HomeMy WebLinkAboutBOT Resolution 2014-1-28 On a motion made by Trustee Epstein and seconded by Trustee Hesier,the following resolution was adopted. RESOLUTION CONSIDERATION OF AN APPLICATION FOR APPROVAL OF A SECOND AMENDED SITE PLAN APPLICATION BY K&M REALTY GROUP,LTD FOR PROPERTY LOCATED ON BOWMAN AVENUE WHEREAS, the Board of Trustees is in receipt of an application by K&M Realty Group, Ltd. for approval of an amended site plan to decrease the density from 18 dwelling units to 10 dwelling units on property located on Bowman Avenue, designated as Parcel ID 141.26-1-1.1 and 141.26-1-1 on the Town of Rye Tax Map and located in the C1 Zoning District and the Scenic Roads Overlay District;and WHEREAS, the Board of Trustees reviewed die following plans and application materials: I. Site Plan Application dated 11/4/13 2. Site Plan Submittal Review Check List dated 11/4/13 3. Short Environmental Assessment Form(Part 1) dated 11/4/13 4. Letter to the Rye Brook Village Board of Trustees from Kip Konigsberg,Purchase, N.Y.dated November 14,2013 5. Engineer's Site PIans prepared by John Meyer Consulting,Armonk,N.Y.: Sheet Number Sheet Title Dated M-1 Cover Sheet 4/7/06 rev. 12/16/13 M-2 Existing Conditions/Wetlands Delineation 4/7/06 rev. 12/16/13 M-2A 0veradl Site Plan 1/10/07 rev. 12/16/13 M--3 Layout Plan 4/7/06 rev. 12/16/13 M-3A Layout Plan(Sinp) 5/30/07 rev. 12/16/13 M-3B Open Space Plan 4/24/12 MA Gradin 72/16/13 g Plan 4/7/06 rev. M-4A Grading Plan(Strip) 5/30/07 rev. 12/16/13 M-5 Utilities Plan 4/27/06 rev. 12/16/12 M-6 Sediment and Erosion Controll WaterQzrako 12/16/13 Mitigation Plan 4/7/06 rev. M-6A Sediment and Emsion Coamll WaterQmality Mitigation Plan(Strip) 12/16/13 5/30/07 rev, M-7 S wdscaping Plan 4/7/06 rev. 12/16/13 M-7A Landscap4gg Plan(Strop) 5/30/07 rev. 12/16/13 M-7B LighlvzgNarz 4/7/06 rev. 12/16/13 M-8 Site Detailr 4/7/06 rev. 12/16/13 M-9 Site Details 4/7/06 rev. 12/16/13 M-10 Site Details 4/7/06 rev. 12/16/13 t i M-11 Site Details 4/7/O6 12/16/13 rev. M-12 Site Details 12/6/06 rev. 12/16/13 M-13 Utility Profiles 2/8/07 rev. 12/16/13 M-14 Mueellaneous.I zgvres 3/7/07 rev. 12/16/13 M-15 $esolsrtions 6/23/08 rev. 3/7/12 SU-1 Survey of Prope?ty 11/19/93rev. 10/ /08 WHEREAS, site plan approval was originally granted by the Board of Trustees on July 24,2007 after the Board of Trustees adopted a bindings Statement pursuant to the New York State Environmental Quality Review Act ("SEQRA") on December 16, 2006 following the preparation of a Draft Environmental Impact Statement and Final Environmental Impact Statement;and WHEREAS, on January 22, 2013 the Board of Trustees approved an application for an amended site plan to increase the density of the project from 10 single family dwelling units to 18 dwelling units consisting of nine (9) attached two- family dwellings,which approval was scheduled to expire on January 22, 2014,but was extended to February 28, 2014 by resolution of the Board of Trustees on December 16,2013;and WHEREAS, the Applicant now proposes to reduce the density back to the 10 single family dwelling units approved in 2007, with certain building changes approved on January 22,2013 that include increased building gross floor areas;and WHEREAS, on November 26,2013 the Board of Trustees,pursuant to the State Environmental Quality Review Act(SEQRA) determined the proposed action to be an Unlisted Action pursuant to SEQRA which will undergo a coordinated review;and WHEREAS, on November 26, 2013 the Board of Trustees referred the application to the Village of Rye Brook Planning Board for Report and Recommendation;and WHEREAS, the Planning Board of the Village of Rye Brook submitted a Report and Recommendation to the Board of Trustees dated December 12, 2013; and WHEREAS, on December 20, 2013 the application was referred to the Town/Village of Harrison, Port Chester-Rye Union Free School District and the City of Rye pursuant to General Municipal Law §239-nn and the Westchester County Administrative Code;and WHEREAS, on December 20, 2013 Notice of Intent to Declare Lead Agency was distributed to all Involved agencies; and WHEREAS, on December 20, 2013 the application was referred to the Westchester County Department of PIanning;and WHEREAS, the Westchester County Department of Planning issued comments dated January 13, 2014 and the Board of Trustees notes the following with respect to Westchester County's comments: i I. Response t Comment #1 - The Board of Trustees and Planning Board have similarly encouraged the Applicant to set aside of portion of the units as affordable housing; however, according to the Applicant affordable housing has been explored but is not feasible; 2. Response to Comment #2 — The Board of Trustees notes that the I development plan for the passive park on the "strip" portion of the Property(Parcel ID 141.26-1-1)was previously approved by the Board of Trustees in 2007 and 2013. The Board of Trustees further notes that shared parking at the Rye Ridge Shopping Center, as recommended by the County, would not be preferable to the Village as the Rye Ridge Shopping Center is private property and the number of parking spaces at the Rye Ridge Shopping Center is currently nonconforming. 3. Response to C mment#3—Approval of the project will be conditioned upon the submittal of a final, detailed monitoring and maintenance plan for all stormwater management facilities to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants, 4. Response to Comment 44 -- Comment noted. Approval from Westchester County Department of Public Works and Transportation for a curb cut on Bowman Avenue is required. 5. Response to Comment #5 — Comment noted. Although the Applicant obtained a Stream Control Permit from Westchester County Department of Public Worlcs and Transportation in connection with the Site Plan approved by the Board of Trustees in 2007, the Applicant must reapply fox a Stream Control Permit in connection with this Amended Site Plan application. 6. Response to Comment#6—The Applicant has offered to contribute 450 Pei: dwelling unit toward a future inflow and infiltration study in the Village. 7. Response to Comment#7 m-The Applicant will revise plans to include a bike rack or sitnilar bike parking area. WHEREAS, on January 28, 2014, the Board of Trustees opened a public hearing on the subject site plan application, at which time all persons interested were given an opportunity to speak on behalf of or in opposition to said application, and the Board of Trustees closed the public hearing on January 28,2014;and WHEREAS, the Village Planning Consultant, Village Engineering Consultant, Village staff, Planning Board and the Board of'Trustees reviewed the information and submitted comments regarding the application. NOW THEREFORE, BE IT RESOLVED, that the Board of Trustees hereby declares itself to be Lead Agency for the Project pursuant to SEQRA;and BE IT FURTHER RESOLVED, that the Board of Trustees hereby determines that, based upon the information stated in the RAF and supplemental information in the record regarding impacts related to traffic,generation of school- age children, parking, municipal services, stormwater management, aesthetics and other relevant environmental impacts, the Project will not result in any significant adverse environmental impacts not addressed or inadequately addressed in the enviromnental review of the Site Plan approved by the Board of Trustees in July 2007 and January 2013 and therefore, the Project does not require the preparation of a Supplemental Environmental Impact Statement, however, in the event the Village take title to the "Strip," deternnes to use a portion of such property as a dog park, and develops plans for such use, the Village shall undertake the appropriate environmental review of such use pursuant to the State Environmental Quality Review Act at that time;and BE IT FURTHER RESOLVED, that the Board of Trustees hereby determines that the Project will not result in any significant adverse environmental E E i i impacts based upon the information stated in the RAF and supplemental information,and hereby adopts the annexed Negative Declaration;and BE IT FURTHER RESOLVED, that upon written request of the Applicant, dated December 4, 2013, and due to the scope of the proposed amendments and the submittal of such documents in connection with previous and recent applications, the Board of Trustees hereby grants the Applicant's request for a waiver from submittal of the documents marked by the Applicant on the Site Plan Review Check List in the"N"and"NA"columns;and BE IT FURTHER RESOLVED, that the Board of Trustees hereby approves the site plan application referenced herein,upon the following conditions: 1. A copy of this resolution shall be attached to the building pertruit application. 2. Prior to the issuance of a building permit,the Applicant shall verify tbat is has received all necessary and applicable permits and approvals from the Westchester County Department of Health, Westchester County Department of Public Works and Transportation, New York State Department of Environmental Conservation and United Water Westchester. Satisfaction of this condition shall be detennined by the Village Attorney. 3. Prior to the issuance of a building permit, the Site flan shall be revised as follows: a. Show a bike rack or similar bike parking area on the strip in a location satisfactory to the Village Planning Consultant. b. Show that the two(2)parkizig spaces proposed to be "land banked" under the 2007 approval shall be"land banked"for construction in the fixture if determined by the Village Engineer to be necessary. Construction of such parking spaces if deemed necessary by the Village Engineer, shall be the responsibility of the Homeowners Association or Condominium Board and language to this effect will be included in the Offering Plan. Such parking spaces shall be constructed within six months of written notice from. the Village Engineer. c. Show the current tax lot lines as shown on the Town of Rye Tax Assessor's Map,as well as the Proposed tax lot lines. 4. Consistent with comments from Westchester County set forth in its memorandum dated October 15,2012,to offset projected increases in sewage flows from this site into existing infrastructure, including adding volume of sewage flow requiring treatment at one of the treatment plans operated by Westchester County, the Applicant has offered to contribute and shall contribute $50 per dwelling unit toward a future inflow and inEttation € study in the Village. , 5. Conditions of approval for development are as follows: a. Construction of basements, now and in the future shall be prohibited. Garages and attics shall not be converted to habitable areas. b. Parking shall be prohibited along the entire access road and all travel aisles. It shall be the responsibility of the Applicant and subsequently the Homeowners Association to place and maintain appropriate traffic regulation signage and enforce the"no parking"rules. c. Additional building bulk or structures of any kind (including, but not limited to additions to buildings, decks, enlargement of patios or walkways, or placement of sheds or other accessory structures) shall be prohibited by deed restriction and/or other appropriate measures subject to prior written approval by the Village Attorney. The foregoing shall not include repairs or rebuilding as originally approved. d. Provision of a final Tree Preservation and Protection Plan to the satisfaction of the Village Engineet/Superintendent of Public Works and/or consultants. e. Maintain the validity of the Steep Slopes Work Permit and the Petrait to Perform Regulated Activities in a Wetland issued by the Village of Rye Brook Planning Board on February 14,2013, by requesting any necessary extensions. Both permits are scheduled to expire on February 14, 2014. f. Provision of a final landscape plan to the j satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. g. Provision of a Final Stormwatet Management Plan to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. h. Provision of a Final Erosion and Sediment Control Plan to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. i. Provision of a final, detailed monitoring and maintenance plan for all wetland buffer and steep slope plantings to the satisfaction of the Village Engineer/Superintendent of Public i i Works and/or consultants. The Applicant and eventually the Homeowners Association or Condominium Board shall be required to inspect, maintain, repair and replace any and all wedand buffer plantings and steep slopes p2antings to comply with the design standard intended, the requirements of the Village Code and to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. j. Provision of a final, detailed monitoring and maintenance plan for all stotinwater management facilities to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. The Applicant and eventually the Homeowners Association or Condominium Board shall be required to inspect, maintain and repair all stormwater management structures and appurtenances in accordance with the approved plans to insure the proposed stormwater management facilities /function to the standards and objectives of the Village of Rye Brook stotmwater management ordinance and to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants. k. Ptovision of a final, detailed monitoring and maintenance plan for all steep slope rip-rap or other stabilization construction to the satisfaction of the Village Engineer/Superintendent of Public Works and/or consultants.the Applicant and eventually the Homeowners Association or Condominium Board shall be required to inspect, maintain, repair and be responsible for monitoring and maintaining the stability of steep slopes on the property to the design standard intended, the requirements of the Village Code and to the satisfaction of the Village Engineer/Supetintendent of Public Works and/or consultants. 1. The monitoring and maintenance of all stormwatet management facilities,wetland buffer and steep slopes plantings and rip rap or other stabilization construction required by the conditions of this resolution that are to be the responsibility of the Homeowners Association or Condominiumn Board shall be clearly and completely described un the condominium offering plan,subject to the prior written approval of the Village Attorney. in. Provision of a £mat construction management plan for the entire site prior to granting of a building pem-)it that includes specific times and i routes for trucks carting material to and from the site,including potential truck routes,number of trucks, number of trips, dust and noise mitigation measures and coordination with the Pont Chester Middle School schedule to avoid traffic conflicts during school arrival and dismissal times fox approval by the Village Engineer/Superintendent of Public Works, fire, and police services and any other consultants determined to be necessary by the Village Engineer/Superintendent of Public Works. Work shall be staged to minimize the number of trucks present at the site at any one time. n. Use of a turbidity curtain during construction i and/or any other method or methods determined to be necessary by the Village Engineer/Superintendent of Public Works, consultants or other approving agencies, to prevent migration of silt into the water environment surrounding the site. o. The Applicant, its successors or assigns, shall include text acceptable to the Village Attorney in the Offering Plan for the proposed Condominium or Homeowner's Association, advising prospective purchasers of conditions 5(a) to (c) and (i) to (1), (q), (s), (t), (u). 'There shall be no amendments to the Offering Plan, by-laws or Rules and Regulations concerning items 5(a) to (c); (i) to (1), (q), (s), (t), (u) of this Resolution without prior approval of the Village Board of Trustees. p. The Applicant, its successors or assigns, shall. include language acceptable to the Village Attorney in the deeds to the individual units concerning conditions 5(a)and 5(c). q. Placement of a 35-foot wide permanent conservation easement on the Peninsula running parallel to the front property line along the entire Bowman Avenue frontage of the Peninsula to preserve the landscape buffer created on the Peninsula pursuant to the requirements of the Scenic Roads Overlay District. The Applicant shall provide the conservation easement for review and approval by the Village Board of '.trustees prior to the issuance of a building permit. Landscaping installed between the Bowman Avenue right-of- way and the residential units within the conservation easement shall be maintained, f according to the requirements of the conservation easement, by the Applicant and thereafter by the Condominium Board or Homeowners Association. r. Installation of a landscape buffer along the Bowman Avenue frontage of the Peninsula sufficient to screen views of the buildings from the street, to the satisfaction of the Village Engincer and/or Consultants. s. No activity of any type shall be permitted on irip-rap steep slopes except required { maintenance. Appropriate signage to that effect shall be installed and maintained by the Applicant and thereafter by the Homeowners Association or Condominium Board. t. Construction of docks or any other structures extending into the watercourse or pond shall be prohibited. u. Switntning, boating, fishing or otber water related recreational activities shall be prohibited. Appropriate signage to that effect shall be installed and maintained by the Applicant and thereafter by the Homeowners Association or Condominium Board and included in the Condominium's Offering Plan., By-Laws and Rules and Regulations. v. Construction traffic shall he scheduled to avoid generation of construction related traffic that coincides with roadway pear hours. w. The property shall be apportioned into two lots as delineated by the existing tax lots 1--1 and 1- 1.1 by the Village,if the Village determines in its sole discretion to receive the strip (Lot 1-1) as a passive public park. x. Construction of all improvements to the Strip (Lot 1-1)as shown on the Site Pian approved by the Board of Trustees by Resolution dated July 24, 2007 and as amended by the Site Plan approved herein, shall be completed prior to offering the Strip for dedication to the Village and within eighteen (18) months of the issuance of the first Building Permit for the ten residential units on the Peninsula or prior to issuance of the last residential Certificate of Occupancy,whichever occurs earlier. T Prior to the issuance of any building permits, a 100%performance bond or Ietter of credit shall be submitted in a sum determined by the Village Engineer/Superintendent of Public Works and shall be furnished to and accepted by the Village, to guarantee the satisfactory and complete installation and construction of all infrastructure and public improvements, as determined appropriate by the Village Engineer/Superintendent of Public Works, for the Peninsula, including landscaping, sewage, water, drainage, roads, scdiment and erosion control measures, sidewalks, stormwater detention, and watercourse buffer mitigation approved as to form by the Village Attorney. z. The Applicant shall provide to the Village, a landscape maintenance bond or letter of credit in the amount of which is to be determined by the Village Engineer/Superintendent of Public Works in a form satisfactory to the Village Attorney. A bond or letter of credit with a minimum term of two years commencing upon the issuance of the 8th certificate of occupancy shall be posted for the maintenance of general site landscaping,the landscaping to thereafter be Maintained and-replaced as necessary. BE IT FURTHER RESOLVED, that all requirements, conditions and mitigation measures related to the project as established by the Board of Trustees in the .Findings Statement shall constitute express conditions of this approval, except as otherwise stated herein, and shall constitute obligations of the Applicant thereunder and its successors and assigns, and shall be enforceable by this Village Board of Trustees or its designated representative;and BE IT FURTHER RESOLVED, approval of this second amended site plan shall supersede the amended site plan approval granted by the Board of Trustees on January 22,2013 and extended to February 28,2014;and BE IT FURTHER RESOLVED, that this approval of the Second Amended Site Plan shall expire one year from the date of this resolution. Upon written request,the Board of Trustees may extend the expiration date for additional periods of time, each such period not exceeding six months, upon good cause shown;and BE IT FURTHER RESOLVED, that upon review of the Conservation Easement document submitted by the Applicant pursuant to Paragraph 5(q) of this Resolution, the Board of Trustees hereby authorizes the Mayor to execute all documents, subject to negotiations by the Village Administrator and approved by the Mayor,in a form acceptable to the Village Attorney,as may be necessary for the recording of the Conservation Easement referred to above in Paragraph 5(q);and BE IT FURTHER RESOLVED, that the approval granted herein shall become null and void if the Applicant does not pay to the Village all applicable fees and professional review fees incurred in connection with review of this Application thin 45 days foIlowing the date of this resolution. TRUSTEE EPSTEIN AYE RUSTEE HEISER AYE TRUSTEE KLEIN AYE TRUSTEE REDNICK AYE MAYOR ROSENBERG AYE STATE OF NEW YORK COUNTY OF WESTCH ESTER SS' VILLAGE OF RYE BROOK I hereby certify that this is the Resolution adopted by the Board of Trustees of the Village of Rye Brook which was duty passed by said Board on January 28 20 14 . IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Seal of the Village of Rye Brook,this 29 day of 3a ary 20 14 Christopher J. Brad r ,Village Clerk