approval
finding that a proper case exists for requiring that parkland be provided as shown on the
subdivision plans; and
WHEREAS, upon review of the revised plans, the Village Board of Trustees determined
that the modifications to the plans since preliminary subdivision plat approval are not substantive
and that a public hearing on the application for final plat approval is not required; and
WHEREAS, upon review of the revised plans, the Village Board of Trustees determined
that the modifications to the plans since preliminary subdivision plat approval do not include
revisions that were not adequately addressed as a part of either the previous environmental review
or the Conditioned Negative Declaration adopted for this application;
NOW THEREFORE, BE IT RESOLVED, that in accordance with the requirements of
the Village's Wetlands and Watercourses Law, the Village Board of Trustees re-affirms its
findings stated in the resolution of preliminary plat approval with respect to the proposed
wetlands disturbance and mitigation; and
BE IT FURTHER RESOLVED, that a wetlands permit shall be granted for this
application subject to the implementation and completion of the wetland mitigation plan, including
all special conditions identified on such plan, to the satisfaction of the Village Engineer or Village
Planning Consultant; and
BE IT FURTHER RESOLVED, that the wetlands permit shall expire three (3) years
from the date of this resolution; and
BE IT FURTHER RESOLVED, that the application for final subdivision plat approval
is granted and the Mayor is authorized to sign such plat subject to the modifications and
conditions listed below; and
BE IT FURTHER RESOLVED, that this final plat approval shall expire 180 days from
the date of this resolution unless all requirements specified herein have been certified as completed
or unless a written request for an extension of final subdivision plat approval (not to exceed two
[2] ninety[90] day periods) is granted; and
CONDITIONS TO BE COMPLETED PRIOR TO
SIGNING OF FINAL PLAT:
I. The applicant shall produce a final plat in accordance with the provisions of Section 219-
40 of the Village's Subdivision Regulations and as may be required to be modified herein.
Upon obtaining a satisfactory review by the Village Engineer, the final subdivision plat
shall be submitted for review and signature by the Westchester
County Department of Health. The signature of the Department of Health shall be
required prior to the signing of the final plat by the Mayor.
2. The final subdivision plat shall be updated with new revision dates and signed and sealed
by a professional engineer or land surveyor licensed in the State of New York,
3. The applicant shall submit verification from the Receiver of Taxes that all taxes assessed
against the property, which are due and owing, have been paid.
4. The applicant shall pay all professional fees, environmental charges and all other applicable
Village fees to the satisfaction of the Village Administrator.
5. The final subdivision plat shall not be endorsed by the Village Board of Trustees until all
roads and related improvements including implementation of the sediment and erosion
control plan, utility plan, landscaping plan, off-site drainage plan, on-site drainage plan and
wetland mitigation plan as shown on the approved construction plans (sheets 1 through
20), as modified, are completed by the applicant to the satisfaction of the Board of
Trustees and Village Engineer, or alternately, the applicant has executed and posted a
performance bond in the amount of$1,750,000 to cover the full cost of all such
improvements with a term of three (3) years, approved by the Village Board of Trustees
as to manner of execution, form and sufficiency to guarantee and assure full compliance by
the applicant with all the terms, conditions, requirements and provisions as set forth in this
resolution.
6. The applicant shall pay into a Village escrow account, the sum of$20,000, to retain
consultants and other personnel needed to evaluate and inspect the appropriateness,
quality and progress of the implementation of the sediment and erosion control plan, utility
plan, landscaping plan, off-site drainage plan, on-site drainage plan and wetland mitigation
plan as shown on the approval construction plans, such that the cost thereof shall not be
borne by the Village. The escrow account will be replenished from time to time by the
applicant on the request of the Village Administrator.
7. The detail sheet on the construction drawings shall be revised to replace the wooden guide
rail with a steel guide rail.
8. The applicant shall submit final common driveway easement and restrictive covenants
identified in the preliminary subdivision approval resolution which shall be subject to the
approval of the Board of Trustees as to substance and subject to approval of the Village
Attorney, as to form. The common driveway easement, including vehicle turnaround area,
and restrictive covenants shall thereafter be executed by the property owner and recorded
in the Office of the County Clerk contemporaneously with the filing of the subdivision
plat.
9. The final plat and construction drawings shall be revised to change the name of"Starwood
Road" to "Red Roof Drive" and "Green Court" to "Birch Lane".
CONDITIONS TO BE COMPLETED PRIOR TO
ISSUANCE OF BUILDING PERMIT:
1. No building permit shall be issued for construction of a residence on any lot in this
subdivision until the rough grading, on-site and offsite drainage improvements and
wetland mitigation area have been completed and operating to the satisfaction of the
Village Engineer and/or Planning Consultant. A note to this effect shall be added to the
final subdivision plat.
2. No building permit shall be issued for construction of a residence on lots 14-3, 14-4, 14-5
or 14-6 in this subdivision until the grading for these lots as shown on the grading plan has
been completed to the satisfaction of the Village Engineer. A note to this effect shall be
added to the final subdivision plat.
3. No building permit shall be issued for the construction of a residence on lots 14-15 or 14-
16 in this subdivision until the drainage improvements and wetland mitigation area have
been completed and are operating to the satisfaction of the Village Engineer.
4. No building permit shall be issued or construction of a residence on any lot in this
subdivision until the sidewalk along the entire frontage of the subject site with North
Ridge Street has been improved by the applicant to the satisfaction of the Village
Engineer.
5. No building permit shall be issued for the construction of a residence on any lot in this
subdivision, until the applicant has conveyed good title to the lands designated on the plat
as parkland to the Village satisfactory to the Village Attorney. The deed to the Village
shall be a bargain and sale deed, shall be executed and in recordable form, and shall be
accompanied by a title report from a licensed title insurer, all at no cost to the Village.
6. No building permit shall be issued for the construction of a residence on any lot in this
subdivision, until the applicant demonstrates that all common driveway easements and
restrictive covenants identified in the preliminary subdivision approval resolution have
been executed and recorded in the Office of the Westchester County Clerk,
contemporaneously with the filing of the plat, satisfactory to the Village Attorney.
CONDITIONS TO BE COMPLETED PRIOR TO
ISSUANCE OF CERTIFICATE OF OCCUPANCY
1. All landscaping, except street trees, shall be installed as shown on the landscape plan to
the satisfaction of the Village Engineer or Planning Consultant. All street trees shall be
installed prior to the acceptance of the subdivision roads by the Village.
2. The applicant shall stake out the lot bounds for which a certificate of occupancy is
requested and file with the Village Building Inspector an as-built survey of premises
i
containing a legend that such stakes have been set as shown thereon.
3. No certificate of occupancy shall be issued for lots 14-16 or 14-17 until a fence or other
physical barrier as deemed appropriate by the Village Engineer or Village Planning
Consultant has bee installed along the twenty-five- (25-) foot no disturbance zone
identified on the wetlands mitigation plan.
4. No certificate of occupancy shall be issued for any building until the water and sewer
improvements have been certified to be in compliance with the applicable sections of the
New York State Sanitary Code and approved by the Westchester County Department of
Health.
5. No certificate of occupancy shall be issued for any building until the road segment
adjacent to the lot on which such building is located has been suitably improved to the
satisfaction of the Village Engineer.
OTHER CONDITIONS
1. When the applicant completes all improvements and dedicates same to the Village, the
applicant shall execute and post a maintenance bond, satisfactory to the Village, in the
amount of fifteen percent (15%) of the total cost of all such improvements with a term of
one (1) year to assure the satisfactory condition of said work and improvements.
2. No clearing, grading or excavation on the proposed public roads will commence without
the written approval of the Village Engineer.
3. The applicant, its successors and assigns, shall, at all times prior to the acceptance of the
roads and improvements by the Village, keep the same in good order and working
condition and maintain all roads in such condition for the safe, free and unobstructed
passage by motor vehicles of every nature and description in all-weather conditions so
that all improvements operate satisfactorily, and shall cause the removal of all snow and
ice within twelve (12) hours of its accumulation or within such time as determined by the
Village Engineer.
4. The applicant, its successors and assigns shall provide the name, address and telephone
number of an agent, representative or private contractor who shall be responsible for the
road maintenance and who shall be authorized to receive notice of any required
maintenance work by the Village Engineer.
5. The applicant shall place appropriate street signs and traffic control signs as directed by
the Village Engineer.
6. The wetlands permit shall be subject to all of the requirements of Chapter 245 of the
Village of Rye Brook Code.
7. All work conducted under this wetlands permit shall be open to inspection at any time,
including weekends and holidays, by the approval authority, the Advisory Council on
Environmental Conservation, the Village Engineer or their designated representative.
8. The wetlands permit holder shall notify the approval authority of the date on which the
work is to begin at least five (5) days in advance of such date.
9. The approval authority's wetlands permit shall be prominently displayed at the project site
during the undertaking of the activities authorized by the wetlands permit.
10. Before the roads in the subdivision may be accepted by the Village the following shall be
done:
a. The owner of the roads shall tender an executed bargain and sale deed, in
recordable form and accompanied by a title report from a licensed title insurer,
conveying to the Village, good title to the roads and the associated sight,
drainage, slope and easements, satisfactory to the Village Attorney.
b. The following documents shall be submitted to the Village through the Village
Engineer and the following work shall be done:
I. A certificate by registered professional engineer or surveyor that the
paved traveled way on all streets in the subdivision have been completed
within the bounds of the right-of-way as shown on the filed plat of the
subdivision shall be submitted.
2. An"as-built' plan and profile in form as determined appropriate by the
Village Engineer, showing the location of all utilities, roadways and
drainage facilities and certified by a registered professional engineer that all
such work, utilities and other appurtenances have been installed as shown on
the construction plans approved with the plat, in accordance with this
resolution and Village specifications in effect on the date of this resolution,
shall be submitted.
11. As used in this resolution, applicant shall mean the applicant, and its successors and
assigns.
Trustee Degling Voting Aye
Trustee Pellino Absent
Trustee Strum Absent
Trustee Zuckerman Voting Aye
Mayor Filipowski Voting Aye
DISCUSSION ON 26 ROCKINGHORSE TRAIL
A discussion followed regarding the options available to the Village with regard to securing the
building located at 26 Rockinghorse Trail, The Building Inspector had coimnenced the procedure
outlined in the Village Code in June, and since the sixty (60) days required by law has passed
without success in having the building properly secured and defects corrected, two course of
action will follow. First, the Building Inspector will issue a violation under the NYS Building
Code, which will be dealt with in the local courts. If that action is not satisfactory to the Village,
the Village Board, by resolution on September 22, 1998, will consider directing the Village
Attorney to take action in State court to authorize the removal of the building.
The meeting was adjourned at 9:40 a.m.
Respectfully submitted,
CZ4/o,//x�
Christopher J. Ru so, Village Clerk