Loading...
HomeMy WebLinkAbout2025-6-12 900 King Street Stuart Lachs, AIA LEED AP Perkins Eastman Letter to Architectural Review Board PERKINSEASTMAN.COM Perkins Eastman Architects DPC 677 Washington Boulevard, Suite 101, Stamford, CT 06901 | +1 203 251 7400 PERKINSEASTMAN.COM June 12, 2025 Mr. Mitchell Levy Chair of the Village of Rye Brook Architectural Review Board And Members of the Architectural Review Board Village of Rye Brook 938 King Street Rye Brook, NY 10578 Project Name: 900 King Street Project Number: 70700.02 Subject: ARB Submission Dear Mr. Levy and Members of the Architectural Review Board On behalf of Sunrise Development Inc., we are pleased to provide the following drawings which have been revised to address comments received from the Planning Board, Architectural Review Board, and the Villages Emergency Services Task Force. The enclosed drawings are as follows: Drawing No. Title Date Cover Sheet Revised: June 05, 2025 BAS-100 ARCHITECTURAL SITE PLAN March 26, 2025 BA-100 PARKING PLAN March 26, 2025 BA-101 FIRST FLOOR PLAN March 26, 2025 BA-102 SECOND FLOOR PLAN March 26, 2025 BA-103 THIRD FLOOR PLAN March 26, 2025 BA-104 FOURTH FLOOR PLAN March 26, 2025 BA-105 ROOF PLAN March 26, 2025 BA-112 TOWNHOUSE PLANS March 26, 2025 BA-200 BUILDING ELEVATIONS Revised: June 05, 2025 BA-201 BUILDING ELEVATIONS March 26, 2025 BA-202 BUILDING ELEVATIONS March 26, 2025 BA-203 BUILDING ELEVATIONS March 26, 2025 BA-211 TOWNHOUSE ELEVATIONS March 26, 2025 BA-212 TOWNHOUSE ELEVATIONS March 26, 2025 Supplemental Attachments Date PROPOSED MATERIALS AND FINISHES - IL Revised: June 05, 2025 PROPOSED MATERIALS AND FINISHES – AL PROPOSED MATERIALS AND FINISHES – TOWNHOUSES Revised: June 05, 2025 Revised: June 05, 2025 ROOFTOP MECHANICAL EXHIBIT – BUILDING SECTIONS ROOFTOP MECHANICAL EXHIBIT – SITE SECTIONS TYPICAL BALCONY CONFIGURATION AND RAINWATER STRATEGY April 2, 2025 April 2, 2025 Revised: June 05, 2025 The Cover Sheet has been revised to reflect revised drawing sheets and supplemental attachment sheets. The heights from average grade to the high points of the 4-story main entrance roof and the 3-story front IL building roof have been added to sheet BA-200 The specific products (manufacturer, product, color or pattern) for the proposed exterior materials and finishes have been added to the three (3) building specific supplemental attachment sheets. Sincerely, Stuart Lachs, AIA, LEED AP Perkins Eastman Architects DPC CC: Sunrise Senior Living, Steve Fewes