Loading...
HomeMy WebLinkAboutMP22-108 t ii 4.o j y J V 4� G . 19 VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A. Klein (914) 939-0668 Christopher J. Bradbury www.ryebrook.org TRUSTEES BUILDING& FIRE INSPECTOR Susan R. Epstein Steven E. Fews Stephanie J. Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE October 30,2023 Rye Hotel LLC 699 Westchester Avenue Rye Brook,New York 10573 Re: 699 Westchester Avenue, Rye Brook,New York 10573 Parcel ID#: 135.74-1-8 This document certifies that the work done under Mechanical Permit #22-108 issued on 7/5/2022 for the installation of four new condensing boilers and three new indirect water heaters have been satisfactorily completed. Sincerely, Steven E. Fews Building&Fire Inspector /to �yE BR1982 C��• BUILDING DEPARTMENT ❑BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street . Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - --- - - - -- - -- INSPECTIONREPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : (O'A-� Ae'*"-�� 6� DATE: l-, It �- PERMIT# ISSUED. SECT. BLOCK: ` LO LOCATION: \ V y�' OCCUPANCY: ❑ Violation Noted THE WORK IS... ['� PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION �JI�� _ {. REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE � K ►` `'" ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION I- �a ❑ Natural Gas ` ❑ L.P.Gas ❑ FUEL TANK V IRE SPRINKLER INAL PLUMBING 0 72 ❑ CROSS CONNECTION A FINAL ❑ OTHER QyE[k(b- ID4 x • 19 BUILDING DEPARTMENT ❑BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street • Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www Uebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : DATE: PERMIT# ISSUED: SECT: BLOCK: LOT: LOCATION: OCCUPANCY: ❑ Violation Noted THE WORK IS... ❑ PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ Natural Gas ❑ � FUEL TANK �'- ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER [3RC��. O 2m 1932 BUILDING DEPARTMENT ❑BUILDING INSPECTOR ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 f (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS: C/ p \ � DATE: PERMIT# Cr`(? f I ISSUED: S SECT:14 ' BLOCK: LOT: LOCATION: c�� � \ OCCUPANCY: -� 1 ❑ VIOLATION NOTED THE WORK IS... ❑ ACCEPTED ❑ REJECTED/ REINSPECTION ❑ SITE INSPECTION '\C REQUIRED ❑ FOOTING c�CQC1r1�'� � Y�C1� �k ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ` r �.y��y ❑ NATURAL GAS 1 �l�d �V S C P CL) �R- S ` 1 �V S� �o �l 1 ❑ L.P.GAS C c� ❑ FUEL TANK ❑ FIRE SPRINKLER `1' \ \n�k !{ 's 1 Q l ❑ FINAL PLUMBING ; \ ❑ CROSS CONNECTION ❑ FINAL C G t242.2 �- 0f V ❑ OTHER O� S �-4e - C—�� G ► 0 S���c S QyE BR(��, BUILDING DEPARTMENT ❑$UILDING INSPECTOR ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK //❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS: (o"Q W,92"2� A " DATE: PERMIT# aa 12:2-O� -' ISSUED: A5ilz�T: \Y>� BLOCK: ' LOT: LOCATION: J C \ "-'oak�' OCCUPANCY: � ' ❑ VIOLATION NOTED THE WORK IS... ACCEPTED ❑ REJECTED/REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING _ n� ❑ ROUGH FRAMING \� ,/gl� U ) ❑ INSULATION v \_ ❑r NATURAL GAS ❑ L.P. GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ! ❑ OTHER I` I i g s ■ y ` a ! N � F� W a n ■ 00 N N N !-1 i\ lr) " v ■ '� ai `n � � � GJ � W ■ °o o a , � aa ■ ' 0 a Wrri � t 0 a� �n �•y ~ M Q A o O N Q 0 73 z 4. 3CN zcn PLO 0 wo V r�Z a A oc oo. z as © z 1-4a a ■ � w Q � a x a a H az v `° � o w U W o x oIS H ■ w U U c0 � _� �� a N W w � O © 0 v a a y CU w In F 150, z Un � ° A " W z oQ 20-4 ° a BUILDING DEPARTMENTID E,C L -V L Fli--) VILLAGE OF RYE BROOK U N 2 4 2022 938 KING STUET RYEBR4ox,NY 10573 (914)939-0668 VILLAGE DE RYE BROOK www.ryab>rook.oriz BUILDING DEPARTM�JT APPLICATION FOR PERMIT TO INSTALL AND/OR REMOVE HEATING, VENTILATION AND/OR AIR CONDITIONING EQUIPMENT FOR OFFICE USE ONLY: PERMIT #: Approval Date: J UN 2 2022 Permit Fee: $ Approval Signature: Other: Disapproved: (fees are non-refundable) REQUIREMENTS FOR RELEASE OF PERMIT&CERTIFICATE OF COMPLIANCE: 1. Properly completed& Signed Application. 2. Site/Staging Plan if Required by the Building Inspector. 3. Copy of Licensed Contractor's Liability Insurance. (village of Rye Brook must be listed as certificate holder) &Workers Compensation Insurance on a NYS Board form(Form#C105.2 or Form#U263/or NY State Workers Compensation Waiver) 4. Payment of Fees/Unit: RESIDENTIAL=$100.00/unit • COMMERCIAL=$350.00/unit. S. Inspection by the Building Department for removal and/or installation. (48 hour notice required 6. Electrical work requires a separate Electrical Permit&Electrical Inspection. 7. Plumbing/Gas work requires a separate Plumbing Permit&Plumbing Inspection. Application dated, CA hereby made to the Building Inspector of the Village of Rye Brook for a permit for the installation and or removal of the HVAC equipment as listed below.The applicant and property owner,by signing this document agrees that said equipment will be installed and/or removed in conformance with all applicable Local,County, State&Federal laws, codes,rules and regulations. cn r f/ /,V y /p-u? 1. Address: !I s 9 2 7 YfL. SBL: /2S 7�1-1-k zone: 2. Property Owner: /f',Y,�- yOTZ L L-51/ AWZ'/d f 6W eC1q dfAddress: Y orv,,¢'f r�h+��rTL'/L ff l//2 GEoFF /?/-v6 9 7,dv-/0a0 y1- 9t2y-3.ZVV F OP19 9/"4:Qa Phone#:.r}'6H/9 Cell#: 4i7-.$1 z_� ' ff email: �n Yid L,vp1 2f r/L�.Go.� 3. Contractor: CN,4.,v11,X1 Cn-✓7'1e W()rt1 Address: /f Cx e f,74 , tt/.&1✓T �✓ G,�C36yTo Phone#: -�O3 Cell#: .203 VS`6'1 email: /tCa,i nf.,tGr� 4. Applicant: 1"4.-V Address: Phone#: Cell#: 1a3 email: /ZaoL® If "Y.� G�ig�/cA�•�% 5. Scope of Work:New Installation( )•Replacement(ff•Removal( )•Other( ): 6. List Equipment: l 41) 1&/,/zJ _ ( 3�/•V,t2//Cr G✓i9T/'/2 ��f%9Ti{��i (2-y"�:y,-712.1 , rJ--)11FD 7. Location of Equipment: n-, A)l 64 4, �oA� 8. Method of Installation/Removal(list all equipment needed to perform job): 4/,FL,Q/L/7J / TC-/LC MJ,:1 111YAft /Z/6G4.vL Qv!/`�''�l£-✓T t an 2/2a21 STATE= OF NEW YORK-COUNTY OF WESTCHESTER ) as: Ryan Ool being duly swum,deposes and states that he/she is the applicant above named, pnnt name of tndi%tdual signing as the applicant! and further states that(s)he is the legal owner of the property to which this application pertains.or that(s)he is the Contractor for the legal owner and is duly authorized to make and Fie this application. undicate architect.contractor.agent,attorney,etc 1 That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. �D —V%A— Sworn to before the this 2-44 Sworn to before me this day of . 20 2-2_ day of�_ MAY t AY 20 2 - tgna a of Pr erty Owner Sig ruure�oof Applicant -�\I4'41Pc 'f `\\�\�rrrrtAltRO //,' / f 14 "li Print Name of Prope er p•'N�TARr'9��+'' Print Name of Applicant T 'NO.01 Fl06348853'Grr%, r D OUALIFIED IN Notary ubllC = ESTCHESTEA COUNTY; = Public COMM. EXP �'•, 09-15.2024 SHILO C. HUNT F p.•13�,G''ypQ�` Notary PubNc,State of Connecticut NIE sus My Commission Expires Oct. 31,2026 This application must be properly _o. j)iLt,l6 li: ,i5 entirety and must include: iL__i::;.• � :Ci..: c.._;.•; legal owner(s) of the subject property. and the applicant of record in the spaces provided. Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void and «•ill be returned to the applicant. STATE OF NEW YORK COUNTY OF WESTCHESTER Subscribed and sworn to before me this 04 of H^Y, 20 Z Z a 12W.1 ■ ao ■ � N C a p ■, N n \ o a PLO � w .� ►- z W C4 U hr i � z a W ■ x rJ. 00 CL a U rp- = h .4 In N o 14 F H 00 z z MM ■ WA ■ W w N zZ n U v a � l w w c op WW a � o N r.� $ 0.4 x I R BUILDING DEPARTMENT JUN 2 4 2022 J VILLAGE OF RYE BROOK 1 938 KING STREET RYE BROOK,NY 10573 s VILLAGE OF RYE BROOK (914) 939-0668 BUILDING DEPARTMENT www.ryebrook.org PLUMBING PERMIT APPjPLICATION FOR OFFICE USE ONi. Approval Date: JUN 2 9 Permit Fee: S Approval Signature: Other: Disapproved: (fees are non-refundable) **********ww******w*****»*»w*w***www**wwwww*w**w*wwwww**w**ww***w**w*ww»www****w*ww**www*w*ww*w*** Application dated, is hereby made to the Building Inspector of the Village of Rye Brook NY, for the issuance of a Permit to install and/or remove Plumbing as per detailed statement described below. The applicant&property owner, by signing this document agree that said plumbing work will be in conformance with all applicable Federal, State.County and Local Codes. 1.Address: 699 Westchester Avenue, Rye Brook, NY 10573 SBL: 135.74-1-8 Zone: H 2.Proposed Work: Reconnect to gas piping to new condensing boilers. Furnish and install new dual mixing valve station and connect to new indirect water heaters. New balancing valves on all hot water return risers in rye wing. 3.Property Owner: Rye Hotel LLC (Signature"on behalf of') Address: 46 Westchester Avenue, Pound Ridge. NY 10576 Geoff Ringler 914-764-1000 914-424-3249 Geoff PanAE uities.com Phone#: _Sylvia Tosun 914-764-1000 Cell#: 917-922-6648 email: Sylviam Spindle Kill.com 4.Master Plumber: Stanley McKenney Address: 15 Commerce Road, Newtown, NY 06470 Lic.#: 1299 Phone#: 203-364-1000 Cell#: 203-948-6192 email: stan@mckenneymechanical.com Company Name: McKenney Mechanical Contractors Address: 15 Commerce Road, Newtown, CT 06470 IN-DICATE FIXTURES& LINES TO BE INSTALLED AS PER THE FOLLOWING SCHEDULE: Location Water Urinals Drinking Sinks Showers Bath Laundry Domestic Fire Sanitary Natural Other* Total Closets Fountains Tubs Tubs Service Service Sever LP Gas Basement 4 1 5 I st Floor 2nd Floor 3`d Floor 4'h Floor 5c°Floor Exterior 5.* List Other Equipment/Provide Details: Armstrong DMC80-60 Digital Mixing Center for domestic hot water. (Notarized Signatures Required Next 2 Pages) 8/1 soz 1 STATE OF NEW YORK,COUNTY OF WESTCHESTER ► as: Ryan Ool ,being duly swom,deposes and states that he/she is the applicant above named, print name of indk idual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the Contractor for the legal owner and is duly authorized to make and file this application. I indicate architect,contractor,agent,anomey,etc.) That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed. or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention& Building Code, the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations Sworn to before me this 2(o Sworn to before me this 2- day of MQ,.4 20 day of M A Y 20_�� Si of perty Owner Signaf6re of Applicant Print Name of Property Owner \\�s�```�A tR0-��,,,,, Print Name of Applicant ' t �: • 01 R06346653'.R` Notary Public = QUALIFIED IN _ Not�r4 Public WESTCHESTER COUNTY; EXP STATE OF NEW YORK Cos-i5-2024 COUNTY OF WESTCHESTER `��' • P uB�.�c•.•'' ' %�y2 ... .. yo\�,. SHILO C. HUNT Subscribed and swom to before me �i, OF N thisQL of P'1�'A�20 22 '///,/r ttlt,E\0\\\ Notary Public, State of Connectia,'t T,. Icatlon tnusT 13; } comple eu .-ntirety and must in My Commission Expires Oct.31,2026 the legal owner(s) of the subject property, and the applicant of record il; of properly completed in its entirety anti%or not properly signed shaii be deemed null and void and will be returned to the applicant. -2- 8/12/202 t BUILDING DEPARTMENT VILLAGE OF RYE BROOK J U N 2 4 2022 938 KING STREET RYE BROOK,NY 10573 (914)939-0668 VILLAGE OF RYE BROOK iiww,ryebrook.orz BUILDING DEPARTMENT ttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt AFFIDAVIT OF COMPLIANCE VILLAGE CODE §216 • STORM SEWERS AND SANITARY SEWERS THIS AFFIDAVIT MUST BEAR THE 10TARIZED SIGNATURE OF THE LEGAL PROPERTY OWNER AND RE SUBMITTED ALONG WITH ANY BUILDING OR PLUMBING PERMIT APPLICATION. ANY BUILDING OR PLUMBING PERMIT APPLICATION SUBMITTED WITHOTY;' THIS COMPLETED AND NOTARIZED FORM WILL BE RETURNED TO THE APPLICANT . STATE OF NEW YORK, COUNTY OF WESTCHESTER ) as: .` 3, ` AN LA IA- TOSu7A , residing at, Cpgq W E7,ni c Fs ER Ni5 qE�[ being duly sworn, deposes and states that (s)he is the applicant above named, and further states that (s)he is the'OS legal owner of the property to which this Affidavit of Compliance pertains at; &9 q WEWC+I r"STEFL VC E &ow, IVq l os y q , Rye Brook, NY. Further that all statements contained herein are true, and that to the best of his/her knowledge and belief, that there are no known illegal cross-connections concerning either the storm sewer or sanitary sewer, and further that there are no roof drains, sump pumps, or other prohibited stormwater or groundwater connections or sources of inflow or infiltration of any kind into the sanitary sewer from the subject property in accordance with all State, County and Village Codes. Sworn to before me this day of , 20 S T oO �• .••'NO ^q�•9iC'% 01R08346653"•UALIF m' :WESOT� IED IN IN ;1V COM►4. EXPUNtr 15-2024 �. OF1 N ETW MCKEMEC-02 SHIRLEY WEN N .�coRn CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDDJYYYY) `—� 5/23/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NOM7ACT — — - NFP Property &Casualty Services,Inc. IPH NNIE FAX 99 Troy Road IA/C,No,E.W.(518)244.4245 _(Ak•No:(518)2"-4262 East Greenbush,NY 12061 $s: INSURER(S)AFFORDING COVERAGE NAIL/ INSURER A:MGM(Mutual Fire Insurance Company 23035 INSURED INSURER B:LM Insurance Corporation _ 336M McKenney Mechanical Contractors,Inc. INSURER c:Ub"Insurance Corp- 424" 15 Commerce Road INSURERD: Newtown,CT 06470 - — INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. _ MISR TYPE OF INSURANCE ADDL SUER POLICY NUMBER POLICY EFF POLICY EXPLTR LIMITS A X COMMERCIAL GENERALLIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE a OCCUR B2-Z11-C1T7G9-021 12/20/2021 12120=22 PR DAMAGE ERENTED 100,000 10,000 PERSONAL 8 ADv INJURY = 1,000,000 GEN'L AGGREGATE LIMIT APPLES PER: GENERAL AGGREGATE S - 2,000,000 P1 POLICY LOC PRODUCTS-COMP/OP AG_G S_ __ 2'W'W R: ESL AGGREGATE 2,000,000 B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT S 1,000,000 X ANY AUTO AS5-Z11-C1T7G9-031 12/20/2021 12/20/2022 gODILYWJURYPer S OWNED TOPE �SDONLY AUTOODyUyLNED I BODILY INJURY Parabt7dartl AUTOS ONLY AUTOS ONLY ariocident C X UMBRELLALIAB X -OCCUR EACH OCCURRENCE S 10,000,000 EXCESSLIAB CLAIMS-MADE TH7-Z11-C1T7G9-041 12/20/2021 12140=22 AGGREGATE 10,000,000 DED X RETENTIONS 10,000 C ANCOMPENSATION D EMPLOYERS'LIABILITY ITY X PER IER TH- ANY PROPRIETOR/PARTNEWEXECUTIVE YIN WC7-Z11-C1T7G9-011 12/20/2021 12/20I2022 1,000,000 FEFIMBE�EXCLUDED? NIA E.L.EACH ACCIDENT �IanFIC dat safe under E.L.DISEASE-EA EMPLOYE 00 S _ 1, 0,000 SCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 1'000,000 it I DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space is required) Operations usual and incidental to the business of the named insured. RE: Permit Application,Boiler Replacement,699 Westchester Ave.,Rye Brook,NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village Of Rye Brook THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN g y ACCORDANCE WITH THE POLICY PROVISIONS. Building Department 938 King Street ---- ------ ----- ----- --- Rye Brook.NY 10573 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Us IWN I Workers' CERTIFICATE OF ATE Compensation NYS WORKERS' COMPENSATION INSURANCE COVERAGE Board 1 a. Legal Name&Address of Insured(use street address only) 1 b. Business Telephone Number of Insured: McKenney Mechanical Contractors,Inc. (203)364-1032 15 Commerce Road,Newtown,CT 06470 Work Location of Insured(Only required if coverage is 1c. NYS Unemployment Insurance Employer Registration Number of Insured: specifically limited to certain locations in New York State,i.e., a Wrap-Up Policy) 1d. Federal Employer Identification Number of Insured or Social Security Number: 06-1221413 2. Name and Address of Entity Requesting Proof of 3a. Name of Insurance Carrier Coverage(Entity Being Listed as the Certificate Holder) Liberty Insurance Corp Village of Rye Brook 3b. Policy Number of Entity Listed in Box"la" Building Department WC7-Z11-C1T7G9-011 938 King Street, 3C. Policy effective period: 12/20/2021 to 12/20/2022 Rye Brook,NY 10573 3d. The Proprietor,Partners or Executive Officers are X included. (Only check box if all partners/officers included) all excluded or certainpartners/officers excluded This certifies that the insurance carrier indicated above in box"3" insures the business referenced above in box 1 a"for workers' compensation under the New York State Workers' Compensation Law. (To use this form, New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers' compensation insurance policy). The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box "2". The insurance carrier must notify the above certificate holder and the Workers' Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate. (These notices may be sent by regular mail.) Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent, or until the policy expiration date listed in box"3c", whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers' Compensation contract of insurance only while the underlying policy is in effect. Please Note: Upon cancellation of the workers' compensation policy indicated on this form, if the business continues to be named on a permit, license or contract issued by a certificate holder, the business must provide that certificate holder with a new Certificate of Workers' Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers' Compensation Law. Under penalty of perjury, I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved By. Shirley A.Swenson (Print name of authorized representative or licensed agent of insurance carrier) 5/23/2022 (Signature) (Date) Title: Senior Account Executive Telephone Number of authorized representative or licensed agent of insurance carrier: Please Note: Only insurance carriers and their licensed agents are authorized to issue Form C-105.2. Insurance brokers are NOT authorized to issue it. C-105.2 (9-17) www.wcb.ny.gov MECHANICAL/PLUMBING SPECIFICATION I.THE CONTRACTOR SHALL COORDINATE WITH EQUIPMENT MANUFACTURER'S GENERAL DRAWING HVAC DUCTWORK STEAM PIPING ABBREVIATIONS SERVICE REPRESENTATIVE TO ENSURE PROPER INSTALLATION,PIPING AND 1.0 EN RAL SERVICE CLEARANCE REQUIREMENTS ARE MET. ABBREVIATIONS AND SYMBOLS ABBREVIATIONS AND SYMBOLS AND SYMBOLS 1.1 SCOPE OF WORK J.LAYOUT SYSTEMS TO MAINTAIN ACCESS AND SERVICE CLEARANCES FOR W/ WITH W/O WITHOUT INSTALLED EQUIPMENT,VALVES,CONTROLS,AND ALL COMPONENTS A.THE WORK UNDER THIS SECTION OF THE SPECIFICATIONS INCLUDES ALL REQUIRING ACCESS. SERVICE ACCESS SHALL BE AS RECOMMENDED BY TYP TYIPIICAL NIC NOT IN CONTRACT OA OUTSIDE AIR FD FIRE DAMPER LPS LOW PRESSURE STEAM LPC LPS CONDENSATE LABOR,MATERIALS,EQUIPMENT AND SERVICES FOR WORK AS SHOWN ON MANUFACTURER OR AS REQUIRED BY CODE WHICHEVER IS GREATER. EX EXISTING KW KILOWATT SA SUPPLY AIR FSD FIRE/SMOKE DAMPER MPS MEDIUM PRESSURE MPC MPS RETURN THE CONTRACT DRAWINGS. WORK SHALL BE IN ACCORDANCE WITH THESE SPECIFICATIONS AND THE CONTRACT DRAWINGS AND SUBJECT TO THE K.MAINTAIN OPERATION OF BUILDING SYSTEMS DURING CONSTRUCTION.ANY AD ACCESS DOOR HP HORSEPOWER RA RETURN AIR BDD BACKDRAFT DAMPER STEAM TERMS AND CONDITIONS OF THE CONTRACT. THE WORK IN GENERAL REQUIRED SHUTDOWNS OF BUILDING SYSTEMS MUST BE COORDINATED WITH AFF ABOVE FINISH FLOOR BHP BRAKE HORSE POWER EA EXHAUST AIR AD ACCESS DOOR HIPS HIGH PRESSURE STEAM HPC HPS RETURN CONSISTS OF,BUT IS NOT LIMITED TO,THE FOLLOWING: THE OWNER.SYSTEMS TO REMAIN OPERATIONAL INCLUDE: CHILLED WATER, STEAM FLOW HEATING HOT WATER,DOMESTIC WATER AND STEAM. DWG DRAWING VSD VARIABLE SPEED DRIVE TA TRANSFER AIR WMS WIRE MESH SCREEN LBS/H POUNDS/HOUR 1. INSTALLATION OF NEW BOILERS,PUMPS,AND ACCESSORIES L.UNLESS OTHERWISE SPECIFIED,THE MOST RECENT VERSIONS OF THE DN DOWN ODP I OPEN DRIP PROOF CFM CUBIC FEET/MINUTE FC FLEXIBLE CONNECTION 2. DEMOLITION OF TWO STEAM BOILERS,PIPING AND ACCESSORIES FOLLOWING CODES AND STANDARDS APPLY AND ARE MADE A PART OF TOTALLY ENCLOSED (100) AIR FLOW-CFM AL ACOUSTICAL LINING THIS SPECIFICATION TEFC FAN-COOLED 3. PIPING,INSULATION AND ASSOCIATED WORK. O ROUND DIAMETER OBD OPPOSED BLADE DAMPER FLOAT AND 1. NEW YORK STATE CODE NEW WORK 4. REPLACEMENT OF BOILER BREACHING AND VERTICAL FLUE CD CEILING DIFFUSER RG RETURN GRILLE THERMOSTATIC TRAP 2. UNDERWRITER'S LABORATORIES,INC.(UL). EXISTING TO REMAIN LD LINEAR DIFFUSER ON OUTSIDE AIR INTAKE INVERTED BUCKET 5. RELOCATION OF FIRE PROTECTION PIPING. >� --X X TO BE DEMOLISHED FA NET FREE AREA TRAP 6. GAS PIPING 3. NATIONAL FIRE PROTECTION ASSOCIATION(NFPA). POINT OF NEW CONNECTION _ THERMOSTATIC TRAP 7. REPLACEMENT OF STEAM WATER HEATERS AND PIPING. 4. AMERICAN SOCIETY OF MECHANICAL ENGINEERS(ASME). TO EXISTING Q 8. MODIFICATIONS TO DOMESTIC WATER RECIRCULATION SYSTEM PUMPS 5. AMERICAN NATIONAL STANDARD INSTITUTE(ANSI).POINT OF DISCONNECTION SINGLE LINE DOUBLE LINE THERMODYNAMIC AND PIPING. SYMBOL SYMBOL TRAP 6. OSHA-FEDERAL STANDARDS O DRAWING NOTE 10x8 10x8 NEW DUCT-FIRST DIMENSION IS TOP SIZE 9. ELECTRICAL WORK 7. AMERICAN SOCIETY OF HEATING,REFRIGERATING AND AIR CONDITIONING Q REVISION SYMBOL (CLEAR INSIDE DIMENSION,INCHES) 10.MOTOR STARTERS AND VARIABLE SPEED DRIVES ENGINEERS,INC.(ASHRAE). INTERNALLY LINED DUCT 1 A SECTION DRAWING SYMBOL - (ALSO REFER TO SPECIFICATIONS) 11.WATER BALANCING 8. AIR CONDITIONING&REFRIGERATION INSTITUTE(ARI). 80 J 8�'j FLEXIBLE DUCT MECHANICAL/PLUMBING 12,RECORD AS-BUILT DRAWINGS AND OPERATING AND MAINTENANCE 9. AMERICAN WELDING SOCIETY(AWS). -� CONTINUATION SYMBOL F j (8 INCH DIAMETER) MANUALS FOR EQUIPMENT PROVIDED BY THIS CONTRACTOR. DRAWING LIST 10.AMERICAN SOCIETY OF TESTING AND MATERIALS(ASTM). [�]OR S.F.SQUARE FOOT m DUCT UP(RETURN SHOWN) 13.PROVIDING AND INSTALLING AUTOMATIC CONTROL VALVES,PRESSURE SENSING LINES AND TEMPERATURE SENSOR WELLS. BUILDING 'rl DUCT DOWN(RETURN SHOWN) M-100 -MECHANICAL/PLUMBING SPECIFICATIONS MANAGEMENT AND CONTROL SYSTEM INSTALLATION WILL BE PROVIDED 1.6 COORDINATION WITH BUILDING MANAGEMENT BY THE HOTEL. M-101 -MECHANICAL/PLUMBING SPECIFICATIONS CONTINUED A.CONTRACTOR IS RESPONSIBLE FOR ADHERING TO THE BUILDING OWNER'S H VA C PIPING ABBREVIATIONS MITERED ELBOW(W/TURNING VANES) RULES AND REGULATIONS.ANY DISCREPANCIES BETWEEN THE CONTRACTOR M-102 -MECHANICAL/PLUMBING SCHEDULES 1.2 BIDDING DOCUMENTS AND THE BUILDING RULES AND REGULATIONS SHALL BE AND SYMBOLS M-200 -MECHANICAL DEMO,VENTING AND WESTCHESTER MEZZ SUBMITTED IN WRITING TO THE ARCHITECT/ENGINEER FOR REVIEW,WITH BID A.CONTRACTOR SHALL VISIT THE JOB AND FULLY FAMILIARIZE THEMSELVES FAN ROOM PLANS WITH THE EXISTING CONDITIONS PRIOR TO SUBMISSION OF BIDS. SUBM SSION. RADIUS ELBOW M-201 -MECHANICAL PIPING PLAN B.COORDINATE WITH BUILDING OWNER FOR ANY SERVICE INTERRUPTION OF CHWS(R) CHILLED WATER HWS(R) HEATING WATER SUPPLY B.CONTRACTOR SHALL COORDINATE THE REQUIREMENTS OF ANY AND ALL EXISTING SYSTEMS AND GIVE NOTICE AS REQUIRED BY BUILDING RULES AND SUPPLY(RETURN) (RETURN) �j M-202 -MECHANICAL DETAILS AND PART PLAN DRAWINGS INCLUDING MECHANICAL,ELECTRICAL AND CONTROLS. ANY REGULATIONS OR A MINIMUM OF TWO(2)DAYS PRIOR TO ANY WORK, CONDENSER WATER 1 BRANCH TAKE-OFF(45 DEGREES) M-300 -MECHANICAL FLOW DIAGRAMS DURING THE BIDDCONFLICT SHALL ING PE BROUGHT TO THE ATTENTION OF THE ENGINEER WHICHEVER IS MORE STRINGENT.CONTRACTOR IS TO PERFORM WORK ON CWS(R) SUPPLY(RETURN) CW CITY WATER hh PREMIUM TIME,IF SO DIRECTED BY BUILDING OWNER,SO AS NOT TO P-200 -PLUMBING PIPING PLAN AND FLOW DIAGRAM C.CONTRACTOR IS TO OBTAIN A COPY OF THE BUILDING RULES AND INTERRUPT BUILDING SERVICES DURING OCCUPIED PERIODS. RADIUS TAKE-OFF REGULATIONS PRIOR TO BID SUBMISSION TO DETERMINE THE REQUIREMENTS DR DRAIN PD PUMP DISCHARGE AND THE EXTENT OF PREMIUM TIME WORK REQUIRED BY THE BUILDING. 1.7 SUBMITTALS BFP BACKFLOW PREVENTOR 1.3 ALTERNATE PRICES A.SHOP DRAWINGS OF THE FOLLOWING SHALL BE SUBMITTED FOR REVIEW GPM GALLONS/MINUTE PRIOR TO PURCHASE AND INSTALLATION. A.ADD ALTERNATE 1- 1. MANUFACTURER'S SUBMITTAL DATA FOR ALL EQUIPMENT SUPPLY/INTAKE SYMBOLS RETURN/EXHAUST SYMBOLS 1.4 WORK BY OTHERS SUPPLIED.SUBMITTALS SHALL CLEARLY INDICATE SPECIFIC ITEMS PROPOSED AND WHERE EACH ITEM IS TO BE APPLIED. DUCT (DUCT A.ASSISTANCE WITH ACCESS TO AREAS OF WORK AND OTHER SPACES. 2, DIMENSIONED AND DETAILED PIPING,EQUIPMENT AND DUCTWORK ASSISTANCE WITH SCHEDULING PIPING ISOLATION,DRAINDOWN AND =1'-0"SCALE,MINIMUM. AIRFLOW DIRECTION �- AIRFLOW DIRECTION REFILLING. LAYOUT AT 3/8" BALL VALVE ❑M ELECTRIC ACTUATOR ® CEILING DIFFUSER CEILING GRILLE 3. SHOP STANDARDS AND INSTALLATION DETAILS FOR DUCTWORK,PIPING, B.BUILDING MANAGEMENT AND CONTROL SYSTEM. INSULATION,STRUCTURAL SUPPORTS,VIBRATION ISOLATION,AND BUTTERFLY VALVE S❑ SOLENOID ACTUATOR LINEAR DIFFUSER LINEAR RETURN SEISMIC SUPPORT. C.COMBINED HEAT AND POWER SYSTEMS,EXCEPT AS NOTED ON DRAWINGS. I� PLUG VALVE PNEUMATIC ACTUATOR OTHER SYMBOLS 4. PIPE CLEANING AND FLUSHING PROCEDURE. D.GENERAL CONTRACTING WORK NOTED AS-BY OTHERS OR BY GENERAL m GATE VALVE I] CONCENTRIC REDUCER f CONTRACTOR ON THE DRAWINGS. 5. BALANCING REPORTS.DIFFUSER THROW(NO Dm GLOBE VALVE ❑ ECCENTRIC REDUCER AIRFLOW IN SHADED 1.5 GENERAL REQUIREMENTS I DIRECTION) 6. OTHER SUBMITTAL DATA NOTED ELSEWHERE. BALANCING VALVE �- FLOW LIMITING VALVE 1 A.ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES. B.SUBMITTALS SHALL BE IN"PDF"FORM. PRESSURE REDUCING � PUMP MANUAL VOLUME --- FIRE&SMOKE VALVE DAMPER FIRE=FD B.CONTRACTOR SHALL PAY ALL FEES AND TAXES,OBTAIN ALL PERMITS AND C.SUBMIT DETAILED PROJECT SCHEDULE,WITHIN TWO(2)WEEKS OF FIRE/SMOKE=FSD APPROVALS,FILE THE REQUIRED DOCUMENTS. CONTRACT AWARD. SAFETY RELIEF VALVE /O PRESSURE GAUGE SPUTTER DAMPER SMOKE=SMD C.THE CONTRACTOR SHALL WARRANTY ALL WORK FOR A PERIOD OF 12 1.8 RECORD DRAWINGS N CHECK VALVE THERMOMETER 13DD BACK DRAFT DAMPER --� CONTROL DAMPER MONTHS FROM ACCEPTANCE BY OWNER.DURING THIS WARRANTY PERIOD, CONTRACTOR SHALL RESPOND TO ALL CALLS FOR SERVICE,REPAIRS AND A.MAINTENANCE MANUALS,AS-BUILT DRAWINGS SHOWING ALL DUCTWORK, VAV BOX DUCT SMOKE ADJUSTMENTS REQUIRED BY OWNER. CONTRACTOR SHALL INSTALL PIPING AND EQUIPMENT AND TEST AND BALANCING REPORTS SHALL BE STRAINER Q A MANUAL AIR VENT D SD DETECTOR REPLACEMENT PARTS AND MATERIAL REQUIRED AT NO COST TO THE SUBMITTED TO THE OWNER AT THE COMPLETION OF THE WORK. THE W/BLOWDOWN VALVE (A=AUTO VENT) OWNER. ALL EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO OWNER AS-BUILT DRAWINGS SHALL ALSO SHOW EXISTING WORK WITHIN THE WORK AND SERVICED BY CONTRACTOR AS PART OF THIS CONTRACT. AREA INCLUDING DUCTS AND PIPING THAT WAS CAPPED,REROUTED AND 151 TDV TRIPLE-DUTY VALVE f W THERMOWELL DUCT COIL THERMOSTAT/SENSOR REMAINING IN WORK,AREA. FLEXIBLE CONNECTION CARBON DIOXIDE D.CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTORS INCLUDING, 3-WAY VALVE X PIPE ANCHOR �IC CO2 SENSOR BMS,FIRE ALARM AND GENERAL CONTRACTOR. �I�5 UNION PIPE GUIDE ® RECTANGULAR TO DUCT RISE(R)OR E.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY WALL OR FLOOR ROUND TRANSITION R 12 PENETRATIONS FOR NEW DUCT OR PIPING WORK AND SHALL PATCH AND (� FC EJ DROP(D)IN REPAIR,TO MATCH EXISTING,ALL HOLES,ACCESS OPENINGS,ETC.DUE TO 07 0. i FLEXIBLE CONNECTION EXPANSION JOINT DIRECTION OF ARROW. NEW WORK AND DEMOLITION WORK. ALL PENETRATIONS SHALL BE pERMR.1 _ C-S ELBOW DOWN -i ELBOW UP D 12 NUMBER INDICATES PATCHED AND FIRESTOPPED AS REQUIRED TO MAINTAIN THE INTENDED FIRE BU' INCHES OF RISE/DROP RATING.UNLESS NOTED OTHERWISE ALL FLOORS AND MECHANICAL ROOM DATEAPP E JUN 2 9 BOTTOM CONNECTION �-(I} TOP CONNECTION (WHEN SHOWN). WALLS SHALL BE CONSIDERED TO BE 2-HOUR RATED. J+ � F.CONTRACTOR SHALL INFORM ENGINEER IMMEDIATELY UPON DISCOVERY OF •NNDHIOINS C70 M��MY,IItI CONTROL VALVE P 1 4 PIPE PITCHED DOWN I ANY ASBESTOS OR OTHER HAZARDOUS MATERIAL THAT WILL BE DISTURBED CV &TRIM IN DIRECTION OF DUE TO THIS WORK. ARROW.NUMBER INDICATES INCHES OF G.DEMOLITION AND OTHER WORK WHICH MAY CREATE A DISTURBANCE MUST PITCH PER FOOT BE COORDINATED WITH THE OWNER. THE DELIVERY,HANDLING AND (WHEN SHOWN). INSTALLATION OF MATERIALS,EQUIPMENT AND REMOVAL OF DEBRIS MUST I���II�_,� i\P,I��I BE ARRANGED TO AVOID ANY INCONVENIENCE AND ANNOYANCE TO OWNER. �J �� I�\)1-III H.THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLITION AND UNUSED JUN Z 4 2022 J MATERIALS. FILE COPY I.THOROUGHLY BRUSH AND CLEAN UP WORK AT THE END OF EACH DAY. VILLAGE OF RYE BROOK REMOVE ALL DEBRIS FROM INSIDE AND OUTSIDE OF ALL DUCTWORK,PIPING BUILDING DEPARTMENT AND EQUIPMENT. J.SUBSTITUTIONS FOR THE SPECIFIED EQUIPMENT SHALL NOT BE PERMITTED 06/22/2022 -- ISSUED FOR PERMIT AK WITHOUT APPROVAL FROM THE ENGINEER. THE ASSOCIATED CHANGE IN THE CONTRACT PRICE SHALL BE INCLUDED WITH ANY PROPOSED DATE REV DESCRIPTION BY SUBSTITUTIONS. H.SEISMIC MOUNTING AND BRACING OF ALL EQUIPMENT,PIPING ETC.SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. Southport Engineering Associates,PC 11 Bailey Avenue Tel.:(203)431-6844 Ridgefield,CT 06877 Fax:(203)431-6877 PROJECT: 699 WESTCHESTER AVENUE BOILER REPLACEMENT 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 NEVI*� �Oq� DRAWING TITLE: MECHANICAL/PLUMBING SPECIFICATIONS ✓W SCALE: NONE DRAWN BY: RDS I DRAWING NO: DATE: 05/18/22 CHECKED BY: AK ^urEs-5 PROJECT N0: 85109 APPROVED BY: AK M-100 MECHANICAL SPECIFICATION - CONTINUED 3.0 PIPING MATERIALS AND INSTALLATION B.PROVIDE PRESSURE GAUGES AS INDICATED ON DRAWINGS.PIPING FOR 3.8 PIPING AND HYDRONIC EQUIPMENT INSULATION B.PROVIDE IDENTIFICATION OF ALL EQUIPMENT(CHILLERS,PUMPS,COOLING MECHANICAL PIPE JOINING SYSTEM SPECIFICATION-STEEL PIPING PRESSURE GAUGES SHALL BE STANDARD WEIGHT BRASS WITH SCREWED TOWERS,ETC.)VFDS,STARTERS AND OTHER EQUIPMENT USING SPRAY 3.1 GENERAL FITTINGS. PROVIDE PRESSURE SNUBBERS OR OIL FILLED GAGES. A.PIPING SHALL BE INSULATED PER SCHEDULE BELOW AND TO MEET ENERGY PAINT AND TEMPLATES OR OTHER APPROVED METHOD. 1.01 GENERAL:USE VICTAULIC CONNECTION GROOVED PIPING SYSTEM,OR EQUAL ACCURACY SHALL BE 1%OF SCALE RANGE. THE GAUGE RANGE SHALL BE CODE.INSULATION SHALL BE INSTALLED IN ACCORDANCE WITH THE APPROVED BY ENGINEER A.PRESSURE RATINGS FOR PRESSURIZED PIPING AND COMPONENTS SHALL BE SELECTED SO THAT THE OPERATING SYSTEM PRESSURE IS WITHIN THE MANUFACTURER'S WRITTEN INSTRUCTIONS.UNLESS NOTED OTHERWISE ALL AS INDICATED BELOW AND AS NOTED ON THE DRAWINGS. ALL SYSTEM MIDDLE THIRD OF THE GAGE RANGE. PRESSURE GAGES TO BE INSULATION SHALL BE MOLDED FIBERGLASS WITH FACTORY APPLIED VAPOR A. GROOVED MECHANICAL-JOINT FITTINGS AND COUPLINGS: MATERIALS AND COMPONENTS SHALL BE SELECTED AND INSTALLED TO PHOSPHOROUS BRONZE BOURDON TUBE TYPE,STAINLESS STEEL CASE, BARRIER JACKET. INSULATION SHALL HAVE SMOKE DEVELOPED RATING OF ACHIEVE THE PRESSURE RATINGS AS FOLLOWS: STAINLESS STEEL MOVEMENT WITH BRONZE BUSHING BRASS SOCKET AND 25 OR LESS AND A FLAME SPREAD AND FUEL CONTRIBUTED RATING OF C.ALL EQUIPMENT MUST HAVE THE MANUFACTURER'S NAMEPLATE VISIBLE 1.BASIS-OF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH BLACK NUMERALS ON A WHITE FACE. MINIMUM OF 3"DIAMETER. 50 OR LESS. FOR COLD WATER PIPING MAINTAIN INSULATION VAPOR AND SHALL NOT BE PAINTED OVER,INSULATED OR LOCATED WHERE REQUIREMENTS,PROVIDE A PRODUCT BY ONE OF THE FOLLOWING: SERVICE PRESSURE RATING MANUFACTURED BY H.0.TRERICE,WEISS,MILJOCO OR APPROVED EQUAL. BARRIER USING VAPOR BARRIER ADHESIVES AT JOINTS AND MASTIC AT DIFFICULT TO VIEW. CHILLED,HOT,CONDENSER WATER 150 PSIG EACH GAUGE TO INCLUDE BRASS PETCOCK. END JOINTS AS RECOMMENDED BY MANUFACTURER. INSULATION A. VICTAULIC COMPANY OF AMERICA. THICKNESS SHALL BE AS FOLLOWS: 6.0 MOTORS.MOTOR STARTERS&VARIABLE SPEED DRIVES OTHER PIPING 150 PSI C.PROVIDE DIGITAL THERMOMETERS WITH LCD DISPLAY AS (INDICATED ON 2.JOINT FITTINGS:ASTM A 536,GRADE 65-45-12 DUCTILE IRON; DRAWINGS. THERMOMETER TO HAVE ADJUSTABLE PIVOT AND BE PROVIDED B.SCHEDULE 6.1 GENERAL ASTM A 53/A 53M,TYPE F,E,OR S,GRADE B FORGED OR WITH A SEPARABLE BRASS THERMOWELL. ACCURACY SHALL BE 1%OF FACTORY-FABRICATED STEEL;OR ASTM A 234,GRADE WPB STEEL B.PIPING AND COMPONENTS USED FOR POTABLE HOT AND COLD WATER FULL SCALE. EACH THERMOMETER TO BE INSTALLED IN AN EXTENSION SERVICE SIZE THICKNESS A.MOTORS,MOTORS STARTERS AND VARIABLE SPEED DRIVES SHALL BE FITTINGS WITH GROOVES OR SHOULDERS CONSTRUCTED TO ACCEPT SHALL BE LEAD-FREE PER US FEDERAL STANDARDS,AND APPROVED FOR NECK BRASS SEPARABLE SOCKET. EXTENSION NECK LENGTH TO BE CHW&SW(DUAL TEMP)LESS THAN 1-1/2" 1" PROVIDED BY THIS CONTRACTOR AND INSTALLED/CONNECTED BY THE GROOVED-END COUPLINGS;WITH NUTS AND BOLTS TO SECURE GROOVED USE IN POTABLE WATER SYSTEMS. COORDINATED WITH INSULATION THICKNESS. SOCKET AND THERMOMETER ELECTRICAL CONTRACTOR. PIPE AND FITTINGS. INSERTION LENGTH TO BE MINIMUM OF 75%PIPE DIAMETER.H.O.TRERICE, CHW&SW(DUAL TEMP)1-1/2"AND LARGER 1-1/2" 3.2 PIPE AND FITTINGS WEISS OR AS APPROVED. B.ENCLOSURES SHALL BE NEMA 1 FOR INDOOR APPLICATIONS AND NEMA 3R 3.COUPLINGS 2"THROUGH 12'.TWO DUCTILE IRON HOUSING AND SYNTHETIC A.PROVIDE PIPING AS INDICATED ON SCHEDULE BELOW AND INDICATED ON 3.6 PIPING SYSTEMS INSTALLATION PRIMARY HW(160F) LESS THAN 1-1/2" 1-1/2" FOR OUTDOOR OR LOCATIONS SUBJECT TO MOISTURE. RUBBER GASKET OF CENTRAL CAVITY PRESSURE-RESPONSIVE DESIGN; DRAWINGS. SECONDARY HW WITH NUTS AND BOLTS-rO SECURE GROOVED PIPE AND FITTINGS. A.DIELECTRIC FITTINGS MUST BE USED AT JOINTS CONNECTING DISSIMILAR 6.1 MOTORS SERVICE PIPING JOINTS METAL PIPE OR VALVE MATERIALS. PRIMARY HW(160F) 1-1/2"AND LARGER 2" A.RIGID TYPE: HOUSINGS SHALL BE CAST WITH OFFSETTING, SECONDARY HW 150E A.MOTOR ELECTRICAL CHARACTERISTICS ARE IDENTIFIED ON DRAWINGS. CHW,HW,SW-UP TO 2 IN. TYPE L COPPER SWEAT, ( ) ANGLE-PATTERN BOLT PADS TO PROVIDE SYSTEM RIGIDITY AND PROPRESS B.ROUTE PIPING IN ORDERLY MANNER,PLUMB AND PARALLEL TO BUILDING DOMESTIC HW LESS THAN 1-1 COORDINATE REQUIREMENTS WITH ELECTRICAL CONTRACTOR. ALL THREE SUPPORT AND HANGING IN ACCORDANCE WITH ASME 831.1 AND B31.9. "2 1" PHASE MOTORS SHALL NEMA MG-1 PREMIUM EFFICIENCY. MOTORS USED STRUCTURE,AND MAINTAIN SPECIFIED GRADIENTS. /CHW,HW,SW-2-1/2"AND UP SCH 40 STEEL WELD,THREAD HWR WITH VARIABLE SPEED DRIVES SHALL BE NEMA MG-1 INVERTER-DUTY TYPE.SINGLE PHASE MOTORS SHALL BE ECM UNLESS SPECIFIED 1) 2"THROUGH 12"SIZES: VICTAULIC STYLE 107N(QUICKVICT61) GROOVED C.INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT OTHERWISE. INSTALLATION READY RIGID COUPLING DESIGNED FOR DIRECT STRESSING PIPE,JOINTS,OR CONNECTED EQUIPMENT. DOMESTIC HW 1-1/2"AND LARGER 1-1/2" `STAB"INSTALLATION ONTO GROOVED END PIPE WITHOUT PRIOR DOMESTIC WATER TYPE L COPPER SWEAT, HWR B.UNLESS NOTED OTHERWISE MOTORS TO BE ODP FOR INDOORS AND TEFL DISASSEMBLY AND NO LOOSE PARTS,GRADE`EHP"EPDM GASKET PROPRESS D.INSTALL THERMOWELLS AND PRESSURE TAPS IN SYSTEM PIPING FOR THE " FOR OUTDOOR OR LOCATIONS SUBJECT TO MOISTURE. WITH RED COLOR CODE FOR WATER SERVICES FROM-30 DEG F TO CONTROLS/BUILDING MANAGEMENT SYSTEM SENSORS. COORDINATE DOMESTIC COLD WATER ALL SIZES 1 +250 DEG F. GAS SCH.40 IRON THREAD,WELD LOCATION AND QUANTITY WITH THE CONTROLS SYSTEM SUBCONTRACTOR. 6.2 MOTOR STARTERS 11) 10"AND 12"SIZES: VICTAULIC STYLE 07(ZERO-FLEX®) C.INSULATE VALVES,PUMPS,AIR SEPARATORS AND ALL OTHER STANDARD RIGID COUPLING WITH GRADE`E"EPDM GASKET WITH E.ALL VALVES AND SPECIALTIES SHALL BE SO PLACED AS TO PERMIT EASY COMPONENTS. INSULATION SHALL A THE SAME THICKNESS AS A.EXCEPT AS NOTED OTHERWISE,ALL MOTORS SHALL BE PROVIDED WITH GREEN COLOR CODE FOR WATER SERVICES FROM-30 DEG F TO B.COPPER PIPING:WROUGHT COPPER FITTINGS. SWEAT JOINTS 95-5 TIN OPERATION AND ACCESS. MOTORS STARTERS TO BE INSTALLED BY THE ELECTRICAL CONTRACTOR. +230 DEG F. ANTIMONY SOLDER JOINTS. ASSOCIATED PIPING. EXCEPT THAT COMPONENTS IN HOT WATER PIPING 1" STARTERS TO BE COMBINATION FUSED DISCONNECT AND F.PROVIDE VALVES IN ALL BRANCHES MAINS AND RISERS,AT ALL PUMPS, OR SMALLER DO NOT NEED TO BE INSULATED,AND HEATING COIL ACROSS-THE-LINE MAGNETIC TYPE WITH: HAND-OFF-AUTOMATIC SWITCH, B. FLEXIBLE TYPE: USE IN LOCATIONS WHERE VIBRATION ATTENUATION C.STEEL PIPING:ASTM 53 SCHEDULE 40 SEAMLESS STEEL. ALL TURNS AND TANKS,REDUCING AND CONTROL VALVES,HEATING,AND COOLING CIRCULATION PUMPS DO NOT NEED TO BE INSULATED. OVERLOADS MATCHED TO THE MOTOR,OPERATING INDICATOR LIGHT, AND STRESS RELIEF ARE REQUIRED. BRANCHES IN PIPING SHALL BE MADE USING FITTINGS EXCEPT WELDOLETS SURFACES AND AT ALL APPARATUS;SO LOCATED,ARRANGED AND AUXILIARY CONTACTS(MINIMUM OF 2 OR AS NEEDED FOR CONTROL)AND rM) MAY BE USED WHEN THE SIZE OF THE BRANCH PIPING IS 1/2 THE SIZE OPERATED AS TO GIVE COMPLETE SHUTOFF.EXCEPT WHERE FLANGED D.COMPONENTS REQUIRING ACCESS SHALL BE FITTED WITH REMOVABLE, CONTROL TRANSFORMER. 1)2"THROUGH 8"SIZES: VICTAULIC STYLE 177N(QUICKVIC OR LESS OF THE MAIN BRANCH. VALVES ARE USED,EACH CONNECTION TO EQUIPMENT SHALL INCORPORATE INSULATED ENCLOSURE CONSTRUCTED OF RIGID INSULATION OR OTHER INSTALLATION READY STAB-ON FLEXIBLE COUPLING DESIGNED FOR A UNION ON THE EQUIPMENT SIDE OF THE VALVE. APPROVED METHOD.INSULATE VALVES,PUMPS 6.3 VARIABLE SPEED DRIVES DIRECT'STAB'ONTO GROOVED END PIPE WITHOUT PRIOR D.JOINTS:SCREWED FOR PIPE 2 INCH AND UNDER;WELDED OR GROOVED DISASSEMBLY AND NO LOOSE PARTS,GRADE`£HP"EPDM GASKET FOR PIPE OVER 2 INCH, G.PROVIDE UNE-SIZE BLOW-OFF VALVES AT ALL STRAINERS,AND WHERE E.PROVIDE PREINSULATED PROTECTION SHIELDS AT PIPE HANGERS. INSERT WITH RED CODE FOR WATER SERVICES FROM-30 DEG F TO+250 SHOWN ON THE DRAWINGS. MATERIAL FOR COLD PIPING TO BE FOAMGLAS OR OTHER APPROVED A.VARIABLE SPEED DRIVES(VSD'S)SHALL BE SOLID STATE PWM INVERTER DEG F. E.FLANGES,UNIONS,AND COUPLINGS: PIPE SIZE 2 INCHES AND UNDER: MATERIAL. PIPING SHALL NOT BE IN DIRECT CONTACT WITH HANGER FOR TYPE,3 PHASE,48OV,60 HZ INPUT,RATED FOR CONTINUOUS DUTY,AND SERVICE 150 PSI WORKING PRESSURE MALLEABLE IRON UNIONS FOR H.CONNECTIONS TO EQUIPMENT SHALL BE WITH FLANGES OR UNIONS. INSULATED PIPING. FOR COLD PIPING MAINTAIN VAPOR BARRIER AT PIPE HOUSED IN A NEMA 1 ENCLOSURE. VSD SHALL HAVE THE FOLLOWING IQ COUPLING WITH GRADE`THROUGH 12"SIZES: VICTAULIC STYLE 77 STANDARD FLEXIBLE LIGHT INDICATORS: POWER ON AND PROBLEM,. PROVIDE FRONT C GASKET WITH GREEN COLOR CODE THREADED FERROUS PIPING;BRONZE UNIONS FOR COPPER PIPE.FLANGES SUPPORTS. MOUNTED KEYPAD TO PROGRAM USER FUNCTIONS AND TO INTERFACE WITH FOR WATER SERVICES FROM EPDM GM-30 DEG F TO+230 DEG F. FOR FERROUS WELDED PIPING. I.PROVIDE CLEARANCE FOR INSTALLATION OF INSULATION,AND ACCESS TO VSD DISPLAY. THE LCD DISPLAY SHALL BE ALPHANUMERIC,BACK LIGHT VALVES AND FITTINGS. F.INSULATION FOR CHILLED WATER AND DUAL TEMPERATURE WATER SYSTEMS ILLUMINATED WITH PREPROGRAMMED MENU TO GUIDE USER,AND ABLE TO 4.AGS GROOVED JOINT COUPLINGS: TWO ASTM A536 DUCTILE-IRON 3.3 VALVES AND PIPING SPECIALTIES SHALL BE SHALL BE CLOSED CELL ELASTOMERIC,ARMAFLEX WITH LAP DISPLAY AS A MINIMUM: SET-UP PARAMETERS,RUNNING PARAMETERS, HOUSING SEGMENTS CAST WITH WEDGE-SHAPED AGS KEY PROFILE, J.SLOPE PIPING AND ARRANGE SYSTEMS TO DRAIN AT ALL LOW POINTS WITH SEAL OR AS APPROVED. FAULT REASON,AND HISTORY OF PREVIOUS FAULTS. DRIVE SHALL BE LEAD-IN CHAMFER AND FLAT BOLT PADS FOR METAL-TO-METAL A.ALL VALVES SHALL BE OF A DESIGN WHICH THE MANUFACTURER LISTS 3/4"MINIMUM DRAIN VALVES AND CAPS. DESIGNED TO OPERATE RELIABLY AT TEMPERATURE RANGE FROM 0 TO CONTACT. GASKETS SHALL BE WIDE-WIDTH,PRESSURE-RESPONSIVE FOR THE SERVICE AND SHALL BE OF MATERIALS ALLOWED BY THE LATEST G.INSULATION OF PIPE FITTINGS AND ELBOWS: INSTALL PREFORMED 40C,AND 0 TO 90%RH. SYNTHETIC RUBBER OF A FLUSHSEAL®DESIGN,GRADE`E"EPDM FOR EDITION OF THE ASME CODE FOR PRESSURE PIPING,FOR THE MAXIMUM K.PROVIDE AUTOMATIC AIR VENTS AT SYSTEM HIGH POINTS AND AS SECTIONS OF SAME MATERIAL AND DENSITY AS STRAIGHT PIPING. WHERE WATER SYSTEMS TO 2307,AND ZINC-PLATED STEEL BOLTS AND NUTS. OPERATING PRESSURE AND TEMPERATURE,UNLESS A HIGHER GRADE OR INDICATED ON DRAWINGS. AIR VENTS TO BE 3 4"MINIMUM.PROVIDE PREFORMED SECTIONS ARE NOT AVAILABLE FIELD FABRICATE USING THE QUALITY IS HEREIN SPECIFIED.ALL VALVES SHALL BE OF THE SAME / SAME MATERIAL IN SEVERAL LAYERS WITH JOINTS OFFSET. B.CHOKVSDSES THROUGH 200 HP SHALL HAVE INTERNAL SWINGING(NON-LINEAR) SHUT OFF VALVES. PIPE VENTS TO DRAIN WHERE INSTALLED OVER CHOKES PROVIDING IMPEDANCE EQUIVALENT TO 5%TO REDUCE THE A. RIGID TYPE: VICTAULIC STYLE W07,PROVIDES SYSTEM RIGIDITY AND MANUFACTURER,EXCEPT FOR SPECIAL APPLICATIONS. ELECTRICAL EQUIPMENT OR IN A CONCEALED LOCATION. H.REPLACE DAMAGED SECTIONS OF EXISTING INSULATION WHERE MEETING HARMONICS TO THE POWER LINE.SWINGING CHOKE SHALL BE REQUIRED SUPPORT AND HANGING IN ACCORDANCE WITH ASME B31.1 AND B31.9. B.EACH VALVE SHALL HAVE THE MAKER'S NAME OR BRAND,THE FIGURE OR L.INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL,NOT INVERTED. NEW WITH NEW INSULATION MEETING THIS SPECIFICATION. RESULTING IN SUPERIOR PARTIAL LOAD HARMONIC REDUCTION.LINEAR B. FLEXIBLE TYPE: VICTAULIC STYLE W77,ALLOWS FOR LINEAR AND LIST NUMBER AND THE GUARANTEED WORKING PRESSURE CAST ON THE CHOKES ARE NOT ACCEPTABLE.5%IMPEDANCE MAY BE FROM DUAL ANGULAR MOVEMENT,VIBRATION ATTENUATION AND STRESS RELIEF. BODY AND CAST OR STAMPED ON THE BONNET,OR SHALL BE PROVIDED M.GROUP PIPING WHENEVER PRACTICAL AT COMMON ELEVATIONS. I.INSULATION SHALL NOT BE INSTALLED UNTIL PIPING SYSTEM HAS BEEN (POSITIVE AND NEGATIVE DC BUS)CHOKES,OR 5%SWINGING AC LINE WITH OTHER MEANS OF EASY IDENTIFICATION. TESTED AND SIGNED OFF. CHOKES. VFD'S WITH ONLY ONE DC CHOKE SHALL ADD AN AC LINE 4.GROOVED JOINT FLANGE ADAPTERS: DUCTILE IRON HOUSING,FLAT N.MINIMUM HORIZONTAL HEIGHT OF PIPING SHALL BE 8'-0",UNLESS CHOKE. FACED,FOR INCORPORATING FLANGED COMPONENTS WITH ANSI CLASS C.PROVIDE VALVES AS INDICATED ON SCHEDULE BELOW AND INDICATED ON APPROVED. 3.9 PIPING SYSTEMS HANGERS.ANCHORS AND SUPPORTS C.VSD SHALL HAVE CAPABILITY TO COMMUNICATE WITH THE NEW CONTROL 125,150,AND 300 BOLT-HOLE PATTERNS TO A GROOVED PIPING DRAWINGS. SY'TEM(BMS)USING MODBUS OR OTHER MAJOR COMMUNICATION PROTOCOL SYSTEM. VICTAULIC STYLE 741,W741 AND 743. 0.BULLHEAD TEES ARE NOT PERMITTED.SERVICE VALVE A.ATTACHMENTS TO STRUCTURE FOR ALL NEW AND MODIFIED PIPING TO BE COMPATIBLE WITH THE BMS. A MINIMUM OF TWO ANALOG AND TWO CHW,HW,SW-UP TO 2-1/2 IN. BALL P.ALL NEW PIPING MUST BE TESTED. LEAK TEST SHALL BE CONDUCTED ON SUPPORTED BY SUPPLEMENTARY STRUCTURAL STEEL CONNECTED TO DIGITAL OUTPUT FUNCTIONS SHALL BE AVAILABLE FOR REMOTE ALL PIPING SYSTEMS PRIOR TO FINAL CONNECTIONS TO EQUIPMENT OR STRUCTURAL BEAMS. PROVIDE ALL REQUIRED SUPPLEMENTARY STEEL. MONITORING. PROVIDE INTEGRAL DOOR INTERLOCKED DISCONNECT. CHW,HW,SW-3"AND UP BUTTERFLY APPLYING INSULATION OR CONCEALING. TEST SHALL BE CONDUCTED IN PROVIDE EXTENDED WARRANTY. C. VSD'S SHALL INCLUDE SELF THE PRESENCE OF REPRESENTATIVE OF THE OWNER AND AUTHORITIES B.ATTACHMENTS FOR PIPING 2"AND SMALLER WITH LOADS ONLY UP TO 250 PROTECTION AND RELIABILITY FEATURES,INCLUDING CURRENT LIMITING, DOMESTIC WATER BALL HAVING JURISDICTION. THE CONTRACTOR IS TO CAP OFF OR ISOLATE ALL LBS.IS TO BE ACCOMPLISHED BY DRILLED-IN EXPANSION SHIELD TYPE OVERCURRENT TRIP,OVERVOLTAGE TRIP,UNDERVOLTAGE TRIP, NEWLY INSTALLED PIPING AND HYDRAULICALLY PRESSURE TEST NEW PIPING ANCHORS. OVERTEMPERATURE TRIP,AUTOMATIC RESET/RESTART AND STATUS AT 150 PERCENT OF THE SYSTEMS WORKING PRESSURE OR 100 PSI,WHICH INDICATION. UNIT SHALL ALSO HAVE SINGLE POLE,DOUBLE THROW D.BALL VALVES UP TO 2-1/2 INCHES:BRONZE TWO PIECE BODY,STAINLESS EVER IS GREATER. TEST PRESSURE SHALL BE MAINTAINED FOR TWO(2) C.HANGERS FOR COPPER PIPING SHALL BE COPPER PLATED. CONTACT FOR REMOTE ALARMING;CONTACT WILL CHANGE WHEN ANY TRIP STEEL FULL PORT BALL,TEIFLON SEATS AND STUFFING BOX RING,LEVER HOURS WITH NO DROP IN PRESSURE. THE CONTRACTOR SHALL PROVIDE CONDITION HAS OCCURRED. HANDLE SOLDER ENDS, TEMPORARY CONNECTIONS TO SERVICES,INSTRUMENTS,PUUMPS AS D.BUILDING FIRE PROOFING SHALL BE RESTORED WHERE DISTURBED NECESSARY FOR TESTING. D.MANUFACTURER AND MODEL: A.B.B.MODEL ACH-550 IN A NEMA 1 E.PROVIDE EXTENDED SHAFT HANDLES FOR BALL VALVES WHERE INSULATION E.DO NOT HANG PIPING FROM HANGERS FOR OTHER TRADES. ENCLOSURE,WITH THE FOLLOWING ACCESSORIES: BYPASS WITH IS REQUIRED TO ALLOW INSULATION OF SPECIFIED THICKNESS TO BE Q.PRE-OPERATIONAL CLEANING: AFTER THE PIPING SYSTEMS HAVE BEEN DISCONNECT,HAND-OFF AUTO SWITCH,ANNUAL POTENTIOMETER,0-100% INSTALLED. PRESSURE TESTED,THE CONTRACTOR SHALL PERFORM A F.PIPE HANGERS SHALL BE OF THE CLEVIS TYPE,EXCEPT WHERE OTHERWISE SPEED METER,REMOTE"ENABLED"INDICATION AND DISCONNECT SWITCH. PRE-OPERATIONAL CLEANING OF THE PIPING SYSTEMS. ALL CHEMICALS NOTED. F.BUTTERFLY VALVES:LUGGED DESIGN,DUCTILE IRON,ALUM.BRONZE DISK AND APPLICATION PROCEDURES SHALL BE SUBMITTED TO ENGINEER FOR E.PROVIDE FUSED OR CIRCUIT BREAKER DISCONNECT WITH VSD WHERE WITH RESILIENT EPDM SEAT. LEVER HANDLE FOR 4"AND SMALLER AND REVIEW.ENGINEER AND OWNER AND ENGINEER SHALL BE NOTIFIED 48 G.HANGER RODS SHALL BE GALVANIZED STEEL. HANGER ROD SHALL BE SHOWN ON ELECTRICAL DRAWINGS. GEAR DRIVE FOR LARGER VALVES. BRAY OR APPROVED EQUAL. HOURS IN ADVANCE OF WHEN THE CLEANING IS TO TAKE PLACE,AND GALVANIZED AND NOT EXCEED 6 FEET IN LENGTH. SUPPLEMENTARY STEEL SCHEDULE SHALL BE APPROVED BY THE OWNER AND ENGINEER. SHALL BE PROVIDED AS NECESSARY. PROVIDE HANGERS PER DRAWING F.INSTALLATION OF VSDS AS INDICATED ON DRAWINGS G.FLOW LIMITING VALVES SHALL BE Y-BODY WITH REPLACEABLE INSERTS. DETAILS. MINIMUM OPERATING PRESSURE SHALL BE 2 PSI OR LESS. FLOW LIMITING H.WHERE PIPING IS RUN NEAR THE FLOOR AND NOT HUNG FROM THE G.WARRANTY AND START-UP SERVICE VALVES SHALL BE GRISWOLID,HAYS OR APPROVED EQUAL 3.7 � CEILING CONSTRUCTION,BUT IS SUPPORTED FROM THE FLOOR OR IN A TRENCH SUCH SUPPORTS SHALL BE OF PIPE STANDARDS WITH BASE 1.THE VSD MANUFACTURER REPRESENTATIVE SHALL BE SUBCONTRACTED , H.CHECK VALVES INSTALLED IIN THE HORIZONTAL POSITION SHALL BE SWING A.JOINTS BETWEEN SECTIONS OF PIPE AND BETWEEN PIPE AND FITTINGS TO PROVIDE START UP SERVICE FOR ALL VFD'S PROVIDED. SERVICE CHECKS;VALVES INSTALLED IN THE VERTICAL POSITION SHALL BE SILENT SHALL BE FUSION WELDED IN ACCORDANCE WITH THE RECOMMENDATIONS FLANGE AND ADJUSTABLE TOP YOKE. SHALL INCLUDE INSPECTION,FINAL ADJUSTMENT,OPERATIONAL CHECKS, CHECKS,EXCEPT THAT ALL CHECK VALVES IN PUMP DISCHARGES SHALL OF THE AMERICAN WELDING SOCIETY.MITERING OF PIPE TO FORM ELBOWS, I.WHERE PIPING IS RUN ABOVE THE FLOOR,AND IS NOT HUNG FROM THE AND A FINAL REPORT FOR RECORD PURPOSE. START UP SERVICE BE SILENT CHECKS. MATCHING STRAIGHT RUNS TO FORM TEES OR ANY SIMILAR CONSTRUCTION CEILING CONSTRUCTION OR NOT SUPPORTED FROM THE FLOOR,SUCH SHALL BE PERFORMED BY A FACTORY APPROVED AND CERTIFIED SHALL NOT 6E DONE. TECHNICIAN, PIPING SHALL BE SUPPORTED FROM THE WALL WITH BRACKET HANGERS, I.ALL VALVES AND SPECIALTIES SHALL BE SO PLACED AS TO PERMIT EASY EXPANSION BOLTED TO THE WALL. OPERATION AND ACCESS. B.ALL WELDING SHALL BE DONE AS OUTLINED IN THE LATEST EDITION OF 2.VSDS SHALL HAVE 2 YEAR PARTS AND LABOR WARRANTY. THE ASME CODE FOR PRESSURE PIPING. 3.10 PIPING SYSTEMS VIBRATION ISOLATION J.ALL VALVES UP TO 2 INCHES IN DIAMETER SHALL HAVE SWEAT OR SCREW 7.0 TESTING AND BALANCING ENDS, 2 2-1 "IN DIAMETER AND OVER SHALL HAVE FLANGED OR GROOVED C.WELDING PROCESS-ALL WELDING SHALL BE DONE BY THE OXYACETYLENE / A.PROVIDE VIBRATION ISOLATION FOR ALL MOTORIZED EQUIPMENT.ALL ENDS. OR ELECTRIC ARC WELDING PROCESS IN ACCORDANCE WITH THE A.SUBCONTRACT WITH AN INDEPENDENT AGENCY FOR THE TESTING, SPRING TYPE ISOLATORS SHALL BE SEISMICALLY STABLE AND SHALL HAVE REQUIREMENTS SET FORTH IN WELDING OF PIPE JOINTS OIF THE CODES FOR ADJUSTMENT,AND BALANCING OF WATER SYSTEMS.AGENCY SHALL BE K.DRAIN VALVES SHALL BE PROVIDED WITH HOSE END,BRONZE BODY WITH PRESSURE PIPING. AN ADDITIONAL TRAVEL TO SOLID OF 507.ALL COMPONENTS OF EXPOSED ISOLATORS INCLUDING FASTENERS SHALL BE CORROSION PROTECTED BY COMPANY SPECIALIZING IN THE ADJUSTING AND BALANCING OF SYSTEMS CAP AND CHAIN. ZINC OR GALVANIZED PLATING,POWDER COATING OR OTHER METHODS SPECIFIED IN THIS SECTION WITH MINIMUM 5 YEARS EXPERIENCE,CERTIFIED D.BEVELING AND WELDING-ALL PIPE 2-1/2 INCHES AND LARGER MAY BE ACCEPTABLE TO THE ENGINEER BY AABC.PERFORM WORK UNDER SUPERVISION OF REGISTERED . PURCHASED MILL BEVELED OR SHALL BE MACHINE BEVELED ON BOTH PROFESSIONAL ENGINEER.TOTAL SYSTEM BALANCE SHALL BE PERFORMED 3.4 CONTROL VALVES ENDS BEFORE WELDING. ON ODD LENGTHS OF PIPE,BEVELING MAY BE C.PROVIDE FLEXIBLE PIPING JOINTS FOR PUMP DISCHARGE AND SUCTION AS IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD ACCOMPLISHED BY MEANS OF THE OXYACETYLENE CUT11NIG TORCH SHOWN ON DRAWINGS. MASON INDUSTRIES MODEL BSS(SHORT LENGTH) MEASUREMENT AND INSTRUMENTATION,TOTAL SYSTEM BALANCE. A.PROVIDE CONTROL VALVES. WATER VALVES SHALL BE SIZED FOR PROVIDED ALL PAINT,RUST,SCALE AND OXIDE ARE CAREFULLY REMOVED OR APPROVED EQUAL. MAXIMUM OF 3 PSI PRESSURE DROP,HAVE EQUAL PERCENTAGE WITH HAMMER,CHISEL OR FILE AND BEVEL LEFT SMOOTH AND CLEAN. B.ADJUST FLOW TO WITHIN 5 PERCENT OF DESIGN REQUIREMENTS.PREPARE CHARACTERISTIC AND HAVE MINIMUM RANGEBILITY OF 100. VALVES MAY JOINTS SHALL BE PREPARED AND WELDED TO ASSURE THOROUGH FUSION D PROVIDE SPRING VIBRATION ISOLATION HANGERS FOR ALL WATER PIPING AND SUBMIT A BALANCING REPORT SHOWING ALL READINGS INCLUDE BE ROTARY OR GLOBE TYPE. ANSI LEAKAGE CLASS IV OR BETTER. .ER. OF ALIGNMENT AND THE PRODUCTION OF A JOINT THAT SHALL DEVELOP WITHIN 20 FEET OF PUMP DESIGN VALUES FOR THE SAME.REPORT TO INCLUDE ACTUAL ELECTRICAL . THE FULL STRENGTH OF THE PIPE AND THAT SHALL BE LEAKPROOF IN CHARACTERISTICS OF EACH PIECE OF EQUIPMENT TO BE BALANCED(RPM, B.STEAM VAVLES SHALL BE THE SAME AS WATER VALVES SIZED FOR 7 PSI SERVICE. 4.0 HOUSEKEEPING PADS AMPS,BHP,ETC.)AS WELL AS ELECTRICAL NAMEPLATE CHARACTERISTICS. 06/22/2022 -- ISSUED FOR PERMIT AK INLET PRESSURE AND 2 PS;I OUTLET PRESSURE.ANSI LEAKAGE CLASS IV ACCURATELY RECORD ACTUAL LOCATIONS OF BALANCING VALVES. DATE REV DESCRIPTION BY OR BETTER. E.WELDING TEES-WELDING TEES SHALL BE USED WHEN SPECIFIED A.PROVIDE HOUSEKEEPING PADS(AND EXTEND EXISTING PADS)FOR ALL HEREINAFTER.WHERE NECESSARY,BRANCH CONNECTIONS SHALL BE C.SEQUENCE WORK TO COMMENCE AFTER COMPLETION OF SYSTEMS AND C.ELECTRIC ACTUATORS SHALL HAVE MANUAL OVERRIDE PROVISIONS. REINFORCED IN AN APPROVED MANNER. FOR THE SMALLER BRANCHES, FLOOR MOUNTED EQUIPMENT AND AS SHOWN ON DRAWINGS. MINIMUM SCHEDULE COMPLETION OF WORK BEFORE SUBSTANTIAL COMPLETION OF I nn PROVIDE SPRING RETURN FAIL-OPEN TYPE FOR PREHEAT APPLICATIONS. WHERE WELDING TEES ARE UNAVAILABLE,NOZZLES SHALL BE WELDED TO HOUSEKEEPING PAD THICKNESS SHALL BE 4"AND EXTEND A MINIMUM OF PROJECT.BEFORE COMMENCING WORK,VERIFY THAT SYSTEMS ARE BELIMO MFT ACTUATORS OR APPROVED EQUAL. PIPE. WHERE SUCH NOZZLES ARE WELDED TO THE PIPE,ALL CUTTING 4"BEYOND THE EQUIPMENT ON ALL SIDES. PROVIDE 1"CHAMFER AT COMPLETE AND OPERABLE.ENSURE THE EQUIPMENT IS OPERABLE AND IN Southport Engineering Associates,PC OXIDE WHICH MAY DROP INSIDE THE PIPE SHALL BE REMOVED BEFORE UPPER EDGES,ALL AROUND. HOUSEKEEPING PADS SHALL BE CONCRETE A SAFE AND NORMAL CONDITION,THE TEMPERATURE CONTROL SYSTEMS 431-6844 11 Bailey Avenue Tel.: 203 D.VALVES AND ACTUATORS SHALL BE BY BELIMO,OR APPROVED EQUAL. WELDING THE BRANCH OR SECTION IN PLACE. WHERE BRANCH SIZE IS OF MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI. PROVIDE 6"X6"10 ARE INSTALLED COMPLETE AND OPERABLE AND PROPER THERMAL Ridgefield,Avenue e6877 Fax:�203)431-6844 ONE HALF THE SIZE OF MAIN OR LARGER,USE WELDING'TEES.WHERE GAUGE REINFORCING MESH. OVERLOAD PROTECTION IS IN PLACE FOR ELECTRICAL EQUIPMENT. 3.5 PIPING ACCESORIES BRANCH SIZE IS TWO(2)SIZES SMALLER THAN THE SIZE.OF MAIN BEGINNING OF WORK MEANS ACCEPTANCE OF EXISTING CONDITIONS. PROJECT: "WELDOLETS"OR"SOCKOLETS"MAY BE USED. 5.0 IDENTIFICATION 699 WESTCHESTER AVENUE A.WATER STRAINERS SHALL BE Y-TYPE WITH REMOVABLE SCREEN.TWO-INCH D.REPORT ANY DEFECTS OR DEFICIENCIES NOTED DURING PERFORMANCE OF AND SMALLER,SCREWED BRONZE,2-1/2"AND LARGER,FLANGED CAST F.WELDING RODS-THE WELDING ROD USED FOR WELDING'STEEL AND A.PROVIDE IDENTIFICATION OF PIPING USING SPRAY PAINT AND TEMPLATES SERVICES TO ENGINEER.PROMPTLY REPORT ABNORMAL CONDITIONS IN BOILER REPLACEMENT IRON. PROVIDE BRASS SCREENS WITH 1/16"PERFORATIONS FOR WATER WROUGHT IRON SHALL BE APPROVED WELDING ROD IN ACCORDANCE WITH OR WITH PLASTIC STRAP ON MARKERS AS MANUFACTURED BY SETON MECHANICAL SYSTEMS OR CONDITIONS WHICH PREVENT SYSTEM BALANCE. 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 STRAINERS UP TO 3"INCLUSIVE; 1/8"PERFORATIONS FOR 4"AND ASTM SPEC.A233. NAME PLATE COMPANY. COLORS AND LETTERING SHALL MATCH EXISTING. 64 NEW yo ABOVE. STRAINERS AT 4"AND ABOVE LOW PRESSURE DROP DESIGN, G.WELDER SHALL BE FULLY CERTIFIED BY THE AUTHORITIES HAVING PIPING PASSE PIPING SHALL BEH LABELED DWALMIINIMUM OF EVERY 30 FEET AND WHERE E.PERMANENTLY RESTORED.DARK SETTINGS LOCK ADJUSTMEMORYMENT SDEVICES ALLTER ADJUSTMENT, SETTINGS *`fit seP g4 DRAWING TITLE: /� METRAFLEX LPD OR APPROVED. TAKE MEASUREMENTS TO VERIFY BALANCE HAS NOT BEEN DISRUPTED OR s�* MECHANICAL/PLUMBING JURISDICTION TO CERTIFY WELDERS FOR PRESSURE PIPING. _THAT SUCH DISRUPTION HAS BEEN RECTIFIED. SPECIFICATIONS CONTINUED F.LEAVE SYSTEMS IN PROPER WORKING ORDER,CLOSING DOORS TO t CALE: NONE DRAWN BY: lJ RDS DRAWING N0: ELECTRICAL SWITCH BOXES,AND RESTORING THERMOSTATS TO SPECIFIED 6 oa�sea SETTINGS. ht� DATE: 05/18/22 CHECKED BY: AK PROJECT NO: 85109 APPROVED BY: AK M-101 HYDRONIC PUMP SCHEDULE HYDRONIC BOILER SCHEDULE HYDRONIC COIL SCHEDULE DESIGNATION HWP-1,2 HWP-5,6 HWP-7,8 HWP-9,10 HWP-13,14 P-AHU-12 P-HV-3 P-AHU14&15 P-FILT P-BOILER DESIGNATION BLR-1,2,3,4 DESIGNATION DTC-HV3 DTC-HV3 LOCATION BOILER ROOM CHILLER ROOM CHILLER ROOM CHILLER ROOM WEST.MER AHU-12 MER WEST WING MER WEST MEZZ.MER BOILER ROOM BOILER ROOM LOCATION BOILER ROOM LOCATION HV-3 HV-3 SERVICE PRIMARY HW MAIN HW RYE WING SW FIN TUBE WEST MTG ROOMS AHU CIRCULATION AHU CIRCULATION AHU CIRCULATION FILTER CIRCULATION BOILER CIRCULATION SERVICE HEATING SERVICE BACK OF HOUSE BACK OF HOUSE TYPE END SUCTION END SUCTION END SUCTION END SUCTION END SUCTION IN-LINE IN-LINE IN-LINE IN-LINE IN-LINE ,E VERTICAL SUPPLY CFM 7,000 7,000 TYPE CONDENSING OUTSIDE AIR CFM 7,000 7,000 PUMP DATA BOILER DATA COIL SCHEDULE COOLING HEATING CASING MATERIAL CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON CAST IRON FLUID WATER SENSIBLE HEAT-TRANSFER RATE-kBTU/H 194 --- COUPLING FUEL NAT.GAS TOTAL HEAT-TRANSFER RATE-kBTU/H 288 --- SEAL TYPE MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL INPUT-MBH 3,000 ENTERING-AIR,DRY-BULB TEMPERATURE-DEG F 90 5 FLUID WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER OUTPUT-MBH 2,907 ENTERING-AIR,WET-BULB TEMPERATURE-DEG F 73 --- CAPACITY-GPM 775 525 700 70 115 20 20 32 40 200 EFFICIENCY 97% LEAVING-AIR,DRY-BULB TEMPERATURE-DEG F 65 70 TOTAL DYNAMIC HEAD-FEET 80 100 120 80 45 10 10 10 10 20 MAX OPERATING PRESSURE-PSI 160 LEAVING-AIR,WET-BULB TEMPERATURE-DEG F 62 --- BREAK HORSEPOWER 6.5 16 27 1.7 -- -- -- -- -- FACE AREA-SQ.FT. 14 --- EFFICIENCY 79% 80% 79% 57% 79% - RELIEF VALVE SETTING-PSI 150 MAXIMUM FACE VELOCITY-FPM 500 INLET SIZE-NPS 5 4 5 1.5 3 1.25 1.25 1.25 1.5 3 MAXIMUM AIR-SIDE,PRESSURE DROP-INCHES 0.3 --- VOLTS/PHASE/HZ 460/3/60 TUBE MATERIAL CU --- OUTLET SIZE-NPS 4 3 4 1.25 2 1.25 1.25 1.25 1.5 3 FULL-LOAD AMPERES 10.3 FIN MATERIAL ALUM --- IMPELLER SIZE-INCHES 10.5 11.0 11.5 8.4 6.9 -- -- -- -- -- ELEC. FINS SPACING-FINS/INCH 12 TYPE INVERTER INVERTER INVERTER PREM EFF. INVERTER PSC PSC PSC PSC ECM MIN.CIRCUIT AMP. 20 --- ERCURRENT 20 NO.OF ROWS 3 MAX.. --- SPEED(RPM) 1750 1750 1750 1750 1750 1750 1750 1750 1750 --- PRESSURE RATING-PSIG 200 --- HORSEPOWER 20 20 30 3.0 2.0 1/12 1/12 1/6 1/6 2 FLUID FLOW-GPM 38 15 MOTOR VOLTS/PHASE/HZ 460/3/60 460/3/60 460/3/60 460/3/60 460/3/60 110/1/60 110/1/60 110/1/60 110/1/60 208-460/3 MANUFACTURER DATA(BASIS OF DESIGN) MAXIMUM FLUID PRESSURE DROP-FEET 5.1 0.9 FULL-LOAD AMPERES MANUFACTURER PK NATER ENTERING-FLUID TEMPERATURE-DEG F 42 140 MIN.CIRCUIT AMP. MODEL DESIGNATION AND NO. CK-3000 LEAVING-FLUID TEMPERATURE-DEG F 57 100 MAX.OVERCURRENT WEIGHT-LBS 2425 MANUFACTURER DATA(BASIS OF DESIGN) MANUFACTURER HEATCRAFT --- MANUFACTURER DATA(BASIS OF DESIGN) MODEL NUMBER 5WL1203A --- MANUFACTURER B&G B&G B&G B&G B&G B&G B&G B&G B&G B&G NOTES I WEIGHT 273 --- MODEL DESIGNATION AND NO. e-1510,4EB e-1510,3EB e-1510,4GC e-1510,4GC e-1510-2ADes PL-30 PL-30 PL-35 PL-50 ECOCIRC 27-320 1.PROVIDE IN-LINE NEUTRALIZER KIT,AND LOW WATER NOTES 1 --- CUTOUT. 2.PROVIDE WITH GAS REGULATORS FOR FIELD NOTES: SPECIFIC NOTES INSTALLATION. 1.STAINLESS STEEL SLOPED CONDENSATE PAN. GENERAL NOTES 3.PROVIDE MASTER CONTROLLER W/BACNET 2.CONTACT KEN HACK FOR COILS: (845)896-3800 COMMUNICATION INTERFACE FOR BMS. SPECIFIC NOTES CONTROL VALVE SCHEDULE STORAGE WATER HEATER SCHEDULE VARIABLE SPEED DRIVE AND MOTOR SCHEDULE MAX DESIGNATION WH-1,2,3 DESIGN MOTOR CIRCUIT PRESS VALVE ACTUATOR 2-POS/ SPRING HOTOR NEW ELECTRONIC MANUFACIER SYSTEM/FUNCTION DESIGNATION FLOW DROP VALVE TYPE SIZE CV MANUFACTER VALVE MODEL MODEL MODULATE RETURN NOTES LOCATION BOILER ROOM SYSTEM/FUNCTION HP MOTOR VOLTAGE/ BYPASS BREAKER MODEL NOTES (GPM) (PSI) SERVICE DOM HW PHASE DISCONNECT TYPE VERTICAL BOILER ROOM STORAGE TANK BOILER ISOLATION VALVE(TYP) PROVIDED WITH BOILERS.INSTALLED BY CONTRACTOR. CAPACITY GALLONS 300 HEATING SYSTEM WATER HEATERS(TYP) PROVIDED AND MOUNTED WITH WATER HEATERS TYPE- ASME PRIMARY HOT WATER PUMP HWP-1 20 YES 460/3 NO YES ABB-550ACH 1 UNIT HEATER VC-1 3 -- 2W-BALL 3/4 BELIMO B219B 2-POS YES MATERIAL 316 SS PRIMARY HOT WATER PUMP HWP-2 20 YES 460/3 NO YES ABB-550ACH 1 MAIN HEATING SYSTEM PRESSURE RATING-PSIG 125 MAIN HOT WATER PUMP P-5 20 YES 460/3 NO YES ABB-550ACH 1 MAIN HOT WATER PUMP P-6 20 YES 460/3 NO YES ABB-550ACH 1 HOT WATER RETURN CONTROL VALVE VC-11 400 3 2W-BALL 4 186 BELIMO B6400S MOD 0-10V NO DOM.WATER PIPING CONNECTIONS-INCHES 1.5 RYE WING SW PUMP P-7 30 YES 460/3 NO YES ABB-550ACH 1 RYE WING SECONDARY WATER SYSTEM 2-POS NO DOM.WATER HX CONNECTIONS-INCHES 2 RYE WING SW PUMP P-8 30 YES 460/3 NO YES ABB-550ACH 1 HOT WATER RETURN CONTROL VALVE VC-21 220 3 2W-BALL 3 110 BELIMO 86300S MOD 0-10V NO COATING NONE WEST.MTG ROOM HW PUMP P-13 2.0 YES 460/3 NO YES ABB-550ACH 1 2.5 HOT WATER SUPPLY ISOLATION VALVE VC-22 220 -- 2W-BALL 3 110 BELIMO B6300S MOD 0-10V NO INSULATION THICKNESS/R-VAL JACKET MATERIAL PAINTED NTED STEEL WEST.MTG ROOM HW PUMP P-14 2.0 YES 460/3 NO YES ABB-550ACH 1 CHW SUPPLY CONTROL VALVE VC-23 500 EXISTING EXISTING 2-POS NO CHW RETURN ISOLATION VALVE VC-24 500 -- 2W-B.FLY 4 186 BELIMO B6400S MOD 0-10V NO RECOVERY CONTINUOUS-GPH 2,400 DOM. ENTERING-FLUID TEMPERATURE-DEG F 40 FIN TUBE HEATING SYSTEM 2-POS NO NATER LEAVING-FLUID TEMPERATURE-DEG F 140 HOT WATER RETURN CONTROL VALVE VC-31 80 3 2W-BALL 2 46 BELIMO B249 MOD 0-10V NO GENERAL NOTES: HEAT EXCHANGER SOUTH ZONE ISOLATION VALVE VC-32 80 -- 2W-BALL 1.25 37 BELIMO B232 2-POS NO TYPE- BRAZED PLATE, DOUBLE WALL SPECIIFIC NOTES: WEST.WING SECONDARY WATER SYSTEM NUMBER OF PASSES 1 1.MOTOR PROVIDED WITH NEW PUMP. HOT WATER RETURN CONTROL VALVE VC-41 70 3 2W-BALL 2 46 BELMO B249 MOD 0-10V NO PIPING CONNECTIONS-INCH 2" HOT WATER SUPPLY ISOLATION VALVE VC-42 70 -- 2W-BALL 2 108 BELIMO B249VS 2-POS NO PLATE MATERIAL 316SS CHW SUPPLY CONTROL VALVE VC-43 210 3 2W-BALL 3 110 BELIMO B6300S MOD 0-10V NO PRESSURE RATING-PSIG 150 CHW RETURN ISOLATION VALVE VC-44 210 -- 2W-B.FLY 4 451 BELIMO F6100 2-POS NO FLUID TYPE WATER UNIT HEATER SCHEDULE WEST.MEETING SECONDARY WATER SYSTEM FLUID FLOW-GPM 60 DESIGNATION UH-A MAXIMUM FLUID PRESSURE DROP-FEET 15 LOCATION BOILER ROOM HOT WATER RETURN CONTROL VALVE VC-51 70 3 2W-BALL 2 46 BELIMO 8249 MOD 0-10V NO BOILER SERVICE MER ENTERING-FLUID TEMPERATURE-DEG F 160 HOT WATER SUPPLY ISOLATION VALVE VC-52 70 -- 2W-BALL 2 108 BELIMO B249VS 2-POS NO SUPPLY CFM 1,900 LEAVING-FLUID TEMPERATURE-DEG F 90 HEATING SCHEDULE CHW SUPPLY CONTROL VALVE VC-53 208 3 2W-BALL 3 110 BELIMO B6300S MOD 0-10V NO FOULING FACTOR SENSIBLE HEAT-TRANSFER RATE-BTU/H 44,700 CHW RETURN ISOLATION VALVE VC-54 208 -- 2W-B.FLY 3 228 BELIMO F680 2-POS NO MANUFACTURER DATA(BASIS OF DESIGN) ENTERING-AIR,DRY-BULB TEMPERATURE-DEG F 60 AIR HANDLING UNIT COILS LEAVING-AIR,DRY-BULB TEMPERATURE-DEG F 81.4 MANUFACTURER HUBBELL PRESSURE RATING-PSIG 150 AC-12 HW RETURN CONTROL VALVE, VC-61 25 3 2W-BALL 1.5 19 BELIMO B238 MOD 0-10V YES BWP300316L MODEL NUMBER FLUID FLOW-GPM 3.0 AC-12 HW SUPPLY ISOLATION VALVE VC-62 25 -- 2W-BALL 2 57 BEUMO 8250 2-POS YES -2400BPD MAXIMUM FLUID PRESSURE DROP-FEET -- AC-12 CHW SUPPLY CONTROL VALVE VC-63 52 3 EXISTING -- -- EXISTING --- MOD 0-10V YES DIMENSIONS-INCHES DIM X HEIGHT 40X88 WATER ENTERING-FLUID TEMPERATURE-DEG F 140 AC-12 CHW RETURN ISOLATION VALVE VC-64 52 -- 2W-BALL 2 108 BELIMO 8249VS 2-POS YES WEIGHT -APPROX. 2180 LEAVING-FLUID TEMPERATURE-DEG F 110 HV-3 RETURN CONTROL VALVE VC-71 15 3 2W-BALL 3/4 10 BELIMO B219B MOD 0-10V YES REMARKS: FAN SCHEDULE HV-3 HW SUPPLY ISOLATION VALVE VC-72 15 -- 2W-BALL 1.25 37 BELIMO B232 2-POS YES 1.PROVIDE WITH TWO-WAY MODULATING BOILER CONTROL VALVE AND TYPE PROP DRIVE TYPE DIRECT 06/22/2022 -- ISSUED FOR PERMIT AK TEMPERATURE CONTROLLER. HV-3 CHW SUPPLY CONTROL VALVE VC-73 38 3 2W-BALL 1.5 29 BELIMO B239 MOD 0-10V YES RPM 1,140 DATE REV DESCRIPTION BY 2.PROVIDE ALTERNATE PRICE FOR BACNET COMMUNICATIONS. HV-3 CHW RETURN ISOLATION VALVE VC-74 38 -- 2W-BALL 1.5 84 BELIMO B239VS 2-POS YES HORSEPOWER 1/3 3.120V 5A POWER REQUIRED OONJ 15L11J O OO C�15 L JVOO C���lS�c AC-14,15 3-WAY CONTROL VALVE VC-81 83 -- 3W-BALL 2 91 BELIMO B250VS 2-POS YES TOR SPEED(RPM)) 1,140 MOTOR AC-14,15 SUPPLY CONTROL VALVE VC-82 83 -- EXISTING -- -- EXISTING --- MOD 0-10V YES VOLTS/PHASE/HZ 120 1/60 Southport Engineering Associates,PC TYPE ECM 11 Bailey Avenue Tel.: 203 431-6844 MANUFACTURER DATA(BASIS OF DESIGN) Ridgefield,CT 06877 Fax:(203)431-6877 AIR HANDLING HW CIRCULATION PUMP MANUFACTURER TRANE PROJECT: PUMP ISOLATION(TYP OF 4) VC-CP 25-35 -- BALL-2W 1.5 84 BELMO 82329VS 2-POS NO 1 MODEL NUMBER S-120 699 WESTCHESTER AVENUE WEIGHT-LBS. 59 BOILER REPLACEMENT NOTES' 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 GENERAL NOTES: �p M�YpR� DRAWING TITLE: 1:ALL ACTUATORS 24VOLT. 2.VALVES TO BE FURNISHED AND INSTALLED BY MECH CONTRACTOR. 3.BALL VALVES TO HAVE STAINLESS STEEL BALLS e+y* MECHANICAL/PLUMBING NOTES: 1.VALVES TO HAVE OPEN AND CLOSED END SWITCHES SCHEDULES CALE: NONE DRAWN BY: RDS DRAWING NO: tsxo'FI DATE: 05/18122 CHECKED BY: AK PROJECT NO: 85109 APPROVED BY: AK M-102 (E)BLOWDOWN TANK AND PIPING jy (E)FUEL OIL BOILER VENTING SPECIFICATION PIPING MAINTENA )STEAM RELIEF ROOM SERVI A.BASIS OF DESIGN:SECURITY CHIMNEYS SECURE SEAL SPECIAL GAS VENT. SHO AND SLOWDOWN B.SHALL BE MANUFACTURED FROM STAINLESS STEEL SPECIFICALLY DESIGNED PIPING FOR EXTREME RESISTANCE TO CHLORINE ION PITTING,CREVICE CORROSION, ❑ AND STRESS CORROSION INDUCED BY THE GENERATION OF CORROSIVE CONDENSATES BY PARTIALLY OR FULLY CONDENSING NATURAL GAS OR 11 k� PROPANE FIRED HEATING APPLIANCES. MAINTENANCE CO-GEN DRAIN AT C. THE SYSTEM COMPONENTS, SUPPORTS AND TERMINATIONS SHALL BE CUP ( FUEL OIL ENG.OFF. LOW POINTSp FACTORY-BUILT BY SECURITY CHIMNEYS, THE PRODUCT OF ONE PUMPS MANUFACTURER,SHALL BE LABORATORY TESTED AND LISTED BY INTERTEK 10"�VENT O O TESTING SERVICES (ETL) FOR USE WITH CATEGORY I, II, III, AND IV (E)BOILER REMOVE STAIR CUP (TYP) APPLIANCES AND BE LISTED TO UL 1738 AND,FOR DOUBLE-WALL DIAMETERS BOILER NO.13 F I CF-1. 3 TO 241D, UL 641. THE SYSTEM, WHEN SEALED, SHALL MAINTAIN 01 (4)12"0 COMBUSTION B1 11 AIRTIGHT INTEGRITY FOR POSITIVE,NEUTRAL,AND NEGATIVE PRESSURES UP AIR(ABOVE AND ENG.OFF. TO 35"W.C. I ti B It::! ER 0 M BELOW). 1 2 '�2� D. THE COMPLETE VENT SYSTEM SHALL BE FABRICATED AS FOLLOWS: CAP EXISTING OA PLENUM. STAIR 1.THE INNER WALL MATERIAL SHALL BE AL29-4C OR 316L STAINLESS CLEAN AND REPLACE WMSQ2 t NO.13 STEEL. REMOVE STEAM a BEHIND LOUVER WITH 1/4"WMS f24X24 AD 2.THE OUTER JACKET MATERIAL SHALL BE STAINLESS STEEL. FOR ❑ INSTALLATIONS LINING AN EXISTING CHIMNEY,THE OUTER JACKET IS COIL AND PIPING T INSULATE ENTIRE PLENUM. t i _ NOT REQUIRED FOR THE LINER. PIPING TO BE� rBC It€R-RO@M' BB4 3.THE INSULATION BETWEEN THE INNER WALL AND OUTER JACKET SHALL REMOVED(TYP) Las INSTALL WALL BE A 1.0 INCH ANNULAR AIR SPACE. IN PLENUM R O 24"0 VEN TO BOILER a _UPS21 C _ I ROOF® E. THE COMPLETE SECURITY CHIMNEYS SPECIAL GAS VENT SYSTEM, FROM CAP} CAP THIS SECTION OF - APPLIANCE OUTLET TO TERMINATION, SHALL BE DESIGNED TO ELIMINATE (E)CONDENSATE n PLENUM IS RESERVED 0 ❑ ON-SITE WELDING THROUGH THE USE OF A SLIP FIT,RIGID CONNECTION WITH RECEIVER PUMPS AND --��S--c REINFORCING RIBS,BUILT-IN MECHANICAL LOCKING CLIPS AND A V1TON0 / FOR CHP CONTRACTOR CONDENSATE PIPING P2 0-RING. FOR 26 TO 361D,V-BANDS AND VITONO SEALANT SHALL BE C 9DOUBLE WALL CAT IV.----- ACCEPTED IN LIEU OF BUILT-IN MECHANICAL LOCKING CLIPS AND VITONO Ps BANQUET PREP.ASSET REFER TO SPECIFICATIONS. NOTE:VENTS AND COMBUSTION O-RING, SILICONE GASKETS AND SILICONE SEALANT AT SECTION JOINTS ARE N CAP KEYED NOTES: PITCH TOWARD BOILERS. AIR DUCT TO BE RUN ABOVE BOILER NOT ACCEPTABLE DUE TO ADVERSE REACTIONS WITH CARBONIC ACID. g PIPING,AT LEVEL OF EXISTING ROOM n Qj 1"PRESSURE CLASS DUCTWORK.PITCH BOILER FLUE. F. ALL TEES SHALL 45-DEGREE(LATERAL)TEES;BOOT TEES AND 90-DEGREE (E)14"LPS TOWARD BOILERS AT 1/4"/FT. A COMMON TEES ARE NOT ACCEPTABLE. COMBUSTION AIR DUCT CAN BE USED INSTEAD OF INDIVIDUAL VENTS AS BANQUET PREP ASSET ARE RESIDENTIAL-TYPE SPECIAL GAS VENTS,SUCH AS DURAVENT AND Z-FLEX, . APPROVED BY BOILER MANUFACTURER. ARE NOT ACCEPTABLE. ONLY SECURITY CHIMNEY SPECIAL GAS VENTS ARE HV-1 PROVIDE AUTO COMBUSTION AIR DAMPERS ACCEPTABLE. AT EACH BOILER. H. THE VENT SYSTEM MANUFACTURER SHALL VERIFY THAT THE SHOP DRAWINGS' w 2�1-1/2"EXTERNAL RIGID INSULATION, PROPOSED EXHAUST SYSTEM COMPLIES WITH THE APPLIANCE 3 LBS/C.F.DENSITY W/ASJ JACKET. MANUFACTURERS'WRITTEN REQUIREMENTS AND THAT THE INSTALLATION WILL (E)LPC IN 3 UL 1738 VENT,CAT IV. DOUBLE WALL. SAFELY EXHAUST THE CONNECTED EQUIPMENT. DRAFT CALCULATIONS SHALL TRENCH BE BASED UPON THE APPLIANCE MANUFACTURERS'WRITTEN REQUIREMENTS. ❑H CHILLERR OM El RUN WITHIN NEW 2-HOUR RATED THE DRAFT CALCULATION SHALL BE BASED UPON ASHRAE'S CHIMNEY DESIGN ENCLOSURE TO ROOF. TERMINATE 36" EQUATION AND SUBMITTED WITH THE APPLIANCE MANUFACTURERS' REMOVE HEAT-, LPC ABOVE BUILDING WITHIN 10 FEET. REQUIREMENTS FOR REVIEW AND APPROVAL BY THE ENGINEER. EXCHANGE L i REMOVE 3 WATER H AH CH. LANT HEATERS. REMOVE EXISTING S 8"LPS MECHANICAL BOILER ROOM VENTING AND COMBUSTION AIR PLAN m REMOVE PIPING TO m SCALE:1/8"=V-0" EQUIPMENT,AND ASSOCIATED EQUIPMENT. (TYP). AI-1 w L (E)LPS&R =I -6 FROM KITCHEN � # MODIFY COOLING COIL PIPING PER DETAIL ON M-300 FBI CAP ❑e P-AHU-14. INSTALL ON TOP P-AHU-15 (TYP) CAP REMOVE MODIFY COOLING REMOVE HEAT (TYP) EXISTING LPC COIL PIPING PER OF AHU.(TYP) ABANDON EXCHANGERS DETAIL ON M-300 STEAM COIL 48X8 W/AUTO TAIR#11 DAMPER !- AHU- MECHANICAL BOILER/CHILLER ROOM STEAM PIPING REMOVALS PLAN REMOVE STEAM U-14 /—MEW 36X12 RA SCALE:I/S"=1'-0" PIPING AND ACCESSORIES WITHIN RETURN FA ROOM. FAN�� 12X14 TT FAN 48X24 GENERAL NOTES KEYED NOTES ROOM> - z z 1.PLAN SHOWS STEAM PIPING AND GENERAL O TURN OVER BOILER BURNER AND OTHER ACESSORIES -- ' _ l 48X24 I EQUIPMENT REMOVALS IN THIS AREA. REFER TO AS DIRECTED BY THE HOTEL. SA OTHER DRAWINGS FOR ADDITIONAL REMOVALS AND MODIFICATIONS IN THIS AND OTHER AREAS. - - - - 4$X24 ��'� 36X24 2.CONTRACTOR TO REMOVE ALL INACTIVE STEAM AND +��p- RA RA CONDENSATE PIPNG WITHIN BOILER AND CHILLER _ ROOMS,AND AS INDICATED ELSEWHERE. 62 RA SA TA 11W911. SA RA RA SA SA RA BALLROOM 1C BALLROOM 2 BALLROOM 3 BALLROOM 4 06/22/2022 -- ISSUED FOR PERMIT AK DATE I REV I DESCRIPTION BY MECHANICAL WESTCHESTER WING MEZZANINE FAN ROOM PLAN Southport Engineering Associates,PC SCALE:1/8"=T-0" 11 Bailey Avenue Tel.: 203 431-6844 Ridgefield,CT 06877 Fax:M3)431-6877 PROJECT: 699 WESTCHESTER AVENUE BOILER REPLACEMENT NEW 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 p r�R¢ DRAWING TITLE: MECHANICAL DEMO,VENTING AND WESTCHESTER MEZZ FAN ROOM CALE: AS NOTED DRAWN BY: RIDS DRAWING NO: �FESS�W�• DATE: 05/18122 CHECKED BY: AK /� s PROJECT NO: 85109 APPROVED BY: AK M-2OO H TI MATCH LINE ■-'" �� � �� I�� � ELEV.Na.1 A No.3 (N)4"HWS&R - H SWS&R UP MAINTENANCE 7 i SHAFT TO PAD_ SHOP EXTEND FLOOR ABOVE RAGE (N)2"HWS&R CO-GEN (E)2"GA c r--- BOILER ROOM UP CHIP -- _ LP-FILT�� (E)PLUMBING \ F-1,2 LINES B-2 CF-1 ENG.OFF. 4ir n GAS CONNECTION DCW "BOI REPLACE STEAM COIL FOR CHIP.BY 1 TQn4 " -- CHP CONTRACTOR - WITH DUAL TEMP COIL. (E)HV-3 PROVIDE DRAIN PAN. --- ----------- 3"HWS&R TO CHP. O B=4 (BOH HV UNIT) DTC-HV-3 H H = ;o ------------ �P-AHU-12 (E)SWS& FOR CONNECTION BY - - ''­,,CHP CONTRACTOR AS-1 Ll 1 P H W P AREA RESERVED FOR 18c3 WOMENS CHP EQUIPMENT E G 1&2 - c LOCKER E A-2 LLI__ ®� LEIf 11 " H �-- PAD / (E)F M�LOCKER ROOM UH1 � EXTEND HWP-14 uC/V r � I BOILER / (E) �D ROOM _ MECHANICAL AHU-12^FAN ROOM PIPING PLAN-LOWER LEVEL) r BANQUET PREP.A BE REMOVED OE�4 36s1� 7 O (N)HWP 1 SCALE:1/8"=1'-D" 0 (E)HEAT L7i7 N 6"HWS&R RELOCATE FINTUB XCHANGER TO -----.)H n H x ' _ p, BE REMOVED (N)4"CHWS&R (N)I 4 SWS&R EMPLOY EXPANSION TANKaLli CAFE LF HV-1 j" I I(E)SW PUMPS GUESTROOMS P-11,12 �1^H M - M E-�-R _ -MP VC RELOCATE CHILLER - 3 ��O -EXPANSION ROOM E'4"'CHWS&R TAN i �s K WEST.WING PUMP ROOM (E)4"LPS (E)1-1/4" (E)4"SW HWS&R S. - _ FINTUBE S&R DOWN �� f �QQ� � x 4" TO WATER HEATERS � -CA AH I�ECH. LANT 2-1/2" H --- q��bl-1114"SWS&R -i P-9/P-10 h1EW (N)2"HWS&R _ S DOWN THROUGH FINTUBE PUMPS CORRIDOR No.1 SHAFT.REFER TO ON EXIS11NGi PADS --- a PART PLAN FOR 1 FLOOR BELOW. I lr 6"H W5 ��6"H WR 7 / P 300 DP VA x ALLOW CLEARANCE H 1 II (N)4"HWS&RI FOR EXISTING RENTAL CHILLER TAPS r _ ��__- -------T--��------� I ALTERNATE A BEVERAGE STORAGE � NEW HEATING I STORAGE I QI REPLACE PUMP II IMPS I II P-7&P-8 II r REFER TO PART I i oil PLAN ON DRAWING M-203 m R TO TAI I RYE WING SW 5 HWS&R PUMP TO VSD'S I STAIR - - M W SYSTEM ON WALL I No.6 ---SYSTEM-.--- --------------_J 0 F4 f (E)6"CWS&R UP ❑x O MECHANICAL BOILER/CHILLER ROOM PIPING PLAN VAULT VAULT - SCALE:1/8"=l'-O" 4- N ET W O R K PROTECTOR RM 5 . �/ STORAGE STORAGE KEYED NOTES GENERAL STORAGE4-LPS O 1-1/4"DCW TO BACK FLOW PREVENTOR AND HEATING (E)1(E)2"LPS SYSTEM PRESSURIZATION RIG. REFER TO DETAIL. (E)6"CWS&R O DASHED LINE:FOLLOW ROUTE OF REMOVED STEAM ELECTRIC (E)5"CWS&R LINE.REUSE HANGERS RODS. SWITCR (E)LPR 3O EXISTING EXPANSION TANKS TO BE RELOCATED FOR S USE AS ET-1.REFER TO FLOW DIAGRAM. � - ®PROVIDE 6"PADS BELOW BOILERS TO ALLOW FOR H CONDENSATE DRAINAGE.INSTALL NEUTRALIZERS AND PIPE CONDENSATE TO FLOOR DRAIN. ROOM SERVICE WITH D INSTALL WITH REGULATOR AND PIPING PER ■■ •■ • •■ ■ ••-■ •• ■■ ■• ■•_�•■ O6 22 2022 -- ISSUED FOR PERMIT AK O EXTEND 4'GAS MAIN AND CONNECT TO EACH BOILER I' MATCH LINE ➢ / / DATE REV DESCRIPTION BY MANUFACTURERS PIPING DIAGRAMS. MAINTAIN MECHANICAL WESTCHESTER WING PUMP EXISTING 2"GAS LINE. ROOM AND BACK OF HOUSE PIPING PLAN SCALE:1/8"=V-0" Southport Engineering Associates,PC 11 Bailey Avenue Tel.: 203 431-6844 KEYED NOTES Ridgefield,CT 06877 Fox: 203 431-6877 PROJECT: (�1 INSTALL PUMPS ON NEW 4"PADS. 699 WESTCHESTER AVENUE REMOVE ALL STEAM AND STEAM CONDENSATE PIPING BOILER REPLACEMENT WITHIN PUMP ROOM. 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 f''OE fIEWYO SEP AF DRAWING TITLE: MECHANICAL PIPING PLANS �? CALE: AS NOTED DRAWN BY: RDS DRAWING NO: DATE: 05/18122 CHECKED BY: AK PROJECT NO: 85109 1 APPROVED BY: AK M-201 I i I I I li lilt i i W HANGER ROD 6"HWS = (SEE SCHEDULE) SUPPORT-REFER TO REMOVE CHECK U SPECIFICATIONS VALVE INSTALL PRESSURE CONTROL VALVE 6"HWR LOCKING NUT GAUGE R �__. _-__ - AND WASHER 1 ISOLATION (E)CONTROL VIB ATION VALVE TO CV CHWR [ REMAIN. MOTOR CV CHWS SUPPORT NUT AND WASHER a --� -- --� -- -x-- - REMOVE(E)INERTIA CLEVIS HANGER CV pP5 f BASE AND PROVIDE i J P_7 CV (N)6"PAD(TYP) INSULATION (E)HWR PIPE 8 P 6 , HIGH DENSITY INSULATION STRAINER UNION ECCENTIRIC CHECK ISOLATION OR SHEETMETAL SHIELD TO REDUCER VALVE VALVE CV PROVIDE PIPE SUPPORT. n > FVSN VSD SHEETMETAL SHIELD, 12"LONG MINIMUM. TYPICAL INLINE PUMP DETAIL TAIR ' SCALE:NONE 6"SWR 6"SWS 6"HWS PUMP VSD'S FROM RYE TO RYE ON WALL INSULATED PIPE SUPPORT DETAIL wlNc wlNc SCALE:NONE MECHANICAL FIRST FLOOR PUMP PART PLAN SCALE:114"=V-0" BUTTERFLY VALVE AND CHECK VALVE ASSEMBLY. HIGH CAPACITY AIR VENT LINE SIZE. V IC MODEL 300 VALVE AND 716 CHECK VALVE. UNION -----PRESSURE GAUGE FROM SYSTEM FIRST TWO MECHANICAL CONNECTORS TO BE 1/2"COPPER FLEXIBLE COUPLINGS. GAUGE LINES AIR SEPARATOR-�� TO SUCTION HEADER TYPICAL FOR DISCHARGE OF PUMPS AND SUCTION. BASE TO BE SHIMMED _� PRESSURE GAUGE LEVEL,BOLTED AND DRAIN VALVE W/3/4" W/PET COCK SUCTION HOSE CONNECTION. DIFFUSER PLUS_-`� ® GROUTED TO BASE. PROVIDE W/CAP.(TYP.) AUTO AIR VENT W/STRAINER PRESSURIZED EXPANSION �� SUCTION DIFFUSER�� PA HOUSEKEEPING D SHUT-OFF VALVE W/TAG TANK. SUPPORT "THIS VALVE TO BE OPEN AT ALL TIMES EXCEPT WHEN DRAINING TANK" 1"TO NEAREST 4"HIGH HOUSE KEEPING DRAIN VALVE W/3/4"HOSE FLOOR DRAIN PAD. _ CONNECTION.PROVIDE W/CAP. (TYPICAL) END SUCTION PUMP DETAIL SCALE:NONE SLEEVE PIPE THRU WALL SHEETMETAL SAFING ALL SLEEVE PIPE THRU WALL EXPANSION TANK AND AIR SEPERATOR DETAIL AROUND(MINIMUM 22 GA.). SCALE:NONE PACK GLASS FIBER INSULATION PIPE INSULATION.EXTEND OR CONCRETE INFILL AROUND PIPE FULL DEPTH OF THROUGH SLEEVE FOR PIPE INSULATION.STOP PARTITION. CHILLED WATER PIPING. NON-HARDENING CAULK AT WALL. AIRTIGHT ALL AROUND.FIRE DRAIN LINE TO BE AT LEAST NON HARDENING CAULK. RATED FOR FIRE RATED WALLS. THE SAME SIZE AS THE NIPPLE ON THE DRAIN PAN AIR HANDLING UNIT CASING AUTO AIR VENT MAKE UP WATER 1"BYPASS CLEAN OUT PIPE PIPE BALL VALVE TYP. FLOW METER / PRESSURE GAUGE SYSTEM O1 O CONNECTION SLOPE CW FM BFP CLEAN OUT DRAIN PAN PACK GLASS FIBER INSULATION O3 RELIEF VALVE 1\ OR APPROVED FIRE STOPPING AROUND PIPE FULL DEPTH OF RPZ BACKFLOW PREVENTOR DRAW THRU UNITS PARTITION. PRESSURE HEIGHT SHALL BE A MINIMUM OF 1.5 REDUCING VALVE 1^-___, TIMES PRESSURE IN DRAIN PAN. EXPANSION TANK _I ----- BLOW THRU UNITS KEYED NOTES HEIGHT SHALL BE A MINIMUM OF 1 INCH. PIPE PENETRATION DETAIL PIPE PENETRATION THROUGH O BADGER WATER METER MODEL 35 WITH RTR OPEN DEPTHMIN O M SOF 1 SEAL HALLTIM SE SCALE:NONE FIRE-SCALE:NRAE ED WALL DETAIL TRANSMITTER REGISTER.1 INCH. DRAIN PRESSURE ON DRAIN PAN OWATTS MODEL ES-009 BACK FLOW PREVENTER. (BLOW THRU AND DRAW 1 INCH.PIPE TO FLOOR DRAIN. THRU). OPRESSURE REDUCING VALVE. 1 INCH WATTS 3 SERIES U5B WITH 25 TO 75 PSI RANGE. SET NOTE: AT 35 PSI. ADJUST MOUNTING HEIGHTS OF COOLING COILS AND DRAIN PANS ABOVE FINISHED FLOOR AS REQUIRED PRESSURE MAINTENANCE DETAIL TO OBTAIN ABOVE DIMENSIONS. AUTOMATIC CONTROL VALVE SCALE:NONE AIR HANDLING UNIT CONDENSATE DRAIN DETAIL s�A SCALE:NOT TO SCALE pC y M ISOLATIONRF N q7N VALVE Mg7N BALANCING VALVE O1 FOR SINGLE COIL AQUASTAT THERMOMETER PRESSURE GAUGE INTERLOCK A (TYPICAL) (TYPICAL) W/FAN BALANCING AIR VENT COCK(TYP.) 1/4 INCH BALL VALVE (TYPICAL) 06/22/2022 -- ISSUED FOR PERMIT AK 11 A DATE REV DESCRIPTION BY HWS UNIT REFER TO FLOW oOM ISLITJ�O OO C�L5 [ c�c�OC���o l5C�� HEATER DIAGRAM FOR M /� ADDITIONAL Southport Engineering Associates,PC HWR I p\R yy Cl�p REQUIREMENTS. 11 Bailey Avenue Tel.: 203 431-6844 Ridgefield,CT 06877 Fax:�203 431-6877 T TWO POSITION CONTROL Cl PROJECT: VALVE \ 699 WVESTCHESTER AVENUE BOILER REPLACEMENT LOW VOLTAGE u ' W ,- I 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 THERMOSTAT DIRT LEG WITH HOSE 3/4 BALL VALVE /CAPPED ail END CONNECTION HOSE CONNECTION,TYPICAL ,yti� $gy qY DRAWING TITLE: KEYED(NOTES f °�* MECHANICAL DETAILS UNIT HEATER DETAIL WATER COIL PIPING B&G CIRCUIT SETTER. 1. AND PART PLAN SCALE:NONE SCALE:NOT TO SCALE SCALE: AS NOTED DRAWN BY: RDS DRAWING NO: DATE: 05/18l22 CHECKED BY: AK ��]] s-,. PROJECT NO: 85109 APPROVED BY: AK M-LO2 ,-4"/-6" /-6"1 /6" /'6" /-4" 4 11� VC _____ 2„ EXISTING SWS&R M 22 5 5 La� 4" TT I CHIP PLANT TO GUESTROOMS 4 CHWR M VC VC 8" 04 3" I FUTURE I TT PT 23 U��CHWS M HWS VC M NORTH 21 31 2-1/2" L————— 02 21 11 FINTUBE 2" r2" 1° PHW-P1 TT 01 FM TT 4" HWR PT VC M POOL BOILER RM Ot 01 03 TS —————————— /-8" r2" _ TT I 32 I HEAING UNIT HEATER SENSOR/GAUGE 21 I 11 FISOUTH PHW-P2 OAS 1 8"J 8" VALVES(TYP) TT x— 8" TT x 12 x Hhx 22 x HX ' x TT 4" 2-1/2» CHEM VSD SS SC DL I FEED 20 MESH 1 I I CF=1 P x P-5 32+ —xx xHH (�)Ot Ot otO STRAINER r- 4"TYP J J p=8 PPS TT21 — 31 20 MESH PRIMARY HOT ET-1 BOILER WATER PUMPS O 4 VSD(MSS oL VSD SS SC DL P-0 STRAINER® PUMP 21 21 21 11 11 11 (TYP) SC DL BOILER BOILER BOILER BOILER P-FILT (TYP) (TYP) STIR SS ST WHWH2 WH-1 O of of #4 #3 #2 #1 DL FILTER (TYP)31 31 ET-2 TYPICAL PIPING1 OZ FILTER LAYOUT FOR ALL RYE WING SECONDARY MAIN HOT WATER FINTUBE SYSTEM WATER HEATERS BOILERS WATER SYSTEM HEATING SYSTEM BALANCING HOT WATER MASTER BOILER VALVE BOILERS CONTROL KEYED NOTES: O1 A5-1: 8"AIR SEPARATORS.AMTROL 8ASL. WITH HIGH CAPACITY AIR VENT MODEL 747. 8" 3" ^r O ET=1:TWO RELOCATED EXPANSION TANKS: VC ] 0 Liz:!106 GALLON EXPANSION TANKS:AMTROL MEETING ROOM 52 M 2-1/2"W/ SW S&R 2" 1-1/2" CAPPED VALVES. 2" VC ®F1:2"MAGNETIC FILTER,ADAY MAGNA 3 1-1/4„ 51 M COMMERCIAL. 2-1 2" 73 M 05 F=2:BAG FILTER HOUSING,FILTREX SL,SINGLE 42 M M V F_q TT TT n PT — BASKET,2"NPT,ASME. CARBON STEEL PIPING 52 51 ti 5t _ ARRANGEMENT D. PROVIDE(10)20 MICRON BAGS. _ 3" VO VO M ©CF=L 6 GALLON BYPASS FEEDER. O VO 72 M 1-1 2" O7 REPLACE THREE-WAY CONTROL VALVE W/ I L2° TWO-WAY AND CAP BYPASS PORT. A" CAP-r,CAP 4" VC ®ARRANGE PIPING TO ALLOW FOR WATER HEATER 71 M ISOLATION/REMOVAL WITHOUT CUTTING PIPING. 43 _ VCM 1-1/2"�PPU-HV-3 (E)4-CH �E)4"CHWR [ ]HEATING (ji� 54 M _3" P-13 [ ]COOLING FROM PLANT TT TT P-11 �L _ -14 HTG 4t 42 CLG P-12 REMAINS COIL 41 OPEN VSD SS SC DL HVHV3 7(E)DUCT SS SC DL 51 51 51 DTC COIL HV-3 COOLING COIL WSD 41 41 41 (TYP) (REPLACE STEAM TO REMAIN ( ) COIL WITH WATER WESTCHESTER WING COIL) BACK OF HOUSE WESTCHESTER WING MEETING ROOM SECONDARY MAKE-UP AIR UNIT GUESTROOM SECONDARY WATER SYSTEM GROUND WATER SYSTEM LEVEL LOWER LEVEL EXISTING SWS&R 4 DTR TO GUESTROOMS DTS s3 M 82 M CONTRACTOR COMMISSIONING RESPONSIBILITIES COMMISSIONING NOTES PROVIDE 2" 1.FACILITATE THE COORDINATION OF THE COMMISSIONING WORK BY THE 1. COMMISSIONING IS REQUIRED BY THE ENERGY CODE:THE PRIME CONTRACTOR CAPPED VALVES. INDEPENDENT COMMISSIONING AGENT(CXA)WITH ALL SUB-CONTRACTORS SHALL BE MEMBER OF THE COMMISSIONING TEAM WHICH SHALL INCLUDE AN VC M ONE SET OF AND THE OWNER. INDEPENDENT COMMISSIONING AGENT,ENGINEER,AND OWNER. THE 62 M VALVES REQUIRED CONTRACTOR SHALL INCLUDE COORDINATION OF SUBCONTRACTORS Nq IN FAN ROOM 2.FURNISH A COPY OF ALL CONSTRUCTION DOCUMENTS,ADDENDA,CHANGE COMMISSIONING WORK AND INCLUDE SUBCONTRACTOR COMMISSIONING COSTS IN HTG ORDERS AND APPROVED SUBMITTALS AND SHOP DRAWINGS(IF APPLICABLE) PROJECT. VC P-AH-14.15 M 8 RELATED TO COMMISSIONED EQUIPMENT TO THE CXA. 2. COMMISSIONING:WORK SHALL BE DONE IN COORDINATION WITH INDEPENDENT 61 COMMISSIONING AGENT.PARTICIPATION SHALL INCLUDE BUT NOT LIMITED TO: M P-AH-12 CLG A.COMMISSIONING MEETINGS.TWO MEETINGS MINIMUM.ADDITIONAL MEETINGS AS CF M STR 2-1/2"� 3.IN EACH PURCHASE ORDER OR SUBCONTRACT WRITTEN,INCLUDE REQUIRED TO FACILITATE THE COMMISSIONING PROCESS. VC REQUIREMENTS FOR COMMISSIONING TASKS. B.SHOP DRAWING,SUBMITTAL REVIEWS STIR MCP' 1-1/2" C.SITE PROGRESS INSPECTIONS AND COMMISSIONING ISSUE LOG REVIEW AND 4.PROVIDE ALL NECESSARY STAFF,TOOLS AND INSTRUMENTATION AND WRITTEN RESPONSE. COORDINATION REQUIRED FOR THE COMMISSIONING WORK. D. SYSTEM DEMONSTRATIONS,START UP AND TESTING SHALL INCLUDE BUT NOT BE LIMITED TO: [ ]HEATING [ ]HEATING DA* BOILERS,HOT WATER HEATING AND DOMESTIC HOT WATER SYSTEMS: [ ]COOLING [ ]COOLING 5.ENSURE THAT ALL SUBCONTRACTORS EXECUTE THEIR COMMISSIONING D.2. FUNCTIONAL PERFORMANCE TESTS. TEST EACH SEQUENCE IN THE (E)TO REMAIN (E)TO REMAIN RESPONSIBILITIES ACCORDING TO THE CONTRACT DOCUMENTS AND SCHEDULE. SEQUENCE OF OPERATIONS AND OTHER SIGNIFICANT MODES AND SEQUENCES NOT MENTIONED INCLUDING STARTUP,SHUTDOWN,MANUAL E E 6.A REPRESENTATIVE SHALL ATTEND A COMMISSIONING SCOPING MEETING AND MODES AND POWER FAILURE.TEST FUNCTIONALITY OF EACH PIECE OF HTG H HTG R EQUIPMENT AND AS A SYSTEM IN ALL CONTROL STRATEGIES INCLUDING CLG C CLG C OTHER NECESSARY MEETINGS SCHEDULED BY THE CXA TO FACILITATE THE INTERLOCKS AND SAFETY DEVICES. COIL COIL COMMISSIONING PROCESS. E. AS-BUILT DRAWINGS AND CLOSE OUT DOCUMENTATION 06/22/2022 -- ISSUED FOR PERMIT AK AH-12 AFL14 F. TRAINING DATE REV DESCRIPTION BY AHUE5 7.COMPLETE ALL CONSTRUCTION CHECKLISTS INCLUDING MANUFACTURER'S 3. SYSTEMS ADJUSTING AND BALANCING SHALL COMPLY TO ENERGY CODE CHECK,TEST AND START-UP DOCUMENTATION. REQUIREMENTS. 1gma� r� o WESTCHESTER WING WESTCHESTER WING Ou t CORRIDOR AIR BALL ROOMS AIR HANDLING UNIT HANDLING UNITS Southport Engineering Associates,PC 11 Bailey Avenue Tel.:(203)431-6844 Ridgefield,CT 06877 Fax:(203)431-6877 PROJECT: 699 WESTCHESTER AVENUE BOILER REPLACEMENT 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 E6i NEW pp pt s[p R¢ DRAWING TITLE: / * MECHANICAL I 5 FLOW DIAGRAMS CALE: NONE DRAWN BY: RDS DRAWING NO: DATE: 05/18/22 CHECKED BY: AK PROJECT NO: 85109 APPROVED BY: AK M-300 ❑ y MAINTENANCE SHOP 00 1 1 TT TT — F-1 CF— t 2 2" DWHS(140F)KITCHEN CO—GEN B=2 ENG,OfF. 4" DWHS(120 F) CHIP ❑ STAIR 4 DCW BB 3 NO.13 BALANCING 4„ VALVE I B=4 -- — � 1" DHWR(120F) IL-ER-ROCMv I �WESTCHESTER WING 00 I T 0 P-1 ` ` f L -1 1-1 4" DHWR(120F) TANK TANK TANK DUAL MIXING _ BOILER WATER S&R BY 300 GAL 300 GAL 300 GAL RYE WING VALVES P2 I MECHANICAL H H H DW PUMPS 1&2 CONTRACTOR(TYP) X O X O X OI (RELOCATEDI BOILER 2 1-1/4" ROOM 3 WATER WATER WATER 4 DHWR(140 F)KITCHEN HEATER#1 HEATER#2 HEATER#3 ®DW PUMP 3 EXPANSION EW TANK BANQUET PREP.ASSE DOMESTIC HOT WATER FLOW DIAGRAM SCALE:NONE Hv-1 KEYED NOTES (E)4"CW,4"HAS{120'), 2"HW(140'),i LiO WATER HEATERS:REFER TO SCHEDULE. J = 2O EXPANSION TANK:AMTROL ST-70VC.ASME 150 PSI.TYPICAL OF 2. U I CHILLER LOCATION pF 3Q MIXING VALVE:ARMSTRONG DRV-80.PREPIPED DUAL VALVE ASSEMBLY. ®®I C ROOM — Jr DOMESTIC WATER ��— MIXING VALVES, ®PUMP#3:GRUNFOS UPS15-355,3—SPEED,STAINLESS STEEL 120V.WITH EXPANSION]TANK AND 1-1/4'UNION CONNECTION. _ WH —3 1 RECIRCULATION PUMPS I— AH44EH.I LANTREPLACE THREE WATER L�LH2 HEATERS WITH THREE NEW WATER HEATERS.STEAM r (2)RECIRCULATION PUMPS PIPING REMOVALS UNDER TO BE RELOCATED TO MECHANICAL WORK. _ MIXING VALVE LOCATION iJ WH 1 m Io RETURN FROM TOP OF RISER r CRAWL T AH-1 SPACE EXISTING BALL x EXISTING 3/4" VALVES(TYP) EXISTING 3/4" ❑e i NEW THERMOMEGATECH 3/4" TYPICAL FOR CIRCUIT SOLVER W/UNION ---` 40 RISERS AND 20 MESH Y STRAINER. L 115 DEGREE SETPOIT EXISTING HWR IN m CRAWL SPACE TAIR#11 TO)BE REPLACED VALVES CHECK ~ Ch � �'� m ° RYE WING HW RETURN RISER BALANCING VALVES PLUMBING BO,ILER/CHILLER ROOM PLAN SCALE:1/8"=1'-0" 06/22/2022 -- ISSUED FOR PERMIT AK DATE REV DESCRIPTION BY Southport Engineering Associates,PC 11 Bailey Avenue Tel.: 203 431-6844 Ridgefield,CT 06877 Fax: 203 431-6877 PROJECT. 699 WESTCHESTER AVENUE BOILER REPLACEMENT p OF NEW r�R 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 sE Q DRAWING TITLE: * PLUMBING PIPING PLAN AND FLOW DIAGRAM CALE: AS NOTED DRAWN BY: RIDS DRAWING NO: 06l844•�{��` ss+orp� DATE: 05/18122 CHECKED BY- AK n PROJECT NO: 85109 APPROVED BY- AK f—200 EXISTING EXISTING DRAWING DEMOLITION NOTES SWBD"SS-1" SWBD"SS-1" 1. COORDINATE WITH THE MECHANICAL CONTRACTOR SCHEDULING AND PHASING FOR CONNECTING ALL NEW AND EXISTING EQUIPMENT THAT IS TO REMAIN TO THE NEW DISTRIBUTION PANEL"HP—MD1"WHICH WILL REPLACE MOTOR CONTROL CENTER"MCC—A". CONFIRM CUT—OVER FOR EACH EQUIPMENT WITH THE OWNER'S REPRESENTATIVE AND MECHANICAL CONTRACTOR PRIOR TO START OF ELECTRICAL WORK. NO EQUIPMENT SHALL BE RENDERED OUT OF SERVICE WITHOUT DISTRIBUTION PANEL"DS-1"SECTION TWO— THE PRIOR KNOWLEDGE AND APPROVAL FROM THE OWNER'S REPRESENTATIVE AND MECHANICAL CONTRACTOR. 1600A,480V,30,3W RENAMED PANEL"HP—BR1"—400A,480V,30,3W —— —— ER —— — —— ——�ER DRAWING KEYED NOTES 200AS 600AS 600AS 600AS 30AS 30AS 400AS 30AS 30AS 30AS 30AS 1 REMOVE AND REPLACE EXISTING FUSES IN EXISTING SWITCH COMPARTMENT WHICH IS TO REMAIN WITH NEW FUSES SIZED VIF 450AF VIF VIF VIF VIF VIF WIF VIF AS SHOWN ON DRAWING E-001. COORDINATE SHUTDOWN WITH THE OWNER'S REPRESENTATIVE. � � � 300AF VIF � j3P 3P 3P �3P� �3P 3P 3P—— 3P — 3P 3P 3P— O2 PROVIDE NEW COMBINATION SIZE 0 STARTER AND 30A,600V,3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. FIELD COORDINATE EXACT LOCATION WITH THE MECHANICAL CONTRACTOR. CIRCUIT TRACE ALL EXISTING 30—AMP i SWITCHES FOR EXISTING SERVING LOADS, ER ER ER i ER ER AFTER ALL DEMOLITION IS COMPLETE, PROVIDE NEW UPDATED TYPEWRITTEN �y �v EXISTING EXISTING R R LABELS FOR EACH SWITCH. r LOAD LOAD T AC—COMP AC—COMP FUEL OIL FUEL OIL #1 #2 PUMP PUMP LP—OD EXISTING MOTOR CONTROL CENTER FEEDER TO REMAIN, TWO SETS 3#300MCM WITH GROUND. FIELD VERIFY EXISTING CONDITIONS INCLUDING CONDUCTOR TYPE (COPPER OR ALUMINUM). RENAMED PANEL"HP—BR2"—600A,480V,30,3W �ER A3P 80AF 80AF 100AF t00AF ER —— 3P — 3P — 3P� TAP EXISTING FEEDER [VFD] ,R ffTDI=R 'VFD'F �60�\ER ��0\-P CHILLER CHILLER CHILLER CHILLER PUMP#4 PUMP#3 PUMP#2 PUMP#1 2 ELECTRICAL DEMOLITION POWER SYSTEM SINGLE-LINE DIAGRAM E� SCALE:NONE i BASE BID — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Z — — — — — — — — — — — — — — — I I NEW 3#600MCM,1#4/0—GND,4"C MOTOR CONTROL CENTER"MCC—A"—480V,36,3W —— — —— —— —— —— —— — —— I - ER I I SPACE I I I kER ER ER h ER ER ER ER ER ER ER ER ER 1, CONNECT TO BOILER EMERGENCY POWER—OFF SYSTEM. AH'1 L^ FAN L7 AH5 1 FAN L AH/2 FAN r r H 2-r AIR BOILER \FAN HVJ 1 R HV 1 4 \1�FRREFER TO SHUNT—TRIP SYSTEM DETAIL AND DIAGRAM �; �E HV-3 ON DRAWING E-300 FOR ADDITIONAL INFORMATION PUMP ACR-1 SUPPLY B-1 B-2 E-2 PUMP ACR-2 SUPPLY COMP PUMPS TR-1 PUMP SUPPLY AND REQUIREMENTS. DISCONNECT AND REMOVE EXISTING IWIRING AND CONDUIT (TYPICAL OF 9) _ `�_ _ l MOTOR CONTROL CENTER"MCC—A"(CONTINUED)—480V,34,3W 400A( —— —— �ER I NEW DISTRIBUTION PANEL"HP—MD1"—400A,480V,30,3W I ' 100AF 10IOAF 100AF 1OOAF 1OOAF IOOAF 10OAF 100AF IOOAF 100AF 100AF 100AF 100AF 100AF (60AT (60AT (�100AT (100AT (60AT (60AT (80AT (80AT (15AT (15AT —(20AT 20AT 20AT 20AT SWAGES 3P 3P 3P 0—3P 3P 3P — 3P 3P 3P 3P 3P 3P 3P 3P —— 3#12,1#12—G,3/4"C 3#8,1#10—G,3/4"C 2 2 06/22/2022 -- ISSUED FOR PERMIT AK ER I DATE REV DESCRIPTION BY h sd �u P 4 X?J\E P 20 20 20 20 30 30 3 3 � 0 � 0 0 FAN PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP PUMP E-1 P-5 IP-7 P-10 P-6 P-8 P-9 BOILER BOILER BOILER BOILER Southport Engineering Associates,PC L — — — — — — — — — — — — — — — — — — — — — — HWP-1 HWP-2 — — — — HWP-5 HWP-6 HW- HWP-8 HWP-9 HWP-10 B-1— B-2— B-3— 8-4— — — — — — p 9 9 11 Bailey Avenue Tel.: 203 431-6844 Ridgefield,CT 06877 Fax: 203�431-6877 PROJECT: 699 WESTCHESTER AVENUE BOILER REPLACEMENT 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 DRAWING TITLE: ELECTRICAL POWER SYSTEM SINGLE-LINE DIAGRAM e�* ELECTRICAL LEGENDS AND EA00 SCALE:NONE r — _ POWER SYSTEM DIAGRAM 6 y� GALE: AS SHOWN DRAWN BY: SG DRAWING NO: aA1\1 DATE: 05/18/22 CHECKED BY: MF s PROJECT NO. 85109 APPROVED BY: AK E'OOO ELECTRICAL DRAWING LIST ELECTRICAL SPECIFICATIONS A. GENERAL-260100: 5. REMOVE ALL ABANDONED WIRING AND EXPOSED CONDUIT,INCLUDING THOSE ABANDONED ABOVE ACCESSIBLE CEILING FINISHES. CUT CONDUIT FLUSH WITH WALLS AND FLOORS;AND PATCH SURFACES. 1. PROVIDE LABOR,MATERIALS,EQUIPMENT AND SERVICES FOR COMPLETION OF ELECTRICAL SYSTEMS AS SHOWN ON E-000 - ELECTRICAL LEGENDS AND DEMOLITION POWER SYSTEM DIAGRAM THESE DRAWINGS AND AS REQUIRED BY LATEST EDITION OF NATIONAL ELECTRICAL CODE(NEC),STATE AND LOCAL 6. ALL EXISTING BRANCH CIRCUITS NOT TO BE REUSED SHALL BE REMOVED BACK TO SERVING PANELBOARD. CIRCUIT CODES,AND OSHA REGULATIONS. THE CONTRACTOR SHALL PAY ALL FEES;AND OBTAIN ALL CERTIFICATES AND BREAKERS SHALL BE LABELED AS SPARE AND PLACED IN THE"OFF"POSITION. EXISTING CONDUIT SHALL REMAIN E-001 - ELECTRICAL CONSTRUCTION POWER SYSTEM DIAGRAM INSPECTIONS. FROM PANELBOARD TO ABOVE ACCESSIBLE CEILING SPACE. E-100 - ELECTRICAL SPECIFICATIONS 2.NON-COMPLIANCE: SHOULD THE CONTRACTOR PERFORM ANY WORK THAT DOES NOT COMPLY WITH REQUIREMENTS 7. SINCE PROPOSED RENOVATIONS OF PROJECT DO NOT ENCOMPASS ENTIRE FLOOR,IT IS ANTICIPATED THAT MANY OF APPLICABLE BUILDING CODES,STATE LAWS,LOCAL ORDINANCES AND INDUSTRY STANDARDS;HE SHALL BEAR EXISTING CIRCUITS AND BRANCH CIRCUIT BREAKERS IN EXISTING PANELBOARDS MAY BE NEEDED TO SERVE EXISTING E-101 - ELECTRICAL SPECIFICATIONS AND NOTES ALL COSTS ARISING IN CORRECTING THE DEFICIENCIES. LOADS NOT AFFECTED BY MODIFICATIONS. HOWEVER,IT IS THE INTENTION OF THE ELECTRICAL DESIGN TO USE EXISTING SPARE CIRCUITS AND THOSE CIRCUITS MADE SPARE BY DEMOLITION WORK TO MAXIMUM EXTENT POSSIBLE. E-200 - ELECTRICAL GROUND FLOOR DEMOLITION PLANS 3. IN CASE OF DIFFERENCE BETWEEN BUILDING CODES,STATE LAWS,LOCAL ORDINANCES,INDUSTRY STANDARDS,THESE THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXACT CIRCUIT NUMBER AND PANELBOARD DESIGNATION. SPECIFICATIONS AND THE CONTRACT DRAWINGS;THE MOST STRINGENT SHALL GOVERN. THE CONTRACTOR SHALL E-201 - ELECTRICAL GROUND FLOOR CONSTRUCTION PLANS PROMPTLY NOTIFY THE OWNER IN WRITING OF ANY SUCH DIFFERENCE. 8. ASBESTOS PROCEDURE: THE CONTRACTOR SHALL,UPON CONTACTING MATERIAL SUSPECTED OF BEING ASBESTOS, NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY AND WORK AROUND SUSPECTED AREA. E-202 - ELECTRICAL CRAWLSPACE,GROUND FLOOR&MEZZANINE PLANS 4. ALL EQUIPMENT SHALL BE NEW AND UNUSED;AND SHALL BE"UL"LISTED AND BEAR THE"UL"LABEL. C. WIRES AND CABLES-260519: E-300 - ELECTRICAL DIAGRAMS,DETAILS AND SCHEDULES 5. ALL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. ALL MATERIALS SHALL BE OF THE BEST QUALITY FOR PURPOSE INTENDED. TRADE NAMES AND CATALOG NUMBERS ARE INTENDED TO INDICATE THIS 1. ALL CONDUCTORS SHALL BE SOFT 98%MINIMUM CONDUCTIVITY REFINED COPPER,INSULATION TYPE"THHN/THWN" QUALITY AND GRADE. OBTAIN WRITTEN APPROVAL FROM THE OWNER FOR ANY SUBSTITUTIONS MADE AFTER RATED 600 VOLTS UNLESS INDICATED OTHERWISE. ACCEPTANCE OF SUBMITTAL FOR ANY ITEM. FOR A2. ALL CONDSTRANDEDUCTOR CTINNEDABLE FOR VARIABLE FREQUENCY DRIVE(VFD)FEEDERS SHALL BE SPIRALEFLEXIBLE TYPE TTAPEC,FINELY ELECTRICAL GENERAL SYMBOLS AND ABBREVIATIONS 6 PERIOD COF NOT ELEESSCTHANAONE CT(1)YEAR ROM DATE OF INITIAL OPERATION. MANUFACTURE, E CONTRACTOR AGREES TO GUARANTEE ALL WORK ANDQDIPMENT EQUPMENTT SHALL THREE SYMMETRICALOPPER TINNEDICOP ERO 00%-RATED GRE XLPE RATED UNDS;ANDLBLA TS KTSUNLIGHTD ANDPER OIIL RESISTANTDING TYPE CARRY FULL PERIOD OF THE MANUFACTURER'S GUARANTEE AND SHALL NOT BE LESS THAN ONE(1)YEAR. JACKET MATERIAL. JUNCTION BOX 7. PRIOR TO SUBMISSION OF BID,THE CONTRACTOR SHALL VISIT THE JOB SITE TO ASCERTAIN ACTUAL FIELD 3. METAL CLAD CABLE MAY NOT BE USED FOR THIS PROJECT. --- CONTROL WIRING IN CONDUIT CONDITIONS AS THEY RELATE TO THE WORK IN THESE SPECIFICATIONS AND DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO ATTENTION OF THE ARCHITECT AND/OR ENGINEER AT THIS TIME. ALL ITEMS NOT RESOLVED PRIOR 4. ALL WIRES#10AWG AND SMALLER SHALL BE SOLID COPPER. ALL WIRES#8AWG AND LARGER SHALL BE STRANDED BRANCH CIRCUIT IN FLEXIBLE CONDUIT TO BID SHALL BE INCLUDED AS WRITTEN QUALIFICATIONS TO THE BID DOCUMENT. SUBMISSION OF BID SHALL BE COPPER. EVIDENCE THAT VERIFICATION OF THE JOB SITE HAS BEEN PERFORMED. BRANCH CIRCUIT IN CONDUIT-HOT LEG,SWITCH LEG,NEUTRAL AND EQUIPMENT GROUND,RESPECTIVELY 5. FACTORY COLOR CODE USING THE SAME CODE THROUGHOUT FOR CONDUCTORS AS FOLLOWS: 8.THE GENERAL CONTRACTOR SHALL PERFORM ALL CUTTING NECESSARY FOR PROPER INSTALLATION OF ELECTRICAL 120/208 VOLTS-BLACK,RED,BLUE AND WHITE NEUTRAL CONDUCTOR BRANCH CIRCUIT HOMERUN-PANEL AND SPACE AS INDICATED ON DRAWINGS WORK. 277/480 VOLTS-BROWN,ORANGE,YELLOW AND GRAY NEUTRAL CONDUCTOR GREEN CONDUCTOR SHALL BE USED WHERE EQUIPMENT GROUND WIRE IS SPECIFIED. ------ EXISTING EQUIPMENT/WIRE TO BE REMOVED 9.OPENINGS AROUND ELECTRICAL PENETRATIONS THROUGH FIRE RESISTANCE RATED WALLS,PARTITIONS,FLOORS OR CEILINGS SHALL BE FIRE-STOPPED USING APPROVED METHODS. ACCEPTABLE MANUFACTURERS ARE HILTI AND 3M 6. MINIMUM CONDUCTOR SIZES SHALL BE#12AWG FOR POWER AND LIGHTING CIRCUITS,#10AWG FOR BRANCH CIRCUIT EXISTING EQUIPMENT/WIRE TO REMAIN BUT MATERIAL MUST BE APPROVED BY THE LOCAL AUTHORITY HAVING JURISDICTION. RUNS LONGER THAN 100 FEET AND#14AWG FOR CONTROL CIRCUITS UNLESS INDICATED OTHERWISE. NEW EQUIPMENT/WIRE 10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL ELECTRICAL INSTALLATIONS THAT ARE WITHIN 7. NO CONDUCTORS SHALL BE PULLED INTO ANY CONDUIT RUN BEFORE ALL CONDUIT JOINTS ARE TIGHT AND ENTIRE CLOSE PROXIMITY OF OTHER TRADES. CONDUIT SHALL BE INSTALLED AS HIGH AS POSSIBLE ABOVE FINISHED RUN IS SECURED IN PLACE. WHERE NECESSARY FOR WIRING INSTALLATION,PULLING COMPOUND SHALL BE AFF ABOVE FINISHED FLOOR CEILING TO AVOID CONFLICTS WITH OTHER TRADES. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES. POWDERED SOAPSTONE,MINERALLAC#100 OR APPROVED EQUAL ER EXISTING TO REMAIN 11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY LIGHTING AND POWER DURING CONSTRUCTION. 8. TERMINATIONS OF#6AWG OR LARGER AT SWITCHBOARDS AND TRANSFORMERS SHALL BE MADE WITH COMPRESSION CONNECTORS. TERMINATIONS OF#6AWG OR LARGER AT PANELBOARDS SHALL BE MADE WITH MECHANICAL LUGS. RE RELOCATED EXISTING 12.COVER LIGHT FIXTURES,EQUIPMENT,APPARATUS,ETC.TO PROTECT AGAINST CHEMICAL,WATER,DIRT OR MECHANICAL DAMAGE BEFORE AND DURING THE CONSTRUCTION PERIOD UNTIL THE FINAL ACCEPTANCE. ALL 9. JOINS AND TAPS OF#6AWG OR LARGER SHALL BE MADE WITH PRESSURE-INDENT TYPE CONNECTORS. VIF VERIFY IN FIELD EQUIPMENT SHALL BE DELIVERED,PROPERLY PACKED AND STORED AT THE SITE UNTIL FINAL INSTALLATION. 10.TAG ALL FEEDERS ROUTED THROUGH ELECTRICAL BOXES,GUTTER SPACES AND WIREWAYS. 13.THE CONTRACTOR SHALL REPAIR ANY DAMAGE DONE BY HIMSELF OR HIS WORKMEN. RESTORE TO ORIGINAL CONDITION ANY APPARATUS,EQUIPMENT OR SURFACE DAMAGED UNDER THIS SCOPE OF WORK PRIOR TO FINAL 11.ACCEPTABLE MANUFACTURERS ARE ALLIED,GENERAL CABLE,PHELPS DODGE,ROME,SIMPLEX AND SOUTHWIRE FOR ELECTRICAL LIGHTING SYMBOLS AND ABBREVIATIONS ACCEPTANCE,INCLUDING RESTORATION OF DAMAGES TO SHOP COATS OF PAINT. WIRES AND CABLES. 14.IT IS THE INTENT OF THESE SPECIFICATIONS AND DRAWINGS TO REQUIRE AN INSTALLATION THAT IS COMPLETE IN 12.ACCEPTABLE MANUFACTURERS ARE ALLIED,BELDEN AND SOUTHWIRE FOR TYPE TC,VFD CABLE. EVERY RESPECT. IT IS NOT THE INTENT TO GIVE EVERY DETAIL IN THESE SPECIFICATIONS AND DRAWINGS. IF AN LIGHTING OUTLET,CHAIN-HUNG ITEM OF WORK IS SHOWN ON THE DRAWINGS,IT SHALL BE CONSIDERED SUFFICIENT FOR INCLUSION IN THE D. GROUNDING AND GROUND-FAULT PROTECTION-260526: 4 LIGHTING OUTLET,WALL MOUNTED CONTRACT. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIAL AND EQUIPMENT THAT IS NECESSARY FOR COMPLETE INSTALLATION WHETHER SPECIFICALLY MENTIONED OR NOT. 1. GROUNDING SHALL COMPLY WITH NEC ARTICLE 250. EXIT SIGN,WALL MOUNTED-CHEVRONS AS INDICATED ON DRAWINGS 15.THE DRAWINGS FOR ELECTRICAL WORK UTILIZE SYMBOLS AND SCHEMATIC DIAGRAMS WHICH HAVE NO DIMENSIONAL 2. EACH CIRCUIT SHALL HAVE AN EQUIPMENT GROUND CONDUCTOR. MULTI-WIRE CIRCUITS OF DIFFERENT PHASES MAY POLE SWITCH-LOWERCASE LETTER INDICATES CONTROLLED LIGHT FIXTURES SIGNIFICANCE. THE WORK SHALL BE INSTALLED TO FULFILL THE DIAGRAMMATICAL INTENT EXPRESSED ON THE SHARE EQUIPMENT GROUND CONDUCTOR. THE EQUIPMENT GROUND CONDUCTOR SHALL NOT BE LESS THAN#12AWG SINGLE-POLE DRAWINGS AND IN CONFORMITY WITH DIMENSIONS INDICATED ON FINAL WORKING DRAWINGS,FIELD LAYOUTS AND OR AS SHOWN ON DRAWINGS. PROVIDE ELECTRICALLY CONTINUOUS,TIGHT GROUNDING CONNECTIONS FOR ALL SHOP DRAWINGS FROM ALL TRADES. WIRING DEVICES UNLESS NOTED OTHERWISE. WIRING DEVICE GROUNDING CONNECTIONS SHALL BE MADE VIA PIGTAIL FROM GROUND SCREW WITHIN DEVICE BACK BOX. INSTALL IN STRICT ACCORDANCE WITH NEC ARTICLE 300.13(B). 16.PROVIDE TO THE OWNER,A COMPLETE SET OF REPRODUCIBLE AS-BUILT DRAWINGS ON AUTOCAD CLEARLY ELECTRICAL POWER SYMBOLS AND ABBREVIATIONS INDICATING ANY DEVIATIONS FROM THE DESIGN AS SHOWN ON THE DRAWINGS. 3. EQUIPMENT GROUND CONDUCTORS SHALL BE INSTALLED IN CONDUIT OR SUITABLY PROTECTED FROM DAMAGE. 17.PROVIDE TO THE OWNER FOUR(4)COPIES OF THE OPERATING AND MAINTENANCE MANUALS WITH CATALOG 4. CONDUITS ARE NOT TO BE USED AS MEANS OF GROUNDING. DUPLEX RECEPTACLE,WALL MOUNTED INFORMATION ON ELECTRICAL EQUIPMENT INCLUDING,BUT NOT LIMITED TO:TRANSFORMERS,PANELBOARDS AND EMERGENCY POWER-OFF PUSH BUTTON CONTROL SYSTEMS. 5. ACCEPTABLE MANUFACTURERS ARE BURNDY,ERICO AND SQUARE D. � 18.SHOP DRAWINGS AND OTHER INFORMATION REQUIRED: PRIOR TO PURCHASING ANY EQUIPMENT OR MATERIALS,A E. SUPPORTING DEVICES-260529: 0' NONFUSED DISCONNECT SWITCH-TYPE AND SIZE AS INDICATED ON DRAWINGS MANUFACTURER'S LIST SHALL BE SUBMITTED FOR REVIEW. PRIOR TO ASSEMBLING OR INSTALLING THE WORK,THE FOLLOWING SHALL BE SUBMITTED FOR REVIIEW: 1. SUPPORT OF NEW ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE BEST INDUSTRY PRACTICES. DO NOT 0' FUSED DISCONNECT SWITCH-TYPE AND SIZE AS INDICATED ON DRAWINGS FASTEN SUPPORTS TO MECHANICAL EQUIPMENT,DUCTWORK,PIPING OR CONDUIT. 18.1. CATALOG INFORMATION SHEETS,FACTORY ASSEMBLY DRAWINGS AND FIELD INSTALLATION DRAWINGS AS ®' COMBINATION MOTOR STARTER AND NONFUSED DISCONNECT SWITCH-TYPE AND SIZE AS INDICATED ON REQUIRED FOR A COMPLETE EXPLANATION AND DESCRIPTION OF ALL ITEMS OR EQUIPMENT SPECIFIED IN THE 2. FURNISH AND INSTALL STEEL SUPPORT FRAMES,MEMBERS,HANGERS,BRACKETS,ETC.AS REQUIRED FOR PROPER DRAWINGS FOLLOWING SECTIONS. INSTALLATION OF ELECTRICAL EQUIPMENT. ® MOTOR STARTER-TYPE AND SIZE AS INDICATED ON DRAWINGS 18.2.THE PURPOSE FOR THE REVIEW OF SHOP DRAWINGS IS TO MAINTAIN THE INTEGRITY OF THE DESIGN. UNLESS 3, SUPPORT FRAMES FOR NEW LIGHT FIXTURES INDEPENDENT OF OTHER SUPPORTS WHEREVER POSSIBLE. THE CONTRACTOR CLEARLY INDICATED IN WRITING AND ON HIS LETTERHEAD;ANY CHANGES,SUBSTITUTIONS, $M MANUAL MOTOR STARTER,TOGGLE-OPERATED NTH THERMAL OVERLOADS SIZED PER MANUFACTURER'S DELETIONS OR OTHER DIFFERENCES(BETWEEN SUBMISSION AND CONTRACT DOCUMENTS,APPROVAL BY THE 4. SUPPORT FRAMES BOLTED TO FLOOR SLAB AND EXTENDING TO SLAB ABOVE SHALL BE PROVIDED AS REQUIRED FOR SPECIFICATIONS ENGINEER DOES NOT CONSTITUTE ACCEPTANCE. FREE STANDING EQUIPMENT OR WHERE WALLS ARE UNABLE TO SUPPORT EQUIPMENT WEIGHT. ® VARIABLE FREQUENCY DRIVE WITH INTEGRAL DISCONNECTING MEANS-BY OTHERS 18.3.NO SUBSTITUTIONS FOR ANY EQUIPMENT MATERIAL AND/OR MANUFACTURER SHALL BE PERMITTED WITHOUT A 5. ALL CONDUITS UP TO 1 1/2"TRADE SIZE SHALL BE SUPPORTED BY CLAMPS OR PIPE STRAPS SECURED TO BLACK �� FORMAL WRITTEN SUBMITTAL INCLUDING AN EXPLANATION FOR SUBSTITUTION,A LIST OF ANY DEVIATIONS IRON CEILING SUPPORT SYSTEM,STRUCTURAL MEMBERS OR SLAB ABOVE AT INTERVALS NO GREATER THAN 7'-0" 42\ ELECTRIC MOTOR-"#"INDICATES HORSEPOWER RATING FROM SPECIFIED THE MODEL,SHOP IDRAWINGS AND ASSOCIATED CREDIT. IT SHALL NOT BE ASSUMED THAT AND WITHIN 12"OF CONDUIT END. ALL CONDUITS 2"TRADE SIZE OR LARGER SHALL BE SUPPORTED BY APPROVED THE ENGINEER HAS READ TEXT OR REVIEWED ANY TECHNICAL DATA OF A MANUFACTURED ITEM AND ITS HANGERS AND INSERTS FROM SLAB ABOVE AT INTERVALS NO GREATER THAN 10'-0"AND WITHIN 18"OF CONDUIT ® FUSE COMPONENTS EXCEPT WHERE THE VENDOR HAS SPECIFICALLY MENTIONED ALL DIFFERENCES BETWEEN THE END. SUPPORT FROM CEILING TEES,CROSS TEES OR WIRES IS PROHIBITED. f SWITCH SUBSTITUTED PRODUCT AND THE SPECIFIED MODEL.i F. RACEWAYS FOR ELECTRICAL SYSTEMS-260533: 18.3.a.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY EQUIPMENT,WIRING,DEVICES,ETC.REQUIRED FOR CIRCUIT BREAKER THE PROPER INSTALLATION OF THE SUBSTITUTED PRODUCT. THIS INCLUDES MODIFICATIONS OF ANY 1. MATERIALS: KIND THAT ARE REQUIRED TO ALL ASSOCIATED SYSTEMS AFFECTED BY THE SUBSTITUTION. SUCH ST SHUNT-TRIP ITEMS SHALL BE PROVIDED AT THE FULL EXPENSE OF THE CONTRACTOR WITH NO COSTS INCURRED TO 1.1. EMT: THIN WALL,(HOT-DIPPED GALVANIZED STEEL(3/4"MINIMUM)-CONDUIT TO BE USED FOR ALL WORK THE OWNER. CONCEALED IN WALLS AND ABOVE FINISHED CEILINGS;AND FOR EXPOSED RUNS UP TO 1 1/2"TRADE SIZE. 6 EXISTING PAN ELBOARD/LOADCENTER,SURFACE MOUNTED 18.3.b.ALL SUBSTITUTED PRODUCTS SHALL CONFORM TO PERFORMANCE AND SPATIAL REQUIREMENTS IN USE WITH STEEL COMPRESSION FITTINGS ONLY. O EXISTING DISTRIBUTION PANELBOARD,SURFACE MOUNTED THESE SPECIFICATIONS AND DRAWINGS. ALL MODIFICATIONS OR REPLACEMENTS OF ANY PRODUCTS THAT DO NOT MEET THESE REQUIREMENTS SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. 1.2. IMC: HOT-DIPPED GALVANIZED STEEL-CONDUIT MAY BE USED FOR RISERS,PANELBOARD FEEDERS, THREE-PHASE MOTOR FEEDERS;AND FOR CONCEALED RUNS 2"TRADE SIZE AND LARGER. USE WITH G NEW PANELBOARD/LOADCENTER,SURFACE MOUNTED 19.THE CONTRACTOR SHALL PROVIDE TESTS FOR EACH OF THE FOLLOWING: THREADED FITTINGS ONLY. NEW DISTRIBUTION PANELBOARD,SURFACE MOUNTED 19.1. PRIOR TO ENERGIZING THE ELECTRICAL SYSTEM,THE CONTRACTOR SHALL PROVIDE 600-VOLT INSULATION 1.3. RMC: HOT-DIPPED RIGID GALVANIZED STEEL-UNLESS OTHERWISE NOTED;CONDUIT TO BE USED FOR ALL RESISTANCE TESTS FOR ALL DISTRIBUTION AND UTILIZATION EQUIPMENT. THE CONTRACTOR SHALL PROVIDE A RISERS,PANELBOARD FEEDERS,THREE-PHASE MOTOR FEEDERS,CONDUIT INSTALLED IN SLAB;AND FOR GM GROUND-FAULT CIRCUIT INTERRUPTING TYPE DEVICE SUITABLE AND STABLE SOURCE OF TEST POWER. THE INSULATION TEST SHALL BE A"MEGGER"TEST AT 500 EXPOSED RUNS 2"TRADE SIZE AND LARGER. CONDUIT SHALL BE GALVANIZED FOR CORROSION PROTECTION VOLTS DC FOR 30 SECONDS. THE TEST SHALL BE CONDUCTED IN THE PRESENCE OF THE OWNER. A TEST FOR CONDUIT INSTALLED IN CONCRETE SLAB. USE WITH THREADED FITTINGS ONLY. REPORT SHALL BE SUBMITTED TO THE OWNER. THE MINIMUM INSULATION RESISTANCE SHALL BE 1,000,000 OHMS FOR#12AWG CONDUCTORS AND 250,000 OHMS FOR LARGER CONDUCTORS. CONDUCTORS TESTING 1.4. FMC: INTERLOCKING COIL FORMED GALVANIZED STEEL STRIP(72"MAXIMUM LENGTH)-CONDUIT TO BE USED BELOW THE MINIMUM INSULATION RESISTANCE SHALL BE REPLACED AND TESTED AGAIN. FOR ALL LIGHT FIXTURE WHIPS AND FINAL CONNECTIONS TO TRANSFORMERS AND MOTORS. USE WITH INSULATED-THROAT,COMPRESSION CONNECTORS. 19.2.THE CONTRACTOR SHALL PERFORM.A CONTINUITY TEST ON THE ENTIRE ELECTRICAL SYSTEM PRIOR TO ENERGIZING THE SYSTEM TO INSURE PROPER CABLE CONNECTIONS. 1.5. LFMC: HELICALLY WOUND GALVANIZED STEEL STRIP WITH MOISTURE SEALING JACKET(72"MAXIMUM LENGTH) -CONDUIT TO BE USED FOR ALL LOCATIONS WITHIN 6'-0"OF A WATER SOURCE OR WHERE EXPOSED TO 19.3.THE CONTRACTOR SHALL PERFORM CONNECTION TORQUE TESTS FOR ALL LARGER CONDUCTOR BOLTED DAMP ATMOSPHERES OR CORROSIVE MATERIALS. USE WITH LIQUID-TIGHT,INSULATED-THROAT,COMPRESSION CONNECTIONS USING A TORQUE WRENCH. TORQUE SHALL BE TO NATIONAL ELECTRICAL TESTING CONNECTORS. ASSOCIATION'S(NETA)STANDARDS. 2. KEEP CONDUITS AND OTHER OPENINGS CLOSED TO PREVENT ENTRY OF FOREIGN MATTER DURING CONSTRUCTION 19.4.THE CONTRACTOR SHALL PERFORM(MECHANICAL OPERATION TESTS FOR ALL ELECTRICAL EQUIPMENT,SUCH AS AND PRIOR TO WIRE OR CABLE INSTALLATION. 06/22/2022 -- ISSUED FOR PERMIT AK DISCONNECT SWITCHES,CIRCUIT BREAKERS,ETC.;TO VERIFY THAT THE MECHANICAL PORTIONS OF THE DEVICE DATE REV DESCRIPTION BY ARE FUNCTIONING. 3. ALL CONDUIT IN FINISHED AREAS SHALL BE CONCEALED IN WALLS OR ABOVE FINISHED CEILING WHERE POSSIBLE. IN FINISHED AREAS WHERE ANY CONDUIT CANNOT BE CONCEALED DUE TO FIELD CONDITIONS,THE GENERAL n(l n 19.5.AT THE COMPLETION OF THE LIFE-SAFETY SYSTEM INSTALLATION,THE CONTRACTOR SHALL TEST ALL CONTRACTOR SHALL PAINT CONDUIT AS DIRECTED BY THE ARCHITECT. QOC�lSLtllpOO C�l5 EMERGENCY LIGHTING DEVICES. THE CONTRACTOR SHALL SUBMIT A REPORT TO THE ENGINEER VERIFYING THAT THE SYSTEMS ARE FULLY OPERATIONAL. 4. ALL CONDUIT SHALL BE SECURELY FASTENED IN PLACE TO STRUCTURAL MEMBERS. DO NOT FASTEN TO PIPING, Southport Engineering Associates,PC MECHANICAL EQUIPMENT,ETC. PROVIDE HANGERS AND/OR SUPPORTS AT EACH ELBOW AND WTHIN 12"OF EACH B. ELECTRICAL DEMOLITION-260501: CONDUIT TERMINATION INTO A BOX,ENCLOSURE OR CABINET. PROVIDE APPROVED BEAM CLAMPS,PIPE STRAPS OR 11 Bailey Avenue Tel.: 203 431-6844 HEAVY IRON TIES WHERE CONDUITS PENETRATE FLOOR/CEILING SLABS. Ridgefield,CT 06877 Fax: 203 431-6877 1. PRIOR TO BID SUBMISSION,THE CONTRACTOR SHALL THOROUGHLY INSPECT THE WORK AREA. BASED ON THIS PROJECT: INSPECTION,THE CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIAL AND EQUIPMENT TO ACCOMPLISH DEMOLITION 5. ALL CONDUIT TERMINATING IN METAL ENCLOSURES SHALL BE PROVIDED WITH AN INSULATED BUSHING. PROVIDE WORK. "GROUNDING"TYPE BUSHING WHERE REQUIRED. 699 1�r YYESTCHESTER AVENUE 2. AS PART OF DEMOLITION WORK,THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EXISTING SYSTEMS(NOT 6. EXPANSION FITTINGS SHALL BE PROVIDED AT ALL EXPANSION JOINTS. _ BOILER REPLACEMENT SCHEDULED FOR REMOVAL)ENERGIZED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY WIRING DEVICES,WIRE of Nfly y 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 AND CONDUIT AS REQUIRED TO KEEP EXISTING EQUIPMENT AND/OR DEVICES ACTIVE,WHETHER THEY SHARE THE 7. CONDUIT TO BE INSTALLED TO AVOID PROXIMITY WITH STEAM AND HOT WATER PIPING. MAINTAIN 1"B Ep�9p DRAWING TITLE: SAME CIRCUITS AS DEMOLITION ITEMS OR INOT. THIS INCLUDES MECHANICAL EQUIPMENT BRANCH CIRCUITS, CONDUIT AND PIPING WHEREVER POSSIBLE. AT NO POINT SHALL SPACING BE LESS THAN 4"BETWEEN 0 A� RECEPTACLE AND LIGHTING CIRCUITS,COMMUNICATION SYSTEMS,FIRE ALARM DEVICES,ETC. PIPING INSULATION. °+�* ELECTRICAL SPECIFICATIONS 3. EXTEND EXISTING INSTALLATIONS USING MATERIALS AND METHODS COMPATIBLE WITH EXISTING ELECTRICAL SYSTEMS. 8. ACCEPTABLE MANUFACTURERS ARE ALLIED TUBE&CONDUIT,NATIONAL WIRE PRODUCTS,REPUBLIC A I, t 4. VERIFY THAT ALL ABANDONED WIRING AND,EQUIPMENT SERVE ONLY ABANDONED FACILITIES. FOR CONDUITS AND ASSOCIATED FITTINGS, CALE: NONE DRAWN BY: SG DRAWING NO:aa19r0���,�o (REFER TO DRAWING E-101 FOR CONTINUATION.) p, DATE: 05/18122 CHECKED BY: AK C S C ryrEbS PROJECT NO: 85109 APPROVED BY: AK -1 00 ELECTRICAL SPECIFICATIONS G. BOXES FOR ELECTRICAL SYSTEMS-260534: ENCLOSURE WITH GRAY ENAMEL AND(COPPER LUG KIT. TRANSFORMERS SHALL HAVE EFFICIENCY RATINGS IN 4. PROVIDE BALLASTS IN EACH LIGHT FIXTURE RATED AT VOLTAGE AS REQUIRED TO ACHIEVE DESIGN INTENT AS COMPLIANCE WITH DEPARTMENT OF ENERGY(DOE)2016 REQUIREMENTS. MOUNT ON 4"CONCRETE HOUSEKEEPING SHOWN ON DRAWINGS. 1. OUTLET,JUNCTION AND PULL BOXES SHALL BE INDUSTRY STANDARD GAUGE,GALVANIZED SHEET STEEL. BOXES PAD UNLESS INDICATED OTHERWISE. SHALL BE INSTALLED WHERE NECESSARY TO FULFILL DESIGN INTENT REGARDLESS OF INDICATIONS AS SHOWN ON 4A. NON-DIMMING BALLASTS TO BE ADVANCE,OSRAM-SYLVANIA OR UNIVERSAL. BALLASTS PROVIDED WITH LIGHT DRAWINGS. ALL BOXES SHALL BE MADE ACCESSIBLE. PROVIDE ACCESS PANELS WHERE NECESSARY. 2. ACCEPTABLE MANUFACTURERS ARE EATON,GENERAL ELECTRIC,SIEMENS AND SQUARE D. FIXTURE BY THE LIGHT FIXTURE MANUFACTURER ARE ACCEPTABLE IF BALLAST COMPLY WITH THE FOLLOWING. 2. BARRIERS SHALL BE INDUSTRY STANDARD GAUGE,CONDUCTIVE MATERIAL WITH ANGLE IRON FRAMING SUPPORT L. PANELBOARDS-262416: 4.1.a. FLUORESCENT BALLASTS SHALL BE ELECTRONIC HIGH-FREQUENCY,FULL OUTPUT,DUAL VOLTAGE WITH AROUND ITS PERIMETER AND SHALL HAVE ADEQUATE THICKNESS(1/8"MINIMUM)AS REQUIRED FOR MECHANICAL CLASS"A"SOUND RATING AND 10%LOW HARMONIC DISTORTION. STRENGTH NECESSARY TO FULLY PROTECT THE SYSTEM. BARRIERS SHALL BE PROVIDED BETWEEN SEPARATE 1. NEW PANELBOARDS SHALL BE AS FOLLOWS: SYSTEMS AND BETWEEN SEPARATE VOLTAGES. 5, PROVIDE EMERGENCY BATTERY BACK-UP SHALL HAVE A VOLTAGE RATING AS REQUIRED FOR SERVING LIGHT 1.1. NEW DISTRIBUTION PANELBOARDS SHALL BE RATED WITH FIELD-ADJUSTABLE,LSI ELECTRONIC TRIP MAIN FIXTURES AND SHALL BE CAPABLE OF PROVIDING LIGHT OUTPUT FOR A MINIMUM OF 90 MINUTES. ALL EMERGENCY 3. NORMAL POWER AND EMERGENCY POWER SYSTEMS SHALL NOT BE INSTALLED IN COMMON ELECTRICAL BOXES AND CIRCUIT BREAKER OR MAIN LUGS ONLY AS SHOWN ON DRAWINGS. PANELBOARD BOX SHALL BE MADE OF BATTERY BACK-UP SHALL BE NON-SWITCHED. SHALL BE KEPT SEPARATE. SHEET STEEL"BENT-UP",RIVETED OR BOLTED TOGETHER WITH EXTERIOR ANGLE IRON FRAME MOUNTED FLUSH OR SURFACE AS SHOWN ON DRAWINGS. BOX SHALL BE PROVIDED WITH ONE COAT OF GRAY ENAMEL PAINT. 5.1. LIGHT FIXTURE EMERGENCY BATTERY BACK-UP BALLASTS TO PROVIDE A MINIMUM OF 1100 LUMENS. BALLAST 4. PROVIDE ADEQUATE OUTLET BOXES FOR MOUNTING ALL DEVICES. DO NOT USE ROUND JUNCTION BOXES. PROVIDE WITH COPPER BUS BARS,100%RATED SOLID COPPER NEUTRAL,COPPER EQUIPMENT GROUND AND SHALL INCLUDE A SELF-TEST SWITCH AND INDICATOR LAMP THAT IS EASILY VISIBLE. PLUG-ON BRANCH CIRCUIT BREAKERS WITH FIELD-ADJUSTABLE,LSI ELECTRONIC TRIP UNITS. AIC RATING 4.1. FURNISH AND INSTALL 4 11/16"SQUARE BY 1 1/2"OR 2 1/8"DEEP BACK BOX WITH EXTENSION RING FOR AND AVAILABLE SPACE AS SHOWN ON DRAWINGS. 5.1.a. ACCEPTABLE MANUFACTURERS ARE BODINE,IOTA OR AS PROVIDED BY THE LIGHT FIXTURE SWITCH AND RECEPTACLE OUTLETS. MULTI-GANG BACK BOXES SHALL BE APPROPRIATELY SIZED TO MANUFACTURER. ACCOMMODATE INSTALLED WIRING DEVICES. 1.1.a. ACCEPTABLE MANUFACTURERS ARE EATON"PRL5P"SERIES,GENERAL ELECTRIC"SPECTRA"SERIES, SIEMENS"P5"SERIES AND SQUARE D"I-LINE"SERIES. 5.2. EMERGENCY PACKS FOR EXIT SIGNS AND BATTERY-POWERED LIGHTS SHALL PROVIDE FULL LIGHT OUTPUT 4.2. FURNISH AND INSTALL 4"OCTAGONAL BY 2 1/8"DEEP BACK BOX WITH 3/8"FIXTURE STUD FOR CEILING REQUIRED BY THE UNIT. PACKS SHALL INCLUDE SELF-DIAGNOSTICS AND INDICATOR LAMP THAT IS EASILY AND/OR SUSPENDED LIGHTING OUTLETS. 1.1.a.1. EATON"PRL4P"SERIES AND SIEMENS"P4"SERIES ARE ACCEPTABLE ALTERNATIVES WHERE VISIBLE. THE MAXIMUM BRANCH CIRCUIT BREAKER RATING IS 250 AMPERES OR LESS. 5. JUNCTION AND PULL BOXES SHALL HAVE REMOVABLE SCREW-ON COVER PLATES AND BE PROVIDED EVERY 100 FEET 5.2.a. PACKS SHALL BE PROVIDED INTEGRAL WITH THE UNIT. REFER TO ARCHITECTURAL LIGHT FIXTURE OF CONDUIT RUN AND WHERE NECESSARY TO FACILITATE THE INSTALLATION OF EQUIPMENT AND WIRING. 1.2. NEW PANELBOARDS SHALL BE RATED WITH MAIN CIRCUIT BREAKER OR MAIN LUGS ONLY AS SHOWN ON SCHEDULE UNLESS OTHERWISE INDICATED. DRAWINGS. PANELBOARD BOX SHALL BE MADE OF SHEET STEEL"BENT-UP",RIVETED OR BOLTED TOGETHER 5.1. BOXES SERVING EMERGENCY SYSTEM SHALL BE PAINTED YELLOW IN COLOR. WITH EXTERIOR ANGLE IRON FRAME MOUNTED FLUSH OR SURFACE AS INDICATED ON DRAWINGS AND SHALL 6. CONNECTIONS TO LIGHT FIXTURES SHALL BE MADE FROM JUNCTION BOXES VIA FLEXIBLE WHIP(6'-0"MAXIMUM HAVE"DOOR-WITHIN-DOOR"TYPE CODE GAUGE STEEL DOORS INCLUDING LOCK AND KEY FOR INNER DOOR. LENGTH). LIGHTING SHALL NOT BE"THRU-WIRED". 5.2. BOXES SHALL BE SIZED TO COMPLY WITH THE MINIMUM BENDING RADIUS CRITERIA AS SPECIFIED BY THE NEC. BOX AND DOORS SHALL BE PROVIDED WITH ONE COAT OF GRAY ENAMEL PAINT. PROVIDE WITH COPPER BUS BARS,100%RATED SOLID COPPER NEUTRAL,COPPER EQUIPMENT GROUND AND BOLT-ON BRANCH CIRCUIT 5.3. BOXES HAVING ANY SINGLE DIMENSION LARGER THAN 36"SHALL BE PROVIDED WITH CABLE SUPPORT RACKS. BREAKERS. AIC RATING AND AVAILABLE SPACE AS SHOWN ON DRAWINGS. ELECTRICAL GENERAL NOTES CABLE SUPPORT RACKS SHALL CONSIST OF 3/4"DIAMETER STEEL PIPING WITH FLANGED ENDS BOLTED TO FRAME OF BOX AND FITTED CONTINUOUS FIBER INSULATING SLEEVES ARRANGED IN TIERS. INSTALL RACKS 1.2.a. ACCEPTABLE MANUFACTURERS ARE EATON"PRL1"SERIES,GENERAL ELECTRIC"AQ"SERIES,SIEMENS A. DEMOLITION WORK: WITHIN 36"OF BOX. "P1"SERIES AND SQUARE D"NQ"SERIES. 1. ALL SALVAGEABLE ITEMS SUCH AS LIGHT FIXTURES,ETC.THAT ARE NOT TO BE REUSED SHALL BE TURNED OVER 6. ACCEPTABLE MANUFACTURERS ARE APPLETON,CROUSE HINDS,O.Z./GEDNEY,RACO AND THOMAS&BETTS FOR 1.3. NEW PANELBOARDS TO BE MOUNTED 60"AFF TO CENTERLINE OF BOX UNLESS NOTED OTHERWISE. PROVIDE TO THE OWNER. OUTLET,JUNCTION AND PULL BOXES. WITH TYPEWRITTEN DIRECTORY LOCATED ON INSIDE OF DOOR BEHIND TRANSLUCENT COVER. 2. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR ACCESS TO WORK AREAS,CONSTRUCTION SCHEDULING 7. ACCEPTABLE MANUFACTURERS ARE BURNDY,CROUSE HINDS,NEPCO,O.Z./GEDNEY,RACO AND THOMAS&BETTS 1.4, NEW PANELBOARD MAIN CIRCUIT BREAKERS SHALL BE INDIVIDUALLY MOUNTED AND SEPARATE FROM BRANCH AND SERVICE INTERRUPTIONS. FOR BUSHINGS,CONNECTORS,COUPLINGS AND FITTINGS. CIRCUIT BREAKERS. BRANCH-MOUNTED MAIN CIRCUIT BREAKERS SHALL NOT BE PERMITTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION IN AREAS OF RENOVATION. ALL LIGHT FIXTURES, H. VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS-260548: 2. EXISTING PAN ELBOARDS/LOADCEN TERS: CLEAN EXPOSED SURFACES AND CHECK TIGHTNESS OF ALL ELECTRICAL WIRING DEVICES,WIRE AND CONDUIT THAT ARE TO BE REMOVED SHALL BE STORED AS DIRECTED BY THE OWNER OR CONNECTIONS. REPLACE ALL DAMAGED CIRCUIT BREAKERS AND PROVIDE NEW CIRCUIT BREAKERS WHERE RELOCATED AS SHOWN ON NEW FLOOR PLANS. APPROPRIATE MEASURES SHALL BE TAKEN TO ASSURE CONTINUITY 1. PROVIDE SEISMIC RESTRAINTS,INCLUDING ALL STRUCTURAL STEEL MEMBERS,INSERTS,ANCHORS,WIRES,ETC.AS NECESSARY. NEW CIRCUIT BREAKERS SHALL MATCH EXISTING PAN ELBOARD/LOADCEN TER IN MANUFACTURER AND OF EXISTING CIRCUITS WHERE REQUIRED. ALL OUTAGES WHICH MAY RESULT SHALL BE COORDINATED WITH THE REQUIRED FOR ALL ELECTRICAL EQUIPMENT. ALL SEISMIC RESTRAINTS SHALL BE DESIGNED AND CONSTRUCTED IN AIC RATING. PROVIDE CLOSURE PLATES FOR VACANT POSITIONS. PROVIDE NEW UPDATED TYPEWRITTEN DIRECTORY OWNER PRIOR TO THE WORK. ACCORDANCE WITH ALL LOCAL CODES,ORDINANCES AND THE LOCAL AUTHORITY HAVING JURISDICTION. SHOWING REVISED CIRCUITING ARRANGEMENT. THE CONTRACTOR SHALL VERIFY ALL CONDUIT AND FEEDER SIZES ASSOCIATED WTH PANELBOARDS/LOADCENTERS. ALL CODE DISCREPANCIES SHALL BE BROUGHT TO ATTENTION OF 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING SCHEDULES IN ALL ELECTRICAL PANELS THAT ARE I. ELECTRICAL IDENTIFICATION-260553: THE ARCHITECT AND THE ENGINEER. AFFECTED BY THIS WORK. THE UPDATED SCHEDULES ARE TO BE TYPEWRITTEN. 1. PROVIDE THERMOPLASTIC ENGRAVED NAMEPLATES FOR ALL ELECTRICAL EQUIPMENT INCLUDING,BUT NOT LIMITED TO: M. WIRING DEVICES-262726: B. NEW WORK: CIRCUIT BREAKERS,DISCONNECT SWITCHES,PANELBOARDS,SWITCHBOARDS,TRANSFORMERS,ETC.AS REQUIRED BY THE NATIONAL ELECTRIC CODE. NAMEPLATES SHALL INDICATE EQUIPMENT NAME,VOLTAGE AND AMPERAGE. 1. WIRING DEVICES SHALL BE SPECIFICATION GRADE AND AS FOLLOWS: 1. ALL WORK SHALL COMPLY WITH THE 2014 EDITION OF THE NATIONAL ELECTRICAL CODE. 2. NAMEPLATES FOR EQUIPMENT ON NORMAL POWER SHALL BE BLACK WITH WHITE LETTERING. NAMEPLATES FOR 1.1. RECEPTACLES: PROVIDE UL498 LISTED COMMERCIAL GRADE,20A/125V NEMA 5-20R,DECORATIVE 2. EACH CIRCUIT SHALL HAVE AN EQUIPMENT GROUNDING CONDUCTOR. MULTI-WIRE CIRCUITS OF DIFFERENT PHASES EQUIPMENT ON EMERGENCY POWER SHALL BE YELLOW WITH BLACK LETTERING. ARCHITECTURAL STYLE RECEPTACLES UNLESS INDICATED OTHERWISE. MAY SHARE EQUIPMENT GROUNDING CONDUCTOR. EQUIPMENT GROUNDING CONDUCTOR SIZE SHALL NOT BE LESS THAN#12AWG OR AS;INDICATED ON THE DRAWINGS. 3. PROVIDE'DANGER"LABELING FOR ALL ELECTRICAL EQUIPMENT,BOXES,ETC.AS REQUIRED BY NEC CODES. 1.2. GROUND-FAULT CIRCUIT INTERRUPTING TYPE RECEPTACLES: PROVIDE UL498 LISTED COMMERCIAL GRADE, LABELING SHALL INCLUDE ALL REQUIREMENTS FOR ARC-FLASH AND FAULT-CURRENT IDENTIFICATION IN 20A/125V NEMA 5-20R,DECORATIVE ARCHITECTURAL STYLE GFCI TYPE RECEPTACLE WITH SELF-TEST 3. ON THREE-PHASE,FOUR-WIRE SYSTEMS;DO NOT USE A COMMON NEUTRAL FOR MORE THAN THREE BRANCH ACCORDANCE WITH NEC CODES. CIRCUITRY. CIRCUITS. MORE THAN THREE BRANCH CIRCUITS IN ANY ONE CONDUIT IS NOT ALLOWED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER, 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MARKING ALL FIXED EQUIPMENT,RECEPTACLES AND SWITCHES WITH 1.3. SINGLE-POLE SWITCHES: PROVIDE U.L.LISTED COMMERCIAL GRADE,20AMP,120-277VAC SINGLE-POLE, THE PANELBOARD NAME AND CIRCUIT BREAKER NUMBER SERVING EACH DEVICE WITH TYPEWRITTEN LABELS. TOGGLE-OPERATED,QUIET-TYPE,DECORATIVE ROCKER STYLE WALL SWITCH. 3.1.EACH BRANCH CIRCUIT SHALL BE ON A DIFFERENT PHASE. BRANCH CIRCUITS OF THE SAME PHASE SHALL NOT UTILIZE A COMMON NEUTRAL AND/OR BE INSTALLED IN SAME CONDUIT. J. OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDIES-260573: 1.4. FACEPLATES: PROVIDE STAINLESS STEEL FACEPLATES IN MECHANICAL AND ELECTRICAL SPACES. FACEPLATES SHALL BE INSTALLED FLAT AGAINST WALL. NO GAPS WILL BE ALLOWED. 4.ON SINGLE-PHASE,THREE-WIRE SYSTEMS;DO NOT USE A COMMON NEUTRAL FOR ANY CIRCUITS WITHOUT WRITTEN 1. SHORT-CIRCUIT FAULT CURRENTS: PERMISSION FROM THE ENGINEER. 1.5. ACCEPTABLE MANUFACTURERS FOR RECEPTACLES AND SWITCHES ARE COOPER ARROW-HART DECORATOR 1.1. CALCULATE THE MAXIMUM AVAILABLE SHORT-CIRCUIT CURRENT IN RMS SYMMETRICAL AMPERES FOR THE SERIES,LEVITON DECORA SERIES,LUTRON ARCHITECTURAL SERIES AND PASS&SEYMOUR DECORATOR SERIES. 5.BRANCH CIRCUITS SHARING A COMMON NEUTRAL SHALL BE PROVIDED WITH A MEANS TO SIMULTANEOUSLY ELECTRICAL POWER DISTRIBUTION SYSTEM FROM"NORMAL/UTILITY"SOURCE. INCLUDE STUDIES OF SYSTEM DISCONNECT ALL UNGROUNDED CONDUCTORS UTILIZING A MULTI-POLE CIRCUIT BREAKER OR WITH AN IDENTIFIED SWITCHING CONFIGURATIONS AND ALTERNATE OPERATIONS THAT COULD RESULT IN MAXIMUM FAULT 2. ALL RECEPTACLE OUTLETS INSTALLED WITHIN 6'-0"OF SINKS OR OTHER SOURCES OF WATER SHALL BE HANDLE-TIE. CONDITIONS. CALCULATE MOMENTARY AND INTERRUPTING DUTIES ON THE BASIS OF MAXIMUM AVAILABLE GROUND-FAULT,CIRCUIT-INTERRUPTING TYPE. FAULT CURRENT. 6. MINIMUM CONDUCTOR SIZE SHALL BE#12AWG UNLESS OTHERWISE SPECIFIED. ALL CONDUCTORS#1OAWG AND 3. ALL RECEPTACLE OUTLETS SHALL BE INSTALLED WITH GROUNDING PIN LOCATED IN THE TOP POSITION. SMALLER SHALL 13E SOLID COPPER AND ALL CONDUCTORS#8AWG AND LARGER SHALL BE STRANDED COPPER USING 1.2. FAULT CURRENTS SHALL BE DETERMINED AT ALL SWITCHBOARDS,PANELBOARDS,MOTOR CONTROL CENTERS BOLTED LUGS AT TERMINALS. AND CIRCUIT BREAKER POSITIONS OF THE ELECTRICAL POWER DISTRIBUTION SYSTEM. THE CALCULATION 4. ALL SWITCHES SHALL BE INSTALLED WITH"OFF"IN THE BOTTOM POSITION. SHALL BE FOR THE CURRENT IMMEDIATELY AFTER INITIATION AND FOR A THREE-PHASE BOLTED 7. MINIMUM CONDUIT SIZE SHALL BE 3/4"UNLESS OTHERWISE SPECIFIED. ALL CONDUIT SHALL BE INSTALLED AS HIGH SHORT-CIRCUIT. PERFORM A SELECTIVE DEVICE COORDINATION STUDY USING THE FAULT CURRENT LEVELS 5. ALL EXTERIOR WIRING DEVICES SHALL BE PROVIDED WITH A WEATHER-PROOF"WHILE-IN-USE"COVER. AS POSSIBLE(MOUNT TO BOTTOM OF STRUCTURE)TO AVOID CONFLICTS NTH DUCTWORK AND PIPING. COORDINATE ESTABLISHED BY THE SHORT-CIRCUIT CALCULATIONS. INSTALLATION WITH 11HE MECHANICAL CONTRACTOR. 6. ALL WIRING DEVICES SHALL BE INSTALLED PLUMB,SQUARE AND TRUE. WIRING DEVICES INSTALLED IN ADJACENT 1.3. PREPARE A WRITTEN REPORT FOR SUBMITTAL TO THE ENGINEER. THE STUDY SHALL INCLUDE,BUT IS NOT LOCATIONS SHALL BE ALIGNED. 8. THE CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS FOR THE EXACT LOCATIONS OF ALL MECHANICAL LIMITED TO,THE FOLLOWING: EQUIPMENT. FIELD COORDINATE THESE LOCATIONS WITH THE MECHANICAL CONTRACTOR. THE CONTRACTOR SHALL 7. WIRING DEVICES INSTALLED AT A SINGLE LOCATION SHALL BE INSTALLED IN A MULTI-GANG BACK BOX WITH BE RESPONSIBLE FOR!PROVIDING ALL CONTROL WIRING FOR MECHANICAL EQUIPMENT AS DIRECTED BY THE 1.3.a. PROVIDE DEVICE SETTINGS AND RATINGS OF ALL OVERCURRENT PROTECTIVE DEVICES. SUITABLE FACEPLATE WHEREVER POSSIBLE. PROVIDE BARRIERS AS REQUIRED BY CODE. MECHANICAL CONTRACTOR. 1.3.a.1. FOR 600-VOLT OVERCURRENT PROTECTIVE DEVICES,ENSURE THAT INTERRUPTING RATINGS ARE EQUAL TO OR HIGHER THAN CALCULATED 1/2-CYCLE SYMMETRICAL FAULT CURRENT. 8. WIRING DEVICES SHALL BE WHITE IN COLOR. 9. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE BUILDING MANAGEMENT AS FOLLOWS: 1.3.a.2. FOR DEVICES AND EQUIPMENT RATED FOR ASYMMETRICAL FAULT CURRENT,APPLY MULTIPLICATION FACTORS LISTED IN THE STANDARDS FOR 1/2-CYCLE SYMMETRICAL FAULT N. FUSES-262813: 9.1.THE CONTRACTOR SHALL OBTAIN A COPY OF THE BUILDING RULES&REGULATIONS PRIOR TO BID SUBMISSION CURRENT. TO DETERMINE REQUIREMENTS AND EXTENT OF PREMIUM TIME WORK REQUIRED BY THE BUILDING MANAGEMENT. 1. FUSES SHALL BE CURRENT-LIMITING,DUAL-ELEMENT,TIME-DELAY TYPE WITH AN INTERRUPTING CURRENT CAPACITY FOR THE PURPOSE OF THE BID,THE CONTRACTOR SHALL NOT PERFORM ANY NOISY WORK(CHOPPING,CORE 1.3.b. VERIFY ADEQUACY OF PHASE CONDUCTORS AT THE MAXIMUM THREE-PHASE BOLTED FAULT CURRENTS. OF 200,000RMS AMPERES AND A CONTINUOUS CURRENT RATING AS SHOWN ON DRAWINGS. DRILLING,ETC.)AND BASE BUILDING SYSTEM INTERRUPTIONS DURING NORMAL BUSINESS HOURS. VERIFY ADEQUACY OF EQUIPMENT GROUNDING CONDUCTORS AND GROUNDING ELECTRODE CONDUCTORS AT THE MAXIMUM GROUND-FAULT CURRENTS. 2. FUSES SHALL HAVE AN AVERAGE MELTING TIME-CURRENT CHARACTERISTIC TO MEET UNDERWRITERS'LABORATORIES 9.2.THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO THE BUILDING RULES&REGULATIONS. ANY REQUIREMENTS OF"CLASS K"FOR 0-600 AMP FUSES AND"CLASS L"FOR OVER 600 AMP FUSES. DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND THE BUILDING RULES&REGULA11ONS SHALL BE 1.3.c. ENSURE THAT SHORT-CIRCUIT WITHSTAND RATINGS ARE EQUAL TO OR HIGHER THAN CALCULATED SUBMITTED IN WRITING TO THE ARCHITECT AND/OR ENGINEER FOR REVIEW WITH BID SUBMISSION. 1/2-CYCLE SYMMETRICAL FAULT CURRENT. 3. ACCEPTABLE MANUFACTURERS ARE BUSSMAN,GOULD SHAWMUTT AND GENERAL ELECTRIC. 9.3.THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT FOR ANY SERVICE INTERRUPTIONS OF 1.3.d. DEMONSTRATE SELECTIVE COORDINATION BY COMPUTER-GENERATED,TIME-CURRENT COORDINATION 0. ENCLOSED SWITCHES AND CIRCUIT BREAKERS-262816: EXISTING SYSTEMS A MINIMUM OF TWO(2)DAYS PRIOR TO ANY WORK;AND AFTER APPROVAL IS OBTAINED PLOTS. FROM THE BUILDING MANAGEMENT. THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER BEFORE 1. DISCONNECT SWITCHES SHALL BE"QUICK-MAKE","QUICK-BREAK"HEAVY DUTY WITH VOLTAGE RATINGS OF 600 PERFORMING WORK ON PREMIUM TIME,IF SO DIRECTED BY THE BUILDING MANAGEMENT;SO AS NOT TO 1.3.e. SHOW CALCULATED X/R RATIOS AND EQUIPMENT INTERRUPTING RATING FOR 1/2-CYCLE FAULT VOLTS FOR 480/277-VOLT SYSTEMS AND 240 VOLTS FOR 208/120-VOLT SYSTEMS. PROVIDE SINGLE OR THREE DISTURB OTHER EXISTING BUILDING OPERATIONS. CURRENTS ON THE ELECTRICAL POWER DISTRIBUTION SYSTEM DIAGRAM. PHASE WITH AMPERE RATINGS AS SHOWN ON DRAWINGS. U.L.98 LISTED,NEMA KS1. ENCLOSURES SHALL BE NEMA 1 FOR INDOOR AND NEMA 3R FOR OUTDOOR INSTALLATIONS. 1.3.f. PROVIDE TABULAR FORMAT OF SETTINGS SELECTED FOR OVERCURRENT PROTECTIVE DEVICES. 1.1. ACCEPTABLE MANUFACTURERS ARE EATON,GENERAL ELECTRIC,SIEMENS AND SQUARE D. 1.3.g. PROVIDE COORDINATION CURVES: 1.3.g.1. PREPARE TO DETERMINE SETTINGS OF OVERCURRENT PROTECTIVE DEVICES TO ACHIEVE 2. CIRCUIT BREAKERS SHALL BE THERMAL-MAGNETIC,"QUICK-MAKE,QUICK-BREAK"TYPE WITH NONWELDING CONTACTS SELECTIVE COORDINATION, COMPENSATED FOR AMBIENT TEMPERATURES. PROVIDE WITH ELECTRONIC,FIELD ADJUSTABLE,LSI TRIP FUNCTIONS 1.3.g.2. GRAPHICALLY ILLUSTRATE THAT ADEQUATE TIME SEPARATION EXISTS BETWEEN DEVICES FOR CIRCUIT BREAKERS RATED 400 AMPERES AND ABOVE. ALL CIRCUIT BREAKERS SERVING MECHANICAL INSTALLED IN SERIES,INCLUDING POWER UTILITY COMPANY'S UPSTREAM DEVICES. EQUIPMENT SHALL BE"HACR"RATED. 1.3.g.3. PREPARE SEPARATE SETS OF CURVES FOR SWITCHING SCHEMES. 2.1. WHERE INSTALLED IN EXISTING PANELBOARDS,CIRCUIT BREAKERS SHALL MATCH THE EXISTING PANELBOARD IN 2. ARC-FLASH FAULT CURRENTS: MANUFACTURER AND AIC RATING. 2.1. USE FAULT CURRENT LEVELS AND EQUIPMENT DATA CONTAINED IN THE SHORT-CIRCUIT STUDY;AND PERFORM P. ENCLOSED CONTROLLERS-262913: AN ARC-FLASH STUDY THAT COMPLIES WITH THE FOLLOWING: 1. MOTOR STARTERS TO BE ACROSS-THE-LINE MAGNETIC MATH HAND-OFF-AUTO(HOA)SELECTOR SWITCHES,THERMAL 2.1.a. OSHA CFR 39 PART 1910 SUBPARTS OVERLOAD,PILOT LIGHT AND LOW VOLTAGE PROTECTION FOR ALL PHASES. INCLUDE CONTROL TRANSFORMER WITH 2.1.b. NATIONAL ELECTRIC CODE(NFPA 70-2008)SECTION 110.116 ONE(1)SET OF NORMALLY-CLOSED AND NORMALLY-OPEN CONTACTS. 06/22/2022 -- ISSUED FOR PERMIT AK 2.1.c. STANDARD FOR ELECTRICAL SAFETY IN THE WORK PLACE(NFPA 70E-2009) 2.1.d. IEEE GUIDE FOR PERFORMING ARC-FLASH ANALYSIS CALCULATIONS(EEE STD.1584-2002 W/2004 1.1. ALL MOTOR STARTERS SHALL BE ASSEMBLED AND INTERNALLY WIRED WITH ALL DEVICES IN CONFORMANCE DATE REV DESCRIPTION BY AMENDMENT) WITH NEMA STANDARDS. 2.1.e. NATIONAL ELECTRIC SAFETY CODE(IEEE STD C2-2007) 1.2. ACCEPTABLE MANUFACTURERS;ARE ALLEN BRADLEY,GENERAL ELECTRIC AND SQUARE D. 2.2. FAULT CURRENTS SHALL BE DETERMINED AT ALL TRANSFORMERS,SWITCHBOARDS,PANELBOARDS,MOTOR Southport Engineering Associates,PC SYSTEM.CONTROL CENTERS,FUSES,ENCLOSED SWITCHES AND CIRCUIT BREAKERS OF ELECTRICAL POWER DISTRIBUTION Q. LIGHT FIXTURES-265100: 11 Bailey Avenue Tel.:(203)431-6844 1. FURNISH,INSTALL,SET AND LAMP NEW LIGHT FIXTURES. INDEPENDENTLY SUPPORT ALL LIGHT FIXTURES FROM Ridgefield,CT 06877 Fax:(203)431-6877 2.3. PREPARE A WRITTEN REPORT FOR SUBMITTAL TO THE ENGINEER. THE STUDY SHALL INCLUDE,BUT IS NOT BUILDING STRUCTURE. INCLUDE ALL NECESSARY SUPPORTS AND HANGERS AS REQUIRED. PROJECT: LIMITED TO,THE FOLLOWING 2. LIGHT FIXTURES SHALL BE AS SPECIFIED ON THE ARCHITECTURAL LIGHT FIXTURE SCHEDULE UNLESS OTHERWISE 699 WESTCHESTER AVENUE 2.3.a. DETERMINE THE PROTECTIVE DEVICE CHARACTERISTICS AND DURATION OF THE ARC. INDICATED. LIGHT FIXTURES SHALL BE LISTED AND LABELED BY UNDERWRITERS'LABORATORY(UL). _ BOILER REPLACEMENT 2.3.b. DOCUMENT ALL SYSTEM VOLTAGES AND CLASSES OF EQUIPMENT. 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 2.3.c. SELECT THE APPROPRIATE WORKING DISTANCE FOR EQUIPMENT. 3. PROVIDE LAMPS SUITABLE FOR THE SPECIFIED LIGHT FIXTURE AND AS INDICATED ON LIGHT FIXTURE SCHEDULE. Pg�01 NEKq 2.3.d. DETERMINE THE INCIDENT ENERGY FOR ALL EQUIPMENT IN THE STUDY. LAMPS TO BE GENERAL ELECTRIC,PHIILLIPS,SYLVANIA OR AS PROVIDED WITH LIGHT FIXTURE. yt SEp F DRAWING TITLE: 2.3.e. DETERMINE THE FLASH-PROTECTION BOUNDARY FOR ALL EQUIPMENT IN THE STUDY. 3.1. FLUORESCENT LAMPS SHALL BE WARM WHITE,RAPID START WITH A LOW MERCURY CONTENT. e"a* ELECTRICAL SPECIFICATIONS K. TRANSFORMERS-262200: AND NOTES 3.2. LED LAMPS SHALL BE WARM WHITE. PROVIDE LED LAMP DRIVERS AS DIRECTED BY THE LED MANUFACTURER 1. TRANSFORMERS SHALL BE DRY-TYPE VENTILATED GENERAL PURPOSE TYPE RATED AS SHOWN ON DRAWINGS. TO MEET THE DESIGN INTENT AS SHOWN ON THE DRAWINGS. COORDINATE EXACT LOCATION OF ALL REMOTE w PROVIDE 480-VOLT DELTA PRIMARY,208Y120-VOLT SECONDARY WITH COPPER WINDINGS,LOW-IMPEDANCE,100% DRIVERS WITH THE ARCHITECT AND LAMP MANUFACTURER. CALE: NONE DRAWN BY: SG DRAWING NO: RATED NEUTRAL,115'C TEMPERATURE RISE,220'C INSULATION SYSTEM,VIBRATION DAMPENERS,NEMA TYPE 2 °618ta'E� �l�Wp4 DATE: 05J18122 CHECKED BY: AK S, PROJECT NO: 85109 APPROVED BY: AK E-101 MATCHLINE NETWORK PROTECTOR RM 5 GENERAL STORAGE STORE ROOM MAIN SERVICE Li S T BOARD"SS-1" fl ' ' '-" ER 4_ ER ❑ ESWITCHGEAR ER ER ER " I L-SECTION DISTRIBUTION PROVIDE NEW ENGRAVED NAMEPLATE FOR EXISTING ROOM SERVICE STE ❑ PANEL"DS-1" UNLABELED 48OV,30,3W PANEL. ELEV.No.1 STAIR No.3 ELEV. 1-f I1 MACH.RI L.•� NEW 15kVA XFMR MAINTENANCE L- -"•� � _. ER 1 L�j BOILER ROOM ER\\ � MEN t IL ER ENG.OFF. s GROUND FLOOR KEY PLAN ❑ FUEL OIL PUMPS E SCALE:NONE STAIR NO.13 woME ❑ 6 2 B01 ER ROOM i ER B-1 ER B-2 j BOILER AND FRIGERATION 208Y/12 ,304W PANELS f_, -TTL-` EMERGENCY UT-OFFS "UP-M 1" UP-MA2" ELEV. ` MACH.RM. UNIT"AH-13" ER ER ER ER Eft 1. WATER PUMP CONTROL ACU WIREWAY FEMALE LOCKER ROOM PANEL- R MOTOR CONTROL CENTER STORAGE L "MCC-A" BANQUET PREP.ASSEMBLY REST RM. '��'� ` ER ko-- n 5 480Y/277V,30,4W PANEL CONDENSATE PUMPS-' ER ER ER ER ER ER "LP-MA" CONDENSATE PUMP ER MOTOR CONTROL CENTER DRIVES AND OISCONNECTS F CHILLER PUMPS, "MCC-B" TYPICAL OF FOUR. - EMPLOYEES DINING ER GUESTROOM PUMPS"P-11" PROVIDE NEW ENGRA f NAMEPLATE FOR EXISTING &"P-12" N A LED 480V,3o,3 V PANEL. ❑ LLJJ N CHILLER ER o ER z MCC.A/20�-- p r---i 4 ❑ 97Q UP-M 1 of MECH.F LANT MCC.A/25—_­`\\ - o0 ` PANEL"LP-SLB" �__\ AH 2 wTI, `,I $ UP MA ER P9T�'Ji' " CORRIDOR No.1 a ER o 0 WATER HEATER TD BE + HOT WATER CIRCULATING REMOVED BY OT ERS. PUMP TO BE RELOCATED ER BY OTHERS. K�n 0P u AH-1 -MCC-A/23 l 3 CHILLER / --.MCC-A __ BEVERAGE STORAGE ❑H � u ��u P8/ P7 P6 P5 � D7 m _.MCC-A/24``-----MCC-A/19 - STAIR#11 STAIR No.6 CHEFS STORE ROOM ❑ ❑ TET OFFICE MATCHLINE ELECTRICAL GROUND FLOOR BOILER/CHILLER ROOM DEMOLITION PLAN 2 ELECTRICAL GROUND FLOOR MECHANICAL ROOM DEMOLITION PLAN 00 E-200 06/22/2022 -- ISSUED FOR PERMIT AK SCALE:1/8"=V-0" SCALE:1/8"=1'-D" DATE REV DESCRIPTION BY DRAWING DEMOLITION NOTES KEYED DEMOLITION NOTES 1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER AS TO 5. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING Q REMOVE ALL EXISTING WIRING DEVICES,WIRE AND CONDUIT ASSOCIATED WITH CONSTRUCTION SCHEDULING,SERVICE INTERRUPTIONS,AND ACCESS TO WORK SCHEDULES IN ALL ELECTRICAL PANELS THAT ARE AFFECTED BY THIS WORK. MECHANICAL EQUIPMENT THAT IS TO BE REMOVED BY OTHERS. COORDINATE ©REMOVE AND REPLACE EXISTING BOILER EMERGENCY SHUT-OFF PUSH BUTTON. Southport Engineering Associates,PC AREAS. UPDATED SCHEDULES ARE TO BE TYPEWRITTEN. DEMOLITION WORK WITH THE MECHANICAL CONTRACTOR. REFER TO ELECTRICAL GROUND FLOOR CONSTRUCTION PLAN ON DRAWING E-201 11 Bailey Avenue Tel.: Fax:�203 431-6844 � 2. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION IN 6. ALL SALVAGEABLE ITEMS SUCH AS STARTERS,DISCONNECT SWITCHES,ETC. O2 REMOVE EXISTING WIRING DEVICE WITH ASSOCIATED WIRE AND CONDUIT. FOR ADDITIONAL INFORMATION AND REQUIREMENTS. Ridgefield,CT 06877 203431-6877 AREAS OF RENOVATION. ALL LIGHT FIXTURES,WIRING DEVICES,WIRE AND THAT ARE NOT TO BE REUSED SHALL BE TURNED OVER TO THE OWNER, Q7 REMOVE AND RELOCATE EXISTING JUNCTION BOX WITH ALL ASSOCIATED WIRING PROJECT: CONDUIT THAT ARE TO BE REMOVED SHALL BE STORED AS DIRECTED BY THE 03 PROVIDE ADD-ALTERNATE TO REMOVE ALL EXISTING WIRING DEVICES,WIRE AND DEVICES,WIRE AND CONDUIT AS REQUIRED TO ACCOMMODATE INSTALLATION OF 699 WESTCHESTER AVENUE OWNER OR RELOCATED AS SHOWN ON NEW FLOOR PLANS. 7. ABANDON OR REUSE EXISTING CONDUIT IN EXISTING WALLS THAT ARE TO CONDUIT ASSOCIATED WITH MECHANICAL EQUIPMENT THAT IS TO BE REMOVED NEW TWO-SECTION DISTRIBUTION PANEL"HP-MD1". FIELD VERIFY EXISTING REMAIN AS SHOWN ON NEW FLOOR PLAN. BY OTHERS. COORDINATE DEMOU11ON WORK WITH THE MECHANICAL CONDITIONS AND INCLUDE IN BID PRICE ALL WORK THAT WILL BE REQUIRED. BOILER REPLACEMENT 3. APPROPRIATE MEASURES SHALL BE TAKEN TO ASSURE CONTINUITY OF EXISTING CONTRACTOR. 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 CIRCUITS WHERE REQUIRED. ALL OUTAGES WHICH MAY RESULT SHALL BE 8. PRIOR TO SUBMISSION OF BID,CONTRACTOR SHALL THOROUGHLY INSPECT * r�9 DRAWING TITLE: COORDINATED WITH THE OWNER PRIOR TO THE WORK. ELECTRICAL ROOMS,BOILER ROOM,AND WORK AREAS AS REQUIRED. BASED ON ®INTERCEPT EXISTING CONDUIT IN ACCESSIBLE LOCATION,INSTALL JUNCTION BOX `'�♦ S[p '� THIS INSPECTION;FIELD VERIFY ROUTES AND RUNS OF CONDUITS TO AND FROM AND EXTEND CIRCUIT AS SHOWN ON NEW FLOOR PLAN. ety* ELECTRICAL GROUND FLOOR 4, ALL EXISTING BRANCH CIRCUITS NOT TO BE REUSED SHALL BE REMOVED BACK POINTS OF CONNECTION FOR ALL POWER,CONTROL,DATA AND SIGNAL TO PANEL IN THEIR ENTIRETY. CIRCUIT BREAKERS SHALL BE LABELED AS CONDUITS. Q ADD ALTERNATE:EXISTING MOTOR CONTROL CENTER"MCC-A"TO BE REMOVED DEMOLITION PLANS SPARE AND PLACED IN THE"OFF"POSITION. IN ITS ENTIRETY. COORDINATE ALL ELECTRICAL WORK WITH THE MECHANICAL CONTRACTOR. a CALE: AS SHOWN DRAWN BY: SG I DRAWING NO: � FESSI6W DATE: 05/18/22 CHECKED BY: AK PROJECT NO: 85109 APPROVED BY: AK E-200 MATCHLINE - NETWORK � PROTECTOR RM` 1J GENERAL STORAGE STORE ROOM ` MAIN SERVICE eve S T BOARD"SS-1" u ER i` E ❑R EBWITCHGEAR ER ER ERi L ROOM SERVICE STE -SECTION DISTRIBUTION PANEL"HP-BR1" NEW PANEL"LP-BR1" ❑ PANEL"DS-1" ELEV.No.1 STAIR No.3 ELEV. �{ ❑ MACH.RI L� NEW 15kVA XCFMR BOILER EMERGENCY MAINTENAN POWER-OFF CABI T �e ER I A BOILER ROOM V LP-BR1/6 ER MEN N HP-MDI/11 B 7 ENG.OFF. B-2 ER �GROUND FLOOR KEY PLAN ❑HP-M 1/12 LP-BR1/4 E� SCALE:NONE STAIR 1 NO.13 WOME El BOILERSCOPE OF WORK HP-M 1/13 B-3 B-4-4 AS PART OF ELECTRICAL WORK FOR BOILERS,THE CONTRACTOR SHALL PROVIDE THE FOLLOWING: HPg t1 HP-MDt 1 ER BOILER AND I EFRIGERATION 208Y 12 ,30 4 PANELS ER EMERGENCY UT-OFFS / A.REMOVE EXISTING BRANCH CIRCUITS SERVING BOILERS TO /�-- "UP-M 1" UP-MA2 BE WHICH ARE TO BE REMOVED AND REPLACED BY THE HWP-1 20 ELEV. MECHANICAL CONTRACTOR. DISTRIBUTION PANEL UNIT"AH-13" 7 "HP-MD2"ADD-ALTER AC H•RM• 1.REMOVE TWO SETS OF BOILER STARTERS, L-BRi/5 HWP-2�/ �7 ER DISCONNECTS AND CONTROLS. [�` DISTRIBUTION PANEL ER ER ER ®j P_HV_ 2.REMOVE FOUR SETS OF PUMPS,WIRING,STARTERS UH-1 ER "HP-MD1" \ AND CONTROLS. LP-BR1/1 HP-MD 2L2 ttR LP SLB FEMALE LOCKER ROOM B. PROVIDE BOILER EMERGENCY POWER-OFF SYSTEM AND LP-BR1/2 AC HWP-14 PUSHBUTTON STATIONS IN LOCATIONS AS SHOWN ON 2 NEW FLOOR PLAN. INCLUDE ALL DEVICES,WIRING,ETC. - H-2 WH-t R MOTOR CONTROL CENTER STORAGE AS REQUIRED FOR A COMPLETE AND OPERATIONAL WH3 "MCC-A" HWP-13 \ SYSTEM. BANQUET PREP.ASSEMBLY LP- 3 RM.REST C. TRACE AND VERIFY ALL EXISTING CIRCUITS SERVING \ ER DEVICES IN AREA OF WORK SUCH AS PUMPS,FANS,ETC, no,sn o�+n 480Y/277V,30,4W PANEL \�` PROVIDE NEW UPDATED TYPEWRITTEN PANEL DIRECTORY ER ER E ER ER "LP-MA" MCC- INDICATING NEW CONDITIONS. ER B/7 L D.PROVIDE TEMPORARY SUPPORT FOR BRANCH CIRCUIT ER WIRING THAT SHALL REMAIN AFTER DEMOLITION. DRIVES AND ISCONNECTS F CHILLER PUMPS, MOTOR CONTROL CENTER MCC-B" E. PROVIDE CONDUIT W/PULLSTRING FOR ALL CONTROLS TYPICAL OF F UR. WIRING FROM NEW BOILERS TO NEW BOILER CONTROL COORDINATE FINAL LOCATION EC EMPLOYEES DINING PANELS,WATER SYSTEM,HEAT TIMER CONTROLS,ETC., HV-1 OF WATER HEATERS W/MECH AT LOCATIONS SHOWN ON PLAN.COORDINATE EXACT ER CONTRACTOR GUESTROOM PUMPS"P-11" CONDUIT SIZE FOR ALL LOCATIONS WITH MECHANICAL PANEL"HP-BR2" &"P-12" CONTRACTOR AND INDUSTRIAL COMBUSTION WIRING ❑ HP-M❑/ D1 9 DIAGRAM(S)PRIOR TO START. CHILLER R ER o ER RE z 6 4 0 UP-MA o: MECH.F LANT ® HWP_9 PANEL"LP-SLB" o AH-2 0 HWP-10 UP-MA -- --- ER g CORRIDOR No.1 � ER m FYI HP-MD1/10 ELECTRICAL ADD-ALTERNATE WORK FOR REPLACEMENT ER OF PUMPS HWP-7 AND HWP-8. K00 DP ElLI VA HP-D1/8 / HP MD1/7 AH-1 J BEVERAGE STORAGE CHILLER L. I30 HWP-7 7HWP-5 30 1WP-8 20 HWP-6 TAIR#11 HP-MD1 5 STAIR No.6 CHEF'S STORE ROOM ❑ ElO H P-MD1/6 OFFICE E3 - _ ❑m m MATCHLINE-- - -- -- - � -- -- -- -- -- ELECTRICAL GROUND FLOOR BOILER/CHILLER ROOM CONSTRUCTION PLAN (T�ELECTRICAL GROUND FLOOR BOILER ROOM CONSTRUCTION PLAN 06/22/2022 -- ISSUED FOR PERMIT AK E p SCALE:10'=V-0" E-zo SCALE:1!8"=1'-0" DATE REV DESCRIPTION BY DRAWING CONSTRUCTION NOTES DRAWING KEYED NOTES 1. COORDINATE AND CONFIRM SCHEDULING AND PHASING OF ALL AREAS TO BE 5. CONFIRM AND COORDINATE EXACT LAYOUT OF PUMPS WITH MECHANICAL Qt PROVIDE NEW BOILER EMERGENCY PUSHBUTTON WITH CLEAR COVER AND LABEL, RENOVATED WITH THE OWNER'S REPRESENTATIVE,GENERAL CONTRACTOR AND/OR CONTRACTOR. PROVIDE NEW PUMP MOTOR STARTERS WITH ALL ASSOCIATED "EMERGENCY POWER-OFF STATION". PROVIDE ALL DEVICES,CONTROL WIRING, Southport Engineering Associates,PC CONSTRUCTION MANAGER,AND THE MECHANICAL CONTRACTOR PRIOR TO START STRUCTURAL SUPPORTS AND FASTENERS AS REQUIRED FOR MOUNTING STARTERS IN RELAYS,ETC.AS REQUIRED TO DISCONNECT POWER TO BOTH BOILERS UPON 11 Bailey Avenue Tel..:(203)431-6844 OF WORK. FRONT OR SIDE OF PUMP SET. ACTIVATION OF PUSHBUTTON.ENSURE PROPER OPERATION AFTER COMPLETION Ridgefield,CT 06877 Fax:(203)431-6877 OF INSTALLATION. 2. COORDINATE ALL DEMOLITION AND CONSTRUCTION ELECTRICAL WORK ASSOCIATED 6. VARIABLE FREQUENCY DRIVES(VFD)ARE FURNISHED BY THE MECHANICAL PROJECT: WITH BOILER REPLACEMENTS WITH THE MECHANICAL CONTRACTOR. REFER TO CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR. THE MOTOR CONTROL Q2 60A,60OV,3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE 699 WWESTCHESTER AVENUE MECHANICAL DRAWINGS FOR PHASING NOTES. ONE BOILER SHALL REMAIN SWITCHES AND STARTERS SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL OPERATIONAL AT ALL TIMES. CONTRACTOR. Q3 100A,60OV,3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE BOILER REPLACEMENT �NEW 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 3. FIELD VERIFY EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE a FIELD VERIFY EXISTING CONDITIONS AND EXTEND EXISTING CIRCUIT AS REQUIRED. A r�A DRAWING TITLE: MECHANICAL CONTRACTOR. `� Q5 2#12,1#12-G IN 3/4"CONDUIT TO NEW 15A/1P CIRCUIT BREAKER IN °+,* ELECTRICAL GROUND FLOOR 4. PROVIDE LARGE PERMANENT LABELS ON ALL NEW AND/OR RELOCATED AVAILABLE SPACE OF EXISTING PANEL INDICATED. - EQUIPMENT IDENTIFYING EQUIPMENT NAME,AMPERAGE,VOLTAGE,PHASE,AND CONSTRUCTION PLANS SERVING PANEL AND CIRCUIT BREAKER. ©COMBINATION SIZE 0 STARTER AND 30A,60OV,3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE CALE: AS SHOWN DRAWN BY: SG DRAWING NO: 061810: DATE: 05/18/22 CHECKED BY: AK s, PROJECT NO: 85109 APPROVED BY: AK E-201 NETWORK DRAWING CONSTRUCTION NOTES PROTECTOR RM 5 1. COORDINATE AND CONFIRM SCHEDULING AND PHASING OF ALL AREAS TO BE RENOVATED WITH THE OWNER'S REPRESENTATIVE, 17s GENERAL STORAGE STORE ROOM GENERAL CONTRACTOR AND/OR CONSTRUCTION MANAGER,AND THE MECHANICAL CONTRACTOR PRIOR TO START OF WORK. 2. COORDINATE ALL DEMOLITION AND CONSTRUCTION ELECTRICAL WORK ASSOCIATED WITH BOILER REPLACEMENTS WITH THE MECHANICAL CONTRACTOR. REFER TO MECHANICAL DRAWINGS FOR PHASING NOTES. ONE BOILER SHALL REMAIN OPERATIONAL AT ALL TIMES. L — — SWITCHGEAR W 3. FIELD VERIFY EXACT LOCATION OF MECHANICAL EQUIPMENT WITH z THE MECHANICAL CONTRACTOR. [ 4. PROVIDE LARGE PERMANENT LABELS ON ALL NEW AND/OR STEWARDS RELOCATED EQUIPMENT IDENTIFYING EQUIPMENT NAME, ROOM SERVICE AMPERAGE,VOLTAGE,PHASE,AND SERVING PANEL AND CIRCUIT BREAKER. 5 MEECHIRM ANICAID COORDINATE CONTRACTOR.EXACT LAYOUT PUMPS NEW PUMP MOTOR STARTERS ooee WITH ALL ASSOCIATED STRUCTURAL SUPPORTS AND FASTENERS AS REQUIRED FOR MOUNTING STARTERS IN FRONT OR SIDE OF PUMP MAINTENANCE L- ° fv 17 i SET. 6. FIELD COORDINATE EXACT LOCATION OF ALL LIGHT FIXTURES IN ER - J THE BOILER ROOM NTH THE MECHANICAL CONTRACTOR TO AVOID CONFLICTS WITH PIPING,DUCTWORK AND EQUIPMENT. ER ER g MENp � 7. ALL EXIT SIGNS SHALL BE NON-SWITCHED NTH EMERGENCY BATTERY BACK-UP. LP-SLB ER ENG.OFF. ¢ CRAWLSPACE KEY PLAN SCALE:NONE DRAWING KEYED NOTES WOMEN E-zoz ��� /� STAIR O 2#12,1#12-G IN 3/4"CONDUIT TO NEW 15A/1P CIRCUIT 1 2 - L/ NO.13 BREAKER IN AVAILABLE SPACE OF EXISTING PANEL INDICATED. vV\P-ARTT-2 Y x RE N O2 REMOVE EXISTING LIGHT FIXTURE,CLEAN,RE-LAMP AND �\ REINSTALL IN NEW LOCATION AS SHOWN ON FLOOR PLAN. BOILL ROCM ER Q3 PROVIDE NEW 1'x4'LED,INDUSTRIAL-DUTY LIGHT FIXTURE WITH AH-12 ER WIREGUARD TO MATCH EXISTING MANUFACTURER AND STYLE. ELEV. CHAIN-HANG AT SAME HEIGHT AS EXISTING LIGHT FIXTURES ER 5 ER " THAT ARE TO REMAIN. MACH.RM. - ®PROVIDE NEW INDUSTRIAL-GRADE,STEEL LED EXIT SIGN WITH ER EMERGENCY BATTERY BACK-UP, 05 PROVIDE SEPARATE ADD-ALTERNATE PRICING FOR EACH OF N THE FOLLOWING ITEMS: 4 LT 1. ADD-ALTERNATE"LTG-1": PROVIDE ADDITIONAL PRICING TO CLEAN,REPAIR AND RE-LAMP ALL EXISTING 1'x4'WALL 4 AND HANGING LIGHT FIXTURES IN AREA OF WORK. TYPICAL [ OF TEN. BANQUET PREP.ASSEMBLY I N.' ER ER 2. ADD-ALTERNATE"LTG-2": PROVIDE ADDITIONAL PRICING TO REMOVE AND REPLACE EXISTING 1'x4'WALL AND HANGING FLUORESCENT LIGHT FIXTURES WITH NEW 1'x4', LED INDUSTRIAL-DUTY LIGHT FIXTURES WITH WIREGUARD. I_ o°° CHAIN-HANG AT SAME HEIGHT AS EXISTING LIGHT Eioz ELECTRICAL AHU-12 FAN ROOM CONSTRUCTION PLAN 2 ELECTRICAL GROUND FLOOR LIGHTING PLAN °_; FIXTURES. PROVIDE ADDITIONAL EMERGENCY BATTERY e-zaz SCALE:1/8"=V-0" BACK-UP PACKS FOR FOUR(4)OF THE LIGHT FIXTURES. TYPICAL OF TEN. a.'r 5 GROUND FLOOR KEY PLAN 20x 21x 24x T T 35x Ezaz SCALE:NONE ZP-MEZZ/5 DER CIRCUIT BREAKER ENCLOSURE DER F-AHU14 �-AHU-15 AHU-8 ERLL AHU-'s ERAHU-14 ER NEW PANEL"LP-MEZZ" , LP !M -MEZZ/1 LP-MEZZ/3 ER °A ER ER — — — — cX DISTRIBUTION PANEL"DP-AC" _ MOTOR CONTROL CENTER"MCC-A3" 6 MEZZANINE KEY PLAN BALLROOM 1C BALLROOM 2 BALLROOM 3 BALLROOM 4C e-zoz SCALE.NONE 06/22/2022 1 ISSUED FOR PERMIT AK DATE I REV I DESCRIPTION BY Southport Engineering Associates,PC 11 Bailey Avenue Tel.:(203)431-6844 Ridgefield,CT 06877 Fax:(203)431-6877 PROJECT: 699 WESTCHESTER AVENUE BOILER REPLACEMENT of rler p 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 BALLROOM 16 BALLROOM 4B � SFP �A� DRAWING TITLE: ELECTRICAL CRAWLSPACE, s ELECTRICAL BALLROOM MEZZANINE CONSTRUCTION PLAN GROUND FLOOR&MEZZANINE PLANS SCALE:1/8"=V-0" CALE: AS NOTED DRAWN BY: SG DRAWING NO: ` Npv DATE: 05/18/22 CHECKED BY: AK S PROJECT NO: 85109 C APPROVED BY: AK —202 BOILER EMERGENCY PUSH BUTTON C1 TO SHUNT—TRIP CIRCUIT BREAKER#11 IN PANEL"H—MD1-2" C2 TO SHUNT—TRIP CIRCUIT BREAKER#12 IN PANEL"H—MD1-2" C3 TO SHUNT—TRIP CIRCUIT BREAKER#13 IN PANEL"H—MD1-2" C4 TO SHUNT—TRIP CIRCUIT BREAKER#14 IN PANEL"H—MD1-2" CONTINUOUS DUTY,ELECTRICALLY—HELD 120—VOLT C5 SPARE RELAY WITH QUANTITY OF CONTACT POINTS AS C6 SPARE SHOWN.CONTACTS SHALL BE NEMA RATED 120 VOLTS,15 AMPS. CONTROL SEQUENCE: 1. UPON ACTIVATION OF THE BOILER EMERGENCY POWER—OFF PUSH LEGEND PLATE EQUAL TO SQUARE D H INPUTS BUTTON,CONTROL COIL SHALL ENERGIZE AND CLOSE ALL CONTACTS #KN399 WITH MARKING AS SHOWN THUS SHUNT—TRIPPING AND DISCONNECTING POWER TO THE LISTED 2A PIECES OF EQUIPMENT. ASSEMBLY EQUAL TO RACO#983 GROUNDING PIGTAIL WITH SCREW C1 — C2 ---C3--—C4--C5 —C6_ NOTES: �Y TT 1. PROVIDE ENGRAVED NAMEPLATE READING"BOILER EMERGENCY POWER—OFF SYSTEM RELAY CABINET". RED PUSH BUTTON EQUAL TO N TERMINAL STRIP rl SQUARE D#SKR3RH5 IN NEMA 4X 2. TAG ALL CONDUCTORS WITHIN RELAY CABINET. ENCLOSURE 3. PROVIDE ALL NECESSARY EQUIPMENT,DEVICES,WIRING,ETC.AS 8 r J rl I BOILER BOILER BOILER BOILER SPARE SPARE REQUIRED FOR CONNECTION TO EXISTING EMERGENCY POWER OFF "B-1" "B-2" "B-3" "B-4" SYSTEM. FIELD VERIFY EXISTING CONDITIONS. v PADLOCK ATTACHMENT COVER EQUAL OUTPUTS i0 TO SQUARE D#K6 CIRCUIT TO LP—BR1/6 NEMA 1 ENCLOSURE WITH HINGED COVER SIZE AS REQUIRED,LOCATED IN BOILER ROOM ADJACENT TO PANEL"LP—BR1". EQUIPMENT GROUNDING CONDUCTOR (INSULATED GREEN) Emergency"Power-Off Push Button Detail 2 Boiler Emergency Power-Off System Connection Wiring Diagram 3 Device/Junction Box Grounding Detail E.aoo SCALE:NONE E 30° SCALE:None SCALE:NONE NOTES: 1. UTILIZE SAME GROUNDING METHOD FOR SWITCHES. PROVIDE WITH FEED-THROUGH LUG KIT. VOLTAGE: 480V,3W DISTRIBUTION PANEL: "HP-MD1" MOUNTING: SURFACE CU BUS RATING: 600A (BASE BID) ENCLOSURE: NEMA II MAIN: LUGS ONLY EQ.GND CU BUS: YES LOCATION: MECH CORR AIC RATING: 65,000 ISO.GND CU BUS: NO FED FROM: SWBD"DS-1" LOAD(VA) CIR. CIR. LOAD(VA) SERVES BKR. BKR. SERVES Ad BO 00 NO. NO. AO BO CO HOT WATER PUMP"HWP-1" 7483 1 3 3 2 7483 HOT WATER PUMP"HWP-2" 7483 7483 7483 60 6() 7483 SPARE 3 3 3 4 SPARE 100 IGO HOT WATER PUMP"HWP-5" 7483 5 3 3 6 HOT WATER PUMP"HWP-6" PRIMARY PUMP 7483 REDUNDANT PUMP TO"HWP-5" 7483 60 60 HOT WATER PUMP"HWP-7" 11086 7 3 X 8 HOT NPITER PUMP"HWP-8" PRIMARY PUMP 11086 REDUNDANT PUMP TO"HWP-7" 11086 80 HOT WATER PUMP"HWP-9" 1331 9 3 3 10 1331 HOT WATER PUMP"HWP-10" 1331 1331 1331 15 15 1331 BOILER"B-1" 1386 11 3 3 12 1386 BOILER"B-2" SHUNT-TRIP TYPE BREAKER 1386 1386 SHUNT-TRIP TYPE BREAKER 1386 20 20 1386 BOILER"B-3" 1386 13 3 3 14 1386 BOILER"B-4" SHUNT-TRIP TYPE BREAKER 1386 1386 SHUNT-TRIP TYPE BREAKER 1388 20 20 1386 SPACE W/BUS 15 16 SPACE W BUS 301551301551 30155 Ad BO CO 11586 11586 11586 SUBTOTALS X I Y 111Z 41741 41741 41741 IF X Y Z SUB-FEED 28938 28938 28938 "HP-MD1-2" TOTAL 1 70679 70679 70679 CONNECTED_ 212,037 VA 255•04 A DEMAND: 220,352 VA 265.04 A REDUNDANT PUMP WILL NOT OPERATE WHEN PRIMARY PUMP IS RUNNING_ VOLTAGE: 208Y/120V PANEL: "LP-BR1" MOUNTING: SURFACE VOLTAGE: 208YI120V PANEL: "LP-MEZZ MOUNTING: SURFACE CU BUS RATING: 100A ENCLOSURE: NEMA 1 CU BUS RATING: 100A ENCLOSURE: NEMA 1 MAIN: 60A MCB EQ.GND CU BUS: YES LOCATION: BOILER RM MAIN: LUGS ONLY EQ.GND CU BUS: YES LOCATION: MECH RM AIC RATING: 10,000 ISO.GND CU BUS: NO FED FROM: 15kVA XFMR AIC RATING: 10,000 ISO.GND CU BUS: NO FED FROM: "DP-AC' LOAD(VA) CIR. CIR. LOAD(VA) LOAD(VA) CIR CIR. LOAD(VA) Q1 SERVES NO BKR. BKR NO SERVES SERVES NO BKR. BKR.NO SERVES AO BO GO AO BO CO AO BO Co AO BO CO WATER HEATER"WH-1" 600 1 1115 1/15 2 600 WATER HEATER"WH-2" PUMP"P-AHU-14" 528 1 1115 1/15 2 SPARE WATER HEATER"WH-3" 600 3 1/15 1/15 4 528 FILTER CIRCULATING PUMP"P-FILT" PUMP"P-AHU-15" 528 3 1/15 1/15 4 SPARE UNIT HEATER"UH-1" 864 5 1/15 1/15 6 240 BOILER EMERGENCY POWER-OFF SYS MOTORIZED DAMPER 35 5 1115 1/15 6 SPARE 06/22/2022 -- ISSUED FOR PERMIT AK SPARE 7 1/15 1/15 8 SPARE SPARE 7 1/15 1/15 8 SPARE DATE REV DESCRIPTION BY SPARE 9 1/15 1115 10 SPARE SPARE 9 1115 1/15 10 SPARE SPARE 11 1/15 1/15 12 SPARE SPARE 11 1/15 1115 12 SPARE SPARE 13 1/20 1/20 14 SPARE SPARE 13 1120 1/20 14 SPARE l�tlSlllJ tS L�! C�1 L5 SPARE 15 1/20 1/20 16 SPARE SPARE 15 11201 1120 16 SPARE Southport Engineering Associates,PC SPARE 17 1/20 1/20 18 SPARE SPARE 17 1/20 1/20 18 SPARE 11 Bailey Avenue Tel.: 203 431-6844 SPARE 19 1120 1/20 20 SPARE SPARE 19 1I20 1/20 20 SPARE Ridgefield,CT 06877 Fax:M3)431-6877 SPARE 21 1/20 1/20 22 SPARE SPARE 21 1120 1120 22 SPARE SPARE 23 1/20 1/20 24 SPARE SPARE 23 1/20 1120 24 SPARE PROJECT: SPACE W1BUS 25 26 SPACE W/BUS SPACE W/BUS 25 26 SPACE WrBUS 699 WESTCHESTER AVENUE SPACE WI BUS 27 28 SPACEWIBUS SPACE WI BUS 27 28 SPACE VW BUS BOILER REPLACEMENT SPACE Wl BUS 29 30 SPACE Wl BUS SPACE W/BUS 29 30 SPACE W BUS NEW-- 699 WESTCHESTER AVE,RYE BROOK,NEW YORK 10573 600 600 864 AO B0 CQ 600 528 240 528 528 35 A0 B0 I GO 11 0 1 0 0 ! y09) SUBTOTALS SUBTOTALS DRAWING 11TLE: FCONNECTED: 3,432 A Y 953 Z A1200 1128 1104 X Y Z CONNECTED: 1,091 VA Y 3.03 Z A 528 528 35 X Y Z B'a* ELECTRICAL DIAGRAMS,DETAILS DEMAND: 3,648 VA 10.13 A DEMAND: 1,223 VA 3.39 A AND SCHEDULES CALE: AS SHOWN DRAWN BY: SG DRAWING NO: �61$10� DATE: 05118/22 CHECKED BY- AK s PROJECT NO: 85109 APPROVED BY- AK E-300