Loading...
HomeMy WebLinkAboutRB25-0001 �O o N N � r c a O � v oy � Otea, ° o � u m ❑� > > a a O � DC Ln c c a, kn -0 W L.L tt ai 'v a aQ � v WLn+. y E c HLA m .� d N a u.i E v u. X LA a) w L N L -0 o L c 1i1 m � L p, > ^, O > ` ay, 1 W U_ !n � L N Z W L Y 7 0 a Y CN 0~C � (V QQ Mtko soma, aZ L O 2 C) `o > � p � o no a Y G Q O H Y n o Y E E c70 ° o N O W Ul) 8 .0 > 3 E °t Z > N aM ov $ v � v � s c a 0 } E00n N ? M —Q° m0Eo cc > m L O L 8 +�' C m C.Q LL > O Q YW — \ �W to O = OZ H u N > Ow0 O L } E U aawEm ° O O p J p c o m E a O � � N c� -° 3 c a Y ° v � W � o o �, cna w � — � � m >• L Q� Z N Z Q W 7 '�° C C w � M t N = O Q W 3 « ar — am NYC a = �- WO � U o � a>i LLap1.4 V O m � � ° w v E O c� o• 10 a e, Z � t w o. " c1 a a, , s 'X m l� D Q avi c C W w o c C14J cu u OUO = 'me & " E v O } _ LL � _ > � m0 J N L to2Z � �' O c2S v u r' = c- �E° MU� EQE N Q c z O to O c cmm yOO W a CY) u0M U UJ (A 0c i r c L 000 .� Q � M (V o o L .r NEB '" ov y o a� v -0 W o o a V u � m � � � ° mo c ° $ - WYp N 0 � o, > E � c cn V) a- ° c co p LU W w O O Q E 'v co 0 U F- ° C..v 0 a Q a a 0 a v Y Aft, Administrative Exterior Building Permit Application Village of Rye Brook 938 King St Rye Brook, NY 10573 Phone: (914)939-0668 1 www.ryebrook.gov Building Department Administrative Exterior Building Permit Application,page 1/3 Project Information Parcel ID# Zone N.Y. State Construction Classification N.Y. State Use Classification Occupancy Pre-Construction 135.51-1-2 R-12 V R-2 1 Family Occupancy Post-Construction 1 Family Proposed Improvement Dimensions from proposed If building is located on a corner lot, New second floor master suite addition. building or structure to lot which street does it front on: Rear main level addition to create larger lines Elm Hill Drive kitchen and dining room. lower level creation of mud room and bedroom. Front Yard 40.19 finished existing basement to family room, study and laundry room. New exterior siding, roofing and windows for Rear Yard 37.3 new look. Right Side Yard 37.3 Left Side Yard 39.7 Other 0 Area of proposed Total Square Footage of the proposed Total Square Footage of the proposed building in square feet new construction: renovation to the existing structure: 693.0 sq.ft. 2338.0 sq.ft. Basement 958.0 sq.ft. 1st Floor 1774.0 sq.ft. 2nd Floor 816.0 sq.ft. 3rd Floor 441.0 sq.ft. Construction Type Located Pre-engineered wood Floor& Roof Framing Number of stories Overall Height Median Height 2 Basement Basement © Full ❑ Partial © Finished ❑ Unfinished What material is the exterior finish? Roof style Ceder perfection shingle prefinished Peaked Roofing material What system of heating Timberline shingle Hot air Administrative Exterior Building Permit Application,page 2/3 Will the proposed project require the installation of a new, or an extension/modification to an existing automatic fire suppression system? (Fire Sprinkler, ANSL System, FM-200 System, Type I Hood, etc...) ❑ Yes 0 No Will the proposed project disturb 400 sq. ft. or more of land, or create 400 sq.ft. or more of impervious coverage requiring a Stormwater Management Control Permit as per§217 of Village Code? ❑ Yes W No Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code? ❑ Yes 0 No Will the proposed project require a Steep Slopes Permit as per §213 of Village Code? ❑ Yes 0 No Is the lot located within 100 ft. of a Wetland as per§245 of Village Code? ❑ Yes 0 No Is the lot or any portion thereof located in a Flood Plane as per the FIRM Map dated 9/28/07? ❑ Yes 0 No . Will the proposed project require a Tree Removal Permit as per§235 of Village Code? ❑ Yes 0 No Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? ❑ Yes 0 No What is the total estimated cost of construction: Note: estimated cost shall include all site improvements, labor, 400000 USD material, scaffolding, fixed equipment, professional fees, including any material and labor which may be donated gratis. If the final cost exceeds the estimated cost, an additional fee will be required prior to issuance of the C/O. Estimated date of completion 03/02/2026 Administrative Exterior Building Permit Application,page 3/3 � Exterior Building Permit Application Village of Rye Brook 938 King St Rye Brook, NY 10573 Phone: (914)939-0668 1 www.ryebrook.gov Building Department Property Information Property Address: Property Owner Name: 8 Elm Hill Drive Robert Gorgio Exterior Building Permit Application,page 1 13 Project Information Zone N.Y. State Construction Classification N.Y. State Use Classification Occupancy Pre-Construction R-12 V R-2 1 Family Occupancy Post-Construction 1 Family Proposed Improvement New second floor master suite addition. Rear main level addition to create larger kitchen and dining room. lower level creation of mud room and bedroom. finished existing basement to family room, study and laundry room. New exterior siding, roofing and windows for new look. Area of lot Dimensions from proposed building or structure to lot lines Lot Square Feet 12.0 sq.ft. Front Yard 40.19 Acres Rear Yard 37.3 Right Side Yard 37.3 Left Side Yard 39.7 Other 0 Is building located on corner lot? ❑ YES 0 NO Area of Total Square Footage of the For additions, Total Square Footage of the proposed proposed new construction: total square proposed renovation to the building in 693.0 sq.ft. footage added existing structure: square feet(0 (0 if N/A) 2338.0 sq.ft. if N/A) 958.0 Basement '0 Basement sq.ft. sq.ft. 1st Floor 0.0 1st Floor 1774.0 sq.ft. sq.ft. 8160 2nd Floor 0.0 . 2nd Floor q sq.ft. 4410 3rd Floor 0.0 . 3rd Floor q' sq.ft. Construction Type Located Pre-engineered wood Floor& Roof Framing Number of stories Overall Height Median Height 2 Basement Basement © Full ❑ Partial N/A © Finished Unfinished ❑ N/A Exterior Building Permit Application,page 2/3 What material is the exterior finish? Roof style Ceder perfection shingle prefinished Peaked Roofing material What system of heating Timberline shingle Hot air Will the proposed project require the installation of a new, or an extension/modification to an existing automatic fire suppression system? (Fire Sprinkler, ANSL System, FM-200 System, Type I Hood, etc...) ❑ Yes 0 No Will the proposed project disturb 400 sq. ft. or more of land, or create 400 sq. ft. or more of impervious coverage requiring a Stormwater Management Control Permit as per§217 of Village Code? Yes © No Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code? Yes 0 No Will the proposed project require a Steep Slopes Permit as per§213 of Village Code? ❑ Yes 0 No Is the lot located within 100 ft. of a Wetland as per§245 of Village Code? Yes W No Is the lot or any portion thereof located in a Flood Plane as per the FIRM Map dated 9/28/07? Yes 0 No . Will the proposed project require a Tree Removal Permit as per§235 of Village Code? ❑ Yes 0 No Does the proposed project involve a Home-Occupation as per §250-38 of Village Code? Yes 0 No What is the total estimated cost of construction: Note: estimated cost shall include all site improvements, labor, 400000 USD material, scaffolding,fixed equipment, professional fees, including any material and labor which may be donated gratis. If the final cost exceeds the estimated cost, an additional fee will be required prior to issuance of the C/O. Estimated date of completion 03/02/2026 Exterior Building Permit Application,page 3/3 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK,NY 10573 (914) 939-0668 IMPERVIOUS COVERAGE RATIOS RESIDENTIAL DISTRICTS Address: Section: 1 35-�; l Block: 1 Lot: zone: IMPERVIOUS SURFACES (Definition): All buildings, as defined herein, and all areas on the ground or elevated above the ground which are comprised of materials through which water cannot readily flow, including, but not limited to asphalt, concrete, masonry, wood, gravel and clay, and which consist of elements including, but not limited to, court yards,sports courts,swimming pools,patios, sidewalks,ramps,terraces and driveways. , TOTAL MAXIMUM PERMITTED MAX. PERMITTED COVERAGE Zoning IMPERVIOUS LOT AREA BY IWERVIOUS SURFACES District COVERAGE IN FRONT (sq.ft.) For Base Lot For Lot Area YARD(%) Area(sq.ft.)* Over Base R-35 15 Lot Area %) R-25 20 0 to 4,000 0 55 R-20 30 4,001 to 6,000 2,200 35 6,001 to 12,000 2,900 27 R-15 35 12,001 to 16,000 4 520 26 R-15A 35 16,001 to 20,000 5,560 25 R-12 40 20,001 to 30,000 6 560 24 30,001 to 40,000 8,960 123 R-10 45 40,001 & larger 11,260 22 R-7 40 R-5 30 *"Base Lot Area"is the minimum end of the lot size R2-F 30 range in the"Lot Area"column Area of lot: �� 3�5 s .ft. Existing Allowed Proposed Total impervious coverage = z- ISM S .ft. -5 J Z 0 g . ft. 3 z.G Z Sq.ft. Front impervious coverage = �• % '�D % a• % (-738 --AFT) 7.363t fir) I attest to the best of my knowledge and belief,the above information is correct. I i I i c itect's Signature f (4) j 6/l/2024 m I BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 K NG STREET RYE BROOK,NY 10573 (914)939-0668 BULK REGULATIONS IN RESIDENTIAL DISTRICTS Address: Section: 1358 5l Block: I Lot: Z MAXIMUM GROSS FLOOR AREA USE FORMULA: Maximum Gross Floor Area = 4,000 + [(Lot Area—21,780) x 0.11478421 ]: a. Allowed - J '4Z- Sq. Feet b. Existing 3,49.5 Sq. Feet c. Proposed = :13Z,..i Sq. Feet HEIGHT/SETBACK RATIOS FOR RESIDENTIAL DISTRICTS DEFINITION: A standard designed to regulate the height of a building in relation to the average grade of the corresponding portion of the lot line from which it is set back. The ratio modifies the maximum permitted Height of Building by forming an inclined plane beginning at the average grade along the portion of the lot line from which the setback is measured and rising toward the building at the specified ratio above which no part of any building, other than minor architectural features such as chimneys, skylights and dormer windows not covering more than 10% of the entire roof area, shall be permitted to extend. Height and Setback shall be calculated using the formula; Height/Setback =X,where X is the required side or front yard ratio for the zoning district in which a property is located as specified in Article VIII of Chapter 250. A complete elevation view for the proposed improvement must be included on the drawings. FILL IN YOUR RATIOS: ZONE A7457TNO PAZIPOSED A*XWBED FRONT: FRONT: FRONT: .44 ALON SIDE: SIDE: SIDE: 1.20 FRONT: FRONT: FRONT: .48 AL25 SIDE: SIDE: SIDE: 1.30 FRONT: FRONT: FRONT: .60 ALZO SIDE: SIDE: SIDE: 1.60 FRONT: FRONT: FRONT: .60 /!ir-f5 SIDE: SIDE: SIDE: 1.60 FRONT: FRONT: FRONT: .80 ALFSrA SIDE: SIDE: SIDE: 2.40 FRONT: o 5 FRONT: . 6.S FRONT: .69 /R-f2 SIDE:dSG/.L I SIDE:. SIDE:SIDE: 1.60 i FRONT: FRONT: FRONT: .80 AF-10 SIDE: SIDE: SIDE: 2.40 FRONT: FRONT: FRONT: .96 ALL SIDE: SIDE: SIDE: 3.00 i FRONT: FRONT: FRONT: 1.20 ALS SIDE. SIDE: SIDE: 4.00 FRONT: FRONT: FRONT: 1.20 i "ir SIDE: SIDE: SIDE: 4.00 I attest to the best of my knowledge and belief, the above information is correct. rchitect's Signat (5) 611/2024 i F ' I BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK,NY 10573 (914)939-0668 RESIDENTIAL LOT AREA COVERAGE Address: 8 EWA Section: 13SS. Block: , Lot: Z PERMITTED COVERAGE RATIOS IN RESIDENTIAL DISTRICTS YOUR ZONE AREA IN MAIN ACCESS. DECK ZONE DISTRICT SQ. FEET BLDG. BLDG. MAX. CHECK MAX. R-35 35,000 14% 4% 5% R-25 25,000 14% 3.5% 4% R-20 20,000 14% 3.5% 4% R-15 15,000 16% 3.5% 4% R-15A 15,000 12% 3.5% 4% ✓ R-12 12,500 17% 4% 4% R-10 10,000 20% 4.5% 3.5% R-7 7,500 23% 4.5% 3.5% R-5 5,000 30% 5% 3.5% R-2F 5,000 30% 5% 3.5% Existing: Proposed: 1. AREA OF LOT Sq. Ft. 14 309 Sq. Ft. 2. AREA OF HOUSE a. Coverage of Main Building (including Attached Garage or Accessory Building) Jr- 33 Sq. Ft. `�5-7 Sq. Ft. b. Area of 15'Floor Divided By Area of Lot x 100 % } 3' % 3.AREA OF ACCESSORY BUILDING (Includes Detached Garages,Tool Shed, Playhouses) Sq. Ft. Sq. Ft. a. Coverage of Accessory Building Area of Accessory Building Divided By Area of Lot x 100 O 4. AREA OF DECK 4 f-b Sq. Ft. $O Sq. Ft. a. Coverage of Deck Area of Deck Divided By Area of Lot x 100 Z° % ` I I 1 attest to the best of my knowledge and belief,the above information is correct. I chitect's Signlff re (3) 6/J./2024 r � At BRC�t VILLAGE OF RYE BROOK 2 938 King St Rye Brook,NY 10573 ; u✓ Q Phone:(914)939-0668 1 www.ryebrook.gov ��• b2•`t Building Department Other Structures/(Remodel) Permit Permit Set 8 ELM HILL DR P#RB25-0001 R#135.51-1-2 PERMIT INFORMATION Address Permit number Date issued 8 ELM HILL DR RB25-0001 10/10/2025 REVIEWED BY If you have any questions regarding the review of these drawings please contact: Application in general Steven Fews stevefews@ryebrook.org INSTRUCTION AND ATTENTION It is the responsibility of the Applicant to print full size the entire approved permit package and provide at the time of inspection. TABLE OF CONTENTS Cover page 1 Building Permit 2 Required Inspections 3 Building Inspector Stamped&Signed Set of Plans 4-14 Application Materials 15 Application Materials 16 Application Materials 17 Survey(Required Recent Survey) 18 Administrative Exterior Building Permit Application 19-21 Exterior Building Permit Application 22-24 Building Department.938 King St Rye Brook,NY 10573/Phone:(914)939-0668 BR(�k VILLAGE OF RYE BROOK 938 King St Rye Brook,NY 10573 W O� Phone:(914)939-0668 1 www.ryebrook.gov . 1 b2 i Building Department INSTRUCTIONS THE PERMIT HOLDER AND/OR PROPERTY OWNER IS RESPONSIBLE FOR ENSURING THATALL REQUIRED/APPLICABLE INSPECTIONS ARE SCHEDULED AND THAT THE PERMIT IS COMPLETE 0 REQUIRED INSPECTIONS Name Description Footing Placement of all footing forms prior to pouring concrete.Geotechnical review may be required to confirm soil suitability. Foundation wall Construction of foundation wall including all external elements and perimeter drainage system.(Prior to Backfill) Rough plumbing Installation of all plumbing including drains,waste,vents and water supply lines.A test for this portion is required including a 100 psi test on all water supply lines. Rough Electric Rough Electric Framing Construction of all structural framing and stairs.(Rough Plumbing and Heating passed and doors,windows& roofing installed.)Engineered drawings must be provided for roof trusses. Insulation Installation of the insulating material and vapour barrier.Blown-in insulation can be installed after the ceiling drywall is applied and confirmed at the Occupancy inspection. Heating final Installation of furnace,air conditioner(if included in the permit)and grills/registers.An Air Balance Report may be required. Final Electric Final Electric Certificate of Occupancy Completion of ALL Work,All fees Paid and Final Survey in if required) z` 1 a � OAK W + a. gb g 88g b� a g abi z8 4: Z �- o r A� �b 7b Qt6 y a y a Ax z w > E 8 M gg '` Y b 3< _, W W Q � O ac p �i5 F €E -Yg a Sy t U N p „F„ s" EB��� w � � I _� 9' d a � w w a 3i p a sp f fR •8 � <b 78 �g � b b <wM a w O = Z ro 8 a eb � � pa 6o b`x o O a z Q z Y WILL OR 2 g� Q F fat _ b3 03 q5 WQ. OF- Y Z QZ ELM 'p�p4 b 9 ggy-j4 jjpp O i a MOX oP� 40'�{y W� p !d O ' O i0 Pi � •�'SSt M•�'.SLLS A�O Z a 7 1 A F W aka ®--- > 8 i z w .M1yq 6h o R 'bn � x a gbWgbba=4M"�b a tl§a3b� I Z s 8 g pp � �S W obi