Loading...
HomeMy WebLinkAboutBP18-09480AM WKCT METWIS Of TREE FENCING TREE PROTECT DRIP LINE SNOW FEW D FENCE POSTS 9"T NET FILTER FMIC _.r . r. VWV ! SECi'I R SECTION A dob WIVE Stet. . �. TOE -IN IETHM JCiNiNG SECTIONS OF FENCING INION NOTES 1. EXCAVA 'D A 4 INH X 4 INCH TRENCH ALONG THE LOWER PERIMETER OF THE SITE. 2. UNROLL A SECTION AT TiME AND POSITION THE POSTS AGAINST THE BACK (DOWNSTREAM) WALL OF THE TRENCH{ MET SIDE AWAY FROM DIRECTON OF FLOWO 3. DRIVE THE POST INTO THE GROUND UNTIL THENETTING IS A0000XIAAATELY 2 INCH MAU THE TRENCH ROTI'OU Drainage Analysis 157 Country .Ridge Drive Rye Brook, New York 10573 Drainage .Area : The Drainage Area studied is a portion of Lots 6 & 7 as shown on the Site Plan of the new Proposed Pool and Terrace. The final Retention volume shall incorporate all runoff produced by the impervious areas; both proposed and constructiod. Area of Drainage Total Lot Area: Total Lot area 32,378 s,f. 4.743 Acres TOTAL DEVELOPMENT Impervious RUNOFF ANALYSIS ~ 25 year storm (6.41) DESCRIPTION AREA Cn Runoff Runoff Volume 157 Country Ridge Road R e Broo New York 10573 S.F. Inches Cubic Feet .House 2,932 s.E Covered Porches (2) 244 s.f. Walls 185 s.f. All PFlaogstone Terraces (2) 1,364 s.L Ca 98 6.151' 800 s.f. Asphalt Driveway 1,663 s.f. Walks and Pads 409 s.f. Wood Deck 499 s.f. Total .Impervious Area ............. 8 096 S.F. Lawn & Plantings 24,282 s.f. Cn 75 3.46 4. LAY THE TOE -IN FLAP OF THE FABRIC ONTO THE UNDISTURBED BOTTOM Toatal Impervious Area x 6.1 STORAGE REQUIRED OF THE TRENCH, RACKFILL THE TRENCH AND TAMP THE SOIL. p 5 = 8,096 s.f. x 6.15"/12" = 4,149.2 c.f. 1 STEEPER %ODES REQUIRE AN INTERCEPT TRENCH, S. JOIN SECTIONS AS SHOWN ABOVE. STORAGE SOLUTION Retention capacity calculations for each RECHARGER 330XLHD by Cultec Given: Length 8.5 feet Width 52" (4.33' I.D Height 30.5 inches ROSiuN C NTROL Chamber Volume = 63.4 TRtANG1�AR Bay FENCE CORRECT iRitNK n�NG Vo,l. of Excay. ; 10.5' x 6.33' x 3.05'Cllby 202.8 c.ferc --11.0 mtn/inch (field test} �NCE DEL Vol. Of Dry Well 63.4 c.L GRUISVol. Of Gravel = Vol. of Hole -Chamber Vol. = 202.8 c.f. 63.4 c.L =139.4 c.f. gravel MODEL 6GRecharger 330" 139.3 c.f. of Gravel x 40% = void Vol. = 55.8 c.L 0 mot' stilt. & 330HD Storage Vol. =Gravel Voids +ChamberVol.= 55.8 c.L+63.4 119.2 c.f T l c.f. _ ./330X-unit Length 7.50' STORAGE REQUIRED FILTER ' Height 30.5" Total Impervious Area x 6.15" = 8,096 s.f. x 6.15"/12" = 4,149.2 c.L CRUSMED► . - U FABRIC Width 52+' STORAGE SOLUTION �_....X Chamber Volume 46.5 e,fe Retention capacity calculations for each REC GER 330LHD by Cultec 36" 390 gallons Given. Length 8.5 feet Width 52" (4.33' I.D Height 30.5 inches Gravel Volume g ',FILTER f� tt Chamber Volume = 63.4 Cubic Feet Perc =11.0 minlinch (field test) C 18 around 6 deep 82.5 c.f. Vol. of Excay.. 10.5 x 6.33 x 3.05' = 202.8 c.f. Voids Tin Gravel .20.6 c.f. Vol. Of Dry Well 63.4 c.f. Base Area 4.3 s.f./l.f. Vol, Of Gravel =Vol. of Hole -Cham ber Vol. = 202.8 c.f.. - 63.4 c.f. =139.4 c.E gravel Sidewall area 5.5 s.fJl.f. 139.3 c.f. of Gravel x 40% = void vol. = 55.8 c.f. Total filtration Area 9.8 s fJ11 ' Storage Vol. = Gravel Voids +Cha berVol.= 55.8 c.L+63.4 c.f, . =1192 c330XLunit Eff. Area per unit 715 s.f. .f J ,DRY WELL' I " jh E 91", A. I LRetention capacity calc's for each RECHARGER 180HD bY Culteec_; . Given: �, Length'6.33 feet Width 36 Height 20, g 5 inches Chamber Volume = 21.84 Cubic Feet Pere -11.0 �nin/inch (field test) Vol. of Excay. ; 8.5' x 5.5' x ,3.55' = 166.0 c.f. Vol. Of Dry Well 21.9 c.L MODEL "Rechar er 330" ']C _ N D Vol. Of Gravel = Vol. of Hole -Chamber Vol. =166 c.f. - 21.9 c.L =144.1 c.L grvel g 144.1 c.f. of Gravel x 40% =void vol. = 57.7 c.f. a 330IID 1. REQUIRED CAPACITY OF DRY WELLS SHALL B � Storage =Gravel Voids +ChamberVol.= 57.7 c.f.+2L9 c.f. = 79 Length 7.50 .6 c.f./180HD unit Height 30.5►' ' COMPUTED BY A PROFESSIONAL ENGINEER USING Width 52rr � REQUIREMENTS OF THE APPROVING AGENCY. Designed Storage Capacity Q Chamber Volume 46.5 c f. 2. DRYWELLS .SHALL BE LOCATED AT LEAST 10 FEET Design = Volume Required = 4,149.2 cubic feet 390 gallons AWAY FRON 110 PROPERTY LINE AND AT LEAST 10• Number Units Required = 41492i 1192 = 34.8 Units Gravel Volume FROM A BUILDING WITH A BASEMENT BELOW ,.. GRADE. USE : 35 units 18" around 6" deep 82.5 c f. 3. THE DRY WELL SHALL BE PLACED 0 VIRGIN SOIL ONLY. Solution t 34.8 Units Required Less the 25 Units already Installed = 9.48 New ° Voids in Gravel 20.6 cf. Units THE BOTTOM OF TIM DRY WELL SHALL BE AT LEAST 2' 9.48 C.F. x 119.2 c.f./unit =1 30 c.f. of New Stora e x Base Area 4.3 sfllf. ABOVE LEDGE ROCK OR THE WATER TABLE. Sidewall area 5.5 sf./l.f. CAPACITY SUPPLIED (8)(330XL) 8 x 119.2 C.F. = 953.6 c.f. Total filtration Area 9.8 Lf./l.f. 4. THE DRY WELL SHALL NOT BE CO IN ANY WAY (3 180HD 3 x 79.6 C.F. -- 238.8 c. Elf% Area per unit � 73.5 S.f. TO A SANITARY SEWER. SYSTEM OR F� f, Total Capacoty Supplied 1,192.4 c.f. NEW CAPACITY REEC WIRED * 1 130.0 c.f. 1,192.4 c.f, > 1,130.0 c.f. 105.5 % of Required O.K. Revised 9/26/18 SOIL STOCKPILE DETAIL STMUE ENTIM PILE- _�CONSTRUCTION SCHEDULE WITH VW471M to Gt1V . Excavat onlcom lete Water Controls B2CI1MSite StftWiwation w LDS Notify$ldg Dept. 1) ]Excavation, eonstrnc�aion& surface 1 ) Bac kfxll, topsail, seed &mulch I " # W of start at least 5 days water' controls. with salt hay, ail disturbed areas. w w �W W V, �* w� rior to Start. 2)bstall dry !Well and piping.2) Gail for iusp tion by Town at 3)Call for inspection from Town at least 2 days prior to finish of Erosion lControl Measures least 24ays prior to flush off water landsca " W W 10" w W'� w Controls &prior to backWilin , w '° � y 1) Instait max.3+6" high slot ,Wv ww w. w ,y - W w+w#W ,ryww.wi °wwa wwwv Ww wr W V WpyW W fence as per plan before Town Eack8l 41 start of construction. Town Ins eciion' Excavation `StAitPE tw tas U 2) Call for Town Inspection Inspection at least 2days prior to finish Final Inspection of erosion control measures. 1 Prepared By Larry J. Nardecchia Jr.,P.E. 21 McKinley Place Ardsley, New York 10502 (914) 693.1126 -.Nardo1126 aol.cmm.> INSTALLATION NOTES town r;,rosion Maintenance Control 1. AREA CHOSEN FOR STOCKPILING OPERA11ONSSHALL BE DR`i AND Inspection STAKE 1) Contractor to inspect silt fences r �. IUiA?tiMUM SLOPE OF THE STOCKPILING SHALL RE 1.2. after any rain causing runoff and remove any excessive sediment. 3. UPON COMPLETION OF SOIL STOCKPILING, EACH PIPE SOU SURROUNDED WITH EITHER SILT PENCINC OR STRAWRALES, THEN 2) Inspections to continue through STABILED WITH VEGITATION OR Ci# KD. Final removal of silt fence. 4. SEE DETAIL FOR INSTALLATION OF SILTFENCIw 1) All erosion coutrnl measures removed, grass established all plantings .and mdeb installed, 2)-Call for inspectim by Town at least 2 days prior to finish Stormwater & Erosion Control Plao ! so• x N } 10r // d i $ i VT WT 7 r 'o'r Mr a~ .,,,,4 VERIFY PROPERTY tJNE LDCATION y; f i 1 3* x 1 a r U / . x -_- FOR PATIO DIMENSION so T \\ a•r 3 '. ♦,g�%� 0 ! D t \ 1 N `' �... e'T 1 ! { d s•x '1{ �yWy� � Q C.) i i i O sT.6r \ \ t `, a•raxM 'u, tty Jr PtAC�ON STE }\ \\ / 40 Ek METAL MCeAIAW ttc4 \ } WOODED ARIA - ( `, =z PRt?PO5ED YtNYI FNCiOSURE t* \ ^^J/ 1N,t'RAPANE t� PRAFOSEU Keep POOL 9,1 Lo h i ! i } t\ \ \ \\ PUTDOOKStIom ROPOSED STONE TANK g ! ti RELAi ATED GENFP�ITOR ''. ` ) 0 j. cv \ sEpr WALL I$ itx. t Per mete 4a•T \ O e, \\ �i'\\ OG rr !2'CERAR 7'tp9f 1 V ° t\ tl t t x \ <\ s \\ \ Slot Drains Q * 1 (to Dry Wells •� NEM , d' N. �' \ \\ \ \\ � \` \\' ! � $ z FX.5TONE f16t ir�e,_� a% }a• •��. C13\ } i 1\ BOULDEK RETAINING ' Sion to Lot Area 32 378 111 � a° r EXf9iiNG W4OD � , t r ! } t l \ k �. . { SifPS,YO� RMAiN j STAR i tfy ! s.f. (1f ----- AR3 0.7433 Acresto ate. f1 6 p'``''p"•_V 2m r Q , I t7fl5TING WOOD DECK TO ReMAIN "`.,• J 1 \� ? I {� � '�' •' `\ ri /' J � �• � cis •$. . Govindaraj Residence tA•r <fl ' Dl. STOVE SYCP$ / s P Country G? / 1 \\ ; L. ^ REPw3FT1ONf:II NiTEiE .. rJ f; ." ' d • 157 Count • 1 , � Ridge Rd, m <, Rye Brook, N.Y. 10573 0-,.-. 4 "�!'� ! l aj. - �.....i�f bti �s s•Mri. (`\ "'� . L) E r a ail j r ..✓ {.,( , ( "_. C���,'�' `ice 4 e A 4 ' (8) 330XL R N"~ ch - -- ___ r �' ers _ ()3 18 ° nCd OHD Rechargers # 9-11 {�jj(,(t j�j} i��� A Total Stora e 1192.4 c.f. _ , rp Scale 1" 20" K. . O0 -401 ' tncn CONSTRUCTION NOTES 11 Existing330XLHD See 1. ALL WORK SHALL CONFORM TO THE NEW YORK STATE FIRE AND Cultec Rechargers Plan BUILDING CONSTRUCTION CODE AND ALL LOCAL REQUIREMENTS, Dated CODES, REGULATIONS AND ORDINANCES OF TOWN OF RYE BROOK, 14 Existing '330XLHD 10-1-•13 NEW YORK. 10573. Cultec Rechargers by P.B. 2. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS AND PEMITS IN COMPLIANCE WITH ALL LOCAL AGENCY REQUIREMENTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR. VERIFYING ALL DIMENSIONS IN THE FIELD. ANY PROBLEMS SHOULD BE BROUGHT TO THE ENGINEER'S ATTENTION THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION .INSPECTION. "'UIL F11 4. THE CONTRACTOR SHALL CALL IN A CODE 753 FOR PRIOR MARK OUT OF UNDER GROUND UTILITIES PRIOR TO START OF WORK.. 5. ALL TOPSOIL SHALL BE SCRAPED AND STOCKPILED FOR FINE GRADING September 26, 2018 L.J.N. IN THE FUTURE. ALL AREAS DISTURBED SHALT.. BE RESTORED TO ............. CONDITION 64EQUAL TO" OR BETTER THAN ORIGINAL CONDITION. NO FILL SHALL BE IMPORTED FOR THIS PROJECT. 6. AN EROSION CONTROL BARRIER SHALL BE ERECTED AROUND THE PERIMETER OF CONSTRUCTION AREAS AS SHOWN ON THE PLANS. 7. THE EXISTING DRIVEWAY SHALL BE USED AS THE CONSTRUCTION ENTRANCE. 8. A STORMWATER ANALYSIS HAS BEEN PERFORMED BY A LICENSED PROFESSIONAL ENGINEER USING A 25 YEAR STORM (6.4"), CAPTURING 100% NOF RUNOFF FROM IMPERVIOUS SURFACES ON THE LOT, OLD AND PROPOSED. TEN (10) NEW DRY WELLS SHALL BE REQUIRED PURSUANT TO THE DRAINAGE ANALYSIS SHOWN ON THESE PLANS. 9. THE POOL TERRACE SLOT DRAINS SHALL BE CONNECTED TO THE DRY WELLS WITH 4" DIAMETER SDR 35 PIPING. THE DRY WELLS SHALL HAVE POP -UPS FOR OVERFLOW EXCEEDING THE DESIGN STORMS. Rev : 9/26/18 Final `AsBuilt" Dry Well Loc. L.J.N. Rev.: 3/16/2018 Revised .Dry Well Analysis & Layout L.J.N. I IRECETYE OCT 15 2018 Stormwater & Erosion Control Plan Govindaraaaaj residence 1.57 Country Ridge Drive Rye gook, 1�.'. 1 a573 Date :_FebLugry 2 2018 Proj. No. 2018 - 06 Scale, 1" = 20' Drawn By: _jj�1. SW-1,