HomeMy WebLinkAboutBP25-039 :
M N o
m , C/)
w y
Irmml Ln
= O H Lr) �; �c w a o ° FG =
O M J A
ycr
mow\ + It M
°O 7
00
O y °'
W t-i rT'
~ O M `�' p� W W o & oA Q to O
ti L� a co U -
00
W06 44 cn a
w W A aQ
iiiljj o „ .
c
map �"� � � � zz F" O �✓ � � g
aaw
I+I , •° _
a 0 p
tZiWZ W W 0 Off'' •
p► Z p W W A a n,. an• c
a � �
BUIL MENT
VIL E OF RY _ OK
938 YJNG ET RYE BR ,NY 10573
AUG z o 2024
0V ! VILLAGE OF RYE BROOK
"IR HANG DEPARTMENT
FOR OFFICE USE ONLY:
Approval Date:MAR 0 3 LYAA 25 r t r I Application#
Approval Signature: ARCHITECTURAL REVIEW BOARD:
Disapproved: Date: a
BOA'Approval Date: Case# Chairman:
PB Approval Date: Case# : Secret
ZBA Approval Date: Case#
Other:
Application Fee: op— Permit Fees:.
EXTERIOR BUILDING PERMIT APPLICATION
Application dated:_(9—C) is hereby made to the Building Inspector of the Village of Rye Brook,NY,for the issuance of a Permit for the
construction of buildings,structures,additions,alterations or or a change in use,as per detailed statement described below.
1. JobAddress: � _
2. Parcel ID#: f — 3 D Zone: 12-
3. Proposed Improvement(Describe in detail):
4. Property Owner:
Address: 6 GU AJ
Phone# '�Da—��3— b�v3Z Cell# 03 7/oZ e-mail
List All Other Properties Owned in Rye Brook:
Applicant:
Address:
Phone# Cell# e-mail
Architect:
Address:
Phone# n Cell# e-mail P A L2
Engineer: u S
Address:
Phone# Cell# — — e-mailer n
General Contractor: I
-/
Address: � 1 rU gyp-���
r
Phone# --I 1 '"( 7 -7—q� � Cell# e-mail
Cara 1
cl�
6nrzo24
5. Occupancy;(1-Fam.,2-Fam.,Commercial.,etc...)Pre-construction: Post-construction:
6. Area of lot: Square feet: Acres:
7. Dimensions from proposed building or structure to lot lines: front yard: rear yard:
right side yard: left side yard: other:
8. If building is located on a corner lot,which street does it front on:
9. Area of proposed building in square feet: Basement: I"fl: 2"d fl: Yd fl:
10. Total Square Footage of the proposed new construction:
11. For additions,total square footage added:Basement: 111 fl: 2nd fl: 3`d fl:
12. Total Square Footage of the proposed renovation to the existing structure:
13. N.Y.State Construction Classification: N.Y. State Use Classification:
14. Number of stories: Overall Height: Median Height:
15. Basement to be full,or partial: , finished or unfinished:
16, What material is the exterior finish:
17. Roof style;peaked,hip,mansard,shed,etc: Roofing material:
18. What system of heating:
19. If private sewage dispos is necessary,approval by the Westchester County Health Department must be submitted with this
application.
20. Will the proposed project require the installation of a new,or an extension/modification to an existing automat.�tre
suppression system?(Fire Sprinkler,ANSL System,FM-200 System,Type I Hood,etc...) Yes: N
(if yes,applicant must submit a separate Automatic Fire Suppression System Permit application sets of detaile ngineered plans)
21. Will the proposed project disturb 400 sq. ft,or more of land,or create 400 sq.ft.or re of imperv' us coverage requiring a
Stormwater Management Control Permit as per§217 of Village Code? Yes: No: Area:
22. Will the proposed project require a Site Plan Review by the Village Planning Board as per§ 9 of Vill ge Code?
Yes: NO: V, (if yes,applicant must submit a Site Plan Application,&provide detailed drawi s)
23. Will the proposed project require a Steep Slopes Permit as per§213 of Village Code Yes: No: A
(ifyes,you must submit a Site Plan Application,&provide a detailed topographical survey)
24. Is the lot located within 100 ft, of a Wetland as per§245 of Village Code? Yes: No:
(if yes, the area of wetland and the wetland buffer zone must be properly depicted on the survey&site plan)
25. Is the lot or any portion thereof located in a Flood Plane as per the FIRM Map dated 9/28/07? Yes: No:
(ifyes, the area and elevations of the flood plane must be properly depicted on the survey&site plan)
26. Will the proposed project require a Tree Removal Permit as per§235 of Village Code? Yes: No:
(if yes, applicant must submit a Tree Removal Permit Application)
27. Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? Yes: No:
Indicate: TIER I: TIER II: TIER III: (f yes,a Home Occupation Permit Application is required)
28. List all zoning variances granted or denied for the subject property:
29. What is the total estimated cost of construction: $ (d:Z 6-" Note:The estimated cost
shall include all site improvements, labor,material,scaffolding,fixed equipment,professional fees,including any material and labor which
may he donated gratis.If the final cost exceeds the estimated cost, n additional fee will be required prior to issuance of the CIO.
30. Estimated date of completion: ! tJ
(2)
6/]t2024
BUILDING DEPARTMENT
VILLAGE OF RYE BROOK
938 KJNG 3TRFET RYE BROOK,NY 10573
(914)939-0668
RESIDENTIAL LOT AREA COVERAGE
Address: 30�( b 1Li �At UJ+ Section: i 3 s - C r Block: f Lot:
PERMITTED COVERAGE RATIOS IN RESIDENTIAL DISTRICTS
YOUR ZONE AREA IN MAIN ACCESS. DECK
ZONE DISTRICT SQ. FEET BLDG. BLDG. MAX.
CHECK MAX.
R-35 35,000 14% 4% 5%
R-25 25,000 14% 3.5% 4%
R-20 20,000 14% 3.5% 4%
R-15 15,000 16%9 3.5% 4%
R-15A 15,000 12% 3.5% 4%
R-12 12,500 17% 4% 4%
R-10 10,000 20% 4.5% 3.5%
R-7 7,500 23% 4.5% 3.5%
R-5 5,000 30% 5% 3.6%
R-2F 5,000 30% 5% 3.5%
Existing: Proposed:
1. AREA OF LOT 21,703 Sq. Ft. 21,703 Sq. Ft.
2. AREA OF HOUSE
a. Coverage of Main Building 2,220
(Including Attached Garage or Accessory Building) 2,220 Sq. Ft. Sq. Ft.
b. Area of 191 Floor Divided By Area of Lot x 100 10.2 % 10•2 %
3. AREA OF ACCESSORY BUILDING
442
(Includes Detached Garages,Tool Shed,Playhouses) Sq. Ft. 442 Sq. Ft.
a. Coverage of Accessory Building
Area of Accessory Building Divided By Area of Lot x 100 2'0 % 2 0 %
4. AREA OF DECK 289 Sq. Ft. 289 Sq, Ft.
a. Coverage of Deck
Area of Deck Divided By Area of Lot x 100 1.3 % 1.3 %
I attest to the best of my knowledge and belief,the above information is correct.
lo� 4k
Architect's Signature
(3)
611/2024
BUILDING DEPARTMENT
VILLAGE OF RYE BROOK
938 KING STREET RYE BROOK,NY 10573
(914) 939-0668
IMPERVIOUS COVERAGE RATIOS RESIDENTIAL DISTRICTS
Address- Section: ! '1 S. Block: _. j Lot: ;L ,Zone• =�
IMPERVIOUS SURFACES (Definition): All buildings, as defined herein, and all areas on the ground or elevated above
the ground which are comprised of materials through which water cannot readily flow, including, but not limited to
asphalt, concrete, masonry, wood, gravel and clay, and which consist of elements including, but not limited to, court
yards,sports courts,swimming pools,patios,sidewalks,ramps, terraces and driveways.
TOTAL MAXIMUM PERMITTED MAX. PERMITTED
COVERAGE Zoning IMPERVIOUS
LOT AREA BY IMPERVIOUS SURFACES District COVERAGE IN FRONT
(sq.ft.) For Base Lot For Lot Area YARD(%)
Area (sq.ft.)* Over Base R-35 15
Lot Area % R-25 20
0 to 4,000 0 55 R-20 30
4,001 to 6,000 2,200 35
6,001 to 12,000 2,900 27 R-15 35
12,001 to 16,000 4,520 26 R-15A 35
16,001 to 20,000 5,560 25
20,001 to 30,000 6,560 24 R-12 40
30,001 to 40,000 8,960 23 R-10 45
40,001 &larger 11,260 22 R-7 40
R-5 30
*"Base Lot Area"is the minimum end of the lot size R2-F 30
range in the"Lot Area"column
Area of lot: 21,703 s .ft. Existing Allowed Pro ose
Total impervious coverage = 4948 S .ft. 6 S ft. 6
S .ft.
Front impervious coverage= 11.0 % 40 % 11.0
I attest to the best of my knowledge and belief,the above information is correct.
Architect's Signature
(4)
611 t2O24
BUILDING DEPARTMENT
VILLAGE OF RYE BROOK
938 KING STREET RYE BROOD,NY 10573
(9I4)939-0668
BULK REGULATIONS IN RESIDENTIAL DISTRICTS
Section: r
Address: �U�� ��`�{� 5,�vD(,Gl� ' ��a.� j Block ) f�
e Lot'
MAXIMUM GROSS FLOOR AREA NA
USE FORMULA: Maximum Gross Floor Area = 4,000 + [ (Lot Area --21,780) x 0.11478421 ]:
a. Allowed = Sq. Feet
b. Existing = Sq. Feet
c. Proposed Sq. Feet
HEIGHTISETBACK RATIOS FOR RESIDENTIAL DISTRICTS
DEFINITION: A standard designed to regulate the height of a building in relation to the average grade of the corresponding portion of
the lot line from which it is set back. The ratio modifies the maximum permitted Height of Building by forming an inclined plane
beginning at the average grade along the portion of the lot line from which the setback is measured and rising toward the building at the
specified ratio above which no part of any building, other than minor architectural features such as chimneys, skylights and dormer
windows not covering more than 10% of the entire roof area,shall be permitted to extend.Height and Setback shall be calculated using
the formula; Height I Setback=X,where X is the required side or front yard ratio for the zoning district in which a property is located
as specified in Article VIII of Chapter 250, A complete elevation view for the proposed improvement must be included on the drawings.
FILL IN YOUR RATIOS:
ZONE E.lf/ST/NG PROPOSED REQUIRED
FRONT: FRONT: FRONT: .44
0-35 SIDE: SIDE: SIDE: 1.20
FRONT: FRONT: FRONT: .48
R2S SIDE: SIDE: SIDE: 1.30
FRONT: FRONT: FRONT: .60
/TZO SIDE: SIDE: SIDE: 1.60
FRONT: FRONT: FRONT: .60
R-15 SIDE: SIDE: SIDE: 1.60
FRONT: FRONT: FRONT: .80
/r 15A SIDE: SIDE: SIDE: 2.40
FRONT: FRONT: FRONT: .69
R-12 SIDE: SIDE: SIDE: 1.60
FRONT: FRONT: FRONT: .80
07--10 SIDE: SIDE: SIDE: 2.40
FRONT: FRONT: FRONT: .96
R--7 SIDE: SIDE: SIDE: 3.00
FRONT: FRONT: FRONT: 1.20
as SIDE: SIDE: SIDE: 4.00
FRONT: FRONT: FRONT: 1.20
R-ZF SIDE: SIDE: SIDE: 4.00
I attest to the best of my knowledge and belief, the above information is correct.
Architect' Signature (5)
6/1/2024
BUILD MENT i
VI E OF RY OK
938 KING ET RYE BR NY 10573 AUG 2 0 2024
0 Y
ov VILLAGE OF RYE BROOK
BUILDING DEPARTMENT
AFFIDAVIT OF COMPLIANCE
VILLAGE CODE §216 • STORM SEWERS AND SANITARY SEWERS
'PHIS AFFIDAVIT MUST BEAR THE NOTARIZED SIGNATURE OF THE LEGAL PROPERTY OWNER AND BE SUBMITTED ALONG
WITH ANY BUILDING OR PLUMBING PERMIT APPLICATION. ANY BUILDING OR PLUMBING PERMIT APPLICATION
SUBMITTED WITHOtTP THIS COMPLETED AND NOTARIZED FORM WILL BE RETURNED TO THE APPLICANT.
STATE OF NEW YORK, COUNTY OF WESTCHESTER ) as:
—br4 J (.1") , residing at, �v H `��s Y ,��.� �(� y� r�r �YZ
(Print name) (Address where you live) /U Y tO 5 73
being duly sworn, deposes and states that(s)he is the applicant above named, and further states that(s)he is the
legal owner of the property to which this Affidavit of Compliance pertains at;
30 `i R 17 , Rye Brook, NY.
(Job Address)
Further that all statements contained herein are true, and that to the hest of his/her knowledge and belief, that
there are no known illegal cross-connections concerning either the storm sewer or sanitary sewer,and further that
there are no roof drains, sump pumps, or other prohibited stormwater or groundwater connections or sources of
inflow or infiltration of any kind into the sanitary sewer from the subject property in accordance with all State,
County and Village Codes.
(Signature of Property Owner(.,;))
(Print Name of Property Owner(s)}
Sworn to before me this_ G
day of `�S` `�S , 20 �7_A
(Notary Public)
SHARI MELILLO
Notary Public,State of New York
No.OIME6160063
Qualified in Westchester County (6)
Commission Expires January 29,201_]
6/ll2024
This application must be properly completed in its entirety by a N.Y. State Registered
Architect or N.Y. State Licensed Professional Engineer & signed by those professionals where
indicated. It must also include the notarized signature(s) of the legal owner(s) of the subject
property, and the applicant of record in the spaces provided. Any application not properly
completed in its entirety and/or not properly signed shall be deemed null and void, and will be
returned to the applicant. Please note that application fees are non-refundable.
STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as:
, being duly sworn,deposes and states that he/she is the applicant above named,
(print name of individual signing as the applicant)
and further states that (s)hc is the legal owner of the property to which this application pertains, or that (s)he is the
for the legal owner and is duly authorized to make and file this
application.
(indicate architect,contractor,agent,attorney,etc.)
That all statements contained herein are true to the best of his/her knowledge and belief, and that any work performed, or
use conducted at the above captioned property will be in conformance with the details as set forth and contained in this
application and in any accompanying approved plans and specifications, as well as in accordance with the New York State
Uniform Fire Prevention &Building Code, the Code of the Village of Rye Brook and all other applicable laws, ordinances
and regulations. By signing this application, the property owner further declares that he/she has inspected the subject
property, and that to the best of his/her knowledge there are no roof drains, sump pumps or other prohibited stormwater or
groundwater connections or sources of infiltration into the sanitary sewer system on or from the subject property.
Swom to before me this Sworn to before the this
day of , 20 t-21 1 day of 20
Signature of Property Owne Signature of Applicant
a0-r— —6 f'— J
Print Name of Property Owner Print Name of Applicant
Notary Public Notary Public
SHARI MELILLO
Notary Public,State of New York
No.OIME6160063
Qualified in Westchester County
Commission Expires January 29,20ZJj
6/1/2024