Loading...
HomeMy WebLinkAboutBP25-231 3 _ r� ■ M c � • 1 v'o �O p�J' � y N rl N CT 6.'� ■ o a 0-4 F A W �v y [; Q, E u O s ■ W z Cz n. co A, cn 0. (J w W M uT-4 o c y yo �`u ° *q❑gyp ua r I� !�l v'Jl ys �G a. 0 Ln � H �_ � � � S4 y US I+y ■ • � � q w � ro � _ = O C W E •� Cn a ° a R+ r-4 CN .� ©r W �./ cry r r . 1 Or LC en eo 94 C I�i a a v a -c 0.. 3 a. f��71 F+�'I � WWI (�"+_} •�� '�07i v � 0 C7 Q z O ° a fil z � 'f--i � (� ,'�' � vas � � •a ^c BUILDING DEPARTMENT rS C IE ��N� rE VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK,NY 10573 SEP Z 4 2025 (9 4 39-0668 ►itiY lt�li..t�t VILLAGE OF RYE BROOK ��0 EUIlLDING DEPAR '-1JT i OIt 01, 1 l( I 1 tile. ONLN : Approval Date: � 'ermu#_ � ! Application AE&25 Approval Signature: ARCHITECTURAL REVIEW BOARD: Disapproved: Date: 1 BOT Approval Date: Case# Chairman: PB Approval Date: Case# : Secretary: : ZBA Approval Date: Case# Other: Application Fee; Permit Fees: APP IC TIO�N TO INSTALL PHOTOVOLTAIC SOLAR ARRAY Application dated: •J( is hereby made to the Building.Inspector of the Village of Rye Brook,NY,for the issuance of Permit for the installation ofa Photovo taic So ar Array as per detailed statement described below. 1. Job Address: 14 Whittemore Placp, Rye Brook, NY 110573 SBL: 135 75-1-54 Zone: 2 Type,kW&Location of Array,(L,>e aJdrti„nul sheets ifnecessart): Installaion of a utility approved, grid inter-tied,flush mount roof mounted " 11 Hanwha 410 solar panels, 4.51 KW," photo voltaic;electricity generating system. 3. Property Owner: Robin Chipkin Address:34 Whittemore Place, Rye Brook, NY 10573 Phone# 203-858-6671 Cell# e-mail Robindebra@hotmail.com 4.Applicant: Trinity solar Address:2180 5th Avenue Unit 1, Ronkonkoma, NY 11779 Phone# 631-319-7233 Cell# e-mail Operations.upstateny@trinity-solar.com 5. Design Engineer: Ayracon V Almaraz Address: 2211 Allenwood Road, Wall, NJ 07719 Phone# 732-780-3779 Cell# e-mail Operations.upstateny@trinity-solar.com b. Solar Contractor: Trinity Solar Address: 21 SO 5th Avenue, Unit 1, Ronkonkoma, NY 11779 Phone# 631-319-7233 Cell# e-mail Operations.upstateny@trinity-solar.com 7. Occupancy;(I-Fam.2-Fam.Commercial._etc. I Pre-construction: Residential Post-construction: Residential 8. If building is located on a corner lot,which street does it front on: 9. N.Y.State Construction Classification: N.Y.State Use Classification: 10. Construction Type& Location:()Typical Western Lumber Frame;()Timber Frame[TC];()Wood Truss[TT]; ()Pre-engineered wood[PWI; Located;()Floor Framing[F];()Roof Framing[R];()Floor&Roof Framing[FR];Other: 11. Number of stories: Roof Style: (hip.shed.mansard.etc...) 12. Will a New Roof Be Installed: No 50 Yes El (a separate rooting permit is required to re-roof an existing building) 13. Roofing Material&Number of Layers: I 8/12/2021 14. Will the proposed project disturb 400 sq.ft.or more of land,or create 400 sq.ft.or more of impervious coverage requiring a Stormwater Management Control Permit as per§217 of Village Code? No: K Yes: ❑ Area: 15. Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code? No: IN Yes: ❑ (Ifyes,applicant must submit a Site Plan Application.&provide detailed drawings) 16. Will the proposed project require a Tree Removal Permit as per§235 of Village Code?No: CQ Yes: ❑ Of}r> ust submit a Tree Remo%al Permit Application) 17. Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? No: ❑Yes: ❑ Indicate:TIER I:—TIER It:—TIER III:i (if�cs.a I Inme Occupation Permit Applicauon is rcquired) 18. What is the total estimated cost of construction: S 16,687-00 (Note:The estimated cost shall include all site improvements,labor,material,scaffolding,fixed equipment,professional fees,including any material and labor which may be donated gratis.If the final cost exceeds the estimated cost,an additional fee will be required prior to issuance of the CIO). 19. Start Date: Completion Date: This application must bear the notarized signature(s) of the legal owner(s) of the subject property, and the applicant of record in the spaces provided. Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void and will be returned to the applicant. Please note that application fees are non-refundable. STATE OF NEW YOR&COUNTY OF WESTCCHESTER ) as: I, Trinity Solar—12 kw dUa kJa(c ,being duty sworn,deposes and states that he/she is the applicant above named, (print name of individual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the, Contractor for the legal owner and is duly authorized to make and file this application. (indicate architect.contractor.agent,attorney.etc) That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention& Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. /15 7K Sworn to before me this I Sworn to before me this 20 L�r day of ,20 IJ UJ Notary ublic No Puarcze sere n n tie+e Signature of Property Osvner Si t o pp iconRobin Chipkin fL f ,C-Q + arcPrint Name of Property Owner Print Name of Applicant DAVID KALINA Notary Pubfic-State of New York No.0 1 KA6416 5 5 8 2 Qualified Fit Westchester CcunrY My Commiss op^ Expires Apr 19,2025 8/12/2021