Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MP24-089
(t aG[.ut,�y OTC VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A.Klein (914) 939-0668 Christopher J.Bradbury www.ryebrooknv.gov TRUSTEES BUILDING & FIRE INSPECTOR Susan K Epstein Steven E. Fews Stephanie J. Fischer David M.Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE November 22,2024 Alex Patchen&Alexandra Patchen 11 Fellowship Lane Rye Brook,New York 10573 Re: 11 Fellowship Lane, Rye Brook,New York 10573 Parcel ID#: 124.72-1-12 This document certifies that the work done under Mechanical Permit #24-089 issued on 7/5/2024 for the installation of a new condenser and coil has been satisfactorily completed. Sincerely, Steven E. Fews Building&Fire Inspector /to �E BRC�j� o`` tim BUILDING DEPARTMENT ❑BUILDING INSPECTOR El ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAx (914) 939-5801 www.ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : �E ) _�� 1� - J t" DATE: L k PERMIT# ISSUED: - ,t- L I SECT: /2-`1. 77, BLOCK: LOT: I L LOCATION: O A 1rL 9L. OCCUPANCY: ❑ VIOLATION NOTED THE WORK IS... ❑ ACCEPTED ❑ REJECTED/ REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ NATURAL GAS ❑ L.P. GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER/4.V, n,C r , .i c,Co : 6 : a � w v � P-4 Lin n [ y c m a 0-4 � O cn w o = N 10, oj v v W 04 Ln ICI w Mato C ° w'v CA O CIO W e i V u u -o a 0, LI 0 pop O O 0 ce co, p -o v VZO G �y p 't ° 00 w W �Zx Ln F- = u x O WAt0v � uu l � a O {yQ; Ur1 U z a o o. o ° _p Y w z 04 d p O 0 0 ° oP. 5 °J [b W G.7 (J O V A Z W = W O w4 ' 0 D ECIE BuILDIN '.09 � RTMENT JUL - 3 2024 .. VILE*,OE oFr RV oOK 938 KLwGftET R4 8R ,NY 10573 VILLAGE OF RYE BROOK 4). _o .J BUILDING DEPARTMENT APPLICATION FOR PERMIT TO INSTALL AND/OR REMOVE HEATING, VENT11,ATION AND/OR AIR CONDITIONING EQUIPMENT FOR OFFICE USE l'E Wdl"I 177 f Approval Date. r] � 2 O Z y Permit Fee: $ Approval Signature: ��-�`a� � �'`� Other: $4,�0—hcAl Disapproved: lte'cs are non-retwidablel I)O \O 1 11 1R 1 %%ORK or('ONS.I RI (' JON t N 111. A 1'hIt1111 H \ti 81 1,\ Iti6-1 I L) M I FII: tit 11 Ulf(: 1\Sllk.0 10R. 1 11E 'k1)111\IS 1 1100l Ill-, I•FL POlt\%'ORK PROG1 R OR ( ()ItI III.).1 t l) \%111101`F A I`1 I11111 1 1S 12 OI• I I I F 101A1. COS 1'UI- CONS IRt('7'Ito\ I'll A \11\I\It 11 I I.I OF $750.00 RjEoLIRE\IENTS FOR RELEASL OF PERN11'I & Cl H 11Fl( �I E OF COMPLIANCE: I. Properly completed& Signed Application. 2. Site!Staging Plan if Required by the Building Inspector, 3. Copy of Licensed Contractor's Liability insurance. iVill:agc of Ryc Brot)k must be listed its cettiticaw holder)& Workers Compensation Insurance on a NYS Board fora) l l oran a t la5 2 nr porno tr(i26.3 'or N)'State Workers( ompen.Natton 44'ai.crI 4. Payment of Fees/Unit: RESIDENTIAL = S 100 Oil'unn • COMMERCIAL -- S15i1.00-41nit. 5. Complete specifications for each unit being installed. 6. Inspection by the Building Department for removal and/or installation. (48 hour nnlic•e required) 7. Electrical work requires a separate Electrical Permit& Electrical lnspecti011. 8. Plumbing/Gas work requires a separate Plumbing Permit & Plumbing Inspection. Application dated. srztna is hereby mad,:to the Building Inspector of the Villagc of Rye Brook for a pert-nit for the installation and or removal of the HVAC equipment as listed below. The applicant and property owner,by signing this document agrees that said equipment will be installed andlot removed in conformance Kith all applicable Local.Cuunty. State dr #-ederal laws. codes,roles and regulations. I. Address: 11 Fellowship Lane SB1 : &qr7c)—1 J4 Zone: JOU6 2. Property Owner: Alex Patchen Addre.;: 11 Fellowship Lane Phone v: __ (917y 842-5154 Cell email: alexCa patchen.com 3. Contractor: Wesco 33 Heating and Cowling Inc Address: PO Box 834 Sleepy Hollow,NY 10591 Phone>#: _Cell a: 914 882 2032 email: info@wesco53.com; krystal@wesco53.com; ryan@wesco53.com •1. Scope of Work: *tew Installation ( )- Replacenwnt (X )• Rema.val ( 1 - Other l ) 5. List Equipment: heat pump condense coil swapout & Location of Equipment: Existing locations of orginal condenser (exterior; see plot plan), furnace, and coil. LL 7. Method of Installation'Removal (::st;al t:gntptncnt mxucd to Perron"_14): Standard Procedure: no added equipment needed. STATE OF NEW YORK,COUNTY OF'WTSTCl4USTFR ) as: ,being duty awotn,deposes and states that he,she is the applicant above mined. (print name of indi,idual ssgniag as ttst applicant) and further states that Whe is the Heating.Ventilation and-or Air Conditioning Contractor for the legal owner and is duly authorized to make and file this application. That all statements contained herein are true to the best of his;her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance%%-ith the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code.,the Code ofthe Village of Rye$rook and all other applicable laws,ordinances and regulations. Sworn to before me this (S+ Sworn to before me this -?"J day of `f ( 2021 day of 4�s ,30 -2t Signature of PropertyOwner -- sienalike 4A tplieant Pri c Pr crt + Print qamc ul'Applicant Mary I'uhlu• Noia Public — CAITHEIM A. CHRISTIAN Notary Public,State of New YMA JONATHAN ME11A No.O2CH5055251 Notary Public- State of New York Qualified in Kings County No. OIME6362617 CorttfiCate filed In Kings CAu.��j�,�/11/ Qualified in Westchester County commission Expires Feb,5, 5—" My Comm. Expires Aug.7 2ols This application must be properly completed in its entirety and must iJlt lode the notarized signature(s) of the legal ovt•nerlsI of the subject property. and the applicant of record Ili the spaces pro%ided. ,any application not properly completed in its entirety and or not pry+p n-k signed shall be deemed null and void and ivilI be returned to the applicant. 2 10,3012023 r 12 Rye Br, >k-- 11 v0 i v CPO Q3� &0 Heat Gain/Loss Calculations Manual & S Report �1 1 71, A 1 Proiect; 11 Fellowship Lane Rye Brook, NY 10573 Signature.. ' Michael Hicks Date: RESNET Certified HERS Iiater ICC Certified Plans Examiner ICC Certified Energy Inspector Compliance k Specialist "i ACCA Certified HVAC Design Energy 5/21/2024 Energy Efficiency Consultants E. Efficiency Mike Hicks j MHicks.EEC@GMail.com l° Consultants, L.L.C. 845-271-9385 Energy Load Short Form Job: 11 Fellowship Lane Efficiency Entire House Date: May 22,2024 BY: Mike Hicks Consultant0s Plan: 11 Fellowship Lane Energy Efficiency Consultants PO Box661,Portlems,MY12771 Phone:845-271-9385 Email MHicks.EEC@Gmaii.com Project • • For: 11 Fellowship Lane,Rye Brook,NY 10573 Design Information Htg Cig Infiltration Outside db(OF) 14 90 Method Simplified Inside db(OF) 70 75 Construction quality Average Design TD(OF) 57 15 Fireplaces 1 (Average) Daily range - M Inside humidity(%) 30 50 Moisture difference(gdlb) 24 34 HEATING EQUIPMENT COOLING EQUIPMENT Make Bosch Thermotechnology Corp. Make Bosch Thermotechnology Corp. Trade BOSCH Trade BOSCH Model BOVB-60HDN1-M18M Cond BOVB-60HDN1-M18M AHRI ref 206396006 Coil BMA*4860DNTF AHRI ref 206396006 Efficiency 8 HSPF2 Efficiency 10.2 EER2,14.6 SEER2 Heating input Sensible cooling 45900 Btuh Heating output 56000 Btuh @ 47°F Latent cooling 8100 Btuh Temperature rise 29 OF Total cooling 54000 Btuh Actual airflow 1800 cfm Actual airflow 1800 cfm Airflowfactor 0.033 cfrnBtuh Airflowfactor 0.047 cfmBtuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Capacity balance point=18 OF Backup:Existing Furnace TG9S120D1 6MP1 1 B ROOM NAME Area Htg load Clg load HtgAVF CIgAVF (ft2) (Btuh) (Btuh) (cfm) (dm) Kitchen 396 6948 7257 231 338 Living Room 288 4147 4198 138 196 Dining Rm 168 3677 1939 122 90 Den 196 2905 1990 96 93 Foyer 168 6683 2657 222 124 Basement 496 11729 6607 389 308 M Bed 248 3849 4085 128 190 M Bath 140 3557 2228 118 104 Bath 104 872 298 29 14 Bed 2 188 3560 3316 118 155 Bed 3 176 2387 3083 79 144 WIC 1 40 739 189 25 9 WIC 2 48 100 81 3 4 Hall 132 966 416 32 19 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. - wrightsoft- 2024-May-2211:03:43 ^� Right-Suite®Llniversal202424.0.01 RSW7699...,,....................-«.. Page 1 ACCA ...ts\Wdghtsoft I PQVJesco_11 Fellowship Lane.rup Calc=W8 House Front faces:E Powder 35 2097 289 70 13 Entire House d 2823 54216 38633 1800 1800 Other equip loads 0 0 Equip.@ 0.95 RSM 36547 Latent cooling 6394 TOTALS 1 2823 54216 42941 1800 1800 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2024-May-221103:43 Right-Suite®UnNersal 2024 24.0.01 RSU07699 Page 2 / C� ...tsWightsoft HNJV-A ksm_11 Fellowship Lane.rup Calc=MJ8 House Frontfaoes:E Enei,gy Building Analysis Job: 11 Fellowship lane Date: May 22,2024 Efficicnc� Entire House By: Mike Hicks Consultants Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port JerNs,NY 12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com Project Information For: 11 Fellowship Lane,Rye Brook,NY 10573 Design Conditions Location: Indoor: Heating Cooling Westchester CountyAP,NY,US Indoor temperature(OF) 70 75 Elevation: 379 ft Design TD(OF) 57 15 Latitude: 41 ON Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(grAb) 24.2 34.2 Dry bulb(OF) 14 90 Infiltration: Daily range(OF) - 17 ( M ) Method Simplified Wet bulb(OF) - 73 Construction quality Average Wind speed(mph) 15.0 7.5 Fireplaces 1 (Average) • Component Btuh/tt2 Btuh %of load Walls 3.7 9829 18.1 Walls Glazing 26.6 11014 20.3 Doors 22.0 463 0.9 °"s Ceilings 1.5 1786 3.3 Floors 3.4 4121 7.6 Infiltration 3.6 11156 20.6 Duds 15847 29.2 Piping 0 0 Gazing Humidification 0 0 Ventilation 0 0 Adjustments 0 Othme1;;n9s nMat- Total 54216 100.0 Firs Component Btuh/ftZ Btuh %of load Walls 1.1 2862 7.4 walls Glazing 29.0 12021 31.1 Internal Gains Doors 10.8 226 0.6 Ceilings 1.3 1617 4.2 Floors 0.3 382 1.0 Glazing_ Infiltration 0.4 1314 3.4 Duds 11271 29.2 Ventilation 0 0 Internal gains 8940 23.1 Blower 0 0 Adjustments 0 other g Ducts Total 38633 100.0 �81�'"tltration Latent Cooling Load=6394 Btuh Overall U-value=0.087 Btuh/tz-'F, Window/Floor Area=14.7% Data entries checked. wrlyhtsoft- 2024-May-22 1103:43 �►tiy Right-Suite®UnNiersal 2024 24.0.01 RSIJ07699 Page 1 /1�.�T ...ts\ Afightsoftl FQVVesm_11 Fellowship Lane.rup Calc=MJ8 House Front faces:E Encrgi Project Summary Job: 11 Fellowship Lane Date: May 22,2024 Efficiency Entire House W. Mike Hicks consultants Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box661,PortArvis,NY12771 Phone.845-271-9385 Email:MHidcs.EEC@Gmail.com Project Information For: 11 Fellowship Lane,Rye Brook,NY 10573 Notes: Design Information Weather: Westchester County AP,NY,US Winter Design Conditions Summer Design Conditions Outside db 14 °F Outside db 90 °F Inside db 70 °F Inside db 75 °F Design TD 57 °F Design TD 15 °F Daily range M Relative humidity 50 % Ventilation Method ASHRAE 62.2-2016 Moisture difference 34 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 38369 Btuh Structure 27362 Btuh Duds(R-8.0) 15847 Btuh Ducts(R-8.0) 11271 Btuh Central vent(0 dm) 0 Btuh Central vent(0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 54216 Btuh Use manufacturer's data n Rate/swing multiplier 0.95 Infiltration Equipment sensible load 36547 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 4003 Btuh Duds 2391 Btuh Heatin Cooli Central vent(0 cfm) 0 Btuh g ng Area(f:2) 282g 2823 Equipment latent load 6394 Btuh Volume(fN) 23704 23704 Air changes/hour 0.46 0.21 Equipment Total Load(Sen+Lat) 42941 Btuh Equiv.AVF(cfm) 182 83 Req.total capacity at 0.85 SHR 3.6 ton Heating Equipment Summary Cooling Equipment Summary Make Bosch Thermotechnology Corp. Make Bosch Thermotechnology Corp. Trade BOSCH Trade BOSCH Model BOVB-60HDN1-M18M Cond BOVB-60HDN1-M18M AHRI ref 206396006 Coil BMA*4860DNTF AHRI ref 206396006 Efficiency 8 HSPF2 Efficiency 10.2 EER2,14.6 SEER2 Heating input Sensible cooling 45900 Btuh Heating output 56000 Btuh @ 47-F Latent cooling 8100 Btuh Temperature rise 29 °F Total cooling 54000 Btuh Actual air flow 1800 cfm Actual air flow 1800 cfm Airflowfactor 0.033 cfm/Btuh Airflowfador 0.047 dmBtuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Capacity balance point=18*F Backup:Existing Furnace TG9S 1 20D1 6MP1 1 B Input=120000 Btuh, Output=114000 Btuh,95.5AFUE Calculations approved byACCA to meet all requirements of Manual J 8th Ed. t wriyhtsofF� •�-••• -•--. ..., Poght-Suit W 2024-May-2211:03.43 e®Universa1202424.0.01 RS7699 A!�r--#, ...ts\V1Jnghtsoft H\FQVVesoo_11 Fellowship Lane.rup Calc=MJ8 House Frontfaoes: E Pagel Energy Right-JO Worksheet Job: 11 Fellowship Lane ElRderK' Entire House Date: May22,2024 Consultants Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jervis,NY 12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com 1 Room name Entire House 1,Wnen 2 Exiposed wall 365.0 ft 40.0 ft 3 Room height 8.4 ft d 8.0 ft heat/000l 4 Room dimensions 22.0 x 18.0 ft 5 Room area 2823.0 fF 396.0 fY Ty Construction U-value Or HTM Area (M Load Area (n Load number (BtuhAF--°F) (Btuh/fF) or perimeter (fU (Btuh) or perimeter (fq (Btirh) Heat Cod Gross N/P/S Heat Cool Gross NiP/S Heat Cod 6 kt12F-09w 0.065 n 3.67 1.07 768 732 2688 783 0 0 0 0 � 4A5-2ov 0.470 n 26.56 1025 36 0 956 369 0 0 0 0 W 12F-0sv 0.065 a 3.67 1.07 788 616 2263 659 0 0 0 0 4A5-2ov 0.470 a 26.56 30.83 151 0 4003 4647 0 0 0 0 11 11DO 0.390 a 22.03 10.78 21 21 463 226 0 0 0 0 V,11 12F-09w 0.065 s 3.67 1.07 768 755 2771 807 144 144 529 154 -G 4AS-2ov 0.470 s 26.56 17.98 14 0 358 243 0 0 0 0 W 12F-09,v 0.065 w 3.67 1.07 788 574 2106 613 176 112 409 119 4AS-2ov 0.470 w 26.56 30.83 131 0 3465 4023 23 0 597 694 4A5 2ovd OA70 w 26.56 30.83 84 0 2231 2590 42 0 1115 1295 C 1613-38ad 0.026 1.47 1.33 1216 1216 1786 1617 0 0 0 0 F 20P-19w 0.050 2.83 0.56 685 685 1935 382 396 396 1119 221 F 22B-10tpm 0.355 20.06 0.00 531 109 2186 0 0 0 0 0 6 c)AEDexcursion 149 292 Emelope Iossrgain 27213 17108 3770 2775 12 a) InfiMaton 11156 1314 1147 135 b) Room ventilation 0 0 0 0 13 Intemalgains Occupants@ 230 1840 1 230 Applianoes/other 7100 2000 Subtotal(lines 6 to 13) 38369 27362 4917 5140 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 38369 27362 4917 5140 15 Duct loads 41% 41%1 15847 11271 41% 41%1 2031 2117 Total room load 54216 38633 6948 7257 Air required(dm) 1800 1800 231 338 Calculations approved byACCA to meet all requirements of Manual J 8th Ed -via- wrlgrvvwcx t- 2024-May-2211:03:43 - Right-Suite@ Universal 202424.0.01RSU07699 Page tsNWYightsoftHWC\Wesoo_11 Fellowship Lane.rup Calc=MJ8 HouseFrontfaces:E Energ) Right-J(9) Worksheet Job: 11 Fellowship Lane Efficient-) Entire House Date: May 22,2024 Consultant' Mike Hicks lan: Energy Efficiency Consultants P 11 Fellowship Lane PO Box 661.Port Jervis,NY 12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com 1 Room name Li nrlg Room Dining Rm 2 Exposed wall 34.0 ft 26.0 ft 3 Room height I 8.0 ft heat/000l I 8.0 ft heat/cool 4 Roomdimensions 16.0 x 18.0 ft 12.0 x 14.0 ft 5 Room area 288.0 fF 168.0 ft Ty Construction U-value Or HTM Area (ft) Load Area (ft') Load number (Btuh/ft'-'IF) (Btuh/fl') or penmeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6t-G12F-0sw 0.065 n 3.67 1.07 144 144 529 154 0 0 0 0 4A5-2ov 0.470 n 26.56 1025 0 0 0 0 0 0 0 0 IW - 12F-0sw 0.065 e 3.67 1.07 0 0 0 0 96 69 253 74 _D 4A -2ov 0.470 e 26.56 30.83 0 0 0 0 27 0 717 832 11 -D 11DO 0.390I e 22.03 10.78 0 0 0 0 0 0 0 0 12F --G42F�0sw 0.065I w �3.6 11.98 120 87 320 93 1100 1100 4110 1200I C 4A5-2ovci I 0.470I w 26.56 30.83 41I 0 10851 1260I 0 0 0 0 0.470 w 26.56 30.83 0 0 0 0 0 0 0 0 C 168,38ad 0.026 1.47 1.33 0 0 0 0 0 0 0 0 F 20P-19w 0.050 2.83 0.56 9 9 25 5 168 168 475 94 IF22B-10gpm I 0.355 I 20.06 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 216 -64 Envelope loss/gain 1960 1728 1856 1056 12 a) Infiltration 975 115 746 88 � b) Room ventilation 10 0 0 0 13 Intemal gains Occupants 230 230 1 230 Appliances/other 900 0 Subtotal(lines 6 to 13) 2935 2973 2602 1374 Less external load 01 0 1 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2935 2973 2602 1374 15 Dud loads 41% 41% 1212 1225 41% 41% 1075 566 Total room load 4147 4198 3677 1939 Air required(cfm) 138 196 122 90 Calculations approved byACCA to meet all requirements of Manual J 8th Ed �* wrigF>atsoft 2024-May-2211:03:43 Right-Suite(E)Universal 2024 24.0.01 RSW7699 Paget is\VvtightsoftHVzQVksoo_11 Fellowship Lane.rup Calc=MJ8 HouseFrontfaces E Energ). Right-J® Worksheet Job: 11 Fellowship Lane EM,i nc) Entire House Date: May22,2024 Consultants Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661.Port Jervis,NY 12771 Phone:845-271-9385 Email.MHidcs.EEC@Gmail.com 1 1 Room name Den Foyer 2( Exposed wall 14.0 ft I 26.0 ft 3 Room height 8.0 ft heat/cool 14.7 ft heat/cool 4 Room dimensions 14.0 x 14.0 ft 12.0 x 14.0 It 5 Room area 196.0 ft 168.0 ft Ty ConsUuchon U-value Or HTM Area (ft2) Load Area (ft� Load number (Btuh/It=--°F)I (Btuh/ft) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Val 12F-0sw 0.065 n 3.67 1.07 0 0 0 0 224 199 732 213 I—C 4AS-2ov 0.470 n 26.56 10.25 0 0 0 0 25 0 657 254 W 12F-0sw 0.065 e 3.67 1.07 112 72 263 76 176 126 462 134 11 E2 4 D2ov 0.390 e 22.03 10.778 40 0 1070 1240 211 211 463 226 —G 42F-Osw 0.065 w 67 11.07 0 0 0 0 0 0 0I 0 — G 01 4A5-2oed 0.470 w I 26.56 30.83 083 01 0 0 0 0 0 0 0 C 1613-38ad 0.026 1.47 1.33 0 0 0 0 140 140 206 186 F 22B-10tpm 0.355 2006 0.00 110 110 310 60 0 0 OI 0 6 c)AEDexcursion -26 -203 Envelope loss/gain 1654 1362 3296 1713 12 a) Infiltration 401 47 1434 169 b) Room ventilation 10 0 0 0 13 Internal gains Ooz:upants@ 230 0 0 01 0 Appliances/other 0 10 Subtotal(lines 6 to 13) 2056 1409 4730 1882 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2056 1409 4730 1882 15 Ductloads 41% 41% 849 580 41% 41% 1954 775 Total room load 2905 1990 6683 2657 Air required(cfrn) 96 93 222 124 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoTt 2024-May-2211:03:43 AC�A Right-Suite®Universal 2024 24.0.01 RSU07699 Page 3 is\V\kightsoftHVC\VIk9m_11 Fellowship Lane.rup Calc=MJ8 House Front faces: E Enema Right-JO Worksheet Job: 11 Fellowship Lane Effi```ne) Entire House Date: May22,2024 Consultants IBy Mike Hicks Energy Efficiency Consultants Pfan: 11 Fellowship Lane PO Box 661,Port Jervis,NY 12771 Phone:845-271-9385 Email.MHicks.EEC@Gmail.com 1 Room name Basement M Bed 3 Room l 90.0 ft 30.0 ft om height 8.0 ft heaVcool I 8.0 ft heaVcool 4 Room dimensions 15.5 x 32.0 ft 1.0 x 248.0 ft 5 Roomarea 496.0 ft 248.0 ft' Ty Construction U-value Or HTM Area (ft) Load Area number (Btuh/ft�--"F) (Btuh/ftz) or perimeter (ft) (Btuh or (� Load penmetEr (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N!P/S Heat Cool 6 W 12F Osv 0.065 n 3.67 1.07 256 256 940 274 112 112 411 120 L—G 4AS2ov 0.470 in 26.56 10.25 0 0 0 0 0 0 0 0 -T W _ 12F-OsN IL0.065 e 3.67 1.07 124 124 455 133 0 0 0 0 4AS2ov 0.470 e 26.56 30.83 0 0 0 0 0 0 0 0 11 DDT 111 DO 0.390 e 22.03 10.78 0 0 0 04A5 0 0 0 0 16 31 W. I12F-12F0 0.ov �0 w 11.08 1.07 ?24 269 252 2703 128 10� 370 100 Lj4A5-2oKi I 0.470 w 26.56 30.83I 42 0 1115 1295 20I 0 710 830 C 1613-38ad 0.026 1.471 1.331 0 0 0 0 248 248 364 330 0560 F 22B-10tpm 0.355 20.06 0. 4960 90 1805 0 OI 0 0 0 6 c)AED excursion 224 42 Envelope lossigain 5719 2645 1864 1432 12 a) Infiltration 2581 304 860 101 b) Room ventlation 0 0 0 0 13 Internal gains Ocaipants@ 230 1 230 2 460 Applianoes/other 15001 1 1 1 900 Subtotal(lines 6to 13) 8300 4679 2724 2894 Less external load 0 0 01 0 Less transfer 0 0 0 0 Redistnbubon 0 0 0 0 14 Subtotal 8300 4679 2724 2894 15 Dud loads 41% 41°/ 3428 1927 41% 41% 1125 1192 Total room load 11729 6607 3849 4085 Air required(dm) 389 308 128 190 Calculations approved byACCA to meet all requirements of Manual J 8th Ed _ �'* wrtgF�tsoTt 2024-May-2211:03:43 Right-Suiteu Universal 202424.0.01 RSU07699 Page ACC*,` ._tsWightsoft H\AC\Wesco_ll Fellowship Lane.rup Calc=MJ8 House Frontfaces:E Right-J® Worksheet Job: 11 Fellowship Lane Entire House Date: May 22,2024 Carnultants Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jervts,NY12771 Phone:845-271-9385 Email.MHicks.EEC@Gmail.com 1 Room name M Bath Bath 2 Fposed wall 24.0 ft 8.0 ft 3 Room height 8.0 ft heaUcool 8.0 ft heaV000l 4 Room dimensions 14.0 x 10.0 ft 1.0 x 104.0 ft 5 Room area 140.0 ft' 104.0 ft Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/fe--T) (BtuW or perimeter (ft) (Btuh) or penmeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Uhl 12F-09v 0.065 n 3.67 1.07 0 0 0 0 0 0 0 0 I—C 4A5-2ov 0.470 n 26.6 1025 0 0 0 0 0 0 0 0 W 12F-OsN 0.065 e 3.67 1.07 0 0 0 0 0 0 0 0 11 1 11 O I 0.390 e 22.03 10.78 0 0 0 0 0 0 O 0 IW 12F OsN 0.065 s 3.67 1.07 80 67 244 71 64 64 235 68 �—G 4A5.2ov 0.470 s 26.6 17.98 14 0 358 243 0 0 0 0 W� G 12F-09N 0.065 w 3.67 1.07 112 85 314 91 0 0 0 0 L—G 4A5-2ovd 0.470 w 26.56 30.83I 2 70 82 0 0 0 0 0 OI 0 OI 0 C 16B-38ad 0.026 1.47 1.33 140 140 206 1116 104 104 153 1311 F 20P-19w 0.050 2.83 0.6 0 0 0 0 0 0 0 0 F 22B•10tpm 0.355 20.06 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 85 -23 Envelope lossigain 1829 1497 388 184 12 a) Infiltration 688 81 229 27 b) Room ventilation 0 0 0 0 13 Internal gains. Oa Apants@ 230 0 0 01 0 Applianoes/other 0 0- Subtotal(lines 6 to 13) 2517 1578 617 211 Less extemal load 0 0 1 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2517 1578 617 211 15 Duct loads 41% 41% 1040 650 41% 41% 255 87 Total room load 3557 2228 872 298 Air required(cfm) 118 104 29 14 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. - wrigt�tsott'� - - ----- Right-SuiteU Universal 202424.0.01 RS1107699 2024-May-2211:03:43 'C Pages Cp` ...ts\WrightsoftH\PQV*sco_11 Fellowship Calc=MJ8 House Front faces E Eneg' Right-JO Worksheet Job: 11 Fellowship Lane rm i n, Entire House Date: May 22,2024 BByy Mike Hicks Energy Efficiency Consultants Pfan: 11 Fellowship Lane PO Box 661,Port Jervis,NY12771 Phone:845-271-9385 Email:MHichs.EEC@GmaiLcom 1 I Room name Bed 2 Bed 3 3 I Room height l 14.0 ft I 8.0 ft 28.0 ft heat/cool I 8.0 ft heat/oOol 4 Room dimensions 1.0 x 188.0 ft 1.0 x 176.0 ft 5 Room area 188.0 ft' 176.0 ft' Ty Construction U-value Or HTM Area (ft') Load Area number (Btuh/ft=-°F) (Btuh/f 2) or perimeter (ft) (Btuh) or (� Load perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 12F-09w 0.065 n 3.67 1.07 0 O 0 0 0 0 0 0 4A5-20v 0.470 n 26.56 10.25 0 0 0 0 0 0 0 0 W 12F-Osw 0.065 e 3.67 1.07 112 85 312 91 112 851 312 91 4AS20v 0.470 e 26.56 30.83 27 0 717 832 27 0 717 832 1 1 D 11 DO 0.390 e 22.03 10.78 0 0 0 0 0 0 0 0 12F WL-G _Ossw 0.0605 w 23.6 11.07 1120 1120 4110 120 0 0 0 O 4A5-2ovd 0.470I w l 26.56 30.831 OI 0 0 OI OI 0 0 0 0 0 0 C 16B-38ad 0.026 1.47 1.33 188 188 276 250 176 176 259 234 F 20P-19w 0.050 2.83 0.56 0 0 0 0 0 0 0 0 F 2213-10tpm 0.355 I 20.06 0.00 0 0 0 0 0 0 0 0 6 c)AED exairsion -169 -151 Envelope loss/gain 1717 1124 1288 1006 12 a) Infiltration 803 95 401 47 b) Room ventilation 0 0 0 0 13 Intemalgains: Occupants@ 230 230 1 230 Applianoes/other 9001 1900 Subtotal(lines 6 to 13) 2520 2349 1689 2183 Less external load 0 01 1 1 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2520 2349 1689 2183 15 Dud loads 41% 41% 1041 967 41% 41% 698 899 Total room load 3560 3316 2387 3083 Air required(cfm) 118 155 79 144 Calculations approved byACCA to meet all requirements of Manual J 8th Ed _ '*'}� wrigF�tsoft Right-Suitev 2024-May-2211:03:43Universal 2024 24.0.01 RSU07699...ts\V\kightsoft H\A \Wesco_11 Fellowship Lane.rup Calc=MJ8 House Frontfaces: E Page 6 �E°erl;3 Right-ME) Worksheet Job: 11 Fellowship Lane Efrwi Date: May 22,2024 Entire House BByy Mike Hicks Energy Efficiency Consultants Pfan: 11 Fellowship Lane PO Box 661,Port Jervis,NY 12771 Phone.845-271-9385 Email:MHicks.EEC@Gmail.crom 1 1 Room name W1C 1 W1C 2 2 Exposed wall 8.0 ft O ft 3 Room height 8.0 ft heat/cool I 8.0 ft heat/cool 4 Room dimensions 8.0 x 5.0 It 8.0 x 6.0 ft 5 Room area 40.0 ft' 48.0 ft Ty Construction U-value Or HTM Area (ft� Load Area (ft2) Load number (BtuhRtl--F) (Btuh/1P) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 12F-09N 0.065 n 3.67 1.07 0 0 0 0 0 0 0 0 L-G 4A5-20v 0.470 n 26.56 10.25 0 0 0 0 0 0 0 0 W 12F-0sw 0.065 e 3.67 1.07 0 0 0 0 0 0 0 0 4AS2ov 0.470 e 26.56 30.83 0 0 0 0 0 0 0 0 11 D 11 DO 0.390 e 22.03 10.78 0 0 0 0 0 0 0 0 W 12F-0sv 0.065 s 3.67 1.07 0 0 0 0 0 0 0 0 4AS2ov OA70 s 26.56 17.98 0 0 0 0 0 0 0 0 W 12F-Osv 0.065 w 3.67 1.07 64 64 235 68 0 0 0 0 4A5-2ov 0.470 w 1 26.56 30.83 0 0 0 0 0 0 0 0 4AS2ovd 0.470 w 26.56 30.83 0 0 0 0 0 0 0 0 C 1613-38ad 0.026 1.47 1.33 40 40 59 53 48 48 71 64 F 20P-19w 0.050 2.83 0.56 0 0 0 0 0 0 0 0 F 22&10¢1m 0.355 20.06 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion -14 -6 Envelope loss/gain 294 107 71 58 12 a) Infiltration 229 27 0 0 b) Room ventilation 10 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal(lines6 to 13) 523 134 71 58 Less extemal load 01 01 1 1 01 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 523 134 71 58 15 Duct loads 41% 41% 216 55 41°/ 41% 29 24 Total room load 739 189 100 81 Air required(clm) 25 9 3 4 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wr7gF�tsoft 2024-May-2211:03:43 - -- - Right-SuiteG Universal 2024 24.0.01 RSU07699 Page 7 ...ts\Wrightsoft HVPOWesco_11 Fellowship Lane.rup Calc=MJ8 House Frontfaces: E Ene,.g,. Right-J® Worksheet Job: 11 Fellowship Lane Flncieney Date: May 22,2024 Consultants Entire House I Mike Hicks lan: Energy Efficiency Consultants P 11 Fellowship Lane PO Box 661,Port Jervis,NY12771 Phone:845-271-9385 Email:MHidcs.EEC@Gmail.com 1 Room name Hall Powder 2 Exposed wall 4.0 ft 19.0 ft 3 Room height 8.0 ft heaUcuol 8.0 ft heat/ocol 4 Room dimensions 1.0 x 132.0 ft 7.0 x 5.0 ft 5 Room area 132.0 ft2 35.0 ft Ty Construction U-value Or HTM Area (ft) Load Area (r Load number (Btuh/R'-°F) (Btuh/ft=) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 12F-0sw 0.065 n 3.67 1.07 32 21 76 22 0 0 0 0 VG 4AS2ov 0.470 n 26.6 1025 11 0 299 115 0 0 0 0 W 12F-0sw 0,065 e 3.67 1.07 0 0 0 0 656, 206 60 L11 4A O 0.390 e 22.03 10.778 0 0 0 0 0 0 0 0 0 UV 12F-0sw 0.065 s 3.67 1.07 0 0 0 0 40 40 147 43 I-G 4A5-2ov 0.470 s 26.6 17.98 0 0 0 0 0 0 0 0 W�-G 12F-0sni 0.065 w 3.67 1.07 0 0 0 0 6 56 206 60 --GI4A5-2ovd 0.470 w 26.6 30.83 0 0 0 0 0 of 0I 0 0 C 16B-38ad 0.026 1.47 1.33 132 132 194 176 0 0 0 0 F 20P-19w 0.050 2.83 0.6 0 0 0 0 0 0 0 0 F 22B-10tpm 0.355 20.06 0.00 0 0 0 0 35 19 381 0 6 c)AEDexcursion -32 -22 Envelope loss/gain 569 281 939 140 12 a) Infiltration 115 14 545 64 b) Room venfilation 0 0 0 0 13 Intemal gains. Occupants@ 230 0 0 01 0 Appliances/other 0 0 Subtotal(lines 6tto13) 684 295 1484 205 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 684 295 1484 205 15 Ductloads 41% 419,0 282 121 41% 41% 613 84 Total room load 966 416 2097 289 Air required(cfm) 32 19 70 13 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �"� wrights_pTt.4CCA W 2024-May-2211:03:43 Right-Suite®Universa1202424.0.01 RSU07699 Page8 ...ts\Nkightsoft H\PQWesco_11 Fellowship Lane.rup Calc=MJ8 House Frontfaces:E Enerp Right-J80 Form A Job: 11 Fellowship Lane ElMcie°" Entire House Date: May 22,2024 Consultants By Mike Hicks Energy Efficiency Consultants Pfan: 11 Fellowship Lane PO Box 661,Port Jervis,NY12771 Phone.845-271-9385 Email:MHicks.EEC@Gmail.com 1 NameofRoom Entire House Kitchen 2 Running Feetof Exposed Wall 365.0 ft 40.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) I 8.4 ft 6728.3 ft2 8.0 ft 640.0 ft2 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 2823.0 ft2 22.0 x 18.0 ft 396.0 ft2 5 Ceiling Slope(Deg.)and Gross CeilingArea(SgFt) 0 2963.0 ft2 0 396.0 ft' Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating SCIg L-Clg Heating SCIg L-Clg 6 all iaz 0 7 4A5-2ov n 26.56 10.25 36 956 369 0 0 0 Wall 12F-0sw e 3.67 1.07 788 2263 659 0 0 0 11 Door 4AD02ov e 22.03 10.e 26.56 88 121 51 44636 0 I 0 0 Wall 12F-0sw s 3.67 1.07 768 2771 807 144 529 154 laz 4A5-2ov s 26.56 17.98 14 358 243 0 0 0 Wall 12F-09v w 3.67 1.07 788 2106 613 176 409 119 az 4A5-2ov w 26.56 30.83 131 3465 4023 23 597 694 Glaz I4A5-2ovd w 26.56 30.83 I 84 2231 2590 I 42 I 1115 1295 Cal 1613-38ad 1.47 1.33 1216 1786 1617 0 0 0 Flor 20P-19w 2.83 0.56 685 1935 382 396 1119 221 For 226 10tpm I 20.06 0.00 531 2186 0 0 I 0 0 Infiltration Heating Load(Btuh) 0.46 11156 1147 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.21 1.00 1314 0.10 135 Latent Load(Btuh) 1903 Intemal a Occupants at 230 and 200 Btuh 1840 1600 1 230 200 b Scenario number 0 0 13 c DefaultAdjuslments d C ustom Appliances 7100 5110 2000 0 e Plants 0 0 14 Subtotals Sum lines6through 12 38369 27362 4003 4917 5140 Dud EHLF&ESGF 0.413 0.412 15847 11271 2031 2117 15 Loads ELG 2391 335 16 ventilation Loads Vent Cfm 0 E Cfm 0 0 0 0 17 Winter Humidification Load GaIDay 0 0 18 Piping Load 0 19 Blower Heat 0 20 AED Excursion&Latent Moisture Migration Load 149 292 21 Total Load Sum lines 13 through 19 54216 38633 6394 6948 7257 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. ` -�- wrlgFatsotft 2024-May-2211:03:44 AC�A - --• - Right-Suitee,Universal 202424.0.01RSU07699 Page Ls\WF ghtsoft H\PG\Wesm_11 Fellowship Lane.rup Calc=MJ8 House Frontfaces:E Energy Right-A@ Form A Job: 11 Fellowship Lane EMCi ne) Entire House Date: May 22,2024 Consultants BByy Mike Hicks Energy Efficiency Consultants Pfan: 11 Fellowship Lane PO Box 661,Port Jervis,NY 12771 Phone.845-271-9385 Email:MHicks.EEC@Gmail.com 1 NameofRoom Living Room DiningRm 2 Running FeetofExposed Wall 34.0 ft 26.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 544.0 ft2 8.0 ft 416.0 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 16.0 x 18.0 ft 288.0 ft' 12.0 x 14.0 ft 168.0 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 288.0 fF 0 168.0 ft Type of Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 all laz 4A5-2ov n 26.56 10.25 1 0 44 520 1 0 0 0 0 Wall 12F-0sv e 3.67 1.07 0 0 0 96 253 74 Glaz 11 ED= 11D02ov e 22.03 I 10.78 0 0 0 20 I 710 830 (WIall � 12F-09N s 3.67 1.07 0 0 0 112 411 120 t-Glaz 4A5-2ov s 26.56 17.98 0 0 0 0 0 0 Wall 12F-09N W 3.67 1.07 128 320 93 0 0 0 tlaz 4A5-2ovd W 26.56 30.83 1080 1260 0 0 0 Ceil 168-38ad 1.47 1.33 0 0 0 0 0 0 Floc 20P-19w 2.83 0.56 9 25 5 68 475 94 Flo" 22B 10tpm 20.06 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 975 746 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.09 115 007 88 0.21 Latent Load(Btuh) Internal a Occ pantsat230 and 200 Btuh 230 200 1 230 200 b Soenano number 0 0 13 c DefaultAdjusments d Custom Appliances 900 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 2935 2973 2602 1374 Duct fELG HLF&ESGF 0.413 0.412 1212 1225 1075 566 15 Loads 244 142 16 Ventilaton Loads \,entCfm 0 E Cfrn 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat f21 0 AED Excursion&Latent Moisture Migration Load 216 -64 Total Load Sum lines 13 through 19 4147 4198 3677 1939 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. �'}� wrigF�tsoft Right-SuiteC 2024-May-2211:03:44�Universa1202424.0.01 RSU07699 Paget is\Wrightsoftl PQViibsco_11 Fellowship Lane.rup Calc=MJ8 HouseFrontfaces:E El�eig, Right-J80 Form A Job: 11 Fellowship Lane Date: May22,2024 Entire House c<,:vvlcP,a E Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661.Port Jells,NY 12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com 1 1 Name of Room Den Foyer 2 Running Feet of Exposed Wall 14.0 It I 26.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 448.0 fle 14.7 ft 589.3 ft' 4 Room Dimensions(Ft)and Floor PlanArea(SgFt) 14.0 x 14.0 ft 196.0 ft2 12.0 x 14.0 ft 168.0 ft2 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 196.0 fF 0 308.0 fh Type of Com, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating SCIg L-Clg 6 Wall 12F-09N n 3.67 1.07 0 0 0 224 732 213 laz 4A5-2ov n 26.56 10.25 0 0 0 25 657 254 Wall 12F-O%N e 3.67 1.07 112 263 76 176 462 134 11 Door 4A O e 22.03 10.e 26.56 88 410 I 07 1249 00 0 I 211 463 226 Wall 12F-Osw s 3.67 1.07 0 0 0 0 0 0 Iaz 4A5-2ov s 26.56 17.98 0 0 0 0 0 0 wall 12F-09N w 3.67 1.07 0 0 0 0 0 0 E Claz 4A5-2ovd w 1 26.56 30.83 0 0 0 0 I 0 0 Ceil 1613-38ad 1.47 1.33 0 0 0 140 206 186 Flor 20P-19w 2.83 0.56 112 316 62 0 0 0 Flor 22B-10tpm 20.06 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 401 1434 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.04 47 0.13 169 0.21 Latent Load(Btuh) 13 Internal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scenano number 0 I O c DefaultAdjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 2056 1409 4730 1882 Duct EHLF&ESGF OA13 0412 849 580 1954 775 15 Loads ELG 166 142 16 Ventilation Loads \,ant Cfm 0 E Urn 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -26 203 21 Total Load Sum lines 13 through 19 2905 1990 6683 2657 _ Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -�"� wrlyhYsoTt 2024-May-2211:03:44 -- - - Right-Suiteg Universal 2024 24.0.01 RSU07699 Page 3 '�� ...ts\WrightsoftHINGVWesoo_11 Fellowship Lane.rup Calc=MJ8 HouseFrontfaces:E En ,g, Right-J80 Form A Job: 11 Fellowship Lane EfTici" Entire House Date: May22,2024 toroal`a"" By Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jervis,NY 12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com 1 NameofRoom Basement MBed 2 Running Feetof Exposed Wall 90.0 ft 30.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 760.0 ft' 8.0 ft 608.0 ft2 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 15.5 x 32.0 ft 496.0 ft 1.0 x 248.0 ft 248.0 ft2 5 Ceiling Slope(Deg.)and Gross CeilingArea(SgFt) 0 496.0 ft' 0 248.0 ft' Type of Const, Panel HTM Area or Btuh Area or Stun Exposure Number Faces Length Length Htg. Clg, Heating SCIg L-Clg Heating SCIg L-Clg 6 Wall 12F-0sw n 3.67 1,07 256 940 274 112 411 120 laz 4A5-2ov n 26.56 10.25 0 0 0 0 0 0 Wall 12F-09N e 3.67 1.07 124 455 133 0 0 0 1-GI.Doo 11DO v e 26.56 e 22.03 10.78 0 0 0 I 0 0 0 11 �j�D�oor 11D0 �Glaz 4A5-2ov s 26.56 17.98 12F-0sw 3.67 1.07 210 790 230 0 0 0 Wall 12F-09N w 3.67 1.07 124 252 73 128 371 108 3416 Elaz 4A5-2o\d I W 26.56 30.83 42 115 1295 20 I 710 I 830 Ceil 16B-38ad 1.47 1.33 0 0 0 248 364 330 Flor 20P-19w 2.83 0.56 0 0 0 0 0 0 Flor 22B-10gxn 20.06 0.00 4960 1805 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 2581 860 EffectWAR WAR 12 I Sensible Load(Btuh) ACH 0.23 304 0,08 101 0.21 Latent Load(Btuh) Intemal a Occupants at 230 and 200 Btuh 1 230 200 2 460 400 b Scenano number 0 I 0 13 c DefaultAdjustments d Custom Appliances 1500 0 900 0 e Plants 0 0 14 Subtotals Sum lines through 12 8300 4679 2724 2894 Dud EHLF&ESGF 0.413 0,412 3428 1927 1125 1192 15 Loads ELG 420 210 16 Mentilation Loads Vent Cfm 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load 224 42 21 Total Load Sum lines 13 through 19 11729 6607 13849 4085 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. �'}� wrigF�tsoft ACCA - -- Right-SuiteU 2024-May-2211:03:44Universa1202424.0.01 RSU07699 Page4 ._IWiW ightsoft-MG\Wesoo_11 Fellowship Lane.rup Calc=MJ8 House Front faces E >nclg:i Right-J8® Form A Job: 11 Fellowship Lane rm"`w) Date: May 22,2024 Entire House By Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jeros.NY12771 Phone:845-271-9385 Email.MHicks.EEC@Gmail.com 1 NameofRoom I MBath Bath 2 Running FeetofExposed Wall 24.0 ft 8.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 384.0 ftz 8.0 ft 333.3 ftz 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 14.0 x 10.0 ft 140.0 ft" 1.0 x 104.0 ft 104.0 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 140.0 ft' 0 104.0 ft' 7 Type of Const., Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating SCIg L-Clg Heating SCIg L-Clg 6 Vnlaz 4A5-20v n 26.56 1025 0 0 0 0 0 0 Wall 12F-09N e 3.67 1.07 0 0 0 0 0 0 laz 11 [ppG 4A o2ov e 22.03 16 10.88 0 0 0 O I 0 0 W�all � 12F-0sw s 3.67 1.07 80 244 71 64 235 68 Wall G'laz 4 F-0sN w 26.56 3.67 11.07 112 314 291 0 0 0 2 a-z 4AI-2ovd w I 26.56 30.83 0 700 820 I 0 0 0 Cell 1613-38ad 1.47 1.33 140 206 186 104 153 138 Flor 20P-19w 2.83 0.56 0 0 0 0 0 0 Flor 22B-101pm 20.06 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 688 229 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.06 81 0.02 27 0.21 Latent Load(Btuh) Intemal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scenario number 0 I 0 13 c DefaultAdjuslments d CustomApplianoes 0 250 0 250 e Plants 0 0 14 Subtotals Sum lines6 through 12 2517 1578 617 211 Dud EHLF&ESGF 0.413 0.412 1040 650 255 87 15 Loads ELG 119 88 16 Ventilation Loads \L tCfm 0 E Cfm 0 17 Winter Humidificaton Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Exa s on&Latent Moisture Migration Load 85 -23 21 Total Load Sum lines 13 through 19 3557 2228 872 298 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. - wrigl�tsoTt 2024-May-2211:03:44 -- -- - Right-Suitee Universal 2024 24.0.01 RSU07699 Pages is\WFightsoft H\PQWesm_11 Fellowship Lane.rup Calc=MJ8 House Frontfaces:E Enema. Right-J80 Form A Job: 11 Fellowship Lane rro"`nc) Entire House Date: May22,2024 Comultants By Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661.Port Jervis,NY 12771 Phone:845-271-9385 Email:MHid<s.EEC@Gmail.00m 1 Name of Room Bed 2 Bed 3 2 Running Feet of Exposed Wall 28.0 ft 14.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 429.3 ft2 8.0 It 429.3 ft2 4 Room Dimensions(Ft)and Floor PlanArea(SgFt) 1.0 x 188.0 ft 188.0 fP 1.0 x 176.0 ft 176.0 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 188.0 ft2 0 176.0 ft2 Type of Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg, Clg. Heating S-Clg L-CIg Heating SCIg L-Clg hw, aWj II _laz 4AS2ov n 26.56 10.25 0 0 0 0 0 0 all) 12F-Osw e 3.67 1.07 112 312 91 112 312 91 �laz 4A5 2ov e 26.56 30.83 27 717 832 27 717 832 1 1 Door 11 DO I e 22.03 10.78 0 0 0 0 I 0 0 W. - 12F-0sw s 3.67 1.07 112 411 120 0 0 0 t-Glaz 4A5-2ov s 26.56 17.98 0 0 0 0 0 0 Wall 12F-09w w 3.67 1.07 0 0 0 0 0 0 Elaz 4A5-2oid w I 26.56 30.83 I 0 0 0 0 0 0 Ceil 1613-38ad 1.47 1 1.33 188 276 250 176 259 234 Flor 20P-19w 2.83 0.56 0 0 0 0 0 0 Flor 22B-10tpm 20.06 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 803 401 Effect WAR 'WAR 121 Sensible Load(Btuh) ACH 0.21 0.07 95 0.04 47 Latent Load(Btuh) Internal a Occupants at 230 and 200 Btuh 1 230 200 1 230 200 b Scenario number 0 I 0 13 c DefaultAdjustments d CustomAppliances 900 0 900 0 e Ptants 0 0 14 Subtotals Sum lines through 12 2520 2349 1689 2183 Dud fELG HLF&ESGF 0.413 0.412 1041 967 698 899 15 Loads 159 149 16 Ventilation Loads ant Cfm 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -169 -151 21 Total Load Sum lines 13 through 19 3560 3316 2387 3083 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 141- 2024-May-2211:03:44 - RZght-SuiteU Universal 202424.0.01 RSW7699 Page is\WrightsoftH\AC\1M1Iesco_ll Fellowship Lane.rup Calc=MJ8 House Front faces: E EncrAy Right-J80 Form A Job: 11 Fellowship Lane Emcil " Entire House Date: May22,2024 c'omuhaw: �y Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jervis,NY12771 Phone:845-271-9385 Email:MHidcs.EEC@Gmail.00m 1 1 NameofRoom WIC1 W1C2 2 Running FeetofExposed Wall 8.0 ft 0 ft 3 Ceiling Ht(Ft)and Gross WallArea(SgFt) 8.0 ft 208.0 ft' 8.0 ft 224.0 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 8.0 x 5.0 ft 40.0 ft' 8.0 x 6.0 ft 48.0 ft' 5 Ceiling Slope(Deg.)and Gross CeilingArea(SgFt) 0 40.0 ft' 0 48.0 f' Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating SCIg L-Clg Heating SCIg L-Clg 6 awl 11 laz 4A5-2ov n 26.56 10.25 0 0 0 0 0 0 Wall C 12F-09v e 3.67 1.07 0 0 0 0 0 0 83 0 11 �j Door 11 4AD 2ov e 22.03 11 8 0 0 0 0 0 0 a Gdaz 4A5-2ov s 26.56 17.98 0 0 0 0 0 0 Wall G 12F-0sv w 3.67 1.07 64 235 68 0 0 0 Gdaz 4A5-2o d w 26.56 30.83 0 I 0 0 I 0 I 0 0 Ceil 16B-38ad 1.47 1.33 40 59 53 48 71 64 Flor 20P-19w 2.83 0.56 0 0 0 0 0 0 Flor 22B-10tpm 20.06 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.46 229 0 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.21 0.02 27 0 0 Latent Load(Btuh) Internal a Occupants at230 and 200 Btuh 0 0 0 0 0 0 b Scenario number 0 O 13 c DefaultAdjustiments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 523 134 71 58 Dud EHLF&ESGF 0.413 0,412 216 55 29 24 15 Loads ELG 34 41 16 Ventilation Loads ant Cfm 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED E curson&Latent Moisture Migration Load -14 1 -6 21 Total Load Sum lines 13 through 19 t 739 1189 1 100 81 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ -�"�" wr_igFsYsoft 2024-May-2211:03:44 ALGA Right-Suite®Universal 2024 24.0.01 RSU07699 Page 7 tsWightsoftHYNDWtesoo_11 Fellowship Lane.rup Calc=MJ8 House Front faces: E Enei^ Right-J80 Form J1 Job: 11 Fellowship Lane Consult" Entire House Bate May 2 i ks 024 Consultants By Mike Hicks Energy Efficiency Consultants Plan: 11 Fellowship Lane PO Box 661,Port Jervis,NY12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com 1 Name of Room Hall Powder 2 Running Feet ofEVosed Wall 4.0 ft 19.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 551.8 fF &0 ft 192.0 IF 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1.0 x 132.0 ft 132.0 ft' 7.0 x 5.0 ft 35.0 ft Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 132.0 fF 0 35.0 fF Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Hig, Clg. Heating S-CIg L-Clg Heating S-Clg L-Clg 6 aWj II laz 4A5-2ov n 26.56 10.25 11 299 115 0 0 0 hWall C_ 12F-0sw e 3.67 1.07 0 0 0 56 206 60 I--C;Iaz 4A5 2ov e 22.03 10.88 0 0 0 I 0 0 0 11 L-Door 11 DO e 0 0 0 (Wall - 12F-09v s 3.67 1.07 0 0 0 40 147 43 �-Glaz 4A5-2ov s 26.56 17.98 0 0 0 0 0 0 Wall 12F-Osw w 3.67 1.07 0 0 0 56 206 60 Ilaz 4A5-2ovd I w I 26.56 30.83 0 0 0 I I 0 I 0 0 Ceil 16B-38ad 1.47 1.33 132 194 176 0 0 0 Flor 20P-19w 2.83 0.56 0 0 0 0 0 0 Flor 228-10gxn 20.06 0.00 0 0 0 35 381 0 Infiltration Heating Load(Btuh) 0.46 115 545 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.01 14 0,05 64 0.21 Latent Load(Btuh) Internal a Oco pantsat230 and 200 Btuh 0 0 0 0 0 0 b Scenano number 0 I 0 13 c DefaultAdjuslments d CustomAppliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 684 295 1484 205 Duct EHLF&ESGF 0.413 0.412 282 121 613 84 15 Loads ELG 112 30 16 Mentilation Loads Vent Cfm 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -32 -22 21 Total Load Sum lines 13 through 19 966 416 2097 289 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. �'�►- wrigf�tsoTt 2024-May-2211:03:44 �\ ' � ft \ � Right-SuiteO Universal 202424.0.01 RSU07699 PageB g 11 Fellowship Lane.rup Calc=MJ8 House Frontfaces:E Enetgp A Form -Worksheet A Job: 11 Fellowship Lane Efficiency Date: May 22,2024 Entire House By: Mike Hicks Consultants Plan: 11 Fellowship Lane Energy Efficiency Consultants POBox661,PonJervis,NY12771 Phone:845-271-9385 Email:MHicks.EEC@Gmail.com Supporting Detail Project Name: Wesco_11 Fellowship Lane Date: May 22,2024 Address: 11 Fellowship Lane,Rye Brook,NY 10573 Phone: Job ID: 11 Fellowship Lane Worksheet A Location and Design Conditions Weather Location: Westchester CountyAP,NY,US Elevation= 379 Latitude= 41 Indoor Conditions,Heating: DB= 70 °F RH= 30 % Indoor Conditions,Cooling: DB= 75 °F RH= 50 % Table 1 Conditions 99%DB= 14 °F 1%DB= 90 °F Grains Difference= 34 gdlb Daily Range= M Design Temperature Differences HTD= 57 °F CTD= 15 °F Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrightsoR' 2024-May-2211:03:45 ^� w. . .......... .....w_, Right-Suite®Universal 2024 24.0.01 RSU07699 Page 1 AC4K ...ts\MghtsoftHW_\wesoo_11 Fellowship Lane.rup Calc=MJ8 House Front faces:E N Level 2 WIC 1 M Bath M Bed WIC 2 Bath Hall Bed 2 Bed 3 Open to Below Job#: 11 Fellowship Lane Energy Efficiency Consultants Scale: 1 :63 Performed by Mike Hicks for: Paw PO Box a51 Rigtt-&A39 Ur vast 2024 11 FeBowshpLa-e PortJe%rs.NY 12771 24.0.01 RSU07699 Rye Brock,NY 10573 Phone:846271-9385 2024-May-2211039 MH&S=@Gmai.ccm _U4C\wesco 11 FelayshpLa-eW N First Floor Kitchen Living Room Dining Rm Den Foyer r Job#: 11 Fellowship Lane Energy Efficiency Consuttants Scale: 1 :63 Performed by Mike Hicks for: Paget PO BaK 661 Riga&A3E)U mu-A 2C24 11Fd NshpLane PatJervis,NY12771 24.0.01RSU07699 Rye Brock NY 10573 Prue 846-271-9385 2024-May-2211 fl65B MHicksEEC@GrraI= VAC\U\esco 11FdbwshpLa-ejW N Basement Basement Powder Job#: 11 Fellowship Lane Energy Efficiency Consultants Scale: 1 :63 Performed by Mike Hicks for: Page3 PO Bm(661 Rg*SLI39)Urwe sJ 2024 11 FdlcwshipLane PcrtJavis,NY 12771 24.0.01 RSU07699 Rye Brock,NY10573 PYme:84Ci271-9385 X24-May-221103 9 MHicksEEC@Grrdcan _SAC\Wesco 11FdaNshpL3Le Q Encrp- Manual S Compliance Report Job: 11 Fellowship Lane Date: May 22,2024 Efaciency Entire House By: Mike Hicks Consultants Plan: 11 Fellowship Lane Energy Efficiency Consultants PO Box661,PortJews,NY 12771 Phone.845-271-9385 Email MHicks.EEC@Gmail.com Project Information For: 11 Fellowship Lane.Rye Brook,NY 10573 Cooling Equipment Design Conditions Outdoor design DB: 89.6°F Sensible gain: 38633 Btuh Entering coil DB: 76.4°F Outdoor design WB: 73.4°F Latent gain: 6394 Btuh Entering coil WB: 63.1°F Indoor design DB: 75.0°F Total gain: 45027 Btuh Indoor RH: 50% Estimated airflow: 1800 cfm Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Bosch Thermotechnol Model: BOVB-60HDN1-M18M+BMA`4860DNTF Actual airflow: 1800 cfm Sensible capacity: 45900 Btuh 119%of load Latent capacty: 8100 Btuh 127%of load Total capacity: 54000 Btuh 120%of load SHR: 85% Heating Equipment Design Conditions Outdoor design DB: 13.5°F Heat loss: 54216 Btuh Entering coil DB: 68.8°F Indoor design DB: 70.07 Manufacturer's Performance Data at Actual Design Conditions Equipment type: SpIitASHP Manufacturer: Bosch Thermotechnol Model: BOVB-60HDN1-M18M+BMA'4860DNTF Actual airflow: 1800 cfm Output capacity: 56000 Btuh 103%of load Capacity balance: 18 °F Supplemental heat required: 0 Btuh Economic balance: -99 °F Backup equipment type: Gas fumace Manufacturer: Existing Furnace Model: TG9S120D16MP11B 2024-May-22 11:03:45 wright50T't Pight-Suite®Universal 2024 24.0.01 RSU07699 Page /#--CA ...ts\VJhghtsoftHWG\Wesco_11 Fellowship Lane.rup Calc=MJ8 House Front faces: E CERTIFIED rr Certificate of Product Ratings AHRI Certified Reference Number:206396006 Date:05-22-2024 Model Status:Active AHRI Type: HRCU-A-C(Split System: Heat Pump with Remote Outdoor Unit with No Indoor Fan--Air Source) Outdoor Unit Brand Name: BOSCH Outdoor Unit Model Number (Condenser or Single Package):BOVB-60HDN1-M18M Indoor Unit Model Number(Evaporator and/or Air Handler): BMA*4860DNTF The manufacturer of this BOSCH product is responsible for the rating of this system combination. Rated as follows in accordance with the latest edition of AHRI 210/240-2017 with Addendum 1,Performance Rating of Unitary Air-Conditioning& Air-Source Heat Pump Equipment and subject to rating accuracy by AHRI-sponsored,independent,third party testing: Cooling Capacity(A2)-Single or High Stage(95F),btuh: 55000 SEER: 16.00 EER(A2)-Single or High Stage(95F): 10.50 Heating Capacity(H12)-Single or High Stage(47F):56000 HSPF(Region IV):9.50 Rated as follows in accordance with the latest edition of AHRI 210/240—2023, Performance Rating of Unitary Air-Conditioning&Air-Source Heat Pump Equipment and subject to rating accuracy by AHRI-sponsored,independent,third party testing: Cooling Capacity(AFwi)—Single or High Stage(95F),btuh :54000 SEER2: 14.60 EER2(AFuii)—Single or High Stage(95F): 10.20 Heating Capacity(H1Full)—Single or High Stage(47F),btuh :56000 HSPF2(Region IV):8.00 ?"Active"Model Status are those that an AHRI Certification Program Participant is currently producing AND selling or offering for sale;OR new models that are being marketed but are not yet being produced.?Production Stopped?Model Status are those that an AHRI Certification Program Participant is no longer producing BUT is still selling or offering for sale. Ratings that are accompanied by WAS indicate an involuntary re-rate. The new published rating is shown along with the previous(i.e.WAS)rating. The Department of Energy has published updated energy efficiency metrics for central air conditioners and heat pumps.This publication reflects both the 1987 metric(SEER)and the 2023 metric(SEER2).Efficiency requirements are published at 10 C.F.R.430.32(c).Please refer to www.AHR]net.org for more information about updated energy efficiency metrics. DISCLAIMER AHRI does not endorse the product(s)listed on this Certificate and makes no representations,warranties or guarantees as to,and assumes no responsibility for, the product(s)listed on this Certificate.AHRI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s),or the unauthorized alteration of data listed on this Certificate.Certified ratings are valid only for models and configurations listed in the directory at www.ahridirectory.org. TERMS AND CONDITIONS This Certificate and its contents are proprietary products of AHRI.This Certificate shall only be used for individual,personal and confidential reference purposes.The contents of this Certificate may not.in whole or in part,be reproduced;copied;disseminated; entered into a computer database;or otherwise utilized,in any form or manner or by any means,except for the user's individual, personal and confidential reference. AIR-CONDITIONING,HEATING, CERTIFICATE VERIFICATION &REFRIGERATION INSTITUTE The information for the model cited on this certificate can be verified at www.ahridirectory.org,click on"Verify Certificate"link we make life better- and enter the AHRI Certified Reference Number and the date on which the certificate was issued, which is listed above,and the Certificate No.,which is listed at bottom right. ©2024Air-Conditioning, Heating,and Refrigeration Institute CERTIFICATE NO.: 133608633053992719 III Bosch BOVA Split System Heat Pump RmUS Product Specifications Bosch IDS BOVA 5 2 Nomenclature B OV A-36 H D N1 — M 18 M Compressor Brand M: Mitsubishi Efficiency 18: 18 SEER Power Supply M: 208/230V 1 Ph, 60Hz Refrigerant N 1: R410A D-DC Inverter Function Type C: Condenser H: Heat Pump Nominal Capacity 36 36X1,000BTU/H Series A:A Series Unit Type OV: Discharge Type Bosch Figure 1 Bosch Thermotechnology Corp.111.2019 Data subject to change 6 1 Bosch IDS BOVA Product Sp x�, ,..__ 3 Product Specifications BOVA36 BOVA.• Cooling Capacity Nominal Cooling(BTU/h) 34,600 57,000 Nominal Heating(BTU/h) 34,200 55,000 Decibels([dB(A)] Max.@100%load 77 79 Min.@min load 56 50 Compressor RLA 18.5 27.2 LRA 45 58.1 Condenser Fan Motor Horsepower(HP) 1/6 1/3 FLA 1.0 2.5 Refrigeration System Refrigerant Line Size' Liquid Line Size("O.D.) 3/8" 3/8" Suction Line Size("O.D.) 3/4" 7/8" Refrigerant Connection Size Liquid Valve Size("O.D.) 3/8" 3/8" Suction Line Size("O.D.) 3/4" 7/8" Refrigerant Charge(R-410A,oz) 121 163 Expansion Device EEV EEV Maximum Line Length 100 FT 100 FT Maximum Elevation Difference 50 FT 50 FT Charging Specifications Subcooling at Service Valve 10°F(±2°F) 8°F(±2°F) Operating Range Cooling 40°F-120°F 40°F-120°F Heating 5°F-86°F 5°F-86°F Electrical Data Voltage-Phase-Hz 208/230-1-60 208/230-1-60 Minimum Circuit Ampacity 24.2 36.5 Max.Overcurrent Protection' 40 60 Min/Max Volts 187/253 187/253 Weight Equipment Weight(Ibs) 157 205 Ship Weight(Ibs) 187 238 Table 1 1 Tested and rated in accordance with AHRI Standard 210/240. Always check the rating plate for electrical data on the unit being PC 2 Wire size should be determined in accordance with National Electrical Codes; installed. extensive wire runs will require larger wire sizes. Unit is factory charged with refrigerant for 15'of 3/8"liquid line. 3 Must use time-delay fuses or HACR-type circuit breakers of the same size as noted. System charge must be adjusted per Installation Instructions Final Charge Procedure. 4 Weight values are estimated. •Installation of these units requires the specified TXV Kit to be installed on the indoor coil.THE SPECIFIED TXV IS DETERMINED BY THE OUTDOOR UNIT,NOT THE INDOOR COIL. Data subject to change 11.2019 1 Bosch Thermotechnology Corp. Product • • Bosch IDS:O 7 Suction Corrected Factor BOVA-Suction Line Connection Size 3/4"O.D. 3/4"O.D. 7/8"O.D. 7/8"O.D. Suction Line Run-Feet 3/4"Std. 3/4"Std. 7/8"Std. 7/8"Std. 5/8"Opt. 5/8"Opt. 3/4"Opt. 3/4"Opt. Standard 1.00 1.00 1.00 1.00 25' Optional 1.00 0.99 0.99 0.98 Standard 0.99 0.99 0.99 0.99 50' Optional 0.99 0.98 0.98 0.97 Standard 0.99 0.98 0.98 0.97 100' Optional 0.98 0.95 0.97 0.95 Table 17 Std:Standard size aand Using suction line larger than shown in chart will result in poor oil return Opt:Optional size is not recommended. 8 Sound Data ModelFI1'W"'&'e Li...r Sound Power Level clB-Center Frequency-Hz Sound Power Level 3 Ton 56(Low speed) 52.8 47.1 44.8 47.7 45.9 40.4 33.4 40.8 77(High speed) 73.2 67.8 68.9 69.1 66.1 61.3 59.6 58.9 5 Ton 50(Low speed) 42.6 44.9 43.5 42.1 38.9 33.4 27.4 26.4 79(High speed) 73.1 74.1 70.1 70.1 69.6 64.5 60.1 53.6 Table 18 IDS Outdoor Unit Sound Power Level TSound data includes standard compressor blanket. Bosch Thermotechnology Corp.111.2019 Data subject to change Bosch IDSBOVA Product 9 Dimensions AIR DISCHARGE:ALLOW 60" MINIMUM CLEARANCE. L W O�oo �O�O�O• " AIR INLETS LOUVERED PANELS ALLOW 20" ALLOW A MINIMUM OF O� �O MINIMUM CLEARANCE 12"CLEARANCE ON ONE �O ' SIDE OF ACCESS PANEL TO A WALL AND A MINIMUM OF 24"ON THE ADJACENT SIDE OF ACCESS PANEL NOTE:APPEARANCE OF UNIT MAY VARY Figure 2 •• Dimensions(Inches) • • ■ BOVA 36 24-15/16[6331 29-1/8[740] 29-1/8[7401 BOVA 60 33-3/16[8431 29-1/8[7401 29-1/8[7401 Table 19 Data subject to change 11.2019 1 Bosch Thermotechnology Corp. Bosch Multi-Position Cased Coils Cooling and Heat Pump Compatible BMAC Series Installation (R BOSCH C&US .+.��CERTIFIED,. w.�i CERTIFIED,. .o�u Y..er�mmam�y.�w IMary Smel xv LLtdySm.�C RHtl S1iYW�21WPp NN9aga0TI011W slasY whHMYnMnyM��MI rW•..Yr.a e..sr.n�....wwrnua LISTED 6 i1sch Multi-Position Cased Coils Installation Manual 2.4 Dimensional data 19, VAPOR LINE CONNECTION COPPER(SWEAT) COILA PANEL LIQUID LINE CONNECTION AUXILIARY DRAIN CONNECTION H PRIMARY DRAIN 3/4"NPT FEMALE PIPE THREAD CONNETION 3/4" NPT FEMALE PIPE THREAD AUXILIARY DRAIN CONNECTION 3/4"NPT FEMALE PIPE THREAD W W1�' PRIMARY DRAIN CONNETION ? 3/4" NPT FEMALE PIPE THREAD TOP AIR STOP VAPOR LINE CONNECTION LIQUID LINE CONNECTION AUXILIARY DRAIN CONNECTION 3/4"NPT FEMALE PIPE THREAD Figure 3 Model Dimensions inch Weight/Shipping Unit Height"H" Unit Width"W" Supply .po BMAC2430ANTD 20[508] 14%[368] 13[330] 13'h[343] %/% 45.6/62.1[20.7/28.2] BMAC2430BNTD 20[508] 17'h[445] 16[407] 16'/2[419] 3/8/1: 48/66[21.8/29.9] BMAC3036ANTD 20[508] 102[368] 13[330] 13'/2[343] 3/e/% 45.6/62.1[20.7/28.2] BMAC3036BNTD 20[508j 17'h[445] 16[407] 16'/2[419] 3%/3A 48/66[21.8/29.9] BMAC3036CNTD 20[508] 21[553] 19%[495] 20[508] %/% 51.8/74.3[23.5/33.7] Table 1 Data subject to change 04.2023 1 Bosch Thermotechnology Corp. Multi-Position installation Manual Bosch --— — 1 VAPOR LINE CONNECTION- COIL ACCESS COPPER(SWEAT) \ PANEL LIQUID LINE CONNECTION - - H PRIMARY DRAIN AUXILIARY DRAIN CONNECTION CONNETION 3/4"NPT FEMALE PIPE THREAD 3/4" NPT FEMALE PIPE THREAD AUXILIARY DRAIN CONNECTION 3/4"NPT FEMALE PIPE THREAD 21^ W PRIMARY DRAIN CONNETION 3/4" NPT FEMALE PIPE THREAD i. TOP AIR STOP -- VAPOR LINE CONNECTION LIQUID LINE CONNECTION - ------ _ i AUXILIARY DRAIN CONNECTION 314"NPT FEMALE PIPE THREAD Figure 4 Dimensions Model Unit Height"H" Unit Width"W" Supply Duct"A" Liquid line/Vapor Line (LBS tkgl) BMAC4248BNTF 30[762] 17'h[445] 16[407] 16%[419] %/%a 74.3/93.2[33.7/42.3] BMAC4248CNTF 30[762] 21[533] 19'h[495] 20[508] 3/B/%. 74.3/97.8[33.7/44.4] BMAC4248DNTF 30[762] 24Y2[622] 23[584] 23'/2[597] Ya/%a 78/102.9[35.4/46.7] Table 2 Bosch Thermotechnology Corp.104.2023 Data subject to change Multi-Position8 Bosch A 19^ VAPOR LINE CONNECTION COPPER(SWEAT) COIL ACCESS PANEL LIQUID LINE CONNECTION AUXILIARY DRAIN CONNECTION H PRIMARY DRAIN 3/4"NPT FEMALE PIPE THREAD CONNETION 3/4" NPT FEMALE PIPE THREAD AUXILIARY DRAIN CONNECTION 3/4"NPT FEMALE PIPE THREAD W W� PRIMARY DRAIN CONNETION Z 3/4" NPT FEMALE PIPE THREAD TOPAIR STOP VAPOR LINE CONNECTION LIQUID LINE CONNECTION AUXILIARY DRAIN CONNECTION 3/4"NPT FEMALE PIPE THREAD Figure 5 Liquid1 Model Dimensions inch[mm] Weight/Shipping Unit Height"H" Unit Width"W" Supply Duct"A" Will .. BMAC486OCNTF 30[762] 21[533] 19'/:[495] 20[508] /8 A 83/106.7[37.6/48.4] BMAC4860DNTF 30[762] 24%[622] 23[584] 23%[597] Y./N 86.4/111.3[39.2/50.5] Table 3 Data subject to change 04.2023 Bosch Thermotechnology Corp. Installation Manual :oMulti-Position 3 Installation Instructions 3.1 Parts Contact your distributor for authorized replacement parts. Right Hand a Discharge 3.2 Pre-installation instructions f1l' — Carefully read all instructions for installation prior to installing product.Make sure Horizontal Drain each step or procedure is understood and any special considerations are taken into account before starting installation.Assemble all tools,hardware and supplies needed to complete the installation.Some items may need to be purchased locally. Make sure everything needed to install the product is on hand before starting. Left Hand Discharge '> Furnace 3.3 Installation and trap connection Horizontal Drain 1. See Fig.6&7 for coil installation and drain connection. 2. Installation steps for cased coil: Horizontal Drain Conditions A.Shut off or disconnect gas furnace's power and remove gas pipe if (All other drain connections should be plugged) necessary. B.Disconnect and remove a sufficient portion of the supply ductwork to Figure 7 provide clearance for the cased coil. C.Ensure that the coil is level.Seal the gap between coil and furnace. If]See Figure 6&7.In case that coil and furnace sizes are not matched,use proper size of sheet metal or other material to fill the gap and seal the gap to prevent air leak D.Reconnect the ductwork to the coil case,and seal any leakage. E.Reconnect power line on gas furnace,turn on the furnace to check any sign of leakage. Upflow Discharge Downflow Discharge Primary Drain i Alternate Drain '� c E LL LL Primary Drain Alternate Drain Upflow Drain Connection Downflow Drain Connection Vertical Drain Conditions (All other drain connections should be plugged) Figure 6 Bosch Thermotechnology Corp.104.2023 Data subject to change 1 1 .oMulti-Position 4 Drain application 4.1 Condensate drain piping Consult local codes for special requirements. To provide extra protection from water damage,it is always recommended to install an additional drain pan,provided by installer,under the entire unit with a separate drain line.Manufacturer will not be responsible for any damages due to the failure to follow these recommendations. 4.2 Plastic drain pan installation A WARNING: ► Do not use the coil pan shipped with the unit on OIL furnaces or any application where the temperature of the drain pan may exceed 275'F.A field fabricated metal drain pan can also be used for these type of applications.Failure to follow this warning may result in property damage and/or personal injury. The coil drain pan has a primary and an optional secondary drain with 3/4"NP T female connections;use either PVC or copper pipe and hand tighten to a torque of approximately 37 in-lbs.to prevent damage to the drain pan connection.An insertion depth between.355 to.485 inches(3-5 turns)should be expected at this torque setting. Use male 3/4"NPT threaded fitting for outside connection and make sure the drain holes are not blocked. Insulation may be needed for drain line to prevent sweating. Drain pan has two drain connections on each side to provide flexibility of connection and drainage.Make sure pan has proper pitch and plugged if second connection is not used. If the secondary drain line is required,run the line separately from the primary drain and terminate it where it can be easily seen. • Water coming from this line means the coil primary drain is plugged and 1 needs clearing. Install a trap in the drain line below the bottom of the drain pan.If using a copper drain line,solder a short piece of pipe to the connector before installing a drain fitting.DO NO T over torque the 3/4"copper connector to the plastic drain connection.Use a wet rag or heatsink material on the short piece to protect plastic drain pan,complete the drain line installation(Fig.8).Use(Fig.9)as a template for typical drain pipe routing.This figure shows how to avoid interference with vent piping. Data subject to change 04.20231 Bosch Thermotechnology Corp. BoschInstallation Manual CONDENSATE DRAIN TRAP The condensate trap is not mandatory but is recommended for efficiency. N Unit N DO NOT OVERTIGHTEN DRAIN FITTING UNIT MUST BE SLIGHTLY INCLINED TOWARD DRAIN CONNECTION TO APPROVED DRAIN Figure 8 secondary secondary primary primary Figure 9 Bosch Thermotechnology Corp. 04.2023 Data subject to change Bosch 5 Refrigerant connections NOTICE: ► Gently remove the sealing plug of vapor line,use one wrench to fix the valve base,loosen the nut with another wrench,take out the flange pad and and sealing ring.The nitrogen pressure is about 10 PSIG. To prevent refrigerant leak,use proper tools to ensure clean,burr-free cut. NOTICE: ► TXV bulb MUST be protected(wrapped with wet rag)or removed,while brazing the tubing.Overheating of the sensing bulb will affect the functional characteristics and performance of the comfort coil. Use brazing shield when brazing close to the cabinet surface and wet rag to protect rubber grommet.Brazing alloy should be at least 5%silver content. 5.1 Airflow performance[CFM vs pressure drop]: Model Pressure Drop(Inches of Water) 0.05 1 0.15 0.2 1 1 0.35 1 BMAC2430ANTD 307 485 618 729 823 911 991 1063 BMAC2430BNTD 327 527 682 810 925 1024 1122 1217 BMAC2430CNTD 360 585 748 893 1019 1132 1238 1348 BMAC3036ANTD 307 485 618 729 823 911 991 1063 BMAC3036BNTD 327 527 682 810 925 1024 1122 1217 BMAC3036CNTD 360 585 748 893 1019 1132 1238 1348 BMAC4248BNTF 456 638 810 953 1077 1191 1284 1390 BMAC4248CNTF 505 726 932 1098 1244 1375 1494 1604 BMAC4248DNTF 533 857 1105 1319 1509 1675 1824 1956 BMAC486OCNTF 439 699 906 1071 1224 1362 1487 1589 BMAC4860DNTF 466 764 978 1157 1313 1466 1590 1695 Table 2 Pressure drop for cooling and heat pump coils 'Data based on wet coil with entering air at 80°F D8/67°F WB without air filter. Data subject to change 04.2023 1 Bosch Thermotechnology Corp. 71 1-171,a �� �s•�O&«•K. dss�o�i.�` --_ is1ri�O�C.�.. ��}��F�t:.. -sstti�� '•r. a + •'� C• It tt t .. �11. .FVY t y1�. Vm M� �: V� ;.\.� V t,�}h � OV :_�� _ , _;1��/'i'i,°,� �= 14�i101 _� � I�i���i �i� �I�ti��l l•I• 111��� �.- E�� . .... . . .. ... . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . a' U � % < )> C U /)JJ p J.p ad J CN C7 n. `0 s cr 4-6 , cr :,; _.� FBI •r•.I J Lf') CJ � L7.1 • a �u�•/_`�JjA �j M� Z O cC � Z 00 > aU+ L J C .. — C �4 w s rO� Q F— 0 �2 a�i CS � C) " ti Al uj 3 y r' j Imo) O LO U) z LLI KM (<(oD u A � � � •b • x��� L :7 cC cC � N �� CO a O M ` � di14 /{II 111 `1141 c _ `11/1,1/11.isaR- E r 11 `I,1•. L_ {II 11+`aiscs� gy«s )>j v O/)Mt t41Q17/i1, Awl" s7 1 1 @Y F .'� *s� li��.. rYYY A�® CERTIFICATE OF LIABILITY INSURANCE ° s/i6/2 2"' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME: Pinky ArlanZa Rey Insurance Agency Inc PHONE (914)631-7628 VAX No: (914)631-7609 219 North Broadway E-MAIL ADDRESS:pinky @rey insurance.com PO BOX 845 INSURERS AFFORDING COVERAGE NAIC k Sleepy Hollow NY 10591-0845 INSURERA:Utica First Insurance 15326 INSURED INSURERB:Erie Insurance Company 26263 WESCO 53 HEATING AND COOLING INC INSURERC: 188 CORTLANDT ST INSURER D: INSURER E: SLEEPY HOLLOW NY 10591 INSURERF: COVERAGES CERTIFICATE NUMBER:CL2451623791 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. POLICY EFF POLICY EXP TR TYPE OF INSURANCE ADDL SUER POLICY NUMBER MMIDDNYYY MM DDNYYY LIMITS X COMMERCIAL GENERALLIABILITY EACH CH OCCURRENCE $ A CLAIMS-MADE �X OCCUR DAMA E T RENTED 100,000 PREMISES Ea occurr $ X ART3000774890 02/05/2024 02/05/2025 MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERALAGGREGATE $ 2,000,000 X POLICY 0jRo- 7 LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY O a INEDtSINGLE LIMIT $ 1,000,000 CEaB ANYAUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED Q03-5830297 03/08/2024 03/08/2025 BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE X HIREDAUTOS X AUTOS Per accident $ Uninsured motorist BI-single limit $ 1,000,000 UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER TH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? ❑N/A E.L.EACH ACCIDENT $ (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Classification - Heating/Air Cond-EQP Village of Rye Brook is listed as additional insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE VILLAGE OF RYE BROOK THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN 938 KING ST ACCORDANCE WITH THE POLICY PROVISIONS. RYE BROOK, NY 10573 AUTHORIZED REPRESENTATIVE / L Rey Iannarelli/CSR ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS026(201401) NEW Workers' STATE Compensation CERTIFICATE OF Board NYS WORKERS' COMPENSATION INSURANCE COVERAGE la. Legal Name and address of Insured(use street address only) 1b. Business Telephone Number of Insured WESCO 53 HEATING AND COOLING, INC. 188 CORTLANDT ST (845)260-2088 SLEEPY HOLLOW NY 10591 1c. NYS Unemployment Insurance Employer Registration Number of Insured Work Location of Insured (Only required if coverage is specifically 1 d. Federal Employer Identification Number of Insured or limited to certain locations in New York State, i.e. a Wrap-Up Policy) Social Security Number 86-1745391 2. Name and Address of the Entity Requesting Proof of 3a. Name of Insurance Carrier Coverage(Entity Being Listed as the Certificate Holder) Hartford Accident and Indemnity Company Village of Rye Brook 22357 938 KING ST 3b. Policy Number of Entity Listed in Box"1a": PORT CHESTER NY 10573-1226 76 WEG AK3K7L 3c. Policy effective period: 02/03/2024 to 02/03/2025 3d. The Proprietor, Partners or Executive Officers are Included. (Only check box if all partners/officers included) X all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box "3" insures the business referenced above in box "la" for workers' compensation under the New York State Workers' Compensation Law. (To use this form, New York(NY) must be listed under Item 3A on the INFORMATION PAGE of the workers' compensation insurance policy). The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"2". The insurance carrier must notify the above certificate holder and the Workers' Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate. (These notices may be sent by regular mail.) Otherwise, this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent, or until the policy expiration date listed in box"3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Worker's Compensation contract of insurance only while the underlying policy is in effect. Please Note: Upon cancellation of the workers' compensation policy indicated on this form, if the business continues to be named on a permit, license or contract issued by a certificate holder, the business must provide that certificate holder with a new Certificate of Workers' Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers' Compensation Law. Under penalty of perjury, I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Sara Seier (print name of authorized representative or licensed agent of insurance carrier) Sc up 5"4 , Approved by: 05/16/2024 (Signature) (Date) Title: Operations Manager Telephone Number of authorized representative or licensed agent of insurance carrier: (866)225-7966 Please Note: Only insurance carriers and their licensed agents are authorized to issue Form C-105.2. Insurance brokers are NOT authorized to issue it. C-105.2 (9-17) Form WC 88 31 21 F Printed in U.S.A. www.wcb.ny.gov Page 1 of 2