HomeMy WebLinkAbout2016-02-23 Sun Homes Approval Resolution On a motion made by Trustee Epstein and seconded by Trustee Heiser,the following resolution was adopted. RESOLUTION CONSIDERING APPROVAL OF AN APPLICATION FOR A PUD SITE PLAN SUBMITTED BY SUN HOMES FOR PROPERTY AT 1100 KING STREET (RECKSON) VILLAGE OF RYE BROOK BOARD OF TRUSTEES WHEREAS, Sun Homes (the "Applicant"), as authorized by property owner Reckson Operating Partnership L.P., submitted a PUD Site Plan Application in connection with the proposed construction of a residential development of 110 single-family dwelling units on property located at 1100 King Street, designated as Section 129.25,Block 1,Lot 1 on the Town of Rye Tax Map("Property")and located in the Planned Unit Development("PUD")District;and WHEREAS, the instant Site Plan Application constitutes Phase II of a two-phase PUD approval process pursuant to Village Code §250-7.E wherein PUD Concept Plan approval and PUD zone change occur in Phase I and detailed subdivision and site plan review and approval occur during Phase II;and WHEREAS, the Board of Trustees is the Approval Authority for this application pursuant to Section 250-7.E(4)(b)(2)of the Village Code;and WHEREAS, the Board of Trustees and Village staff and consultants have reviewed and considered the following plans and application materials in connection with the proposed application: 1. Full Environmental Assessment Form Part land EAF Mapper Summary 2. Application for Site Plan Approval 3. Letter to the Planning Board prepared by Divney,Tung,Schwalbe,LLP,White Plains,N.Y., dated December 23,2015 f 4. Letter to the Planning Board prepared by Divney,Tung,Schwalbe,LLP,White Plains,N.Y., dated November 25,2015 5. Letter to the Building and Fire Inspector prepared by Divney,Tung,Schwalbe,LLP,White Plains,N.Y.,dated November 24,2015 6. Letter to the Planning Board prepared by Cuddy and Feder,LLP,White Plains,N.Y.dated November 25,2015 7. Letter to the Mayor and Board of Trustees prepared by Cuddy and Feder,LLP,White Plains, N.Y.dated September 17,2015 8. PUD Site Plan Project Description and Rendered Illustrative Home Plans and Elevations prepared by Divney,Tung,Schwalbe,LLP,White Plains,N.Y.,no date 9. Stormwater Management Report prepared by Divney,Tung,Schwalbe,LLP,White Plains, N.Y.,dated September 2015,Revised December 2015 10.Stormwater Pollution Prevention Plan prepared by Divney,Tung,Schwalbe,LLP,White Plains, N.Y.,dated November 2015,Revised December 2015 11.Land Title Survey prepared by Joseph R. Link, Land Surveyor,Mahopac,N.Y. dated March 23, 2002,updated January 26,2015 12.Letter to Divney, Tung, Schwalbe from NYSDEC Division of Fish, Wildlife and Marine Resources,New York State Natural Heritage Program,Albany,N.Y.,dated February 25,2015 13.Willingness to Serve Letter from United Water New York,dated October 9,2015 14.Memorandum to the Village Engineer and the Planning Board prepared by Dolph Rotfeld Engineering,P.C.,Tarrytown,N.Y. dated January 7, 2016 15.Memorandum to the Village Engineer and the Planning Board prepared by Dolph Rotfeld Engineering,P.C.,Tarrytown,N.Y.dated November 3,2015 16.Engineer's Plans,prepared by Divney,Tung,Schwalbe,LLP,White Plains,N.Y.: Sheet Number Sheet Title Date No number Cover Sheet 9/17/15 rev.12/23/15 SP-1.0 Overall Site Plan 9/17/15 rev.12/23/15 SP-1.1 Site Layout Plan 9/17/15 rev.12/23/15 SP-2.0 Grading and Utility Plan 9/17/15 rev.12/23/15 SP-3.0 Site Utility Plan—Overall 9/17/15 rev.12/23/15 SP-3.1 Typical Unit Plan 9/17/15 rev. 12/23/15 SP-4.0 Landscape Plan—Overall 9/17/15 rev. 12/23/15 SP-4.1 Landscape Plan— Typical Unit/Clubhouse 9/17/15 rev. 12/23/15 SP-5.0 Erosion and Sediment Control Plan 9/17/15 rev. 12/23/15 SP-5.1 Erosion and Sediment Control Details 9/17/15 rev. 12/23/15 SP-5.2 Phasing Plan 9/17/15 rev. 12/23/15 SP-6.0 Site Sections 9/17/15 rev. 12/23/15 SP-6.1 Road Profiles 9/17/15 rev. 12/23/15 SP-6.2 Water Profiles 9/17/15 rev. 12/23/15 SP-6.3 Sanitary Sewer Profiles 9/17/15 rev. 12/23/15 SP-6.4 Storm Sewer Profiles 9/17/15 rev. 12/23/15 SP-7.1 to SP-73 Site Details 9/17/15 rev. 12/23/15 SP-8.0 Site Lighting Plan 9/17/15 rev. 12/23/15 L-02 Planting,Lighting and Wetland Mitigation Plan 5/25/07 rev. 11/23/15 F-1 Fire Protection Plan 11/18/15 SS-1.0 Slope Analysis 12/23/15;and WHEREAS, on July 28, 2015 the Board of Trustees adopted a Negative Declaration pursuant to SEQRA for the Proposed Action which included certain test amendments to the PUD zoning regulations in Chapter 250 of the Village Code, rezoning the Property from OB-1 to PUD, PUD Concept Plan and PUD Site Plan approvals,and other required permits and approvals;and WHEREAS,on August 18,2015 the Board of Trustees rezoned the Property from OB-1 to PUD approved a PUD Concept Plan for the Sun Homes development;and WHEREAS, on September 17, 2015 the Board of Trustees received a PUD Site Plan application submitted by Sun Homes;and WHEREAS,on October 2,2015 the Board of Trustees affirmed its continuing role as Lead Agency for the review of the PUD Site Plan application and referred the application to the Village of Rye Brook Planning Board for Report and Recommendation;and WHEREAS, on January 14, 2016 the Planning Board adopted a Report and Recommendation which was submitted to the Board of Trustees for consideration;and WHEREAS, on January 25, 2016, the Applicant was referred to the Westchester County Planning Board in accordance with Section 239-m of the General Municipal Law and the Westchester County Code;and WHEREAS, on February 1, 2016, the Application was referred to the Town of Harrison, New York and the Town of Greenwich, Connecticut in accordance with Section 239-nn of the General Municipal Law and the Westchester County Code;and WHEREAS, on February 12, 2016 the Board of Trustees received comments from the Westchester County Planning Board and reviewed them at their February 23, 2016 public meeting; and WHEREAS, a duly advertised public hearing was held on February 23, 2016, at which time all those wishing to be heard on the Application were given such opportunity;and WHEREAS, the Board of Trustees, Village Planning Consultant, and Village staff have reviewed all application materials,including public comments;and WHEREAS,the Board of Trustees is fully familiar with the application and the Property. NOW,THEREFORE,BE IT RESOLVED,that having adopted a Negative Declaration pursuant to SEQRA on July 28, 2015 and upon considering all public comments, as well as comments from the Applicant, Village Planning Board, Westchester County Department of Planning, other agencies, Village consultants and staff, the Board of Trustees hereby approves the Planned Unit Development Site Plan application for property located at 1100 King Street (Reckson), subject to the following conditions: 1. Satisfaction of any outstanding conditions of the Resolutions adopted by the Board of Trustees on July 28,2015 and August 18,2015 concerning the Sun Homes project. 2. Approval of all required permits and/or approvals from the appropriate agencies for the Project, including approval of a Steep Slopes Permit from the Village Planning Board. 3. Based on the current and anticipated future need for park and recreational opportunities in the Village of Rye Brook,and the demands of the future population of the proposed residential development, the Board of Trustees hereby finds that additional recreation/parkland should be created as a condition of approval for the Application. The Board of Trustees further determines that a suitable park of adequate size cannot be properly and practically located within the Parcel, nor has the Applicant offered recreation/parkland of suitable size and practical location to adequately address the need for additional recreation/parkland within the Village. Therefore,the Board of Trustees hereby requires that the Applicant shall pay a Recreation Fee in Lieu of Parkland in accordance with Sections 250-7.E(2)(0[2] and 209-15 of the Village Code. Such fee shall be based on the Recreation Fee for residential subdivisions as set forth in the Village of Rye Brook License &Permit Fee Schedule._Payment of said fee,in full, shall be a condition precedent to issuance of a building permit for the project. 4. Prior to the issuance of a building permit, the Applicant shall submit to the Village Consulting Engineer the information,data and results set forth below and demonstrate to the reasonable satisfaction of the Village Consulting Engineer that the following test has been performed: A water main flow test shall be performed on the discharge side of the BelleFair community's water pumping station (i.e., at the Anderson Hill Road location) to simulate a discharge flow in excess of the Sun Homes'water demand. This test shall include a hydrant discharge of at least 1,000 gallons per minute (gpm) for a duration of 5 minutes. The discharge hydrant will be located on the Reckson Executive Park site in the general vicinity of the proposed Sun Homes' water main connection. Hydrant#289 in BelleFair shall be flowed at 300 gpm at the same time as the one at Reckson. A hydrant located at the highest elevation on BelleFair Boulevard in the circle shall be monitored/recorded for pressure before, during and after the test at 1 minute intervals. After 5 minutes, the discharge hydrant flow shall be reduced to 500 gpm and shall discharge for another 5 minutes. Pressure readings shall be recorded again at the Bellefair site during and at the end of the test. During these same intervals,residual pressure readings shall be taken at a hydrant in Doral Greens' community farthest from the connection to the 16" water main along Anderson Hill Road. Residual pressure should also be taken before, during and after the test on a hydrant located on the suction side of the booster station on Anderson Hill Road. For information purposes, only, it should be determined whether the second pump has been activated anytime during this test. The results of the test shall be provided to the Village Consulting Engineer for review and a determination whether the BelleFair or Doral Green community would experience a substantive change in water pressure by reason of the provision of water service to the Sun Homes community under current water system operations. Submission to the Village Consultant Engineer shall include the input and results of the model output at the various testing locations referenced above, including information of other extremities of the system such as Lincoln Avenue at Cerebral Palsy of Westchester. The submission shall also include the current results of the model of the water system during peak hour in Doral Green and in BelleFair. Results of the new flow tests shall be plugged into the model and the results of the impact of the tests on the model shall be submitted to the Village Consulting Engineer. The model shall have elevations at the nodes used. Under no circumstances shall a building permit be issued without confirmation from the Village Consulting Engineer that provision of water service to the Sun Homes community is not expected to result in a substantive change in water pressure to the communities at BelleFair, Doral Green and to the customers on the"suction side"of the BelleFair pump station. 5. Consistent with comments from Westchester County set forth in its memorandum dated February 12, 2016, to offset projected increases in sewage flows from this site into existing infrastructure, including adding volume of sewage flow requiring treatment at one of the treatment plans operated by Westchester County, the Applicant shall contribute $100 per dwelling unit toward a future inflow and infiltration study in the Village. 6. The Board of Trustees recognizes the Westchester County Planning Board's recommendation regarding the revision of plans to include sidewalks along roadways within the development and along International Drive, as well as a pedestrian connection between Sun Homes and BelleFair, but the Board of Trustees is satisfied with the plans as proposed without sidewalks because the development is not located on a through street so will not be heavily trafficked, street lighting has been added to the proposed plans to make the streets safer for pedestrians, and the inclusion of sidewalks will reduce the amount of open or green space available on the Property. 7. The Applicant shall cooperate with the Village in developing guidelines for future renovations, home expansions or additions to ensure that no more than 11,000 square feet of additional impervious surface coverage is added to the site without further review and possible modification of the stormwater management system. 8. Prior to the issuance of any building permits the following additional conditions shall be satisfied: a. A performance bond shall be submitted in a sum determined by the Village Engineer/Superintendent of Public Works and shall be furnished to and accepted by the Village, to guarantee the satisfactory and complete installation and construction of all infrastructure and public improvements, as determined appropriate by the Village Engineer/Superintendent of Public Works and approved as to form by the Village Attorney. b. All outstanding comments of the Emergency Services Task Force in its December 7,2015 memorandum shall be satisfied. c. Submission a maintenance agreement for stormwater management facilities, including rain gardens and permeable pavers, for review of the Village Attorney as to form. Such agreement shall be recorded in the Westchester County Clerk's Office and proof of recording shall be submitted prior to the issuance of a Building Permit. d. The approved site plan(s) for Reckson Phase 1 and Phase 2 shall be amended as necessary to accommodate aspects of the PUD Site Plan,including fire access, changes to International Drive, and relocation of the existing trash enclosure and maintenance yard at the rear of the existing parking area. e. The note on the Landscape Plan shall be revised to state that where trees are removed from the buffer areas, additional trees shall be planted to eliminate gaps created in the existing vegetation resulting from the removal of dead, dying or diseased trees. f. Submit to the Village for review and approval of the Village Attorney as to form, all necessary easements to be recorded in the Office of the Westchester County Clerk. Proof of recording shall be submitted to the Village prior to the issuance of a Building Permit. g. The Applicant shall obtain approval from New York State Department of Transportation, Connecticut Department of Transportation and/or the Town of Greenwich, as applicable, for changes to the signal timing for the intersection of King Street and International Drive for the weekday morning peak hour and for the intersection of King Street and Anderson Hill Road for the weekday afternoon peak hour as set forth in the May 19, 2015 memorandum from F.P. Clark Associates. BE IT FURTHER RESOLVED, that pursuant to Village Code §250-7.E(3)(a) the Board of Trustees hereby waives the floor area limitation of 9,000 square feet per acre, set forth at Village Code §250-7.E(2)(d)(1), to allow 12,109 square feet of floor area per acre to be developed due to the inclusion of walk-out basements and attached garages in the design of the dwelling units which are included in the calculation of gross floor area,but contribute positively to the design and layout of the residential community without creating any adverse impacts as the property is capable of supporting the additional buildable area;and BE IT FURTHER RESOLVED, that no permits shall be issued until the Applicant has paid to the Village all applicable fees and professional review fees incurred in connection with review of this Application;and BE IT FURTHER RESOLVED, that for the ten (10) units of affordable housing, the applicant shall work with the village's affordable housing consultant (i.e. the Housing Action Council)to comply with the requirements of the Westchester County federal housing settlement for the purpose of having these units qualify towards satisfying the affordable housing mandates in the settlement;and BE IT FURTHER RESOLVED, that the applicant shall discuss the possibility of connecting walking trails with the BelleFair and Doral Green Homeowners Associations. TRUSTEE EPSTEIN AYE TRUSTEE HEISER AYE TRUSTEE KLEIN NAY TRUSTEE REDNICK AYE MAYOR ROSENBERG AYE State of New York County of Westchester ss: Village of Rye Brook I hereby certify that this is the Resolution adopted by the Board of Trustees of the Village of Rye Brook which was duly passed by said Board on February 23,2016. IN WITNESS WHEREOF,I have hereunto set my hand and affixed the Seal of the Village of Rye Brook,this 25 h day of February,2016. Village Clerk