HomeMy WebLinkAbout2025-3-13 900 King Street Planning Board Meeting Presentation900 KING STREET MARCH 13, 2025
Study 3
MEETING WITH
RYE BROOK PLANNING BOARD
REVIEW OF SITE PLAN APPROVAL MODIFICATIONS
MARCH 13 2025
AGENDA
900 KING STREET MARCH 13, 2025
Agenda
• Introductions
• Comparison of Approved and Proposed Site Plans
• Site Plan Revisions
• Landscape Revisions
• Open Space
• IL and AL Buildings
• Townhouses
• Building Height
PLANNING BOARD MEETING | MARCH 13, 2025
2SUNRISE OF RYE BROOK
EXISTING AERIAL
N
SITE PLAN - APPROVED BY BOARD OF TRUSTEES SEPTEMBER 14, 2021
900 KING STREET MARCH 13, 2025
83
322/
),71(6
6
0/2&
.
(
5
6
:/2&.(
5
6
08/7
,
3
85326(
.,7&+(16725
35(3
35,9
'
,
1
,
1
*
)250$/',1,1*
&$68$/',1,1
*
/281*
(
$'0,1
/2%%
<
$5767
8
'
,
2
$/',
1
,
1
*
3+<6,
&
$
/
7+(5$
3
<
$/75$
6+
5(&(,
9
,
1
*
PROPOSED REVISED SITE PLAN - SUBMITTED FEBRUARY 20, 2025
900 KING STREET MARCH 13, 2025
KS32AS3
KS3C
KS3C
KS30
KS32AS3
KS30
KS32AS3
1B
1BS1B
S
2B
FITNES
S
R
O
O
M
1B S 1B+
ENTER
T
A
I
N
M
E
N
T
W. ACT
SALON
O
R
1
B
+
MEP
2B
1B+
1B
1B
SALES
PARLO
R
1B
1B
WELL
N
E
S
S
EXAM
RCD
TOILET
AVC
STORA
G
E
E.D.
FAMILY
R
O
O
M
W.R.
B.O.C.
A04-M
B01
B01_M
B06
FORMAL
D
I
N
I
N
G
VEST
B01_M
VEST
MAIL
PACKA
G
E
OFFICE
RECP
LIBRA
R
Y
SALAN/
S
P
A
MOVE
M
E
N
T
STREN
G
T
H
OFF
CONSU
L
T
LOCK
LOCK
STOR
WELLNE
S
S
L
O
U
N
G
E
B04_M
B10_M
B10_M
A06_M
A08
A08
B01
B06
CAFE
A08
A08
B01
B01
PVT DIN
I
N
G
CARD R
O
O
M
ADMIN
S
U
I
T
E
B01_M
B01_M
A04_M
CASUAL
D
I
N
I
N
G
/
B
A
R
CENTR
A
L
K
I
T
C
H
E
N
EQUIP
POOL
TRASH/
R
E
C
STOR
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
Parking
Required
•IL: one/DU = 126
•AL: half/DU = 43
•TH: 2½/DU = 50
•TOTAL: 219 spaces
Provided
•IL: 133 spaces
126 Garage (3 acc.)
7 On-grade (2 acc.)
•AL: 51 spaces
51 On-grade (2 acc.)
•TH: 60 spaces
40 Garage
20 Driveway
•TOTAL: 244 spaces
PLANNING BOARD MEETING | MARCH 13, 2025
3SUNRISE OF RYE BROOK
2021 APPROVED MASTER PLAN
N
PLANNING BOARD MEETING | MARCH 13, 2025
4SUNRISE OF RYE BROOK
2025 PROPOSED MASTER PLAN
N
PLANNING BOARD MEETING | MARCH 13, 2025
5SUNRISE OF RYE BROOK
2025 PROPOSED MASTER PLAN W/ 2021 APPROVED PLAN OVERLAY
N
PLANNING BOARD MEETING | MARCH 13, 2025
6SUNRISE OF RYE BROOK
2021 APPROVED PLAN & 2025 PROPOSED MASTER PLAN W / 2021 OVERLAY
PLANNING BOARD MEETING | MARCH 13, 2025
7SUNRISE OF RYE BROOK
2021 APPROVED AERIAL OF EXISTING BUFFER & PROPOSED BUFFER
EXISTING VEGETATION BUFFER WITH GRADE CHANGE
ADDITIONAL VEGETATION BUFFER - PROPOSED TREES ALONG PROPERTY LINE
KEY PLAN AERIAL VIEW
AERIAL VIEW
PLANNING BOARD MEETING | MARCH 13, 2025
8SUNRISE OF RYE BROOK
2025 AERIAL OF EXISTING BUFFER & PROPOSED BUFFER
EXISTING VEGETATION BUFFER WITH GRADE CHANGE
ADDITIONAL VEGETATION BUFFER - PROPOSED TREES ALONG PROPERTY LINE
KEY PLAN AERIAL VIEW
AERIAL VIEW
VIEW STUDY FROM 2017 DEIS - VANTAGE POINT 1
900 KING STREET MARCH 13, 2025
5.2
.
1
8
Figure 8-9900 KING STREET
Existing and Proposed Conditions — Vantage Point 1
Proposed Condition (Leaf-off)Existing Condition (Leaf-off)
Existing Condition (Leaf-on)
VIEW STUDY FROM 2017 DEIS - VANTAGE POINT 2
900 KING STREET MARCH 13, 2025
5.2
.
1
8
Figure 8-18900 KING STREET
Existing and Proposed Conditions — Vantage Point 8b
Proposed Condition (Leaf-off)Existing Condition (Leaf-off)
Existing Condition (Leaf-on)
IL & AL BUILDINGS - LEVEL 1 - APPROVED BY BOARD OF TRUSTEES
900 KING STREET MARCH 13, 2025
!
"
#
"
#
#
$ %
$ & %
!
!
$
&
%
'
!
(
!
#
#
!"
#
$
%
&#'()*+,-.+& /01 2*-3& -'45.617& %& &% &8 & & & & &8 & & &
9
#: &%:% 9
%&%:% 9
%& .9
"&
;+369
*0*/&<& *-39
/'++*+,&<&!.+*+,9
< =&>& ?@ =
: %& &
& : & % %
< <
& *+,& -633-7& C3& 6..D7& "&
& &% $ % & : #&@$ %
& '1*(.+& 03+237& 3;&".6D7& "&
& 315.61& .'17& 64.+D7& "&
& .2-)& 6.'1;'C7& 2*-3& 7&#)*-3& /'*+(7& "
! " #
& % ) $ % $ %&& '% (
IL & AL BUILDINGS - LEVEL 1 - BOT APPROVED WITH PROPOSED OUTLINE
900 KING STREET MARCH 13, 2025
!
"
#
"
#
#
$ %
$ & %
!
!
$
&
%
'
!
(
!
#
#
!"
#
$
%
&#'()*+,-.+& /01 2*-3& -'45.617& %& &% &8 & & & & &8 & & &
9
#: &%:% 9
%&%:% 9
%& .9
% : $
"&
;+369
*0*/&<& *-39
/'++*+,&<&!.+*+,9
< =&>& ?@ =
<
<
&
9
9
&
9A
3
0
*
-
&
.
B
'
/
A
:
:
1
B
)
3
+
$
6
0-
: %& &
& : & % %
< <
& *+,& -633-7& C3& 6..D7& "&
& &% $ % & : #&@$ %
& '1*(.+& 03+237& 3;&".6D7& "&
& 315.61& .'17& 64.+D7& "&
& .2-)& 6.'1;'C7& 2*-3& 7&#)*-3& /'*+(7& "
! " #
& % ) $ % $ %&& '% (
IL & AL BUILDINGS - LEVEL 1 - PROPOSED REVISED - FEBRUARY 20, 2025
900 KING STREET MARCH 13, 2025
MAIN BUILDING
Parking Garage BOT SUBMISSION CURRENT REDUCTION
Basement Parking Area 51,941 47,267 ‐4,674
Independent Living BOT SUBMISSION CURRENT REDUCTION
Basement Program Area 20,544 10,497 ‐10,047
Level 1 56,125 53,734 ‐2,391
Level 2 52,217 47,483 ‐4,734
Level 3 55,714 50,622 ‐5,092
Level 4 40,737 34,305 ‐6,432
Total 225,337 196,641 ‐28,696
Assisted Living BOT SUBMISSION CURRENT REDUCTION
Basement Program Area 10,550 5,500 ‐5,050
Level 1 30,530 22,643 ‐7,887
Level 2 21,652 19,554 ‐2,098
Level 3 21,652 18,984 ‐2,668
Level 4 18,662 16,717 ‐1,945
Total 103,046 83,398 ‐19,648
Main Building Overall BOT SUBMISSION CURRENT REDUCTION
Total SF (excluding parking)328,383 280,039 ‐48,344
Main Building Footprint 86,655 76,377 ‐10,278
IL & AL BUILDINGS - LEVEL 1 - PROPOSED REVISED - FEBRUARY 20, 2025
900 KING STREET MARCH 13, 2025
TYP.
TYP.
The submitted plan incorporates
the following revisions:
Independent Living Building (IL)
1 - Reduce Building Footprint
2 - Port Cochere/Entry
3 - Updated Courtyard Layout
4 - Add balconies and walk-out terraces
around the building
Assisted Living Building (AL)
5 - Reduce Building Footprint
6 - Porte Cochere/Entry revisions
7 - Add porch elements
General
8 - Add outdoor courtyard
9 - Modify rear loading zone
10 - Add structure over generator
11 - Add indoor trash collection and outdoor
pickup
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
IL Entrance
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
AMBULANCE TURNING MOVEMENT PLAN
IL Entrance
Ambulance entrance
under porte-cochère
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
AL Entrance
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
AMBULANCE TURNING MOVEMENT PLAN
AL Entrance
Ambulance entrance
under porte-cochère
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
Back of House / Loading
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
Generators
Trash
Loading /
maneuvering space
Back of House / Loading
PREVIOUSLY APPROVED PROPOSED
900 KING STREET AMENDED SITE PLAN APPROVAL
LAYOUT PLAN
TOWNHOMES
10 Buildings
20 Dwelling Units
No increase in
bedrooms
Added 2-car garages to
each Townhome
PREVIOUSLY APPROVED PROPOSED
TOWNHOUSES - APPROVED BY BOARD OF TRUSTEES SEPTEMBER 14, 2021
900 KING STREET MARCH 13, 2025
!
"
#
!
"
#
#
#
$
% & %% & #
$ '
$
% & %% & #
$
'
! " # $ ! " # #
%&'(
'%&
)% *+, * &'(
-)./' * &'(
-)./' + (
1'2 -&%+
.3 (
4 (
- 4 5 (
467 8 9: 7
. +?.0 ' -&%+
1*+, )''
464
1 )A B +2 " !
.%) .$ )0 '' )'C*' :
0- % '
; % + 3 2 B +2
) % B +2 " #
!# 3 A # - +2
! "
& ! ( '! #$%&'$( ) # *$$ +* &
& ! ( '! #$%&'$( ) ) $& *$$ +* &
!
"
#
!
"
#
# #
$
% & %% & #
$
'
$
% & %% & # $
'
! " # $ ! " # #
'%&
)% *+, * &'(
-)./' * &'(
-)./' + (
1'2 -&%+
.3 (
4 (
- 4 5 (
. +?.0 ' -&%+
1*+, )''
1 )A B +2 " !
; % + 3 2 B +2
) % B +2 " #
!# 3 A # - +2
! "
& ! ( '! #$%&'$( ) ) $& *$$ +* &
! " # ! " "
$%&'
&$%
()$ *+, * %&'
-)./& * %&'
-)./& + '
1&2 -%$+
.3 '
4 '
- 4 5 '
467 8 9: 7
. +?.0 &
&%&A$ *.+
1*+, )&&
464
1 )B C +2 !
.$)( .# )0 && )&A*& :
0-($ &(
; $ + 3 2 C +2
) $ C +2 ! "
" 3 B " - +2
! " #
$% &' $% ()(* $ '&
(* $ '&
(* $ '&
$'+& %', ( ()(* $ '&
! " # ! " "
$%&'
&$%
()$ *+, * %&'
-)./& * %&'
-)./& + '
1&2 -%$+
.3 '
4 '
- 4 5 '
467 8 9: 7
. +?.0 &
&%&A$ *.+
1*+, )&&
1 )B C +2 !
; $ + 3 2 C +2
) $ C +2 ! "
" 3 B " - +2
! " #
$% &' $% ()(* $ '&
$ '&
$ '&
$'+& %', ( ()(* $ '&
4
4
'
'
!
-
;
'<
)
%
=
<
>
1
*
+
,
>
*
%
>
)
>
$
)
?
>
=
6
-
@
0
$% &' $% ()(* $ '&
$% +( $ ()(* $ '&
$% ( $ ()(* $ '&
$'+& %', ( ()(* $ '&
TOWNHOUSES - PROPOSED REVISED - TYPE A
900 KING STREET MARCH 13, 2025
KS30KS30
B10_M
B10_M
B0
TOWNHOUSES - PROPOSED REVISED - TYPE B
900 KING STREET MARCH 13, 2025
KS30KS30
B10_M
B10_M
B0
677 Washington Blvd.Suite 101Stamford, CT 06901 T. +1 203 251 7400 F. +1 203 251 7474
SCALE:
DRAWING TITLE:
PROJECT TITLE:
PROJECT No:
Owner:
Sunrise Development, Inc.
7902 Westpark Drive, McLean, VA 22102
Civil/Site:
JMC PLLC120 Bedford Road, Armonk, NY 10504
Landscape:
MPFP PLLC120 Broadway, Floor 20, New York, NY 10271
TOWNHOUSEELEVATIONS TYPE B
TOWNHOUSE
70700.20
900 KING STREET
2/20/2025
A-212
900 King Street, Rye Brook, NY 10573
SITE PLAN APPROVAL DRAWINGS
3/
1
2
/
2
0
2
5
1
0
:
2
0
:
3
0
P
M
C:\
R
E
V
I
T
L
O
C
A
L
\
7
0
7
0
0
_
K
I
N
G
_
I
L
_
R
2
3
_
A
R
C
H
_
H
i
g
h
R
e
d
u
c
t
i
o
n
O
p
t
i
o
n
_
J
.
S
o
u
t
h
e
r
l
a
n
d
M
M
2
E
8
.
r
v
t
677 Washington Blvd.Suite 101Stamford, CT 06901 T. +1 203 251 7400 F. +1 203 251 7474
SEAL
PROJECT TITLE:
DATENO. ISSUE
KEY PLAN
Owner:
Sunrise Development, Inc.
7902 Westpark Drive, McLean, VA 22102
Civil/Site:
JMC PLLC
120 Bedford Road, Armonk, NY 10504
Landscape:
MPFP PLLC
120 Broadway, Floor 20, New York, NY 10271
900 KING STREET
ELEVATIONS
900 KING STREET MARCH 13, 2025
AVERAGE GRADE (252.56)252' -6 23/32"
WEIGHTED AVG BLDG HT (294.36)
294' -4 41/128"
WE
I
G
H
T
E
D
A
V
G
B
L
D
G
H
T
=
4
1
.
8
'
LEVEL 4 T.O.PLATE294' -11 5/8"
AVERAGE GRADE (252.56)252' -6 23/32"
LEVEL 2 T.O.S.264' -6 3/4"
LEVEL 3 T.O.S.275' -2 5/8"
LEVEL 1 T.O.S.252' -7"
LEVEL 4 T.O.S.
285' -10 1/2"
9' -
1
1
/
8
"
10
'
-
7
7
/
8
"
10
'
-
7
7
/
8
"
11
'
-
1
1
3
/
4
"
42
'
-
4
5
/
8
"
WEIGHTED AVG BLDG HT (294.36)294' -4 41/128"
LEVEL 4 T.O.PLATE
294' -11 5/8"
1 1
/
8
"
WEIGHTED AVG BLDG HT (294.36)294' -4 41/128"
1/16" = 1'-0"4 SOUTH ELEVATION
1/16" = 1'-0"3 WEST ELEVATION
! !"
# ! ! !
$ -$ % $&$' % ()
/ $&$' % ()
% !
AVERAGE GRADE (252.56)252' -6 23/32"
WEIGHTED AVG BLDG HT (294.36)294' -4 41/128"
WE
I
G
H
T
E
D
A
V
G
B
L
D
G
H
T
=
4
1
.
8
'
SOUTH ELEVATION - PROPOSED REVISED
SOUTH ELEVATION - APPROVED BY BOARD OF TRUSTEES SEPTEMBER 14, 2021
HIGHEST POINT OF ROOF REMAINS
UNCHANGED = 57.77’WEIGHTED AVERAGE BUILDING HEIGHT
REMAINS UNCHANGED = 41.8’
(OUTLINE OF BOT APPROVED
SHOWN IN RED)
900 KING STREET MARCH 13, 2025
MEETING WITH
RYE BROOK PLANNING BOARD
REVIEW OF SITE PLAN APPROVAL MODIFICATIONS
MARCH 13 2025