HomeMy WebLinkAboutMP23-061 BR �S-
O`
tcu
Ql•``4 jJ
19
VILLAGE OF RYE BROOK
MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR
Jason A. Klein (914) 939-0668 Christopher J. Bradbury
www.ryebrook.org
TRUSTEES BUILDING& FIRE INSPECTOR
Susan R. Epstein Steven E. Fews
Stephanie J. Fischer
David M. Heiser
Salvatore W. Morlino
CERTIFICATE OF COMPLIANCE
June 5,2023
John Cooper&Rosa Cooper
98 Brush Hollow Close
Rye Brook,New York 10573
Re: 98 Brush Hollow Close, Rye Brook,New York 10573
Parcel ID#: 129.84-2-87
This document certifies that the work done under Mechanical Permit #23-061 issued on 5/1/2023 for the
installation of a new boiler and a direct water heater has been satisfactorily completed.
Sincerely,
Steven E. Fews
Building&Fire Inspector
/to
QyE BRC��,
O� 2m
F o
1982 BUILDING DEPARTMENT
UILDING INSPECTOR
X❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK
.❑.CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573
(914) 939-0668 FAx (914) 939-5801
www ryebrook.org
- - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - t - - - - - - - - - - - - - - -
ADDRESS : �, V , ,J \V�V ATE: 2
-7 PERMIT# ISSUED: JEM: BLOCK: LOT:
LOCATION: OCCUPANCY:
❑ VIOLATION NOTED THE WORK IS... [] ,ACCEPTED ❑ REJECTED/REINSPECTION
❑ SITE INSPECTION REQUIRED
❑ FOOTING cc-
0 FOOTING DRAINAGE
❑ FOUNDATION
❑ UNDERGROUND PLUMBING NOTES ON INSPECTION:
❑ ROUGH PLUMBING
❑ ROUGH FRAMING
❑ INSULATION
❑ NATURAL GAS
❑ L.P. GAS /t
❑ FUEL TANK
❑ FIRE SPRINKLER
❑ FINAL PLUMBING
❑ CROSS CONNECTION
❑ FINAL
❑ OTHER
s
s =
a =
a
r N C W
r N
Gn a 0�cn
10
r
L v h
ca
v
= F° 1 00
N
W00
b C
►n q D o w O Q r
O Z ® r' C O F0-" 3 G a'
f v W
W '" w d O C ° -O r
M "
00
Ln
co
Mo ° Iwo,
� w6 U
O O a °O' a QI
� H pi� o? . g 0 j
w z
V p A o w ° Eov � " 4 w =
p
U o 0 y W
p4 d Z O Q a� Y UU
o O o I°+ 1
CA
C7 A aW. >1 y a~ v o
Cl � " "�
G1 W Ei o � j o -0
� � � U O W oF' •� � .�
DECEME
APR 2 1 2023
B01MING DIEPAR'I'MFNT VILLAGE OF RYE BROOK
VILLAGE OF RYE BROOK BUILDING DEPARTMENT
938 KING,STRIaT Rvv.I3ium.NY 10573
(014)`�t39-066a
W'hV1,r}etollrook.ort
APPLICA"1'10'% FOR PERMIT 10 1 NSIALL AND/OR Rk.ru)yk:
HVA'1'ING,VENTILATION AND/OR .SIR C'ONDI'MNING EQUIPMENT
FOR OFFICF USE:ONLY PERMrr 4
Approvat Datc: Pcmit Fan:$
� D
4pprovat Srgnaturc: -- _ -- Other--
DisWproved:
RRttRitiAsix................11 ..............R#R#aR#RR###!#!R!!!-lV,lff!!R!!!!llRt.......................
RE4UIREMENTS FOR RELFAS�.OF PERMIT&C'rRTIVIC:ATF..or ComPL1ANCE:
1. Properly completed&Sitmcd Applieat in,
2. SitrAtaging.Plan if Required by the)3utldtne Inspector-
3 Copy of I-scensed Contractnr s LYabdity Insuranco.k vmave ni R%a 14n4 mmoo he ltar4 es ocnitlGtc tk det I&Worl:c:rs
Compensation Im-uranec on a NYS Board ftxm itmm v k'Ir.o5 tort Form=t1z6.t ec N?'titate Wtxtc��c'sn:��lnon u'nn.Yi
4. Payment or Fcr;-0,'nit RESIDENTIAL S140.60hmit•COMMEKC'IAI.-$350 0nitsmt
lnspc tion by the I3utJdmg Drpanlment for rcnimal andla installation.(4R Jrrsnr notice rryrured)
G. Electrical work requires a separate Electrical Permit&Electrical Inspection-
7 Plumbrnp Tias wurk requires a sepaTwe Plumhing Permit&.Plumbing Inspection.
♦###!R!!!!!!fi2lfi !!fi ...........IR•fR!#1RfRRRlR!!!R!!!R!!R!!!!!!!t�lt i!!i lei•#►i i1#;#!*!filfitR*#1
Applivatiun daeurl. � � r.herv+A-made a.dw Rktilding lnjnx&M u(elu VrnaFe or Rv� F:nx,k 6'T:i lkatarit GA the
installation and or rcmova cif th.:IIVA( uquipmeni as listed bclLxv.'11c alRdreaw and jvori:Tt. owner.ha �gnmg this docutrrera
apws that said egwprncnt w oil lc insral)W andkK rsxmuved m cimformancc with all appiicabk Lcwat.County.State&Federal lmuw,
codes,ruh-c and
<rLioulmion c
I. Addre�:ems,.yL�17`�ali�c�{l L (.a Xv�f '-T1a�C SUL.
r'rnl+ertp tlwYY /('e�' Ong � AadtLer h'It� (�� lt_l_eyr_-
t(Ii i:h.,ne a 9 �-'7.j '7 fi' �' (illr��r,lI r��c1IG ( '�f l�mria- JrC r �� MA,4,el?rr'
Pl7uall[g.
4 ticor*.of Work:IQ-%tnsaallatim( )'Rg4arcmcnt{yj!Rututval( j•Otht.T
5 Lest Equvisicot /e r _-_0.1�
$ l<>retlon 01}yuilxne ni all C /�G _ l /1-S
7. k"iodotinslallabonfl?= val(�:�n��Roxln"dedtoperfumj.m)
STA"TF'.(W NFW YORK,C'UUNTY(W WIi STC HESI'liK I a,
.bcmg duly sMom'dcpc6c-.,will 3atc%that Wshc is the applicant abu-uarual,
(pr9 name at.sv;a.al<itpwwe x r.,
and lu thet states that(s)he is the I Iwtinp, Ventilation swidor An c_otulitiooing Contractor Cur the legal owmcr and is ditiv
authorwed In make and fil-e this ain4ieatim
That all aoteiriuiauontaated hcmm arc true to the hc.a of hiJhur knowledge and belirl',atwi Chili any wcwl;pert-mod.or u-
"mi,duetaxl at the above captiea"pmptz T�will be in amfcvmanc.:with tlx deu u6 as act f-rib anti umtairtcd mi thts appltcatinn
and in am aewmpan}'my,rMmcid titans and spocifcawmis,m well wN in acairil incc with the Ncw YorL:State tinifintn Fin:
Prcv--muun&liuddtng l'cxlc,the Ctitic of the Village of Rye Ritx*and all othcx applicahlc law:,twdinaticci and tegulatxwts
.�7/-vi( 1
Swom to hefom ine..Chi. _;,;, Swcaiie to hel'are me this
Clay of� r 1 2a dal of __»20_&3 01
'Signature 14-Pto.;L le e Signature of Applicant
i , Wncof prci cyu„ Paint Nstnc p t
Nei ptthhr Now Pub
u .on Dee Hammond
Notary Puarc MIRIAM T GRIGERA
' ?tuona Notary Public-State of New York
Mcult:opaY.
My comm.&P-07PA23 NO.0IGR6344915
Comm;m on No.997101 Qualified In Westchester County
My Commission Expires Jul 11,2024
Ns application must be prtltierty completed in its entirety and trust include the notarized signatures)of
the legal owner(i)of the subject property,and the applicant of record in the spaces provided.Any
application not properly completed in its entirety and;ac not properly signed yhal I be beamed null and void
and will be returned to the applicant
2
4'.
1
Oil Fired,
Chimney or Direct Vented,
Cast Iron Water Boiler
_ t 87°o AFUE. ENERGY STAR-, certified
=r ` -Exceeds DOE-2021 requirements
• 3-pass cast iron sectional design
• Integral. pre-installed low water cut-off(LWCO)
es
• Beckett and Carlin burner options
• Designed for ease of service
—Reversible swing-away burner door
—No target wall
—Removable rear plates access flue passages
• Lifetime limited warranty
• Five sizes available. 0.60-1.60 GPH
Intelligent Controls Simplify
Installation and Operation
Primary Ignition Controls
• Advanced display and diagnostics
—Honeywell" R7284 (for Beckett burner builds)
—Carlin°Pro-XTm 70200(for Carlin burner builds)
HydroStat` 3250 Three Function Hydronic Control
• Easy temperature control
• Low water cut off—selectable auto or manual reset
ECM Circulator included • Fuel savings with thermal targeting or traditional
(Taco or Grundfos) outdoor reset capability
$100+ value • Thermal pre-purge circulation uses latent heat
at no extra charge! before starting new heat cycle
• Easy settings and monitoring
• Primary circulator control function
• LED active status indicators assist contractors and
consumers
BoilerCompany —High temperature. LWCO, economy operation
• Dynamic digital display
—Displays boiler supply temperature and outdoor
temperature (if ODR installed)
—Automatically displays set points during
adjustments
EMP: Technical Information
H Intertek
Standard Equipment EMP Ratings & Specifications
• Precision cast and machined Burner Net Minimum Chimney
sections Capacity Requirements• Return mixing manifold p � DOE AHRI r1 U Approx.
• Powder coated steel jacket Heating Ratings = Round Shipping
• Insulated jacket(Y) Cap. Water 07-70:1 Dia Rect. Height Weight.
• Reversable burner door Model 7GPHMBH' (MBH)2 (MBH)' AFUE% (In.) (In.x In.) (Ft.) (lbs.)
• Removable clean-out ports
• Mounted and wired controls EMP84E 0.60 84 74 64 87 6 8 x 8 15 430
11
• 30 PSI relief valve
• Barometric draft regulator Boiler drain valve EMP140E 1.00 140 123 107 87 6 8 x 8 15 545
•
• Circulator,ECM EMP182E 1.30 182 160 139 87 7 8 x 8 15 658
-Taco®or Grundfo0 EMP224E 1.60 224 197 171, 87 7 8 x 8 15 771
• Primary ignition controls
-HoneyweltO R7284(Beckett°) NOTE:Maximum working pressure:water:30 PSI standard,40 PSI optional
-Carlin®Pro-X1m7020O(Carlin) Optional Equipment: 1. MBH refers to thousands of BTUs per hour
• HydroStat®3250 hydronic Control Direct vent kit(140&182 P/N:102130-02) 2• Based on standard test procedure prescribed by the U.S.DOE at
-LWCO,auto or manual combustion conditions of 13.0%CO2
• Direct vent kit(224 P/N:102130-03)
-Temp control,economy Outdoor sensors;Hydrolevel 48-140,48-145 3. Net AHRI ratings are based on a piping and pickup allowance of 1.15
operation -Available through wholesale distributors
-Thermal targeting
-Thermal pre-purge
-Primary circulator control
-LED status indicators,digital
display
Dimensions I I I
Vent Optional
Model `A' 'B' 'C' Connector Starter"T"
11-5/16" Imo- EMP84E 16-5/8 24 5 Model Diameter Depth'D'
00 EMP115E 16-5/8 24 5 EMP140E 5 14
8-7/8" EMP140E 22-5/8 24 6 EMP182E 5 14
--- ® °O° EMP182E 28-5/8 30 6 EMP224E 6 14.5
EMP224E 34-5/8 36 7
Boiler Control TOP VIEW
-- A +— 12"MIN.
J
Temp/Pressure -B(MIN.) Rear Service
Gauge Clearance
Front Service Clearance 1 1/2„
Burner Swing (Flueway Cleaning)
Door `' FPT Return Piping
Clean-Out
Flame Observation_ over
Port (DIA.) I
33" Collar T
Smokebox Collar
II II Drain Valve • 21-3/8"
I CEO
—19"MIN.- 22-5/8"
Burner Swing Door Clearance Spanner Bar w/
(Fully Open) Adjustable Legs
FRONT VIEW SIDE VIEW REAR VIEW
www.usboiler.net Boiler Compaml
USBL19041-10ms 2/20 02020 U.S.Boiler Company,Inc.-Lancaster,PA
Printed in the U.S.A. Phone:1-888-432-8887
Suggested Specifications - SMART Series Tr i a n S l e
Product Specifications
Model Dimension Height Boiler/Supply Domestic 3rd Domestic Domestic Heating Heat Empty
No. Return Inlet/Outlet Connection* Capacity Water Capacity Surface Weight
•. •. • •
Smart 30 22"dia. 38" 1" 3/4" 3/4" 28 5 13 115
Smart 40 22"dia. 46" 1" 3/4" 3/4" 36 6 16 135
Smart 60 22"dia. 66" 1 1/4" 3/4" 3/4" 56 8 24 190
Smart 80 26"dia. 61" 1 1/2" 11/2" 11/2 70 14 28 271
Smart 100 26"dia. 78" 11/2" 11/2" 112' 95 25 36 362
Smart 120 32"dia. 72" 2" 1 t/2" 1 t/2" 119 43 42 479
(')This fitting can be used as a return connection if circulated domestic water is required or can be used as a connection for the T&P Relief Valve.
Performance
i Model Boiler • Peak/Flow
• Btulhr Recovery . •
.. •.
Smart 30 87,000 140 115 40
Conditions:
Smart 40 112,000 180 150 50 200"boiler water supply
Smart 50 140,000 220 185 65 90"temperature rise
Smart 60 270,000 410 360 100
Smart 80 300,000 460 400 125
Smart 100 337,000 525 450 150
Smart 120 420,000 650 560 190
U"Ic 12!290) 3 _'(X)9-47 SMAKI'Suggested Spec