Loading...
HomeMy WebLinkAboutRP25-0005VILLAGE OF RYE BROOK - BUILDING DEPARTMENT 938 KING STREET - RYE BROOK, NY (914)939-0668 1 www.ryebrook.org Residential / (Roofing) Permit PERMIT #: RP 25-0005 ISSUED: 09/25/2025 ADDRESS: 3 LEGENDARY CIR PARCEL ID #: 124.65-1-8 PARTIES: Applicant Property owner Papa & Son's Contracting inc. Saurabh Rawal Robert Papa 3 Legendary Cir 526 commerce street Rye Brook, New York 10573 Hawthorne, New York 10532 EXPIRES: 09/25/2026 NOTICE 1. THIS MUST BE2.ACOPY FIT THE PROVEEDPLANSOUSLY MU TBEEKEPTOPOSTEDTNTHE SITE. BSITE. Hours of Operation of Construction Equipment/ Village Code §158-4: WEEKDAYS - 8:00am to 6:00pm or dusk, whichever is earlier; SATURDAYS - 9:00am to 4:00pm; - SUNDAYS & HOLIDAYS -No Construction Activity Allowed This permit is valid for a period not to exceed twelve (12) months from the date of issuance, and covers only that work listed above. Separate permits are required for any electrical, plumbing, fire suppression, fire/smoke/carbon monoxide detectors/alarms, or any other work not covered under this permit. The approved plans must be kept on the job site & be made available for review by the Building Department upon demand. Any amendments or changes to the approved plans must be designed by your architect/engineer and submitted to the Building Department for review and approval prior to performing the work. Steven E. Fews - Building & Fire Inspector #R,Roofing Permit ApplicationVillage of Rye Brook 938 King St Rye Brook, NY 10573 Phone: (914)939-0668 1 www.ryebrook.gov Building Department Project Information SBL: Zone: Construction Type: NYS Construction Class: PUD VB R-3 If corner property, indicate street frontage NO Job Description, list all Methods & Materials: Roof replacement Number of stories Height Roof Type 2 20 Peaked Is garage being re -roofed: attached? 0 Yes ❑ No ❑ Yes ❑ No Number of Cars: Estimated Cost of Job: (NOTE: The estimated cost shall include all site improvements, 18000 labor, material, scaffolding, fixed equipment, professional fees, labor, material and labor which may be donated gratis.) Estimated date of completion: 09/30/2025 Roofing Permit Application, page 1 / 1 �yE 6Rnv� VILLAGE OF RYE BROOK F 2m 938 King St Rye Brook, NY 10573 W Phone: (914)939-0668 1 vmw.ryebrook.gov >�• �O� Building Department 1962 ' Residential / (Roofing) Permit Permit Set 3 LEGENDARY CIR P# RP 25-0005 R# 124.65-1-8 PERMIT INFORMATION Address Permit number Date issued 3 LEGENDARY Cl R RP 25-0005 09/25/2025 REVIEWED BY If you have any questions regarding the review of these drawings please contact: Application in general Steven Fews stevefews@ryebrook.org INSTRUCTION ANDATTENTION It is the responsibility of the Applicant to print full size the entire approved permit package and provide at the time of inspection. TABLE OF CONTENTS Cover page 1 Building Permit 2 Required Inspections 3 Roof Work Proposal 4-7 Westchester Home Improvement License 8 Roof Work Proposal 9-12 Roofing Permit Application 13 Building Department. 938 King St Rye Brook, NY 10573 / Phone: (914)939-0668 VILLAGE OF RYE BROOK 938 King St Rye Brook, NY 10573 Phone: (914)939-0668 1 w ..ryebrook.gov Building Department INSTRUCTIONS THE PERMIT HOLDER AND/OR PROPERTY OWNER IS RESPONSIBLE FOR ENSURING THAT ALL REQUIRED/APPLICABLE INSPECTIONS ARE SCHEDULED AND THAT THE PERMIT IS COMPLETE REQUIRED INSPECTIONS Name Final Inspection Certificate of Occupancy Description Completion of all required items under the permit includingthe certificate. Completion of ALL Work, All fees Paid and Final Survey in if required) PAPA 8c SONS ROOFING INC. Certified Weather Stopper•Roofing Contractor Saurabh Rawal 3 Legendary Circle Rye Brook NY 10573 WORK PRACTICE: NAIION AI ROOTI NO CONI3 ACTORS AS SOCIAL ION MEMBER 526 Commerce Street Hawthorne, NY 10532 914-747-4538 August 18, 2025 All work will comply with all state, county, and city building codes. The roof will be watertight by the end of each workday. All grounds must be cleaned every day, and all gutters must be cleared of both existing and new debris. A truck (not a dumpster) will be provided for all related debris. After completion, the job site will be thoroughly cleaned. We will notify you at least 24 hours in advance about commencing the work. We will coordinate and oversee the delivery of all materials to the job site. All materials will remain dry and covered until. Page 1 of 3 All work shall be performed as follows: 1. The contractor will supply all scaffolding, materials, and labor. 2. The contractor will adequately prepare the grounds and protect shrubs during demolition. 3. Remove all asphalt roofing and paper from the wood sheathing. 4. We will thoroughly inspect the wood decking to ensure it is suitable for the installation of the new materials. If any defects are identified, the homeowner or construction manager will be notified. According to the National Roofing Contractors Association, we will replace any defective wood sections at a unit price of $100.00 for each 4'x8' sheet of 1/2" CDX plywood. The cost to replace rotted fascia board is $12.00 per foot. 5. To fabricate and install new aluminum 4" x 4" edge flashing along the bottom edges of the roof. The edging will be placed behind the gutters and on the roof. The gutters will be loosened and reattached to allow for the installation of the edging. The gutters will be pitched adequately toward the leader pipes. 6. Install six feet of GAF Weather Watch leak barrier on the wood sheathing, lapping it over the metal edging. The ice and water shield will be installed from the bottom edge, extending six feet up onto the roof and around all roof penetrations. 7. Install New Castle synthetic felt roof deck protection underlayment on the remaining roof deck. 8. Install aluminum vent pipe flashing on all vent pipes. 9. Install aluminum drip edge on all rake edges. 10. Install GAF HDZTimberline Lifetime warranty asphalt roof shingles on the entire sloped roof area. The installation will follow the manufacturer's specifications using 5, 1%2" roofing nails. 11. Install GAF Timber Tex cap shingles on all roof ridges and hip points. 12. Install Sno Country ridge vent across the peaks of the roof. 13. Install GAF Weather Blocker starter shingles along all eaves and rakes. Total Roof Cost: $ 18,300.00 (Permit fee not included if required). Page 2 of 3 Warranty: Once we complete the work, we will provide you with the manufacturer's shingle warranty and a ten-year workmanship warranty, both of which are valid under normal weather conditions, excluding hail and hurricane scenarios. These warranties can be transferred to the first buyer of the house, but not to any subsequent buyers. PAYMENT TERMS: 50% upon start 50% upon completion ACCEPTANCE OF PROPOSAL: The above process, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to proceed with the specified work. Payments will be made as outlined above. All materials are guaranteed to meet the specifications. All work must be completed in a workmanlike manner according to standard practices. Any alterations or deviations from the specifications that involve extra costs will be executed only upon written order and will incur an additional charge above the original estimate. All agreements are contingent upon strikes, price increases, or delays beyond our control. Workman's compensation insurance fully covers workers. Please sign and return a copy of the proposal to the business address. Contractor's License WC-6739-H95. Contractor's signature: Print Name: Customer's signature: Print Name: Date: Date: Papa & Sons can withdraw this contract proposal if the parties have not entered into this agreement 30 days before the original date. Entry into this contract will be assumed upon receipt of a customer's deposit payment by Papa & Sons Contracting Inc. Page 3 of 3 L z W co w o Q C/) } P W Z Z U W O0 w LLJ w Z 0 O N U Q otj C,4 2 a Q a t. Ill a PAPA 8c SONS ROOFING INC. Certified Weather Stopper•Roofing Contractor Saurabh Rawal 3 Legendary Circle Rye Brook NY 10573 WORK PRACTICE: NAIION AI ROOTI NO CONI3 ACTORS AS SOCIAL ION MEMBER 526 Commerce Street Hawthorne, NY 10532 914-747-4538 August 18, 2025 All work will comply with all state, county, and city building codes. The roof will be watertight by the end of each workday. All grounds must be cleaned every day, and all gutters must be cleared of both existing and new debris. A truck (not a dumpster) will be provided for all related debris. After completion, the job site will be thoroughly cleaned. We will notify you at least 24 hours in advance about commencing the work. We will coordinate and oversee the delivery of all materials to the job site. All materials will remain dry and covered until. Page 1 of 3 All work shall be performed as follows: 1. The contractor will supply all scaffolding, materials, and labor. 2. The contractor will adequately prepare the grounds and protect shrubs during demolition. 3. Remove all asphalt roofing and paper from the wood sheathing. 4. We will thoroughly inspect the wood decking to ensure it is suitable for the installation of the new materials. If any defects are identified, the homeowner or construction manager will be notified. According to the National Roofing Contractors Association, we will replace any defective wood sections at a unit price of $100.00 for each 4'x8' sheet of 1/2" CDX plywood. The cost to replace rotted fascia board is $12.00 per foot. 5. To fabricate and install new aluminum 4" x 4" edge flashing along the bottom edges of the roof. The edging will be placed behind the gutters and on the roof. The gutters will be loosened and reattached to allow for the installation of the edging. The gutters will be pitched adequately toward the leader pipes. 6. Install six feet of GAF Weather Watch leak barrier on the wood sheathing, lapping it over the metal edging. The ice and water shield will be installed from the bottom edge, extending six feet up onto the roof and around all roof penetrations. 7. Install New Castle synthetic felt roof deck protection underlayment on the remaining roof deck. 8. Install aluminum vent pipe flashing on all vent pipes. 9. Install aluminum drip edge on all rake edges. 10. Install GAF HDZTimberline Lifetime warranty asphalt roof shingles on the entire sloped roof area. The installation will follow the manufacturer's specifications using 5, 1%2" roofing nails. 11. Install GAF Timber Tex cap shingles on all roof ridges and hip points. 12. Install Sno Country ridge vent across the peaks of the roof. 13. Install GAF Weather Blocker starter shingles along all eaves and rakes. Total Roof Cost: $ 18,300.00 (Permit fee not included if required). Page 2 of 3 Warranty: Once we complete the work, we will provide you with the manufacturer's shingle warranty and a ten-year workmanship warranty, both of which are valid under normal weather conditions, excluding hail and hurricane scenarios. These warranties can be transferred to the first buyer of the house, but not to any subsequent buyers. PAYMENT TERMS: 50% upon start 50% upon completion ACCEPTANCE OF PROPOSAL: The above process, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to proceed with the specified work. Payments will be made as outlined above. All materials are guaranteed to meet the specifications. All work must be completed in a workmanlike manner according to standard practices. Any alterations or deviations from the specifications that involve extra costs will be executed only upon written order and will incur an additional charge above the original estimate. All agreements are contingent upon strikes, price increases, or delays beyond our control. Workman's compensation insurance fully covers workers. Please sign and return a copy of the proposal to the business address. Contractor's License WC-6739-H95. Contractor's signature: Print Name: Customer's signature: Print Name: Date: Date: Papa & Sons can withdraw this contract proposal if the parties have not entered into this agreement 30 days before the original date. Entry into this contract will be assumed upon receipt of a customer's deposit payment by Papa & Sons Contracting Inc. Page 3 of 3