HomeMy WebLinkAboutNYS DEC 2023-2-23 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Division of Water,Bureau of Flood Protection and Dam Safety
625 Broadway,Albany.New York 12233-3504
P:(518)402-8185 I F:(518)402-9029
www.decny.gov
February 23, 2023
Michael Ford
Blind Brook Club
Golf Course Superintendent
P.O. Box 229
Purchase, NY 10577
Re: Blind Brook Club Dam, DEC Dam ID#: 232-2747
Class C — High Hazard Dam
Rye brook (V) & Harrison(T), Westchester County
Condition Rating: "Unsound — Deficiency Recognized"
Dear Mr. Ford:
Berhanu Gonfa, Ayotunde Adebajo and I conducted a routine inspection of the
Blind Brook Club Dam, a High Hazard Dam, on Feb 7, 2022 as part of the Department
of Environmental Conservation's (Department) ongoing Dam Safety program. I would
like to thank Jeff Sorkow for joining us during the inspection and discussing the details
of the dam. I am writing to you because it is my understanding that you are or represent
the owner of this structure. A copy of my Visual Observations is enclosed for your
information.
Inspection
The left/right nomenclature used in this letter and in the enclosed Visual
Observation Report is based on looking downstream.
Deficiencies may exist beyond those identified here. The Department's visual
inspections are not intended to take the place of a comprehensive engineering
evaluation by a professional engineer. The Department's inspection observations and
notes should not be relied on for "risk management/assessment" or other financially
based determinations.
Regulations
The following table summarizes the current status of compliance for this dam for
those sections of the regulations that have specific deadlines for compliance.
NEWYORK Department of
S IAiI Of
OPPONIUMIIY Environmental
Conservation
Page 2
Citation Requirement Status
673.6 Develop and implement an Inspection & I&M Plan not requested during
Maintenance Plan (I&M Plan). Plan does this inspection.
not have to be submitted to the Department
but needs to be available for inspection if
requested.
673.7 Develop and distribute to the local VIOLATION — EAP, last
emergency responders an Emergency reviewed in 2022, continues
Action Plan (EAP). EAPs should be updated to not be acceptable. See
on an annual basis. To be considered "final" comments below.
a completed Promulgation and Concurrence
(P&C) form must also be submitted
indicating that the EAP has been distributed
to and coordinated with local emergency
responders.
673.8 Submit an Annual Certification (AC) to the The latest AC received was for
Department January 31 of each year calendar year 2022.
(certification is for the previous year).
The Dam Safety Annual Certification form
can be completed online through
the NYSDEC eBusiness Portal at:
hftps://www.dec.ny.gov/pubs/95925.html.
673.13 An Engineering Assessment (EA) shall be An EA was received August
performed, and an engineering assessment 19, 2014. Next EA is due
report submitted to the dam safety section, August 19, 2024.
at a minimum frequency of every 10 years
for dams that have been assigned a hazard
classification of class B or C.
EAP Comments
The EAP is still lacking a P&C form. Please submit a P&C form. A P&C form can
be downloaded from the Dam Safety webpage at:
http://www.dec.ny.gov/lands/58691.html.
Condition Rating
The Department Assigned to the dam a Condition Rating of "Unsound —
Deficiency Recognized" via a July 24, 2019 letter from Syed Alam. The Condition
Rating was due to the dam's inadequate spillway capacity, as revealed in the 2014 EA.
The Condition Rating is still valid as the dam has not been rehabilitated yet and the EAP
is not acceptable. This Condition Rating means that the deficiencies at the dam are of
such a nature that the safety of the dam cannot be assured. This is a violation.
Page 3
Please keep in mind that any repair or construction activities related to the dam
may require permits from the Department. Well before beginning work on the dam,
please check with the Regional Permit Administrator at the Department's Region 3 —
New Paltz office at (845) 256-3054 to see if any permits are required.
If you have any questions, please feel free to contact me by phone at 518-408-
0338, or by e-mail at john.smithta')_dec.ny.gov.
Sincerely,
John Smith, P.E.
Professional Engineer 1 (Environmental)
Dam Safety Section
ec; Jason A. Klein, Village of Rye Brook, Mayor, mayorCcDryebrook.org
Rich Dionisio, Town of Harrison, Supervisor, rdionisioC@harrison-ny.gov
Dennis Delborgo, Westchester County, EMO, drd2(a)westchestergov.com
Donald Canestrari, NYSDEC, Dam Safety Section, Chief
Ayotunde Adebajo, NYSDEC, Dam Safety Section
Berhanu Gonfa, NYSDEC Region 3, Dam Safety Representative
Page 4
Michael Ford
Blind Brook Club
Golf Course Superintendent
P.O. Box 229
Purchase, NY 10577
mford(cD blind brookclub.org
New York State Department of Environmental Conservation _
Bureau of Flood Protection and Dam Safety
NNW
Visual Observations
DAM NAME Blind Brook Club Dam
STATE ID 232-2747 SECTION C HAZARD CODE C
COUNTY Westchester INSPECTION DATE 2/7/2023
NEAREST DS CITY/TOWN Rye INSPECTOR(S) BXG/JZS/ATA
OWNER'S NAME BLIND BROOK CLUB
DOWNSTREAM HAZARD High TOWNSHIP Village of Rye Brook
Town of Harrison
WATER LEVEL BEHIND DAM Impoundment is drained
DRAIN OPERATION Reportedly drawn down at the end of the gol season
DEFICIENCIES
❑ 1)Seepage ® 4)Maintenance ❑ 7)Cracking
❑ 2)Slope Stability ❑ 5)Surficial Deterioration ❑ 8)Movement/Misalignment
❑ 3)Undesirable Growth ❑ 6)Voids ❑ 9)Data
General:
—Inspected with Jeff Sorkow
—Trees and brush within 20 feet of the dam perimeter.
Upstream:
—Efflorescence and horizontal void along construction joint.
Dam Crest:
—Minor concrete deterioration and cracks.
Downstream:
—Low spot on right abutment.
02/07/2023 Page 1 of 5
k
t
'k �kr
Pho'ttoo 1 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Upstream Face
y.
Photo 2 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Upstream Face
02/07/2023 Page 2 of 5
r
Photo 3 Dam lD# 232-2747 Blind Brook Club Dam 02/07/2023
Left Dam Crest
�L7
Photo 4 Dam lD# 232-2747 Blind Brook Club Dam 02/07/2023
Dam Crest
1 1 I of
.L•`a 1
r
Photo 5 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Right Dam Crest
,
"�,� A �. �._ ,(.,•>�•R�' ' . `err �
Photo 6 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Right Abutment
Note: Low Spot
02/07/2023 Page 4 of 5
.i i jr.t.. •�v
Photo 7 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Downstream Face
Photo 8 Dam ID# 232-2747 Blind Brook Club Dam 02/07/2023
Low Level Outlet Conduit
02/07/2023 Page 5 of 5
BLIND BROOK CLUB 1A
ENGINEERING ASSESSMENT(EA) RECOMMENDATION IMPLEMENT1 PROGRESS
•
EA DESCRIPTION DESIGN 1R CONSTRUCTPERMIT
ITEM IMPLEMENT
Repair and remediate concrete N/A(DEC
1 (cracks, spalls, honeycombs, December 2014 July 2015 letter dated November 2015 Completed
eroded joints) 7/29/15
TV Inspection of 36" outlet pipe December 2015 N/A N/A N/A Completed
Repair of sluice gate operating December 2014 November N/A November 2015 Completed
ste m 2015
Construction
attempted in 2015.
Location was
Installation of trash rack at the March blocked by organic
4 sluice gate/outlet pipe 2016 2023 2024 2026 mass. Permitting
and construction to
be incorporated
into spillway
ro�ect.
Increase spillway capacity to
5 convey Spillway Design Flood In Progress
SD
5A Initial draft Alternatives Report May 2015 N/A N/A N/A Completed
Initial discussions with adjacent
513 landowner re: spillway alternatives 2015-2017 N/A N/A N/A Completed
(closure dike vs. lateral weir
" Safety Inspection 2017/2018 N/A N/A N/A Completed
Detailed discussions with adjacent
5C landowner re: spillway and closure 2018 N/A N/A N/A Completed
dike
5D Property Master Plan Update 2018 2019 N/A N/A Completed
Irri ation, Drainage, Spillway)
p
Safety Inspection 2019/2020 N/A N/A N/A Completed
5E Final Spillway Report based on 2019 N/A N/A N/A Completed
Approval of Master Plan p
5F Property Master Plan Local Permit N/A N/A 2020 N/A Completed
Irrigation Pump Replacement N/A 2020 N/A 2021 Completed
within Intake Riser
Safety Inspection 2021/2022 N/A N/A N/A Completed
5G Capital Plan by Owner N/A 2022 N/A N/A In Progress
5H Submit spillway report to NYSDEC 2022 N/A N/A N/A Future
5J Spillway design N/A 2022 N/A N/A Future
51 Negotiate and secure land rights 2023 N/A N/A N/A Future
' Safety Inspection 2023/2024 N/A N/A N/A Future
5K Spillway Local Permit(Harrison) N/A N/A 2024 N/A Future
Page 1 of 2
BLIND BROOK CLUB 1 ►
ENGINEERING ' ►) RECOMMENDATION IMPLEMENT► 1 PROGRESS
DESCRIPTION INVESTIGATE DESIGN OR PERMIT CONSTRUCT
STATUS
IMPLEMENT
5L Spillway Local Permit(Rye) N/A WA 2024 WA Future
5M Spillway Permit(DEC) N/A WA 2024 N/A Future
Future(may be
Next EA Due 2024 N/A N/A N/A extended by DEC
during spillway
ermit rocess
5N Update Capital Allocation by Owner N/A 2025 N/A N/A Future
LSafety Inspection 2025/2026 N/A N/A N/A Future
5*0 Construct spillway N/A N/A N/A 2026 Future
Page 2 of 2