HomeMy WebLinkAboutRB25-0007VILLAGE OF RYE BROOK - BUILDING DEPARTMENT
938 KING STREET - RYE BROOK, NY
(914)939-0668 1 www.ryebrook.org
Residential / Exterior (Remodel/Renovation) Permit
PERMIT#: RB25-0007
ADDRESS: 1 OLD OAK RD
PARCEL ID #: 135.51-1-22
PARTIES:
Applicant
German Granados
109 Pearl St
ISSUED: 09/24/2025 EXPIRES: 09/25/2026
Homeowner/ Property Owner, Property owner
Barry Citrin
1 OLD OAK RD
Port Chester, NY 10573 Rye Brook, NY 10573
License number WC-04796-H92
NOTICE 1. THIS MUST BE CONSPICUOUSLY POSTED2.ACOPY OFIT EA PROVEEDPLANSMU TBEEKEPTOTNTHE SITE. BSITE.
Hours of Operation of Construction Equipment/ Village Code §158-4: WEEKDAYS - 8:00am to 6:00pm or dusk, whichever is earlier;
SATURDAYS - 9:00am to 4:00pm; - SUNDAYS & HOLIDAYS -No Construction Activity Allowed
This permit is valid for a period not to exceed twelve (12) months from the date of issuance, and covers only that work listed above. Separate permits are required for any
electrical, plumbing, fire suppression, fire/smoke/carbon monoxide detectors/alarms, or any other work not covered under this permit. The approved plans must be kept on
the job site & be made available for review by the Building Department upon demand. Any amendments or changes to the approved plans must be designed by your
architect/engineer and submitted to the Building Department for review and approval prior to performing the work.
Steven E. Fews - Building & Fire Inspector
#R,Exterior Building Permit ApplicationVillage of Rye Brook
938 King St Rye Brook, NY 10573
Phone: (914)939-0668 1 www.ryebrook.gov
Building Department
Property Information
Property Address:
1 Old Oak Rd
Property Owner Name:
Barry Citrin
Exterior Building Permit Application, page 1 / 3
Project Information
Zone N.Y. State Construction Classification N.Y. State Use Classification
Occupancy Pre -Construction
R-12
Residential
Occupancy Post -Construction
Residential
Proposed Improvement
Area of lot
Place flagstone on top of existing concrete base landing and step.
Lot Square Feet 13500.0 sq.ft.
Acres
Dimensions from proposed building or structure to lot lines
Is building located on corner lot?
0 YES ❑ NO
Front Yard
Rear Yard
Right Side Yard
Left Side Yard
Other
If yes, please specify the street it fronts on:
Elm Hill Dr
Area of
Total Square Footage of the
For additions,
Total Square Footage of the
proposed
proposed new construction:
total square
proposed renovation to the
building in
0.0 sq.ft.
footage added
existing structure:
square feet (0 if
(0 if N/A)
N/A)
Basement
0.0
q'
0.0
Basement
sq.ft.
1st Floor
s ft
q
0.0
1st Floor
sq.ft.
2nd Floor
0
2nd Floor
0.0
sq.ft.
sq.ft.
3rd Floor
0
sq.ft.
0.0
3rd Floor
sq.ft.
Construction Type
Located
Number of stories
Overall Height
Median Height
Basement
Basement
❑ Full ❑ Partial 0 N/A
❑ Finished ❑ Unfinished
0 N/A
What material is the exterior finish?
Roof style
Exterior Building Permit Application, page 2 / 3
Roofing material
What system of heating
Will the proposed project require the installation of a new, or
an extension/modification to an existing automatic fire
suppression system? (Fire Sprinkler, ANSL System, FM-200
System, Type I Hood, etc...)
❑ Yes 0 No
Will the proposed project disturb 400
sq. ft. or more of land, or create 400 sq.
ft. or more of impervious coverage
requiring a Stormwater Management
Control Permit as per §217 of Village
Code?
❑ Yes 0 No
Will the proposed project require a Site Plan Review by the
Village Planning Board as per §209 of Village Code?
❑ Yes 0 No
Will the proposed project require a
Steep Slopes Permit as per §213 of
Village Code?
❑ Yes 0 No
Is the lot located within 100 ft. of a Wetland as per §245 of
Village Code?
❑ Yes 0 No
Is the lot or any portion thereof located in a Flood Plane as per
the FIRM Map dated 9/28/07?
❑ Yes 0 No
Will the proposed project require a Tree Removal Permit as
per §235 of Village Code?
❑ Yes 0 No
Does the proposed project involve a
Home -Occupation as per §250-38 of
Village Code?
❑ Yes 0 No
What is the total estimated cost of construction:
Note: estimated cost shall include all site improvements, labor,
4400 USD
material, scaffolding, fixed equipment, professional fees,
including any material and labor which may be donated gratis.
If the final cost exceeds the estimated cost, an additional fee
will be required prior to issuance of the C/O.
Estimated date of completion
09/12/2025
Exterior Building Permit Application, page 3 / 3
�yE 6Rnv� VILLAGE OF RYE BROOK
F
2m 938 King St Rye Brook, NY 10573
W
Phone: (914)939-0668 1 vmw.ryebrook.gov
>�• �O� Building Department
1962 '
Residential / Exterior (Remodel/Renovation) Permit
Permit Set 1 OLD OAK RD P# RB25-0007 R# 135.51-1-22
PERMIT INFORMATION
Address Permit number Date issued
1 OLD OAK RD RB25-0007 09/24/2025
REVIEWED BY
If you have any questions regarding the review of these drawings please contact:
Application in general
Steven Fews
stevefews@ryebrook.org
INSTRUCTION ANDATTENTION
It is the responsibility of the Applicant to print full size the entire approved permit package and provide at the time of inspection.
TABLE OF CONTENTS
Cover page 1
Building Permit 2
Required Inspections
3
Site plan
4
Survey (Required Recent Survey)
5
Application Materials
6
Photograph
7
Exterior Building Permit Application
8-10
Building Department. 938 King St Rye Brook, NY 10573 / Phone: (914)939-0668
VILLAGE OF RYE BROOK
938 King St Rye Brook, NY 10573
Phone: (914)939-0668 1 w ..ryebrook.gov
Building Department
INSTRUCTIONS
THE PERMIT HOLDER AND/OR PROPERTY OWNER IS RESPONSIBLE FOR ENSURING THAT ALL REQUIRED/APPLICABLE INSPECTIONS ARE SCHEDULED AND THAT
THE PERMIT IS COMPLETE
REQUIRED INSPECTIONS
Name Description E
Final Inspection Completion of all required items underthe permit includingthe sitegradingand the surveyor'sfinal grading
certificate.
Certificate of Occupancy Completion of ALI-Work. Electric HVAC, Plumbing Etc. Occupancy Certificate it required)
Site Plan
Scope of work:
• Replace flagstone walkway and step on top of existing concrete base
• Haul and dispose of all resulting debris
E
This it to certify, that J hhsve surveyed
Lot 028 ..Map oG 9ect_#1
Elm ALLL
T 0R
z _
od
ARISTOTLE BOURNAZOS, P.C.
LAND SURVEYORS -PLANNERS 1
,I o *4
We&Lcheaier li o. • -N.Y.. LICENSED IN
y VEAVENS NVEN„E NEW NEW
Y, VENNCN N.Y. IJS50 NEW JERSkV i
B+.-06N OB80. DBw CONNECTICUT
Filed In the Westchester County Clerk's Office Division of Land Records 6tj-ne 3, 1955 a8
t have located all existing buildings and lines of possession and have shown their positions hereon.
Survey completed: Febr-LLar� 22, J 983.
Map drafted: FebrELo_ry 83 , J II on scale of one inch to +wpanta feet.
I hereby certify this survey to U.b. L.LPe Title In6. Co.
Thornaa T. & AL06on Sadler
P.000OMD i.I 0"R APbzb MtRf0.V TULY go, i'B9n .
Lo-r#29
l
6 83000' E l0000,
-MACATAM MRiVEK J
Q N �!
27.69 ,.o•.
aa.+�
Et
e' alJ03E0 b
0D DECK C V
0
,TWO 870RZ f
Qj,.s LoT#27
_ FRAME
O . ACA'DAM 'DRIVE CAXACsE
Id
a
0 x &S*O(Y r soots
v
ELM HILL
DRIVE
ARWrOTLE BOURNAZOi. P.C.
FWO, *A No. Po. No. Off lee Map No.
Cwtiflpa No.
September 9, 2025
Rye Brook Building Department
Rye Brook, NY 10573
Re: 1 Old Oak Road
Dear Rye Brook:
We have been instructed by the Village that we needed to file a building
permit for adding stone on top of the existing concrete at the entry to our
house. Our contractor has started the process and made payment for the
fee.
I received a contact from Cloud Permit today that appears to request some
additional information:
• Photograph ( I have uploaded a picture of the house and one of the
entry)
• Site Plan - we do not have a site plan
• Survey - I have attached the most recent survey which the Village has
a copy in their files.
• Home Improvement License (contractor to supply)
We are only adding stone to the existing concrete and are not adding to
ground coverage nor to living area. Please accept the enclosures as
satisfactory documentation.
Barry Citrin
914-924-0796
bdcitrin@gmail.com
.0
1
r
ti
,
0
CA
n
Y
4
n
4 S
y K
f � •r�
JW y ;j
IF
}'
4
., ,
r , +t
fj'^
µ
r * r+
I +
Lv
T � r
}.
F .. ■ ±� t4VA
+ r r
■� r F } f n yx -
- • , t
} f t I
16
r • .
a a
/ r 4
7 f
J e a
FA�■ 4 r
r_ 1--r1� j it .#• ' .1
4
- Y • r t 1
L r F
r
4 "1
I 5
{
-f 1
r rr r � k�
• r 'i{k /` /
•r f _ - f 1 fi r �f•. ar'� j+#; ti .fir r r S } t 4
t JJJ!FFF / r
qr
Yam,",�M�*' } rt! '{ + -' • V / ,
'r 1 r R fir.. �. . 4 � �•
_ f } f,�f - i l rL
�r
y
•{• fi kr. xs { �. J M Ai
* r
f r f$
++•� � � Ci - T L y - k i - .
.r f *r
+ r
, a
Le L
•, 4 ,J !
r �
f r • ,
l !J
, f r sF \ i'• 4 • i
,! h '
ip
Jr
IL
, 1
1,
r
dL
r r• a
_ k F S + k
�'� y `I � 'L' f ; ` � rIr • � r
!.r
i
1� 4 4 -
i
- � 1
i -
r F�` i• LI I .1 r r #
r-
' 4 { I
r r 1
"
■ 4
'1
' 1
'
- 1 iJ •r 1.
I
A
1 l '
- f
■
L L
r h
I i
! y r S
J r L r
4 x '
f
!
I �
r !L
4 t
I ! 1 1
1
k
• 5
{ ^
+
ap
i
I
F .. ■ ±� t4VA
+ r r
■� r F } f n yx -
- • , t
} f t I
16
r • .
a a
/ r 4
7 f
J e a
FA�■ 4 r
r_ 1--r1� j it .#• ' .1
4
- Y • r t 1
L r F
r
4 "1
I 5
{
-f 1
r rr r � k�
• r 'i{k /` /
•r f _ - f 1 fi r �f•. ar'� j+#; ti .fir r r S } t 4
t JJJ!FFF / r
qr
Yam,",�M�*' } rt! '{ + -' • V / ,
'r 1 r R fir.. �. . 4 � �•
_ f } f,�f - i l rL
�r
y
•{• fi kr. xs { �. J M Ai
* r
f r f$
++•� � � Ci - T L y - k i - .
.r f *r
+ r
, a
Le L
•, 4 ,J !
r �
f r • ,
l !J
, f r sF \ i'• 4 • i
,! h '
ip
Jr
IL
, 1
1,
r
dL
r r• a
_ k F S + k
�'� y `I � 'L' f ; ` � rIr • � r
!.r
i
1� 4 4 -
i
- � 1
i -
r F�` i• LI I .1 r r #
r-
' 4 { I
r r 1
"
■ 4
'1
' 1
'
- 1 iJ •r 1.
I
A
1 l '
- f
■
L L
r h
I i
! y r S
J r L r
4 x '
f
!
I �
r !L
4 t
I ! 1 1
1
k
• 5
{ ^
+
ap
i
I
T
+
r
t
k.
"
i
4
'
y
•
4
,
*
6
}
`
a
s
,
+
k.
,
J
"
yt
�
y
k r
L
•
r
lk
•
,�
ir
y +
F
4
it'
r
,
s
,
�
r i
r
iw
•
:..
i
`
w Jr
T
■
i
TI
y�
J
.iw
r
+
9
4
1
i
O y
[I'
i
r Sr
dp
M
OL