Loading...
HomeMy WebLinkAboutNYS DEC 2025-2-24 ]DECENE o K Department of FEB 2 8 2025 KATHY HOCHUL STATE Environmental Governor Conservation VILLAGE OF RYE BROOK � SEAN MAHAR BUILDI-NG.DEPARTMENT Interim Commissioner February 24, 2025 Michael Ford Blind Brook Club Golf Course Superintendent P.O. Box 229 Purchase, NY 10577 Re: Blind Brook Club Dam, DEC Dam ID#: 232-2747 Class C — High Hazard Dam Rye brook (V) & Harrison(T), Westchester County Condition Rating: "Unsound — Deficiency Recognized" Dear Mr. Ford: Thank you for your assistance in conducting a routine visual inspection of the Blind Brook Club Dam, a High Hazard Dam, on Feb 4, 2025 as part of the Department of Environmental Conservation's (Department's) ongoing Dam Safety program. I am writing to you because it is my understanding that you represent the owner of this structure. A copy of my Visual Observations is enclosed for your information. Inspection The left/right nomenclature used in this letter and in the enclosed Visual Observation Report is based on looking downstream. Regulations The following table summarizes the current status of compliance for this dam for those sections of the regulations that have specific deadlines for compliance. Citation Requirement Status 673.6 Develop and implement an Inspection & I&M Plan not requested during Maintenance Plan (I&M Plan). Plan does this inspection. not have to be submitted to the Department but needs to be available for inspection if request d. 673.7 Develop and distribute to the local EAP last reviewed in 2024 in emergency responders an Emergency accordance with the 2024 Action Plan (EAP). EAPs should be updated Annual Certification. on an annual basis. To be considered "final" Division of Water,Bureau of Flood Protection&Dam Safety 625 Broadway,Albany, NY 12233-3504 1 dec.ny.gov I DOWinformation@dec.ny.govl (518)402-9029 a completed Promulgation and Concurrence (P&C) form must also be submitted indicating that the EAP has been distributed to and coordinated with local emergency respond rs. 673.8 Submit an Annual Certification (AC) to the The latest AC received was for Department January 31 of each year calendar year 2024. (certification is for the previous year). 673.13 An Engineering Assessment (EA) shall be VIOLATION —An EA was performed, and an engineering assessment received August 19, 2014. report submitted to the dam safety section, Second EA was due August at a minimum frequency of every 10 years 19, 2024. for dams that have been assigned a hazard classification of class B or C. Annual Certification Please note Annual Certifications can now be submitted electronically through the NYS Dam Safety webpage. The full text of the revised 6 NYCRR Part 608 and Part 673, along with technical guidance, templates and forms can be downloaded from the Dam Safety webpage at: http://www.dec.ny..qov/lands/4991.html. Condition Rating The Department Assigned to the dam a Condition Rating of"Unsound — Deficiency Recognized" via a July 24, 2019 letter from Syed Alam. The Condition Rating was due to the dam's inadequate spillway capacity, as revealed in the 2014 EA. The Condition Rating is still valid as the dam has not been rehabilitated yet and the second EA is past due. This Condition Rating means that the deficiencies at the dam are of such a nature that the safety of the dam cannot be assured. This is a violation. Your 2"1d EA is past due. Your 1st EA identified that the dam does not have adequate spillway capacity to pass the design flood. Within 45 days of the receipt of this letter, please submit the following: • You plan and schedule to submit your second EA • Your plan and schedule to address the dam's inadequate spillway capacity. If you cannot continue to operate and maintain the dam in a safe manner you should consider lowering the impoundment until you can retain an engineer to design and construct a safe dam removal. You would be responsible for damages (loss of life/infrastructure/other) should the dam fail. Please keep in mind that any repair or construction activities related to the dam may require permits from the Department. Well before beginning work on the dam, please check with the Regional Permit Administrator at the Department's Region 3 — New Paltz office at (845) 256-3054 to see if any permits are required. If you have any questions, please feel free to contact me by phone at 518-408- 0338, or by e-mail at iohn.smith@dec.ny.gov. Sincerely, John Smith, P.E. Professional Engineer 1 (Environmental) Dam Safety Section ec; Jason A. Klein, Village of Rye Brook, Mayor, mayor .ryebrook.org Rich Dionisio, Town of Harrison, Supervisor, rdionisio harrison-n . ov Susan Spear, Commissioner, Westchester County, EMO, sbs9(d)_WestchesterCountyNY.gov Donald Canestrari, NYSDEC, Dam Safety Section, Chief Jacob Luther, NYSDEC, Dam Safety Section Berhanu Gonfa, NYSDEC Region 3, Dam Safety Representative Michael Ford Blind Brook Club Golf Course Superintendent P.O. Box 229 Purchase, NY 10577 mford(d,)blindbrookclub.arg New York State Department of Environmental Conservation Bureau of Flood Protection and Dam Safety Visual Observations DAM NAME Blind Brook Club Dam STATE ID 232-2747 SECTION C HAZARD CODE C COUNTY Westchester INSPECTION DATE 2/4/2025 NEAREST DS CITY/TOWN Rye INSPECTORS) JZS/1ML OWNER'S NAME BLIND BROOK CLUB DOWNSTREAM HAZARD High TOWNSHIP Village of Rye Brook Town of Harrison WATER LEVEL BEHIND DAM Drained at the time of the inspection DRAIN OPERATION Opened at the time of the inspection DEFICIENCIES ❑ 1)Seepage FX� 4)Maintenance 0 7)Cracking 7 2)Slope Stability OX 5)SurFcial Deterioration ❑ 8)Movement/Misalignment ❑X 3)Undesirable Growth ❑ 6)Voids 9)Data General: —Accompanied by Mike Ford (Golf Course Superintendent) Upstream: —The upstream face of the dam appeared to be in good condition Dam Crest: —The dam crest appeared to be in good condition with small cracks and moss on the concrete cap. —Low spot around the right abutment. Undesirable growth within 20 feet of the dam perimeter. Downstream: —The right downstream abutment had a depression along the groin —The downstream face of the dam had efflorescence, cracking and moss in the concrete. Service Spillway: —The service spillway appeared to be in good conditon Low Level Valve: —The low-level outlet valve appeared to be in good condition. The valve was opened during the inspection 02/04/2025 Page 1 of 6 4 ' �• 'r��• � �~ -��. III Photo 1 Dam ID# 232-2747 Blind Brook Club Dam 02/04/2025 Service spillway downstream channel r� IP Photo 2 Dam IN 232-2747 Blind Brook Club Dam 02/0412025 Low-level valve 02/04/2025 Page 2 of 6 1 -Y 1F:4 1 IS dx Photo Dam ID# • Brook Club Dam 02/0412025 Dam crest, looking left r A $ � + 1 ► 1 Si w t'. Photo Dam ID# • Brook Club Dam 02/0412025 Dam crest, looking right 1 14 1 of Y 7. r "_ L Him 40-4 r Photo 5 Dam ID# 232-2747 Blind Brook Club Dam 02/0412025 Right upstream embankment, looking left Ar IL r. K Photo 6 Dam ID# 232-2747 Blind Brook Club Dam 02/04/2025 Right downstream face, looking left 02/04/2025 Page 4 of 6 t 1 Photo 7 Dam ID# 232-2747 Blind Brook Club Dam 02/04/2025 Low-level outlet pipe Note: Active during the inspection _ 1 .1 ♦ ,W Photo 8 Dam ID# 232-2747 Blind Brook Club Dam 02/04/2025 Right downstream face Note: Efflorescence present 02/04/2025 Page 5 of 6 Photo 9 Dam ID# 232-2747 Blind Brook Club Dam 02/04/2025 Right downstream face, looking right 02/04/2025 Page 6 of 6