Loading...
HomeMy WebLinkAboutMP22-183 BR(�v� V� 1 �1�u4 uu�j VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A.Klein (914)939-0668 Christopher J.Bradbury www.ryebrook.otg TRUSTEES BUILDING & FIRE INSPECTOR Susan R.Epstein Steven E. Fews Stephanie J. Fischer David M. Heiser Salvatore W.Morlino CERTIFICATE OF COMPLIANCE April 18,2024 Dania Cruz-Ponce 1A Wyman Street North Rye Brook,New York 10573 Re: 1A Wyman Street North,Rye Brook,New York 10573 Parcel ID#: 141.35-1-3 This document certifies that the work done under Mechanical Permit#22-183 issued on 12/7/2022 for the removal of an above-ground oil tank and the installation of a temporary above-ground oil tank has been satisfactorily completed. Sincerely, Steven E. Fews Building&Fire Inspector /to �yE BRC�v�. �m BUILDING DEPARTMENT [I BUILDING INSPECTOR IQ ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK / ❑CODE ENFORCEMENT OFFICER 938 King Street. Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - -- ADDRESS : / ,4 w Y m/g/Y /V o Q ! n DATE: el- / / - Z VZ PERMIT# 'PA Z Z " I U 3 ISSUED: /G-,7'L LSECT: fl jS BLOCK: / LOT: 3 LOCATION: l S 1 n e U ll S4 OCCUPANCY: ❑ Violation Noted THE WORK IS... Q- PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION � A �� �� �� � / ❑ Natural Gas LL- W o 2 1. S P I L L ee/2o 2. t ❑ L.P. Gas C LoS( � ,,c1 CCoScre 2P POD.1 IFC - MOW' FUEL TANK ❑ FIRE SPRINKLER / U SS(I i ❑ FINAL PLUMBING ❑ CROSS CONNECTION FINAL ❑ OTHER M o . p a z � b o 00 po V) a a oWNW *k z � a � • a W I"{ W a C6CA p • a rl In z tn 0.4 00 pp M 2IL O � _ a � z � O � w � w g � � ov •ag � _ o a• o cn Q _ >nd ►' d Q 4 a v .- O rT M GD H .w N — � A Z o `p O A � ,5 U /�� 5 'r�y'' 0 v v Gcd W Fra1 O r,- b a M M'•� W Q W o • A U O z t� }aa■� � �, O w a � F � � a -I-- 3 o U � a 5 z U w ayo � o V � C460.0 No U U Uw IS h O w o a z of �� � � a o O 0 Q O e'� V $ ba � w•� O A Z Am o0 o � .� �� � peas �=i �i I Gq fit' ►-� �l w A � � � a -o a a ���414141441414144;441441444494N494000414;4-04;40419999994141 D BUILDING DEPARTMENT D 0 v REWI-fE NOV Z 9 Z012 VILLAGE OF RYE BROOK PLANS 9 8 KING STREET RYE BROOK,NY 10573 JUN 17 2022 DATED; (914)939-0668:'' VILLAGE OF RYE BROOK wNy .ryebrook.or„; BUILDING DEPARTMENT Application for Permit to Remove, Abandon and/or Install Fuel Storage Tank (*Storage Tanks in excess of 1,100 gallons require registration with the County of Westchester) FOR OFFICE USE ONLY: PERMIT#: iJ�� ._._...__.._. Approval Date: DEC Permit Fee: $ 37 Approval Signature: Other: Disapproved: (fees are non-refundable) REQUIREMENTS FOR RELEASE OF PERMIT& CERTIFICATE OF COMPLIANCE: 1. Application Completed by Bonded, Licensed Contractor. 2.Your contractor's valid proof of liability insurance. (Village of Rye Brook must be listed as certificate holder) 3. Your contractor's valid proof of workers compensation insurance. (Form# C105.2 or Form#U26.3 /or NY State Workers Compensation Waiver) 4. Fee per Tank: Removal,Abandonment, or Installation: $185.00 per Tank.. 5. Dig Safely New York#(dial 81 1): 6. Inspection by Building Department for removal/abandonment and/or installation. 7. Submit all Manifests &Reports(after work has been completed). 8. Certificate of Compliance will be provided when all requirements are fulfilled. Application dated, is hereby made to the Building Inspector of the Village of Rye Brook for a permit to remove,abandon,and/or install a Fuel Tank as herein described.The applicant and property owner,by signing this document agree that the subject fuel tank(s)will be removed, abandoned and/or installed in conformance with all applicable Village, County,State& Federal laws, codes,rules and regulations. Indicate Permit Type: Installation ( } • Removal •Abandonment ( )1 Above Ground Buried in Ground ( ) 1. Address: 4 4/01-j S13L: Zone:���/— 2. Property Owner&Address: �'4 �Y/nA� /i£ET � Phone#: _­_ Cell#: 94,- a/ - 906,(- email:�jD�r�/iRoR Z i✓�/jr,(,Cf� 3. Contractor&Address: � l� `R AV&Z - -75- �LV�/.0 C- �; l p 'N� fl,'�/ /9J:32- Phone#: Q/l/- 91- 3 � Cell#: ,9(K- -3-'L7 / /L7 emaiL Ca4'l 4. Applicant: A� LEA Phone#: Cell#:F/'f-39'7-/0/0 email: 2Y EEi✓� GPGU✓►� 5. Indicate Fuel Type: Fuel Oil )•L.P. Gas( )•Gasoline( )•Other( ): 6. Number and Capacity of each Tank: I-og?� L ( /- a7s r'AC Y 4,e7rCWL, OIL- _rAAhC1 ::4��,,24 y 7. Exact Location(s)of each Tank: 01,l? 4A/K Gu7 rb ®A/ AST Dom- - ��P /�J A 27F r�pu"s� t 8/12/2021 STAT1,#A1 1'.NEW YORK,COUNTY OF WESTCHEST'ER _ Ide ,being duly sworn,deposes and states that he/she is the applicant above named, (print name of individual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the CoRt:�A;rrg , for the legal owner and is duly authorized to make and file this application.(indicate architect,contractor,agent,attorney,etc.) That all statements contained bercin are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this co? Sworn to before me this day of 1.20 day of ,20L C-IpAre of Prope O er ,Q Signature of Applicant Print a of Property Owner Print Name of Applicant Vic. otary Public Notary lif6lic ANNABINASCO f�LIZABETH SARLES NOTARY PUBLIC,STATE OF NEW YORK NO.01131640%36 NOTARY PUBLIC-STATE OF NEW YORK QUALIFIEWIN WESTCIJESTER COUNT`' Thi =bME ,130bbtrlpleted in its entirety and must inclu tl�otl 045 signature(s) of the legal otivne s of the subject property, and the a li ''"}}�t}fie"';;}}LPui�Im c `y"K, p 1 ?'• 1 p �t}n1r�t�ttl �btT� Pir,P II-�2023 provided. Any application not properly completed in its entirety and/or not properly siencc S to �C deemed null and void and will be returned to the applicant. x 8/12/2021 Alfredo DiVitto From: O'Dee, John (DEC) <john.odee@dec.ny.gov> Sent: Tuesday, April 16, 2024 3:52 PM To: Alfredo DiVitto Subject: DEC Spill 2105448 Attachments: 2105448.2023-05-26.pdf Hello Mr Divitto, Following up on our phone conversation earlier this week concerning the heating oil tank at 1A Wyman St North, I did manage to speak with Ty Cole at Milro. He informed me that Milro removed the temp tank and installed a new AST on 5/26/2023. Milro forwarded a copy of their work order and a copy of a Rye Brook permit to me, I am attaching those documents.Ty Cole states that an Inspector from Rye Brook was present when the work was completed. From the information I have received from Milro and Westmore Fuel, the majority of the petroleum that leaked from the overturned tank was washed away in flood waters. There was no significant contamination that required remediation. Please be advised that I am closing the Spill number, the DEC requires no further action at this time. Please feel free to contact me if you have any questions. John O'Dee Environmental Program Specialist 1 New York State Department of Environmental Conservation 21 South Putt Corners Road, New Paltz, NY 12561 New Paltz: (845) 256-3876 1 Tarrytown: (914) 803-8146 1 john.odee(8-dec.ny.gov ZNTMOR Department of Am ATE Environmental `g Conservation NYSDEC 24 HR SPILL HOTLINE: 1-800-457-7362 1 Danbury,CT cylz203.743.6902 c � ) JOB LOCATION: I DATE: * I n sp e c to r W t l► be- TIME ARRIVED ON SITE: Y AM M TIME DEPARTED SITE: IS AM/e-Pne rc I -aprn to se e TEMP TANK SERVICE: ctlSCOrNreG`fGcl tcrr1p TEMP TANK LOCATION. . hk I FILL&VENT PIPE: I(GAL): VED CEMENT Do r1`� Q C r'U z, PRODUCT TRANSFERRE �� �� A t O TANK REMOVED: z7/6 (�� NO �/������TANK INSTALLED(SIZE/TYPE): 1...C_.O L1 0. TANK SERIAIIt: Rye rc)Qk. M y 10,573 TANK LOCATION: .OuFILL LOC.: Q �- Du _MANUFACTURER: Wwov PRODUCT TRANSFERRED(GAL): �a:O ) MANUFACTURE DATE: *-Tns -179-ecQ Qrd PRODUCTbISPOSED(GAI): �/�a3 O11 eXis+i fi PQ OI I *NOTIFICATION(Y/N) CONTACT: � 71ME: � A+tOtC(rt +Qn k to MATERIALS QUANTITY USE MATERIALS QUANTITY USED . pa cl w/•-Fi QI/�9Q�S NIPPLES t bo It's 2"X 2"ST.45 2"X 1/2" FLARE A 2"X 3/8 BLK 90 2"X 3/8"BLK NIPPLE 2"X 1/.2"BLK NIPPLE _2"X90 _ 1/2"BLK 90 2"X45 i 1/2"BALL VALVE 2"UNION 2"ST.90 OTHER 2"SCULLY ASSM.(STRAIGHT OR 45) CONCRETE SLAB 2"VENTALARM BOTTOM TANK VALVE 3/8 FLARES FIREMATIC VALVE MISC. SPEEDY DRY(BAG) GARB ER COMPLETE FILTER PLASTIC COVERING(EACH) 3/8"OSV LATEX GLOVES TIGER LOOP EXTRAS 3/8"TUBING(FT) 2"F/V PIPE TOTAL LENGTH(FT) 1/2"TUBING(FT) 2"PLUG FLEX CONDUIT(FT) TANK GAUGE 2"COUPLINGS 20X 21/2"DUPLEX BUSHING CUTS 2"X 3/8 DUPLEX BUSHING SAWZALL BLADES COLLISION POLE(S) hJ� MEN: ` IiRS: EQUIPMENT: HRS: Q E BRC�� ,I,- . 1982 BUILDING DEPARTMENT BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street•Rye Brook,NY 10573 (914)939-0668 FAx(914) 939-5801 wwwxy-cbrook.org - -- - - - - - -- - - - - -- - - - - INSPECTION REPORT - - - - - - - - - - - - - --- - - - - ADDRESS:_ IQ IliATE• PERMIT �f 2 ' # ISSUED: 1 SECT: I. BLOCK: LOT LOCATION: V1� OCC PAN Y: \ S<< ❑ Violation Noted E WORK IS... PASSED ❑ FAILED /REINSPECTION �G ❑ SITE INSPECTION U�� REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ Natural Gas ❑ •.P.Gas FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER 4117/24,6:26 PM Spill Incidents Database Search INW YORK Department of TE OF ORTUNITY Environmental Conservation Spill Incidents Database Search Details Spill Record Administrative Information DEC Region: 3 Spill Number: 2105448 Spill Date/Time Spill Date: 09/03/2021 Spill Time: 09.00.00 AM Call Received Date: 09/07/2021 Call Received Time: 11 :39:00 AM Location Spill Name: CRUZ -AST Address: 1A WYMAN ST NORTH City: RYE BROOK County: Westchester Spill Description Material Spilled Amount Spilled Resource Affected #2 fuel oil UNKNOWN Soil Cause: Storm Source: Private Dwelling Waterbody: Record Close Date Spill Closed: 04/16/2024 "Date Spill Closed" means the date the spill case was closed by the case manager in the Department of Environmental Conservation (the Department). The spill case was closed because either; a) the records and data submitted indicate that the necessary cleanup and removal actions have been completed and no further remedial activities are necessary, or b) the case was closed for administrative reasons (e.g., multiple reports of a single spill consolidated into a single spill number). The Department however reserves the right to require additional remedial work in relation to the spill, if in the future it determines that further action is necessary. If you have questions about this reported incident, please contact the Regional Office where the incident occurred. i Refine This Search j https://extapps.dec.ny.gov/cfmx/extapps/derexternal/spills/details.cfm?pageid=2 1/1