TO: Robert Goodman, Planning Board Chairman
& Planning Board Members.
FROM: Anthony Oliveri, P.E.
SUBJECT: 900 King Street Redevelopment
Rye Brook, New York
Sunrise Senior Living – Amended PUD Application
DATE: April 8, 2025
With regard to the above-mentioned project, this office has received and reviewed the
following:
1. JMC Comment Response Letter, dated April 7, 2025.
The JMC memo referenced above was submitted as a response to the project review
letter dated March 12, 2025 by AI Engineers. We have no further comment, other than
the following points.
The planning Board should consider including the following conditions of any resolution
of approval for the project in addition to any other conditions previously noted:
1. The issuance of an updated Willingness to Serve letter issued by Veolia Water;
and completion of the improvements to their system as has been previously noted.
Prior to construction, regardless as to whether these improvements have been
completed, the Village Fire Department should confirm that existing water supply
facilities – in the vicinity of the project – provide sufficient fire hydrant proximity,
flow and pressure to adequately support fire service for the property during the
construction phase of the project.
2. It has been our experience that the Westchester County Department of Health
(WCDOH) does not allow/approve privately owned and operated sanitary sewer
extensions, and that such systems are typically owned and operated by the
municipality having jurisdiction. That being said, any resolution of approval should
therefore be conditioned that – if the WCDOH does allow the proposed sanitary
sewer system to be privately owned and operated – such a sanitary sewer system
be required to provide to the Village a formal operation and maintenance
agreement, otherwise ownership of the sanitary sewers by the Village and the
necessary access easements will be required.
900 King Street Site Plan April 8, 2025
Page 2
Improving Life. By Design.
3. Any agreed to Sanitary Sewer I&I reduction be completed to the satisfaction of the
Village Engineer.
4. Additional soil testing be performed in the vicinity of the existing building footprint
subsequent to demolition to verify soil infiltration characteristics.
If you have any questions on the above, please advise.
Thank You