From: Laura Petersen
Sent: Tuesday,January 3, 2023 3:32 PM
To: Sylvia Tosun
Subject: RE: 699 Westchester Ave - Temp Generator Permit App - Updated
Good afternoon and thank you for the email.
Please provide information regarding diesel refueling operations for the generator; methods &
means, fuel-spill prevention/protection, fire prevention/portable fire extinguishers.
Thank you
Laura
Laura Petersen
Office Assistant
Village of Rye Brook A6AN55N [ 0
938 King Street
Rye Brook, New York 10573
Phone (914) 939-0668 1 letersen@ryebrook.org
-----Original Message-----
From: Sylvia Tosun <sylvia@spindlehill.com>
Sent: Tuesday, January 3, 2023 2:50 PM
To: Laura Petersen <LPetersen@ryeb rook.org>
Subject: 699 Westchester Ave - Temp Generator Permit App - Updated
Good afternoon,
Please see attached Temporary Generator Permit Application with Updated Information as
Requested.
Many thanks and have a wonderful day.
Sylvia Tosun
Rye Hotel LLC
i
I �
BUILDING DEPARTMENT D E C IE� vJ
E
VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK,NY 10573 DEC 16 � 1 ID
(914)93 668 VILLAGE OF RYE BROOK
w�� c ok.r►r BUILDING DEPARTMENT
...........................................................................................................
FOR OFFICE USE ONL%.
Approval Date: Permit# _ Application #
Approval Signature: _ _ ARCHITECTURAL REVIEW BOARD:
1)i,:;l11,n,%,'1:
BOT Approval Date: Case#
PB Approval Date: Case#
ZBA Approval Date: Case#
a IL MA
Other: b
Application Feei Perm it Fees:
r.....rr..►..........rr...r.............rr....•.rr....r........ir....r...r..r......rr.r..r.rr........rr....
'r EN4IORAR
APPLICATION TO INSTALL A RL STANDBY BACKUP GENERATOR
Application dated: is hereby made to the Building Inspector of the Village of Rye Brook for the issuance of a Permit to install a
permanent standby backup generator in accordance with§2504.1.of the Code of the Village of Rye Brook as per detailed statement described below.
Please note that electrical and plumbing permit applications must be filed separately by those licensed professionals•and that separate permits arc required
for the installation of any related fuel tanks. Further note that all applications for commercial use will require a site plan approval from the Village
Planning Board prior to the issuance of any permit.
I. Job Address: (o9 I V�rSTca6S19 R. AJ F-PAU6 7R4 4:1R10oK
2. Parcel ID#: 35 . 144 — 1 -• $ Zone: A
3. N.Y.State Construction Classification: N.Y.State Use Classification:
4. Proposed Generator& Fuel Type(axAribe in detail): 7Qy Lt)SZ—C*,A inn —S eltiAt :_YlnI Q
rDb(zrA,iby -b 1 E S I=1 +-UEL• WPORARR UP V34%LE ur r
5. Property Owner: O J-L_C' t g I N 1
Address: — e Av=
Phone# R 14. 164. 1 ow Cell#!q It{. 42y.32yq email: CAC Fi=Mk JI*tE IiTTIEt,CpJ i
Applicant: %4 Ly1 A -C'OSAhl oral .PNALF-OF rZY E AoTrc"Z LLt-
Address: Le 99 W kSl C A ESTE'_ AJC IIR4 E 0-Amic -P A\J 1 ns l3
Phone# Cell# 1 q??. l.Ly email:51IL.yU4 @ C-&l4bLBJ1GL,UM
Architect or Engineer(if applicable): F('Z AIN*rC, Z)F_NN5R__
Address: 65Z. \NNEAT _430h� STREET GtARAGE 1�1y N�I0031.
Phone# 12 1q_A1AS'2 _Cell# _ email:FbEMf;A j FRANK'bENNEL
General Contractor: RGMtTECTS.W/{
06
Address: � �L(�t tt3L1�JVJ }�►> '
Phone�_ _Cell#q (o�� „c _email:Abi EBL=- FC P-\(,
�P11Q�11 • ��
t
cutvloit
6. Give exact dimensions from proposed generator to lot lines:
front yard: �,g3� rear yard:/L��_a r' right side yard: �g '' left side yard: SIC)
7. If building is located on a comer lot,which street does it front on:
8. Will the proposed project disturb 400 sq.fl.or more of land,requiring a Storm water Management Control Permit fmm the Village
Engineer as per Chapter 217 of the Code of the Village of Rye Brook? Yes: _ __ No:
9. Will the proposed project require a Site Plan Review by the Village Planning Board as per Chapter 209 of the Code of the Village
of Rye Brook? Yes: No: ___ (provide detailed drawings m per Chapter 209) --DR-hUWA(x ►�R011\ l�
10. Will the proposed rolect require a Steep Slopes Permit as per Chapter 213 of the Cod oUbe.V.r#3M.lq
jL, �.�¢
Yes: No:� (provide a detailed topographical survey) REV
IL Is the lot or any portion thereof located in a Wetland as per chapter 245 of the Code o th 4" - 3 2023
Yes: No:�(provide a detailed survey indicating the Wetland& Buffer Zone) DAT12. Is the lot or any portion thereof located in a Flood "Lone as per the FEMA Flood Insurance Rate Mao OOk
BUILDING DEPARTMENT
dated 9/28/07? Yes: No:V "-------
13. Will the proposed project require a Tree Removal Permit as per Chapter 235 of the Code of the Village of Rye Brook?
Yes:No: V (a tree replanting schedule may be required)
14. Does the proposed project involve a Home-Occupation as per Chapter 250-38 of the Code of the Village of Rye Brook?
Yes: No: J If so, indicate: TIER 1: TIER II: TIER III:
15. What is the total estimated cost of construction: SA,_�-�k00 XA%1 IEPd A4S'oQ. EST•• (I he estimated cost shall include all
site improvements,labor,material,scaffolding fixed equipment professional fees,and material and labor which may be donated eratis)
16. Estimated date of completion: `�j_ . 3 YE'NQ (2tENERr -Mr4b ,`�"� � •�S�ooO.
STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as:
SJLJIATGStIA f 1Z4f h`oZ[L.Lt.C_ being duly sworn,deposes and states that he/she is the applicant above named,
(print name of individual signing as the applicant)
and further states that (s)he is the legal owner of the property to which this application pertains, or that (s)he is the
AgEr•1 r l h2Emes ewATA t for the legal owner and is duly authorized to make and file this application.
(indicate architect,contractor•agent,allomcy,etc.)
"('hat all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use
conducted at the above captioned property will be in conformance with the details as set forth and contained in this application
and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire
Prevention&Building Code,the
�Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations.
Sworn to before me this (�,1 Sworn to before me this i b
I
day of ,20 LZ_ day of 20 Z
re of Pro rty Owner of Ap cant
LLL 4�7 rAM1�� J ►/�- ern o� Pp - F
t Name ol'Property Owner Pri t Name of Applicant ��� y��:�
u"
.em C-'
Notary Public Nntari Public SHARI MELILLO
SHARI MELILLO Notary Public,State of New York
This appl Notary PublIc,Stale of New y.,tinploted In its entirety and must include " No.01ME9160093 tie
legal own No.011M88160063 and the applicant of record in the sp . QuallfW to WastchestorCoun) . LD t
properl, Qualified in Weetchegw County roperly signed shall be deeme. Commhtalon txplre�Jrlrt IV�fi.Lt d
Commission Expires January 29.20� ,iote that application fees are r,
2
911212021
Mike Izzo
From: Mike Izzo
Sent: Monday, December 19, 2022 11:32 AM
To: 'Sylvia Tosun'
Cc: Steven Fews;Tara Orlando; Laura Petersen; Christopher Bradbury
Subject: Rye Hotel Temporary Diesel Generator
Attachments: Color0340.pdf
Dear Ms. Tosun,
The Building Department is in receipt of an application submittal to install a temporary diesel-fired portable
generator at the former Hilton property, a copy of that submittal is attached hereto for your convenience.
Upon review of the submitted materials I offer the following comments:
1. Neither the application nor the submitted materials indicate the reason for the temporary generator
nor the duration that such temporary Lrenerator will be present on the property. Please provide a
narrative signed by the property owner attesting to tie reason for the -
�/2. temporary generator and the removal date of same for review.
Please provide information regarding diesel refueling operations for the generator; methods & means,
fuel-spill prevention/protection, fire prevention/portable fire extinguishers.
4. The temporary generator is proposed to be located within the exterior egress path-of-travel serving
the Rye Town Wings A, B, and C. This is in direct conflict with the 2020 Fire Code. However, since
the building is currently unoccupied the Building Department may consider a special exception
depending on the information provided to items 1 and 2 above.
Please provide the requested information for review.
Thank you.
lWael(7, /zzo
Building& Fire Inspector
Village of Rye Brook, NY
(914) 939-0668
Laura Petersen
From: notify@proudcity.com
Sent: Tuesday, January 3, 2023 3:09 PM
To: Tara Orlando; Laurence Simmons; Laura Petersen
Subject: New payment from Building Permit Payment
Name
Sylvia Tosun
Company Name
Rye Hotel LLC
Address
699 Westchester Avenue
Rye Brook, NY 10573
United States
Map It
Email
Sylvia(cDSpindleHill.com
Phone
(917) 922-6648
Comments:
Rye Hotel LLC-699 Westchester Ave-Temporary Generator Permit Application Fee-to serve as a temporary back-up while
Existing Permanent Unit is in Repair.
Payment Information
Permit Type
Other
Credit Card
Visa
XXXXXXXXXXXX4131
Order
Product Qty Unit Price Price
Price 1 $400.00 $400.00
Transaction Fees: 3% + $0.30 1 $12.30 $12.30
Total: $412.30
1
Building Permit Check List&Zoning Analysis
Address: `j S FPS`G t l S i fit_ A"),;I- SBL: J
Zone: 14 ' 1 —Use: V- l Z- Const.Type Other.
Submittal Date: Z I l(P Z Revisions Submittal Dates:
Applicant: F L,G, �
Nature of Work: 0 L l_ HU
l E
a I w1u M I U L 1i
Reviews:ZBA: DEC 1 9 2022 PB• BOT: Other.
OK
( ( ) FEES:Filing.A-5 LQO�Pb BP: C/O: Flood Plane: Legalization:
( ) („Y APP: Dated. ✓ Notarized. -- SBI- ✓Truss I.D. Cross Connection: H.O.A.:
( ) ( ) Scenic Roads: Steep Slopes: Wetlands: Storm Water Review: Street Opening.
( ) ( ) ENVIRO:Long. Short: Fees: N/A:
PLAN:Topo: Site Protection: S/W Mgmt.: Tree Plan: Other.
( ) ( ) SURVEY:Dated: Current: Archival• Sealed: Unacceptable:
( ) ( ) PLANS:Date Stamped Sealed Copies: Electronic Other.
( ) ( ) License Workers Comp: Liability. Comp.Waiver. Other.
( ) ( ) CODE 7S3#: Dated: N/A:
HIGH-VOLTAGE ELECTRICAL:Plans: Permit: N/A Other.
( ) ( ) LOW-VOLTAGE ELECTRICAL:Plans: Permit N/A Other.
( ) ( ) FIRE ALARM/SMOKE DETECTORS:Plans: Permit: H.W.I.C.:_Battery:_Other.
( ) ( ) PLUMBING:Plans: Permit Nat. Gas: LP Gas: N/A/: Other.
( ) ( ) FIRE SUPPRESSION:Plans: Permit: N/A: Other.
( ) ( ) H.V.A.C.: Plans: Permit N/A: Other.
( ) ( ) FUEL TANK:Plans: Permit: Fuel Type: Other.
O O 2020 NY State ECCC: N/A: Other.
( ) ( ) Final Survey Final Topo: RA/PE Sign-off Letter. As-Built Plans: Other.
( ) ( ) BP DENIAL LETTER: C/O DENIAL LETTER: Other.
( ) ( ) Other.
( )ARB mtg.date: approvaL• notes:
( )ZBA mtg.date: approval• notes:
( )PB mtg.date: approval• notes:
REQUIRED EXISTING PROPOSED NOTES
Ck&.
EmpW
FSQW
Front:
Ste:
Main Cov
Accc.Cov
Ft.H/Sb
Sd.H/Sb:
Q
Tom:
P
Hight/Stories:
notes: GA*J N v T- `4GE C To.N;L�Lrc m- t.tj e 4 t T::TPM4 MAV F_C-
2
t N
Mike Izzo
From: Mike Izzo
Sent: Wednesday, November 30, 2022 1:26 PM
To: Sylvia Tosun
Cc: Laura Petersen; Steven Fews; Tara Orlando; Christopher Bradbury
Subject: RE: 699 Westchester Ave - Temporary Generator
Attachments: Generator Full 8.2021.pdf
Dear Ms. Tosun,
On October 17, 2022, the Building Department received an application along with a $400.00 application fee
for a permit to install a 20KW Kohler propane-fired permanent automatic generator to replace the existing
generator. Yesterday I received a call from All County Generators, the name of the generator supplier and
installation contractor appearing on the application, inquiring as to the status of the permit. I informed them
that we were still awaiting further information regarding the proposed size and location of the propane
tank(s), to which they replied that to their knowledge, the proposed generator was natural gas fired and that
there were no propane tanks slated for installation, this despite the information provided on the application.
You and I are now in discussions regarding a temporary generator only, to be placed in service while the
existing generator undergoes repair.
Given the level of confusion regarding this initiative I must insist that the Rye Hotel submit a new Generator
Permit Application complete with a dimensioned site plan which reflects the Hotel's actual intensions, as well
as all pertinent generator manufacturer's literature. We will gladly transfer the application fee to the new
application.
I have attached a copy of the Generator Permit Application hereto for your convenience.
Thank you.
ltli��ad(T Izzo
Building& Fire Inspector
Village of Rye Brook, NY
(914) 939-0668
From: Sylvia Tosun <sylvia@spindlehill.com>
Sent:Tuesday, November 29, 2022 10:10 AM
To: Mike Izzo <Mlzzo@ryebrook.org>
Cc: Laura Petersen<LPetersen@ryebrook.org>; Steven Fews<SteveFews@ rye brook.org>; Tara Orlando
<torlando@ryebrook.org>; Christopher Bradbury<CBradbury@ryebrook.org>
Subject: Re: 699 Westchester Ave -Temporary Generator
Mr. Izzo,
I apologize for not realizing we need a site plan for a temporary unit, and will ask our Architect to provide one asap.
1
In the meantime, Mr. Manocherian has had this unit delivered for you to see during your visit on Thursday,and can also
have it easily removed if it is not appropriate. It is on wheels and just near the Fire Pump Room where the existing
Generator connection is located.
Many thanks,
Sylvia Tosun
On Nov 29, 2022, at 9:39 AM, Mike Izzo<Mlzzo@ryebrook.org>wrote:
Ms. Tosun,
Without a proposed site plan showing placement of the temporary unit there's not a lot I can
do with the specifications.
lffl and(l Izzo
Building& Fire Inspector
Village of Rye Brook, NY
(914) 939-0668
From:Sylvia Tosun<sylvia@spindlehill.com>
Sent: Monday, November 28, 2022 4:47 PM
To: Mike Izzo<Mlzzo@ryebrook.org>
Cc: Laura Petersen<LPetersen@ryebrook.org>; Steven Fews<SteveFews@rye brook.org>;Tara Orlando
<torlando@ryebrook.org>;Christopher Bradbury<CBradbury@ryebrook.org>
Subject: 699 Westchester Ave-Temporary Generator
Dear Mr. Izzo,
Please see the attached information for your review, regarding a Proposed Temporary Back-up
Generator.
Should your approval be granted, our hope is to establish connection for the next couple of months,
while the existing Unit is being repaired.
Looking forward to your response, I remain with most respectful regards.
Many thanks,
Sylvia Tosun
Rye Hotel LLC
<Taylor Generator Spec Sheet.pdf><Generator Specs.pdf>
2
BUILDING DEPARTMENT D [E C MW E
VILLAGE OF RYE BROOK
938 KING STREET RYE BROOK,NY 10573 DEC 16 2022 3
(914)939-0668 VILLAGE OF RYE BROOK
wvv,w.n,cbrook.orV, BUILDING DEPARTMENT
***********************************************************************************************************
FOR OFFICE USE ONLY:
Approval Date: Permit# Application#
Approval Signature: ARCHITECTURAL REVIEW BOARD:
Disapproved: Date:
BOT Approval Date: Case#
PB Approval Date: Case# e e
ZBA Approval Date: Case#
Other:
Application Fee: Permit Fees:
APPLICATION TO INSTALL A STANDBY BACKUP GENERATOR
Application dated: is hereby made to the Building Inspector of the Village of Rye Brook for the issuance of a Permit to install a
permanent standby backup generator in accordance with§250-4.1.of the Code of the Village of Rye Brook,as per detailed statement described below.
Please note that electrical and plumbing permit applications must be filed separately by those licensed professionals,and that separate permits are required
for the installation of any related fuel tanks. Further note that all applications for commercial use will require a site plan approval from the Village
Planning Board prior to the issuance of any permit.
1. Job Address: (n9 9 W STGarS 11=R kJ k.NUE 2i a'- Roa1< W ► o s4,3
2. Parcel ID#: k 515 . Zone:��
3. N.Y. State Construction Classification: N.Y. State Use Classification:
4. Proposed Generator&Fuel Type(Describe in detail): Lo(2 1" I CYO S E9 I AL. Z n I q I
-"br A�>,� - a ► LsE� t-UEL_ - �►=NP0!RAQj g6ACX •UP
5. Property owner: y E go-M L L LC-, n
Address: '�( W ES►GIB 6 R AvE 7POI
Phone# gIL1. 164. IOco Cell#g14, 42L1.3Z SAS email: Ca E@ MMAEQLvasxwj
Applicant: %1j L.V1`I�•1�oSU1l-1 ON AF-14�AJ-F oar �Rl r AoTiEL L.� —
Address: (Q 99 W kSl G4 ESTE-Q_ �N)I 12�(C \�12rn1L N)4 Ios na
Phone# Cell# 91-^�922. email: @ SpinbLEA)u-CDM
Architect or Engineer(if applicable): F I�A N\<,
Address: SSZ. V�Eszx q 3(& STg Et t G AR4 Cat L_
Phone# k I z ,319.8'S3S2_ Cell# email:FDEANC-R e!FRAOI!ak, EQ,
General Contractor: Rc,NtTEcTS.ceR
Address:
Phone# Cell#q��.699.g1„c..4q email:) 1F-RL5—(,EGTQ-1G
Crk I
1
8/12/2021
6. Give exact dimensions from proposed generator to lot lines:
front yard: y 33� '}tt rear yard:(636t 2" right side yard: 4S9' -4 " left side yard: 51 O' m"
7. If building is located on a corner lot,which street does it front on:
8. Will the proposed project disturb 400 sq.ft.or more of land,requiring a Stormwater Management Control Permit from the Village
Engineer as per Chapter 217 of the Code of the Village of Rye Brook? Yes: No: Y
9. Will the proposed project require a Site Plan Review by the Village Planning Board as per Chapter 209 of the Code of the Village
of Rye Brook? Yes: NO: (provide detailed drawings as per Chapter 209)
10. Will the proposed roject require a Steep Slopes Permit as per Chapter 213 of the Code of the Village of Rye Brook?
Yes: No: (provide a detailed topographical survey)
11. Is the lot or any portion thereof located in a Wetland as per chapter 245 of the Code of the Village of Rye Brook?
Yes: No: �/ (provide a detailed survey indicating the Wetland&Buffer Zone)
12. Is the lot or any portion thereof located in a Flood Zone as per the FEMA Flood Insurance Rate Map#36119CO279
dated 9/28/07? Yes: No:
13. Will the proposed project require a Tree Removal Permit as per Chapter 235 of the Code of the Village of Rye Brook?
Yes: No:V (a tree replanting schedule may be required)
14. Does the proposed project involve a Home-Occupation as per Chapter 250-38 of the Code of the Village of Rye Brook?
Yes: No: J If so, indicate: TIER I: TIER 11: TIER III:
15. What is the total estimated cost of construction: $ (The estimated cost shall include all
site improvements,labor,material,scaffolding,fixed equipment,professional fees,and material and labor which may be donated gratis)
16. Estimated date of completion:
STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as:
SJ LEI I A_b5 /'R4F AoTcL LL , being duly sworn,deposes and states that he/she is the applicant above named,
(print name of individual signing as the applicant)
and further states that (s)he is the legal owner of the property to which this application pertains, or that (s)he is the
AQ E► -r Z hRemeS EN' m)� E for the legal owner and is duly authorized to make and file this application.
(indicate architect,contractor,agent,attorney,etc.)
That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use
conducted at the above captioned property will be in conformance with the details as set forth and contained in this application
and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire
Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations.
Sworn to before me this�o Sworn to before me this i 12
day of , 20 Z� day of , 20�
re of Pro erty Owner e of Ap 'cant
<<AA Icru �.� d �I _
Ime of Property Owner Pri t Name of Applicant
Notary Public Public SHARI MELILLO
SHARI MELILLO Notary Public,State of New York
This applicaLi&@ryrplipJ?S V&Wpleted in its entirety and must include the not lllq$tl QJ[6G0M(s) of the
legal owner(s) of 11fts"et6goWerty, and the applicant of record in the spaces %WAW�/H��i�'f_Spll tt�b��1qt
properly com tg4riniWasUM"Qm fp t properly signed shall be deemed� a;,;8r"1y B�I #r d
Commission *p1grt8pt2P�e note that application fees are non-refundable.
z
8/12/2021
E F
JZO 02E9 c
j F Z CIA
a� WIN N �� ;
Q CL
U U o
CO
O� j LLJd Z �_� �on l ] gE 11,
6
Q�LIJ88
�� 3m`m
CE
mov wsa ;bFF pjEp{j` { ]
LU
W
JJ+ N
O
z
I •�
i
�t
i
W _J
a
1N3W12idd30 ONicni 18 + `°
>i00N8 3A1 J JO 3�11A
I 8,
ao}eiaua!D algepod pasodo j j
AJOA mGN `Aooig aAH 'anuany .Jajsaya4saM 669
I TI!,1.0
N0111H NMOl 9JI�J y; F°a N
I I I I
I
LU
Z
' I WU' i
1
LV W
1 in II W Y J
W
HoW 1 I� 0000D
r � 1 (7 LL,
i I � � 1 Z W
T 3.a W 11 _� J W
,I► II W W II X O W
Z 0 I W Y 0
I 1
II I II 1
1
I I I I
\ III II III 11
� I II I 11
I I I 1
I I I 1
I I I
I I I \
I I I
I I I
I I I
I I
1 I I
I I I
I I I
I I I
I I I
I I 1
I I
I \
I \
i
1 1 \
� J
CY-D
V)
' o
TAYLOR
POWER SYSTEMS
Model: TM100 Ratings Range:
50Hz 60Hz
Standby: kw 74 - 80 82 - 100
kva 93 - 100 103 - 125
Prime: kw 62 - 72 71 - 90
ai 1 l� j
kva 78 - 90 89 - 113
• -- • 125'C Rise 105'C Rise
- Standby Rating Prime Rating
_ Generator Voltage PH Hz kW/kVA Amps kW/kVA Amps
277 480 3 60 100 125 150 90 113 136
139 240 3 60 100 125 301 90 113 272
254 440 3 60 94 118 155 85 106 139
127 220 3 60 94/118 310 85 106 278
Features 240 416 3 60 90 113 157 78 98 136
120 208 3 60 90 113 314 78 98 272
UC1274C311 120 240 3 60 90 113 272 78/98 236
• Single source responsibility for the generator 219 380 3 60 1 82 103 156 71 89 135
set and accesories. 120 24o t 60 68 68 283 59 59 246
254 440 3 50 74 93 122 62/78 102
• Prototype and production tested to insure 127 220 3 50 74 93 244 62 78 204
one step load acceptance per NFPA 110. 120 208 3 50 80 100 278 67 84 233
240 415 3 50 80 100 139 67 84 117
• Two year limited warranty on generator sets 219 380 3 150 80 100 152 67 84 128
and accessories. 110 190 3 50 80 100 304 67 84 255
110 220 1 50 60 60 273 50 50 227
• Unit conforms to CSA,NEMA,EGSA,ANSI 277 480 3 60 100 125 150 90 1 13 136
and other standards. 139 240 3 60 100 125 301 90 113 272
254 440 3 60 100 125 164 90 113 148
• Analog control system with an ECU-9988 127 220 3 60 100 125 328 90 1 13 297
providing metering and monitoring. 240 416 3 60 100 125 173 90 1 13 157
120 208 3 60 100 125 347 90 113 314
• Heavy duty 4 cycle industrial engine for UC1274D311 120 240 3 60 100 125 301 90 1 13 272
reliability and fuel efficiency. 219 380 3 60 96 120 182 88 1 10 167
120 240 1 60 79 79 329 72 72 300
• Brushless rotating field generator with 254 440 3 150 80 100 131 72/90 118
class H insulation. 127 220 3 150 80 100 1 262 72 90 236
120 208 3 150 80 1D0 1 278 72 90 250
• Integral vibration isolators 240 415 3 150 80 100 1 139 72 90 125
219 380 3 150 80 100 1 152 72 90 137
110 190 3 150 80 100 304 72 90 273
• EPA Tier 2 certified engine 1 10 220 1 50 68 68 309 60 60 273
UCI274C06 120 240 1 60 90 90 375 75 75 313
• Trailer with integral fuel tank and storage trunk U027411306 120 240 1 60 100 100 417 88/88 367
DUAL 277 480 3 60 100 125 151
• Full Output Circuit Breaker VOLTAGE 120 208 3 60 100 125 347
RATINGS: All three—phase units are rated at 0.8 power factor. All single—phase units are rated at1.0 power factor.
STANDBY RATINGS: Standby ratings apply to installations served by a reliable utility source. The standby rating is applicable to
varying loads for the duration of a power outage. There is no overload capability for this rating. Ratings are in accordance with
ISO-3046/1, BS 5514, AS 2789, and DIN 6271.
PRIME POWER RATINGS: Prime power ratings apply to installations where utility power in unavailable or unreliable. At varying load
the number of generator set operating hours is unlimited. A 10% overload capacity is available for one hour in twelve. Ratings
in accordance with ISO-8528/1, overload power in accordance with ISO-3046/1, BS5514, AS2789, and DIN 6271. For limited
running time and base load ratings consult the factory. The generator set manufacturer reserves the right to change the design
or specifications without notice and without any obligation or liability whatsoever.
GENERAL GUIDELINES FOR DERATION: Altitude: Derate 0.5% per 100m (328 ft.) elevation above 1000m (3279 ft.)
Temperature: Derate 1.0% per 10'C (18'F) temperature above 40'C (104'F).
APPLI,CATION & ENGINEERING DATA
ENGINE FUEL
Engine Specifications 60 Hz 50 HZ Fuel System 60 Hz 50 Hz
Manufacturer Perkins Fuel supply line, min. ID, in. (mm) 5/16 (7.93)
Engine, model, type 1104C-44TAG2 DIRECT INJECTION Fuel return line, min. ID, in. (mm) 1/4 (6.35)
Cylinder arrangement 4 in—line Max. lift. engine—driven fuel pump, ft. 5.7
Displacement, cu. in. (L) 269 4.4 Max. fuel flow, gph (L ph) 39 (150) 1 39 (150)
Bore and stroke, in. (mm) 4.13 (105) x 5 (127) Fuel prime pump manual
Compression ratio 18.3:1 Fuel filter ENVIRONMENTAL ECO PLUS
Piston speed, ft/sec. (m/sec) 25 (7.62) 20.8 (6.35) Recommended fuel2 diesel
Rated rpm 1800 1500 FUEL CONSUMPTION
Max. power at rated rpm, hp (kw) 157.5 (117.5) 138 (103)
Cylinder head material Cast iron
Crankshaft material Forged steel Fuel Consumption 60 Hz 50 Hz
Governor type ELECTRIC Diesel,gph(Lph)at%of load
Frequency regulation, no load to full load .25% 100% 7.85 29.7 5.58 24.9
Frequency regulation, steady state +0.01%
75% 5.34 22) 4.5 17.1)
Air cleaner type, all models Dry paper element
50% 3.72 (14.1) 3.1 (11.8)
Combustion air, cfm (m3/min.) 276 (7.84) 221 (6.27)
EXHAUST COOLING
Exhaust System 60 Hz 50 HZ Cooling System 60 Hz 50 Hz
Ambient tern erature"F (°C) 127 53
Exhaust flow at rated M cfm (m;/min.) 721 (20.4) 594 (16.3) Radiator system capacity, including
Exhaust temperature at rated kW, dry 1065 (574) 1009 (543) engine, gal. (L) 3.3 (12.6)
exhaust,`F (°C)
Engine jacket water flow, gpm (Lpm) 44.9 (170) 1 37.5 (142)
Maximum allowable back pressure, 1 77- HG 6 KPA Heat rejected to coolin water at
in. Hg (kPa) ( ) rated
kW, dry exhaust Btufm a 3641 2881
Exhaust outlet size at hookup, in. (mm) 2.5- (63.9) Water pump type centrifugal
ENGINE ELECTRICAL Ton diameter, including blades, in. (mm) 22 (559)
Fan hp (kW) 8 (6) T 6.5 (5)
Engine Electrical System 60 Hz SO Hz Max. restriction of coaling air, intake and
discharge side of rod., kPa 200
Battery charging alternator:
Ground (negative/positive)............. Negative Radiator—cooled cooling air, 7966 225.6
Volts (DC)....................................... 12 cfm (m3/min.) ( ) 5848 (1656
)
Ampere rating................................. 65
Starter motor rated voltage (DC) 12 LUBRICATION
Recommended battery cold cranking
amps (CCA) rating for O"F (-18•C) 770 Lubricating System 60 Hz 7 50 Hz
Quantity of batteries 1 Type Full Pressure
Battery voltage (DC) 12 Oil pan capacity with filter, qts. (L) 8.5 (8)
Oil filter, quantity, type 1 sin on
Oil cooler INTEGRAL WATER COOLED
ANALOG CONTROL PANEL
• Taylor Power Systems Analog Auto Start Control Panel.The panel is equipped with AC Voltmeter,AC Frequency Meter,
Percent of Load Meter,Running Time Meter,Control Toggle Switch with Off/Auto/Manual positions,and ECU-"88 engine
control with specific safety shutdown lights.
• Oil Pressure Gauge,Water Temperature Gauge,Battery Voltmeter,Fuel Level Gauge,and Hourmeter
ECU-9988 FEATURES
• Engine Started LED
• Overspeed Shutdown LED
• Overcrank Shutdown LED
• High Water Temperature Shutdown LED
• Low Oil Pressure Shutdown LED
The ECU automatically cranks,starts,and monitors the engine for Overcrank,Overspeed,High Water Temperature,
and Low Oil Pressure.A built in speed switch uses a magnetic pickup to monitor engine speed for crank disconnect and
overspeed.The bypass timer/logic assures Low Oil Pressure and High Water Temperature override during the crank
period and an additional adjustable period after crank disconnect.The ECU monitors the Magnetic Pickup signal for
problems during both cranking and running.If a problem is detected the engine will shutdown and Overcrank and
Overspeed LED's will both turn on.
GENERATOR
SPECIFICATIONS
STANDARDS WINDINGS & ELECTRICAL
BC16 and BC18 industrial generators PERFORMANCE
meet the requirements of BS5000 PART 3,
VDE0530, UTE5100, NEMA MG1-22, All generator stators are wound to 2/3
CEMA, IEC34-1, CSA22.2 AND AS1359. pitch. This eliminates triplen (3rd, 9th, 15th...)
harmonics on the voltage waveform and is found
to be the optimum design for trouble—free supply
EXCITATION SYSTEMS of non linear loads. The 2/3 pitch design avoids
excessive neutral currents, sometimes seen with
SX460&SA465 AVRs higher winding pitches, when in parallel with the
The SX460 AVR is available for use mains.
with both BC16 and BC18 generators. A fully connected damper winding reduces
The SA465 AVR is available for use oscillations during paralleling. This winding, with
with the BC18 generator only. 2/3 pitch and carefully selected pole and tooth
With these self—excited systems the main designs, ensures very low waveform distortion.
stator provides power via the automatic TELEPHONE INTERFERENCE
voltage regulator (AVR) to the exciter
stator. The high efficiency semiconductors THE (as defined by BS4999 Part 40) is better
of the (AVR) ensure positive build up
from initial low levels of residual voltage. than 2�. TIF (as defined by ASA C50.12) is
The exciter rotor output is fed to the better than 50.
main rotor through a three phase full wave RADIO INTERFERENCE
bridge rectifier. The rectifier is protected by
a surge suppressor against surges caused, The absence of brushgear and the high quality
for example, by short circuit or out of phase AVR ensure low levels of interference with radio
paralleling. transmissions.
The SA465 will support a range of Additional RFI suppression may be supplied if
electronic accessories, including a 'droop' required.
Current Transformer (CT) to permit parallel
operation with other ac generators. ENCLOSURE
VOLTAGE REGULATION IP22 (NEMA 1) is standard for all industrial
generators. Giving drip proof protection of 60
degrees from vertical.
Self excited AVRs are 2 phase average Inlet air filters are available as an option on
voltage sensed and will control the all generators, at reduced ratings (5% derate).
generator output voltage to within the
following limits: SHAFT
SX460 ± 1.5% All generator rotors are dynamically balanced to
SA465 ±1.0% better than BS6861: Part 1 Grade 2.5 for
from no load to full load including cold minimum vibration in operation.
to hot variations for any power factor
between 0.8 lagging and unity allowing QUALITY ASSURANCE
for a 4% engine speed variation. Generators are manufactured using production
Voltage is adjusted using a trimmer procedures having a quality assurance level
on the AVR. to BS EN (IS09001).
INSULATION / IMPREGNATION
The insulation system is Class W.
All wound components are impregnated with
materials and processes designed specifically to
provide protection against the harsh enviroments
encountered in generator applications. Varnishes and
resins are selected and developed to provide the high
build required for static windings and the high
mechanical strength required for rotating components.
STANDARD FEATURES AND ACCESSORIES
Standard Features Detailed Description of Trailer
• Trailer with integral fuel tank Trailer equipped with tandem 3500 pound axles,
• Weather enclosure integral DOT rated 150 gallon fuel tank,
• Vibration isolators electric brakes with safety disconnect and 7
wire connector, torsion axle, front tongue
• Oil drain valve with extension jack, two rear stabilizer jacks, ICC lighting, and
• Battery license plate bracket. These trailers also come
• Battery rack with a lockable storage trunk at front of trailer
• Battery cables and cable storage in the rear.
• Exhaust silencer
• Flex exhaust connector
• Analog Control Panel
• Owners manual
• Flexible fuel lines
WEIGHTS AND DIMENSIONS TM100
• Glowplug cold weather starting aid Overall Size Standard Unit,
• Line circuit breaker L x W x H, in.: (148- X 72- x 95-)
Overall Size Sound Attenuated Unit,
• Electronic Isochronous Governor L x w x H, in.: (171.5- x 72- X 85-)
• 15 amp GFI duplex receptacle Standard unit dry weight: 4025 pounds
Sound attenuated unit dry weight: 4350 pounds
Optional Accessories GVWR: 7000 pounds
❑ Sound attenuated enclosure
❑ Block Heater ■
❑ Battery charger DI
❑ PMG exciter o 0
❑ Output Power Cable
❑ Multi—voltage selector switch w L
❑ Dual Voltage Generator Note: This drawing is provided for rwference only and should not be used for planning
installation. Contact your local distributor for mops dstailed information.
TAYLOR DISTRIBUTED BY:
POWER SYSTEMS
461 Hwy.49S
Richland,Mississippi 39218
Phone(601)-932-5674
Toll Free 1-800-367-7639
FAX(601)-932-4028
Web Site www.taylorpower.com
TPSTW 10005