HomeMy WebLinkAbout2025-5-30 900 King Street Anthony P. Nester, RLA JMC PLLC Letter
May 30, 2025
Chairmen Robert Goodman and
Member of the Village Planning Board
938 King Street
Rye Brook, New York 10573
RE: JMC Project 22042
900 King Street Redevelopment
Sunrise Rye Brook
900 King Street
Village of Rye Brook, NY
Amended Site Plan Approval
Chairman Goodman and Members of the Planning Board:
On behalf of Sunrise Development Inc., we are pleased to provide the following drawings
which have been revised to address comments received from the Planning Board,
Architectural Review Board and the Villages Emergency Services Task Force. The
enclosed drawings are as follows:
1. JMC Drawings:
Dwg. # Title Date
C-000 “Cover Sheet” last rev. 05/29/2025
C-001 “Notes & Legends” last rev. 05/29/2025
C-010 “Existing Conditions” last rev. 05/29/2025
C-020 “Demolition Plan” last rev. 05/29/2025
C-030 “Existing Steep Slopes Map” last rev. 05/29/2025
C-040 “Tree Removal/Protection Plan” last rev. 05/29/2025
C-041 “Tree Removal/Protection Chart” last rev. 05/29/2025
C-100 “Layout & Striping Plan” last rev. 05/29/2025
C-110 “Fire Truck/Emergency Vehicle & Truck Turning Plan” last rev. 05/29/2025
C-120 “On-Site Fire Protection Plan” last rev. 05/29/2025
C-130 “Intersection Sight Distance” last rev. 05/29/2025
C-200 “Grading Plan” last rev. 05/29/2025
C-210 “Excavation Cross Section” last rev. 05/29/2025
C-211 “Road Profiles” last rev. 05/29/2025
C-212 “Road Profiles” last rev. 05/29/2025
C-300 “Utilities Plan” last rev. 05/29/2025
C-310 “Storm Sewer Profiles” last rev. 05/29/2025
C-320 “Sanitary Sewer Profiles” last rev. 05/29/2025
C-400 “Erosion & Sediment Control Plan (Construction
Phase 1)” last rev. 05/29/2025
C-401 “Erosion & Sediment Control Plan (Construction
Phase 2)” last rev. 05/29/2025
C-402 “Erosion & Sediment Control Plan (Construction
Phase 3&4)” last rev. 05/29/2025
C-403 “Erosion & Sediment Control Plan (Construction
Phase 5)” last rev. 05/29/2025
C-404 “Erosion & Sediment Control Plan (Construction
Phase 6)” last rev. 05/29/2025
C-405 “Erosion & Sediment Control Plan (Construction
Phase 7)” last rev. 05/29/2025
C-600 “Lighting Plan” last rev. 05/29/2025
C-900 “Construction Details” last rev. 05/29/2025
C-901 “Construction Details” last rev. 05/29/2025
C-902 “Construction Details” last rev. 05/29/2025
C-903 “Construction Details” last rev. 05/29/2025
C-904 “Construction Details” last rev. 05/29/2025
C-905 “Construction Details” last rev. 05/29/2025
C-906 “Construction Details” last rev. 05/29/2025
C-907 “Construction Details” last rev. 05/29/2025
C-908 “Construction Details” last rev. 05/29/2025
C-909 “Construction Details” last rev. 05/29/2025
C-910 “Construction Details” last rev. 05/29/2025
As mentioned above, we have made some minor changes to the Amended Site Plans for
the project. These changes included depicting a new sidewalk from the project’s east
driveway along Arbor Drive and connecting to the existing sidewalk along the west side of
King Street. This sidewalk was a requirement from the original approval. On-site fencing
has been identified, and the On-Site Fire Protection Plan has been updated to satisfy the
Village Emergency Services Task Force. In addition, the lighting plan has been adjusted to
better identify locations of proposed lighting at the IL/AL building exits.
As a requirement of the original approval for the project, we have shown a 5-foot-wide
concrete sidewalk that connects the sidewalks from the site as well as to Harkness Park to
King Street along the north side of Arbor Drive. This section of sidewalk requires an
approximately 4-foot-high retaining wall to construct the sidewalk. This retaining wall will
have a 4-foot-high black aluminum safety fence on top of the wall.
The various types of on-site fencing have been identified on the Site Plans. These fence
types are:
a) All safety fencing on top of retaining walls is to be 4-foot-high black aluminum
fencing.
b) Fencing at the north end of the terrace area at the IL building is to be 4-foot-high
black aluminum fencing.
c) The fence enclosing the east AL Garden area is to be a 6-foot-high black aluminum
fence.
d) The fence enclosing the western AL Garden is to be an 8-foot-high board-on-board
vinyl fence.
e) The fencing surrounding both the generators and trash area is to be 6-foot-high
wooden fencing.
The On-Site Fire Protection Plan has been revised to incorporate additional “No Parking
Fire Lane” signs along the access to the Townhomes. Also, additional roof entry points
have been added around the building to include access to each level of the IL/AL roof. In
addition, the access to the emergency access leading to the Village Fire House will have a
bollard and chain assembly with the latch or lock.
The Site Lighting plan photometrics has been updated to reflect a change to the wall pack
lights above the IL/AL building exits, to a more architectural style sconce light in line with
the building architecture. The revise photometrics continue to provide required lighting
levels at these locations. In addition, the symbols of these lights have been enlarged to
better locate them on the site plan. This was a comment we received from the Architectural
Review Board.
Lastly, we have noted that the existing property sign located on King Street is to be
replaced with a new Sunrise sign, not to exceed the height of the existing sign. Please
refer to the Site Plan Detail sheets, which contain a detail of the sign. This was also a
comment we received from the Architectural Review Board.
We trust that the minor changes described above address the Planning Boards, as well as
satisfy the Architectural Review Board and Emergency Services Task Force comments.
We look forward to reviewing these minor changes with you at the June 12th Planning
Board meeting.
Sincerely
JMC Planning Engineering Landscape Architecture & Land Surveying, PLLC
Anthony P. Nester
Anthony P. Nester, RLA
Principal
CC: Clyde McGraw
David Steinmetz, Esq.
Stuart Lachs
Valerie Mutterperle