HomeMy WebLinkAboutAbandoned Application Building Permit Check List&Zoning Analysis
Address: tr1D --T->A.,j Ct, SBL l 2�1'i l — ('� l O
Zone: F-► Use: Z to Const.Type: Other.
Submittal Date: �C1 l Z 2— Revisions Submittal Dates:
Applicant: R_
Nature of Work 2 Z k`�_D V . AF—tl"l o ,.; S� A 2
Reviews:ZBA: O C T - 5 2022 PB• BOT
Other.
OK
( ( ) FEES:Filing•. 7S, � BP: C/O: Flood Plane: Legalization:
( ) (� APP: Dated. ✓ Notarized. ✓ SBL ✓ Truss I.D. Cross Connection H.O A
( ) ( ) Scenic Roads: Steep Slopes: Wetlands: Storm Water Review. Street Opening.
( ) ( ) ENVIRO: Long. Shore Fees: N/A:
( ) ( ) SITE PLAN:Topo: Site Protection: S/W Mgmn: Tree Plan: Other.
( ) ( ) SURVEY:Dated: Archival• Sealed: Unacceptable:
( ) (•�jPLANS.Date tamped: e C o ' Other:
( ( License Workers o v Other.
( ) ( ) CODE 753#: N/A:
(� ( ) HIGH-VOLTAGE E / Other.
( ) ( ) LOW-VOLTAGE ELE Other.
( ) ( ) FIRE ALARM/SMOKE DETECTORS:Plans: Permit: H.W.I.C.:_Battery:_Other.
( ) ( ) PLUMBING Plans: Permit Nan Gas: LP Gas: N/A/: Other.
( ) ( ) FIRE SUPPRESSION:Plans: Permit: N/A: Other.
( ) ( ) H.V.A.C.: Plans: Permit: N/A Other.
( ) ( ) FUEL TANK:Plans: Permit: Fuel Type: Other.
( ) ( ) 2020 NY State ECCC: N/A Other.
( ) ( ) Final Survey Final Topo: RA/PE Sign-off Letter. As-Built Plans: Other.
( ) ( ) BP DENIAL LETTER: C/O DENIAL LETTER: Other.
( ) ( ) Other.
(_�'ARB mtg.date: l o 1 Iq 1,Z Z, approval notes:
( )ZBA mtg.date: approval notes:
( )PB rntg.date: approval;- notes:
REOUIRED ExgTnNG PROPOSED NOTES
Atm
Circle:
FroaW
Front:
Front-.
Sim:
Main Cov
Accs.Cov
F H S
S .H Sb:
S
Ton Imp
Fc Imp
Perkin—S
HHight/Stories:
notes:
f
Residential Building Permit Fee Work Sheet
Permit#: Date Issued: SBL: Zone:
Address:
Property Owner& Contact Info:
Job Description:
sq. ft. or more made to existing
40A Le 4t}- y: (plus any alteration fees
10 H 1 Z Z '0/$I,000.00
�EMOOCJ70f,
• hiLding Permit Fee
Bas $I 5.00/$I,000.00 = $
Attached C $I5.00/$I,000.00 = $
$I5.00/$I,000.00 = $
EMO/ IPC4 �, e l l a 3 $I5.00/$I,000.00= $
$I5.00/$I,000.00= $
Em2
$15.00/$1,000.00=
Total ' Total B.P.Fee= $
Total Amount Paid = $
Aas Total Amount Due = $
/'eC'G/VP d ca// Qck- ,o w
840mg fie.
Date: Signed:
D IEC [E�Y[E DD
BUILDING DEPARTMENT SEP 16 Z022
VILLAGE OF RYE BROOK VILLAGE OF RYE BROOK
938 K NG STREET RYE BROOK,NY 10573 BUILDING DEPARTMENT
(914)939-0668_FAx(914):939-5801
www.rvebrook.ore
ti;;;;#R#iittt tttttRR;#;##ii Rtt#t;;t;#i#tit#t###;tt;;4#tt4iit#t4tt#ittt4.4#;#####ttR;#ttitittRtt##ii;;4#;t4
ARCHITECTURAL REVIEW BOARD CHECK LIST FOR APPLICANTS
This form must be completed and signed by the applicant of record and a copy shall be
submitted to the Building Department prior to attending the ARB meeting. Applicants
failing to submit a copy of this check list will be removed from the ARB agenda.
Job Address: 10 David Ln Date of Submission:
Parcel ID#: ��9,,�j � .�� Zone:
Proposed Improvement(Describe in detail): APPLICANT CHECK LIST:
11.220 KW PV SOLAR PANEL ROOF MOUNT MUST BE COMPLETED BY THE APPLICANT
The following items must be submitted to the Building
03) PANELS 0eRf y pplicant-no exceptions.
l pplication
2 of sealed plans. (one full size(maximum
PropertyOwner: Yavin MulleRep II able plan size=36"x 42")and one I l"x17")
Address: 10 David Ln 2 ies of the property survey.
2 ies of the proposed site plan.
Phone# 646-662-9704 5. (X)One electronic/disc copy of the complete
Applicant appearing before the Board:
application materials.
6. (X)Filing Fee.
Joseph Guadagno 7. (X)Any supporting documentation.
Address: 227 N RT 303 CONGERS NY 10920 8. (XX)HOA approval letter.(ifapplicable)
9. (X)Photographs.
Phone# 385-352-4876 10.(X)Samples of finishes/color chart.(a sample board or
Architect/Engineer:
PA U LZAC H E R model may be presented the night of the meeting)
Phone# 916-961-3960
By signature below, the owner/applicant acknowledges that he/she has read the complete Building Permit
Instructions&Procedures,and that their application is complete in all respects.The Board of Review reserves the
right to refuse to hear any application not meeting the requirements contained herein.
Sworn to before me this 21�_ Sworn to before me this 1�5
j day of u�s 20 ZZ JACLYN M SGRO day of VJ�� , 20 1,?,
40, NOTARY PUBLIC-STATE OF NEW YORK
ONo.01SG6315056
Signature of Property Owner QualiiiedinROCklandCountq tureof scant
My Commission Expires 1 1-17 22
Yavin Muller Joseph Guadagno
Print Name of Property Owner Print Name of Applicant
Notary blic Notary Publi
3/21/19
D LC� C ��IL
BUILDING DEPARTMENT
VILLAGE OF RYE BROOK SEP 16 2022
938 KING�S_rREET RYE BROOK,NY 10573
(914)939-0668 FAX(914)939-5801 VILLAGE OF RYE BROOK
www:ryebrook.orp, BUILDING DEPARTMENT
+##iitt#fi#44tt##4tiit4it###4itttft#tots/#s+i/##+#filet#it#kis##+stletiff4##4#tt##f##/t♦ttsit/ttitt/i#sit#i++
FOR OFFICE USE ONLY:
Approval Date: Permit# Application#
Approval Signature: ARCHITECTURAL REVIEW BOARD:
Disapproved: Date:
BOT Approval Date: Case#
PB Approval Date: Case#
ZBA Approval Date: Case#
Other:
Application Fee&75 I"b Permit Fees: ow
####t#4tiit#######/t/###ftk#t##ski#t/#kk#itt###ifkt+k#tstt4f isi�###kktt#4+#ifit/tt#it#i##+#tiittffff i##ttit
APPLICATION TO INSTALL PHOTOVOLTAIC SOLAR ARRAY
Application dated: 712212022 is hereby made to the Building Inspector of the Village of Rye Brook,NY,for the issuance of a Permit for the
installation of a Photovoltaic Solar Array as per detailed statement described below.1. Job Address: 10 David Ln SBL:/�9i3-S- /—f-10 ne: �
2 Type,kW&Location of Array,(use additional sheets if necessary):
11.220 KW PV SOLAR PANEL ROOF MOUNT( 3) PANELS
3.Property Owner: Yavin Muller Address: 10 David Ln
Phone# 646-662-9704 Cell# e-mail
4.Applicant: Joseph Guadagno Address: 227 N RT 303 CONGERS NY 10920
Phone# 385-352-6895 Cell# e-n,iilJoseph.Guadagno@sunrun.com
5. Design Engineer: Paul Zacher Address: 1478 STONE POINT DRIVE
Phone# 916-961-3960 —Cell# e-mail PROJECTS@PZSE.COM
6.Solar Contractor: SUNRUN INSTALLATION SERVICES Address: 227 N RT 303 CONGERS NY 10920
Phone# 385-352-6895 Cell# e-mail Joseph.Guadagno@sunrun.com
7. Occupancy;(t-Fam.,2-Fam.,Commercial.,etc...)Pre-construction: 1 FAM Post-construction: 1 FAMILY
8. If building is located on a comer lot,which street does it front on:
9. N.Y.State Construction Classification: N.Y.State Use Classification:
10. Construction Type&Location:()Typical Western Lumber Frame;()Timber Frame[TC];()Wood Truss[TT];
O Pre-engineered wood[PW];Located;O Floor Framing IF];O Roof Framing[R];O Floor&Roof Framing[FR];Other:
11. Number of stories: Roof Style:(hip,shed,mansard,etc...)
12. Will a New Roof Be Installed: No 11 Yes ❑ (a separate roofing permit is required to re-roof an existing building)
13. Roofing Material&Number of Layers: COMP SHINGLE
1
3/21/19
14. Will the proposed project disturb 400 sq.ft.or more of land,or create 400 sq.ft.or more of impervious coverage requiring a
Stormwater Management Control Permit as per§217 of Village Code? No: 129 Yes: ❑ Area:
15. Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code?
No: n Yes: ❑ (If yes,applicant must submit a Site Plan Application,&provide detailed drawings)
16. Will the proposed project require a Tree Removal Permit as per§235 of Village Code?No: LXYes: ❑
(If yes,applicant must submit a Tree Removal Permit Application)
17. Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? No: ❑ Yes: ❑
Indicate:TIER I:_TIER 11:_TIER III:_ (if yes,a Home Occupation Permit Application is required)
18. What is the total estimated cost of construction: $ 22,000
(Note:The estimated cost shall include all site improvements,labor,material,scaffolding,fixed equipment,professional fees,including any material and labor
which may be donated gratis If the final cost exceeds the estimated cost,an additional fee will be requited prior to issuance of the GO).
19. Start Date: ONCE PERMIT IS APPROVED Completion Date:
This application must bear the notarized signature(s)of the legal owner(s)of the subject property,and the
applicant of record in the spaces provided.Any application not properly completed in Its entirety and/or not
properly signed shall be deemed null and void and will be returned to the applicant.Please note that application
fees are non-refundable.
STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as:
1 Joseph Guadagno ,being duly sworn,deposes and states that he/she is the applicant above named,
(print name of individual signing as the applicant)
and further states that(s)be is the legal owner of the property to which this application pertains,or that(s)he is the,
AGENT for the legal owner and is duly authorized to make and file this application.
(indicate architect,contractor,agent,attorney,etc.)
That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at
the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying
approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code
of the Village of Rye Brook and all other
ra applicable laws,ordinances and regulations.
Sworn to before me this 2_ Sworn to before me this
day of 20 ZL day of J cJ 20 ZZ
J n
Notary c Notary
Signature of Property Owner tgnamre of A pGcant
Yavin Muller Joseph Guadagno
Print Name of Property Owner Print Name of Applicant
JACLYN M SGRO
NOTARY PUBLIC-STATE OF NEW YORK 2
No.O1SG6315056
Qualified in Rockland County
My Commission Expires 11-17.202'2 3l21/19