HomeMy WebLinkAboutMP22-057 �yE OR �tw
198
C��•LC G
VILLAGE OF RYE BROOK
MAYOR 938 King Street, Rye Brook, N.Y. 10573 ADMINISTRATOR
Jason A. Klein (914) 939-0668 Christopher J. Bradbury
www.aebrook.org
TRUSTEES BUILDING& FIRE INSPECTOR
Susan R. Epstein Steven E. Fews
Stephanie J. Fischer
David M. Heiser
Salvatore W. Morlino
CERTIFICATE OF COMPLIANCE
January 12,2024
David Seif& Hillary Seif
1 Mark Drive
Rye Brook,New York 10573
Re: 1 Mark Drive, Rye Brook,New York 10573
Parcel ID#: 135.34-1-3
This document certifies that the work done under Mechanical Permit #22-057 issued on 4/8/2022 for the
installation of a new hot water heater has been satisfactorily completed.
Sincerely,
Steven E. Fews
Building&Fire Inspector
/to
�yE BRC��.
198,2.
cu �
�7
BUILDING DEPARTMENT
❑BUILDING INSPECTOR
-ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK
❑CODE ENFORCEMENT OFFICER 938 King Street • Rye Brook,NY 10573
(914) 939-0668 FAx (914) 939-5801
www ryebrook.org
- - - - - - - - - - - - - - -- - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - -
ADDRESS : / PU1 A/Z Ic �1 R t ✓C, DATE:
PERMIT# ro 1 2 2 Q S7 ISSUED: ZZ SECT: % '�'% BLOCK: / LOT:
LOCATION: OCCUPANCY: -"')/J
❑ Violation Noted THE WORK IS... [S} PASSED ❑ FAILED /REINSPECTION
❑ SITE INSPECTION REQUIRED
❑ FOOTING
❑ FOOTING DRAINAGE
❑ FOUNDATION
❑ UNDERGROUND PLUMBING NOTES ON INSPECTION:
❑ ROUGH PLUMBING
❑ ROUGH FRAMING
❑ INSULATION
❑ Natural Gas E GJ 1A)A � �A-Pc�
❑ L.P. Gas
❑ FUEL TANK
❑ FIRE SPRINKLER
❑ FINAL PLUMBING
❑ CROSS CONNECTION -
�'FINAL
❑ OTHER
t
t w
00 00 1Myy
Cc, c r
cn
CS
Ln
O W H w O p C o ! W
Ir■■1 �O o � �.� � o o (�
: � O z N 0° o ° � c.•� O
s x o w n
• o L� �i Cl Nt -a � a :
n CS 'C o
W °u o
'a >,b a 4
_ �T� w ~ `Q � � V � O C � •U � _
r Q •
1■+ 1 �i FF��1 00 �
O � W � a p rb � 9 � 0.,
7 ;14 o o
d- e
sav c� ■
00 �
w � u
= x zZ vw cvi
v ICI
C
z a °e a u v v7
0 $ 2.-5 .M'
A � � � Ei w
emu" W o O o la,
�i (n 7 H Q a t/1
U O ONO
O V' S ° � a �i
z
� p � W A O � a .�•� '°
• v 0
Qj
"�4141414144104144 Q 41-4144141414141414141414146 46C U A4616 99964;4;66
yE l3linu D IE C IE --
VILL F BROOK
BU G DEP MENT APR - 6 2022
938YUNG T YE K,NY10573 VILLAGE OF RYE BROOK
(914)934� ebrook.or BURLDING DEPARTMENT
9 (_._._ D l
APPLICATION FOR PERMIT TO INSTALL, MODIFY AND/OR
REMOVE MECHAMCAL EQUIPMENT
OFFICE USE ONLY: WcD<�—at-)-7Permit#: hh Building Inspector: APR — 8 2022
Fee Paid: A /oo-- 1b Date of Approval:
Parcel ID#: Bldg/Use Class: Res. ( ; Comm. ( );
REQUIREMENTS FOR RELEASE OF PERMIT: (A CERTIFICATE OF COMPLIANCE Is REQUIRED To CLOSE OUT THIS PERMIT)
1.Properly Completed&Signed Application.
2. Payment of Application Fee: Residential =$100.00; Commercial =$250.00 (fees are nan-refundable)
3. Site/Staging Plan as required by the Building Inspector.
4. Seated Construction/Installation Documents&Specifications as required by the Building Inspector.
5.Copy of Licensed Contractor's Liability insurance. (village of Rye Brook must be listed as certificate holder)&
Workers Compensation Insurance on a NYS Board form
(Form#C105.2 or Form#U263/or NY State Workers Compensation Waiver)
6. Payment of Permit Fee:
Residential =$15.0011000.00 of Construction/Materials Cost with a minimum fee of$100.00.
Commercial=$25.00/1000.00 of Construction/Materials Cost with a minimum fee of$275.00.
7. Inspection by Building Department for removal and/or installation. (48 hour notice required)
8.Any electrical work requires a separate Electrical Permit and Electrical Inspection.
9.Any gas/plumbing work requires a separate Plumbing Permit and Plumbing Inspection.
Application dated, 04/0412022 is hereby made to the Building Inspector of the Village of Rye Brook,NY,for a permit
for the installation,modification,and/or removal of the specific Mechanical Equipment as listed below.The applicant and
property owner,by signing this document agrees that said equipment will be installed and/or removed in conformance with the
approved plans,and with all applicable Local,County,State&Federal laws,codes,rules and regulations.
1.Address: 1 Mark Drive SBL: I r 3'1—/-3 Zone: /--
2.Property Owner: Hillary Self Address: 1 Mark Drive
Phone#: Cell#: 1-781-367-7207 email: dgseif@gmaii.eom
3.Contractor: Salvatore W Morlino Address: 1 Bonwit Road Rye Brook NY 10573
Phone#: Cell#: 914-260-1592 email: salvatoreserious@gmail.eom
4,Applicant: Salvatore W Morlino Address: 1 Bonwit Road Rye Brook NY 10573
Phone#: cell: 914-260-1592 email: salvatoreserious@gmail.com
5. Scope of Work:New Installation(y)•Replacement( )-Removal( )•Other( )
6.Type of Equipment: 75 gallon conventional hot water heater.
7.Location of Equipment: Basement
8.Cost of Equipment including Installation Cost:$$3000
1 8/12/2021
STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as:
Salvatore W Morlino ,being duly sworn,deposes and states that he/she is the applicant above named,
(pnnt name of individual signing as the applicant)
and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the
c4o"tra`x0r for the legal owner and is duly authorized to make and file this application.
(indicate architect,contractor,agent,attorney,etc.)
That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use
conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in
any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&
Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations.
Sworn to before me this 6th Sworn to before me this 6th
day of April 2022 day of April ,20 22
Hillary SO
Signat r of Property Owner _ Signature of Applicant
Salvatore W Morlino
Prin ame of Pr rty Owner Print Name of Applicant
o'er
Notary Public st - �1Zb r1,'L No `IOM
1
1M�gttiec Y,}. JJ esk SUS,
Otyt'
This applicifion must be properly completed in its entirety and mustl-ncl�ude the notarized signature(s) of the
legal owner(s) of the subject property, and the applicant of record in the spaces provided. Any application not
properly completed in its entirety and/or not properly signed shall be deemed null and void and will be returned
to the applicant.
2 8/12/2021
TM
PERFORMANCE P&TINUM
late
The new degree of comfort."
PERFORMANCE PLATINUM TM High Demand gas water heaters
offer larger gallon capacities and exceed ANSI
standards for flammable vapor iginition resistance . .110111ir _.
Performance Warranty
■Recovery Capacity: 72.8 gallons at a 12-Year limited warranty for tank
100'F rise'" and parts,3-year full in-home labor
■FHD: 105 gallons warranty-
Low Emissions `See written warranty for complete details
■Eco-friendly burner, low NOx design
Efficiency I All models tested according to ANSI test
■Meets 40 ng/J NOx requirements procedures,and meet or exceed the thermal efficiency
and standby loss requirements of current ASHRAE
Maintenance Free standard(EPact).Also exceeds energy efficiency
Burner System codes of all states including California Energy Com-
mission(CEC).
W Exclusive air/fuel shut-off device Safety and Construction I Design certified by CSA:
■Maintenance free-no filter to clean For operation at 160 degrees;meets all safety and
construction requirements of ANSI Z21.10.3;as an
■Disables the heater in the presence of automatic storage or instantaneous water heater;as
flammable vapor accumulation an automatic circulating tank water heater;and for
operation on combustible floors and in alcove installa-
Longer Life tions.Al models are North Carolina Code compliant.
Certified for 150 PSI maximum working pressure
■Premium grade anode rod provides (160 PSI for ASME models),
long-lasting tank protection
Plus... ANOMROO
H H
PERFORMANCE PLATINUM
®Easy to light-no matches required wA�TER COLD
CONNECTION; NNEC High Demand
COWATM N
■Durable brass drain valve F 75-Gallon Capacities
■Temperature and pressure relief valve I LRELNEFT
included O IIwVr 75,100 Btu/h
PENING
■Low lead compliant C o O■Standard 1"water connections with A B G eMT
side water connections for space
,n-
heating applications -
D
PERFORMANCE PLATINUM High Demand Gas Specifications
Recovery NLb Went Water 1.1'1
Nominal Rated Gas Input in G.P.H. First Hour Ht.to Tank I HL to Side Conn. Ship ErrerB/
Gallon ' Gallon Model In Thole. 100°F Delivery Vent Height Dian. Conn. She Center Tap Valve sin Weight Fa•ler
Fuel Type Description Cepaelry Capacity NumberBtWh Rbe^ G.P.N. A III 1) E F G N (I BS)
Tall 75 73 XG75T12ST76UO 75.1 72.8 105 84 1/4 80-1/4 28-1/4 14.3/4 4 11 53-1/4 1 320 0.81
Uniform Energy Factor,Energy Factor and rated gallon capacity based on Department of Energy(DOE)requirements.
"Recovery Capacity is based upon a 100*F water temperature rise and calculated per ANSI Z21.10.3 standards.
In keeping wrfh its policy of continuous progress and product improvement,Rheern reserves the right to make changes without notice.
Rheem Water Heating • 101 Bell Road
Montgomery,Alabama 36117-4305 • www.rheem.com
04117 FORM NO.THD-PPGHD Rev.4