Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MP22-051
l'3 . 19 40A atudamaW VILLAGE OF RYE BROOK MAYOR 938 King Street, Rve Brook,N.Y. 10573 ADMINISTRATOR Jason A. Klein (914) 939-0668 Christopher J. Bradbury www.ryebrookror TRUSTEES BUILDING& FIRE INSPECTOR Susan R. Epstein Mchael J. Izzo Stephanie J. Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE December 29,2022 Eric Hammer&Barrie Hammer 25 Old Orchard Road Rye Brook,New York 10573 Re: 25 Old Orchard Road, Rye Brook,New York 10573 Parcel ID#: 135.26-1-68 This document certifies that the work done under Mechanical Permit #22-051 issued on 4/4/2022 for the installation of a new geothermal heating system has been satisfactorily completed. Sincerely, Michael J. Izzo Building&Fire Inspector /to QyE BRC�v� Q • 1982 BUILDING DEPARTMENT ❑BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAX (914) 939-5801 www ryebrook.ors - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - -- - - - - - - - - - - - - ADDRESS : �-' �J 1� T DATE: PERMIT# 22 l 6SA ISSUED: -22SECT: I ���kBLOCK: \ LOT:` 6 LOCATION: N�° , �'^ ` ` T OCCUPANCY: Z `� r ❑ VIOLATION NOTED THE WORK IS... `ACCEPTED ❑ REJECTED/REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ NATURAL GAS ❑ L.P.GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER BRC�v� o tim 1932 BUILDING DEPARTMENT A❑ UILDINGINSPECTOR SSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAx (914) 939-5801 www Uebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTIONREPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : ATE• tr/7 ` ' aO 1 �1 L ZG ! r PERMIT# ISSUED: SEC BLOCK: ` LOT: \ LOCATION: -+�U yC `' 1 OCCUPANCY: �( V ❑ VIOLATION NOTED THE WORK IS... ACCEPTED ❑ REJECTED/REINSPECTION i ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑' UNDERGROUND PLUMBING 1,t �-- NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING V ❑ INSULATION ❑ NATURAL GAS ❑ L.P. GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER O �. v a F+� p v W cn o F" x a°"a $ Uj U 00 LInu u O W42 72 : O d [ a v a o �Ln 00 O�Q C�Jn O z 0 a IS oj O y o MM 00 `J � a � � N c� �• N � FBI CN W d d v p -d zzo � aj w d ° vwi � � z " o o y � u 0.-0 V? w H O Z F Q D� 8 ONO � ^ O W. W. V . a -O z B OM f�l .. BUILDS 7EARIMENT VI E OF Rv90900Ic APR — 4 2022 938 KING ET RYE,HR ; ,NY 10573 VILLAGE OF RYE BROOK (914)9 �9 39-5801 BUILDING DEPARTMENT APPLICATION FOR PERMIT TO INSTALL AND/OR REMOVE HEATING, VENTILATION AND/OR AIR CONDITIONING EQUIPMENT FOR OITICI:USl?ONLY: APR — 4 Z Approval Date: Permit I ee: $ Approval Signature: Other: Disapproved: (fees are nun-refundable) REQUIREMENTS FOR RELEASE OF PERMIT&CERTIFICATE OF COMPLIANCE: l. Properly completed& Signed Application. 2. Site/Staging Plan if Required by the Building Inspector, 3. Copy of Licensed Contractor's Liability Insurance.(village ol'Rye Brwilo must he li%led a%certificate holder)&Workers Compensation Insurance on a NYS Board form(form#C 105.2 or Forrn#t126.3/or IVY Stale Worker%Compensation Waiv ) 4. Payment of I-'ccs/Unit: RI:Sll)I-'N"I'IAI._$100.00/unit•C'OMMI�RC'IAI.=$350.00/unit. 16l� -• 1 Ltn.►P 100 5. Inspection by the Building I)cpartment for removal and/or installation.(48 hour police required) 6. I?Iectrical work requires a separate Electrical Permit& Electrical Inspection. 7. Plumbing/Gas work requires a separate Plumbing Permit& Plumbing Inspection. Application dated. 30=22 is hereby made to the Building Inspector of the Village of Rye Brook for a permit for the installation and or removal of-the I IVAC equipment as listed below.The applicant and property owner,by signing this document agrees that said equipment will be installed and/or removed in conformance with all applicable Local,County.State&Federal laws,codes,ntles and regulations. 1. Address: 25 Old Orchard Rd, Rye Brook, NY 10573, USA SBL: 135.26-1-68 Zone: '� 2. Property Owner: Eric Hammer Addrc:ss: 25 Old Orchard Rd,Rye Brook,NY 10573,USA Phone#: (914) 275-6107 Cell#: email: edh50@aol.com 3. Contractor: Dandelion Energy Address: 333 North Bedford Rd Suite 220 W Kisco NY 10549 Phone#: 845 649 6073 Cell#: 845 649 6073 email: idevore@dandelionenergy.com 4 Applicant: John DeVore of Dandelion Energy Address: 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 Phone#: 845 649 6073 Cell#: 845 649 6073 email: idevore@dandelionenergy.eom 5. Scope of Work:New Installation( )• Replacement( )•Removal( )•Other( ): Geothermal 6. List Equipment:—7,4.11 (7'rol4D,w4 �1!4 C"mo 0,cut lam sj r► RrrAVfT4 7. 1 A)cation of Equipment; Q'je n en� -— - 8. Method of Instal lation/Remova I(list ail equipment needed 14,perform job): 1 3121/19 Virginia Henrico John oeyore ,being duly sworn,deposes and states that he/she is the applicant above named, (print name ofindividual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the Agent/Contractor for the legal owner and is duly authorized to make and file this application. (indicate ar hite t,vunlydetor,agent,anurney,etc.) That all statements contained herein are true to the best ofhisiber knowledge and belief;and that any work perli rmed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained ui this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform lire Prevention& Building Code,the Code of the Village of*Ryc Brook and all other applicable laws,ordinances and regulations. Sworn to belbrc me this � Sworn to belbrc me this 1st day of ftl ,10 day of April ,Al_ ` '01Ilarlrr � LaRonda Shanik Toter ' REGIRTION NUMBSignatt of Propely honer N Signature of Applicant 7SM770 EXPEric Hammer �'°�";,Ifjll;,;"; COMMISSION April 3G,2024 John DeVOre rmt Name o Property Owner —Print Name of Applicant - CAfZOLYN-MARIE CANNISTRARC _)440•r+ r ` Not Public Notary Public-Slate of New York Kr6y Public No.01 CA6177080 Qualified in Westchester County My Commission Expires Nov.5,2023 Notarized online using audio-video communication This application must be properly completed in its entirety and must include the notarized signature(s)of the legal owner(s) of the subject property, and the applicant of record in the spaces provided. Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void and will be returned to the applicant. 2 O� _ N c N N 0 W _ W � v� w � � aH W w N00 C/O N Ln00 � u O0 w z w N T 0 O a a o � t < ^ • � � � W z rS c� �I A w �, o V� z Ao a Oc7ao z w oZ � 3z ''" v M W ItO �- z C7 Q z � 3 02 v ZOC) A m CA a _ ►� en O v a o c H x A N Y c CA N Z Z w a W Z W o U H a ad .. Z0. ' z � W O w w o z � CA w z x ,r) z w a o a N A a w a v 02 �I a a 4 i w = � BUIL DEPARTMENT VIL E OF RYE # I APR - 7 2022 938 KiN 'IREET RYI ,NY 10573 VILLAGE OF RYE BROOK (914)939-W68 B 939-5801 BUILDING DEPARTMENT w�uvarye�rooiz.org ELECTRICAL PERMIT APPLICATION Westchester County Master Electricians License Required FOR OFFICE USE ONLY —�s� EP Approval Date: APR — 8 2027 Permit Fee: $ Approval Signature: Other: Disapproved: (fees are non-refundable) Application dated, 3/3/2022 is hereby made to the Building Inspector of the Village of Rye Brook NY, for the issuance of a Permit to install and/or remove electrical equipment,wiring, fixtures,or to perform other high or low voltage electrical work as per the detailed statement described below. The applicant & property owner, by signing this document agree that all electrical work performed will be in conformance with all applicable Federal, State,County and Local Codes. /� 1.Address: 25 Old Orchard Rd, Rye Brook, NY 10573, USA SBL: 135.26-1-68 Zone:/e_/Z15" 2.Property Owner: Eric Hammer Address: 25 Old Orchard Rd, Rye Brook, NY 10573, USA Phone#: (914) 275-6107 Cell#: (914) 275-6107 email: edh50@aol.com 3.Master Electrician: Joe Covais Address: 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 Lic.#: 1768 Phone#: 8456496073 Cell#: 8456496073 email: Jdevore@dandelionenergy.eom Company Name: Dandelion Energy Address: 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 4.Proposed Electrical Work/Fixture Count: ��5��11 �on �Iwcn.ctl he _ 6�� Y 9 r- x ie is<ie K ie sr iex*****fir*�Y it ie�e ie ie at ie ie ie ix it ie ie ie it ie ixk*�Y ie iex***********ir it it re ie ie ie ie it ie ie ie r.icxie iexie k<ix is is is is ie ie is ie it ix it ie it irzzae ie ix iext is ix irxic iexxie STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as: '6� � -�" 6AXiS ,being duly sworn,deposes and states that he/she is the applicant above named,and does further (print name of individual signing as the applicant) state that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the Contractor for the legal owner and is duly authorized to make and file this application. (indicate architect,contractor,agent,attorney,etc.) The undersigned further states that all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this Sworn to before me this ')4-11- day of ,20_2�2 _ day of dpisk 120 a1 Signa a of Property Owner Si , ature of Applicant Eric Hammer -10e At s Print Name of Property Owner Print N of Appl•c Notary Public CAROL MARIE CANNISTRARC Notary ublic Notary Public-State of New York C L) No.01CA6177080 d Qualified in Westchester County My Commission Expires Nov.5,2023 STATEWIDE • Service With lnlegrit.v SWIS JOBAPPLICATION tel845.202.72241 • • 1• • • • Office Use Elect.Permit# 1 ` �. Date Bldg-ferYrttt'#' / / nC �f O�/ Utility ID# Final Certificate##�,J�" City/Village YUG 1/ Zip Township ���. rU� // County 1 Address C ' I Cross Street Section Block Lot 7 G r r'1 Owner Name/Address(If different than above) Contact Number ❑Basement ❑1st Fl. ❑2nd Fl. ❑3rd Fl. ❑More Than 3 A. ❑Garage ❑Attic ❑Outside ❑Residential ❑Commercial Receptacles Special Recept GFCI AFCI Switches Dimmers Smoke Alarms Carbon Monox Hood Trash Compact Amt Amps Range(s) Cooktop(s) Oven(s) Dishwashers Refrigerator Disposal Microwave Warm Draw Incandescent Fluorescent SERVICE Amperage Voltage 1 P 3P #Meters #Disconnect ❑Underground ❑New ❑Reconnect ❑Overhead ❑Change ❑Visual Re-Inspection ❑ Safety Re-Inspection ❑ Re-Inspection Additional Information ee 1601 APR -7 2M VILLAGE OF RYE BROOK BUILDING DEPARTMENT This application is valid for one(t)year from the date received by SWIS.This application is intended to cover the above listed items to be inspected,N at any time of inspection additional items haw been installed,you are authorized to make the inspection and adjust the fee for the additional hems Inspected.The applicant declares that there is no open applications for the above address with any other inspection company.fife applicant,owner or authorized agent agrees to all the above terms and conditions as set forth for the application. Inspector Date Finalized Inspector# Company Name Date Signature Address / City/State { Zip Code <i License# Phone# - Rp DD State Wide Inspection Services CC� C ��I� 1080 Main Street DEC — 7 2022 Fishkill, NY 12524 TO�0 845 202-7224 Phone VILLAGE OF RYE BROOK 914-219-1062 Fax STATE WIDE INSPECTION SERVICES BUILDING DEPARTMENT Email: office@swisny.com Website: www.swisny.com Service With Integrity BY THIS CERTIFICATE OF COMPLIANCE STATE WIDE INSPECTION SERVICES CERTIFIES THAT: Upon the application of: Upon Premises Owned by: Dandelion Energy Eric& Barrie Hammer Joe Covais 25 Old Orchard Road 1 Corporate Drive Rye Brook, NY 10573 Peekskill, NY 10566 Located at: 25 Old Orchard Road, Rye Brook, NY 10573 Section: Block: Lot: Electrical Permit Number: EP 22-069 135.26 68 Certificate Number: 2022-8060 Building Permit Number: MP 22-051 A visual inspection of the electrical system was conducted at the Residential occupancy described below.The electrical system consisting of electrical devices and wiring is located in/on the premises at: 25 Old Orchard Road, Rye Brook, NY 10573 The Basement was inspected in accordance with the NYS and NFPA 70-2017 and the detail of the installation, as set forth below,was found to be in compliance on the 7th day of December 2022. Name Quantity Rating Circuit Type Geothermal System 01 Officer: Frank 1. Farina This certificate may not be altered in any way and is validated only by the presence of a seal at the location indicated.This certificate is valid for work performed on the date of inspection only. r, .. - - .. fir•` :� .d3 is yy� �i•.. '1,, i r _r 3 �1 71 � 1 � 1 n 11 BORE LL�' 1a•C-C w J 11{{ a BORE Al i 1 _•::tf3_L' � �1 1 w 1 rc 1 sr4i,; 1 Y �T�` !�- • • t r `�;.aC{ 1dx; >��"� ' v Rid; • �' � ;'�� •1 � d i chi°7�pe • i o ° ui _ W a z ;«3 I ] ) \ k ) � � w ® § ° § & § \ ( § m § q k ' 0 | ` � k It § o )c : . \ § �| ` z (§| 2 ' 0JA ||||! - ---9.-----.---. ` ■ ||§|| �\' -f- -.-----.{__� i § ll , ------ - w 2 9 ��� ■ . § $ ° \ 2cm b o % 1 § § in k - � v \.� N W g CM E E � .. 2 } d Lilƒ % z u z § § 2 k L k / 8 8 a } S } � ) e \ w - w e \ \ z R 3 r LL ° 3 § \ j ± \ S § 0 � I > m a < Q = a a = e = a § z O .. \ » § k k 6 w ix ƒ \ / E w E o\ w � �s X0 2 = / / § % z < ( _ U k E o t i / / q ire = < « uu « n « � og2 � ; o a < e - o a z u z e , e u a a. ° u � u » ° > o > I > > > ) �| ® c e u e o e u w P Ix G —j o o o o > W o u u a z z = o c e z E w E k E E E } %| Z Ir _ ¥ u w o < < @ - M oui W o g ( z 2 § 2 $ : § $ $ w § K 2 \ m o > 0 A m � \ � #� u s z % 91 } } \ 0 uJ ) ® § a \ \ \ \ [ ()|/ S } z ,` , A } .§. CY / ( § § §§§|| � \/ e J 2 2 § \ / 2 & � § w § § R � m J 2 ~ co § j ° § C / @ k.� 9 W $ E N u E 0 < a / 6 2 ) - \ z G G > 7 X ƒ / ƒ \ z $ ° w ° a o / = 2 o w 2 $ / f< � / co \ @ $ z § F .. w m LAJ 2 a.a w § 2 [ - w 5 wz 2 G w w Q o u E \ � i \ § \ D _ LU w z \ } z CO [ \ / / § ) \ K \ 2 5 - 2 2 E / @ /| ( LL 2 Q Zn ± $ i / £ 2 � ' 0 ' 0 \ 0 ■a� , w D ± �. ) z _ o ) A } \ 0 Li ) ® § a ( § ) \ V) \ Ln 0 !, Ln 0 § 2 ƒ §4! I § w 2 E u w e « ) ) § § ( $ ( 2 } LD § 3 .. ) Ln § a § r U \ '= 9 W g 1 � E z & / � u 6 z \ d LU k u \ § z m \ § \ = m \ g z < § Z $ e z E - § U § � \ ( 2 w D § % u \ ) w z Q ( o § � < ) co 0 \ w o K j u : p w z § ) / § $ � § ) ( G \ k \ § ( § ( § %| § x « = 7 E � 0 \ \ > � . y Lb m § @ oo j ® § j \ G LI § f ± \ J ■ , e U- CL / } z / z - L - < uj o e e , - S \ \INJ \ . § q \ z \ LU V) 0 % / §| \ # j) z §| 0 |�Sgl E J 2 2 A ' Z \ 2 2 u LU g 3 0 c'j UJ w / _ kt, 8 q § `■ I a / - w Iz $ b _� � U \ .= o W § � \ E E cc N z \ 2 \ & § f ( b G w } o u 0 0 @ e \ / > E k } { ® E \ \ \ ) j 2 / ) < j 3 < u / ® _ ui Z $ $ L z § / / \ } ± R § = z O ca o u o cr z < w m o@ o o g 0 x i 3 \ i \ \ / @ % \ j S b 2 / / / G 6 z 3 _ § 3 Z \ a z \ \ ) e m / o { \ k / O \ e g = \ o ƒ / u z < o $ w 3 \ \ g \ \ 5 § ® ° j 3 0 § § K @ z = z ( z 2 u b § 7@ a e \ a /| § _ < u e � e e x W e = e z u = 0 0 0 U) 0 @ / E / / < § ƒ 2 < G § ( / u j < u CO 0 ( « � m * « u z A 2 ƒ § Lij � a § \ § / zLLJ \ \ § k \|/\ 2E Z Z§| / !ESH 2 |�|| !\- 1 §!!|! J q a \ / W \ _ N : u m 5 6 q / _ « g 3 .. POU-) ( § \ I � Q \ '= o W § � § E 2 E cz } § 6 LU q \ 0 / z E / w a § / § Z < co q Eb / cmco � [ u ( » .. u �2 < m A 2 § \ } ) \ 2 ) < m x _ w c [ 0 _ \ / �C \\j \ 2 /\ | \ uko J w /| § z / 7 . , .. � LL ¥ - , ) O § ^ �� _o = -` kw_ zk j i \ --1 & | _ : QQ 2 00 /2| [ [ § | z§ q ] 7 §o< § ] - \ 13 w ° > !,1) kk� \ § ) 2 j §0\Z m�a \ _ 2 � « / ) \2 2&\ ( ( 2§ z ` = 2 (WI) ) � » - § xxx 2 | - ®gym �k » § §a k k�� § § z o § §)/§| | | XMW�O[ 2 k f yJ >0 892-8(// \ § §/ S§-»!)an 9 ƒ C3 e P \ \ _ w\a§�\ / / A .00§w5!2_ 0 / )I�*22§§) / § rz / _!|*9om. m / §k ���}�§ 2 f W-91g!W, , q La:0:,(B§�\ \ / ,ay N! 0 /§K£/}"a�� § cn a §Lij \k ]\ a2; ; ; ; : ; ; m ; � ! t | ( ( KQ \ ) K§ Elk# § m � ^ 4 ) � © | � � . - n . . ; ■ . ■ w u | § . .. § ! | ! < z § : X ( § § § § \ $ � , ` $ $ § 21 k k } \k )k �lu kK R � � �° `� § z ! § 5 = ® B 2 2 z k \ $ v w ILL a O 0. U y ^ Q Z gL) ma e c Z a cri w ado U' o �g oQF o u Z x N w l7 Z Q d o ?0 00 z m UY fwW 3 f v X i7 w ml W y v o U w0 o�W o m W W N m W r 0 w Z =n 0 0 x N w O '� 2e a4 de ~ r b Z r III III—III—I —III— I U a O W n Z Z 2 U E G O SO F:W W Ovwi QU>g a 7 LL OU D 1 O O IZA RL W N W 3 LL O �j �j o o LL z '� g � U *�33Ni \��\�� rc i a a w o w o O of U w 2 o o z 3 eO \ \ \ \ Z z K U H U w z �aOW > u W 2 w Q \�\� — rw�x Z o z b pWFw III—III—I I I—I I I—III-151 II z N w O DUCE IIII III�I1IIIII IIIIIlIIIIIIIIIII,II, a 0.�X0 r � WJK � W Dam III W x x N N x W W N Izz f0 Q L O z 0 9 ch _ O LO w p >> N w W N 2 r Z [L'Z I Z W 2w< O o J w Cl� 3 a o2 N O"+aa Zo w a z 0. N aao m� N u w ; QQIQ F- w0 K U (� w o N w J < O ~ a � Z a o v� ra D Wmw \ N z W O N a Q x W W UQQ N 'OWL W> W ¢ N f (� w U z W j Z F, W O 0 w O a 0 Z Q CZ, w W K O 3 zO a Z0 j W WQ KF a J Q Q U Q J W O Jar w W Z f Z o Q Z O ~ �0W U2 O m O:YO in� NQ � a iZ V0 ZU N O N W Q O H W N ((a�� U IOi d O x N E wV N� �QrQJ wLO 00 W Ur Om N r E co n 0 UN = h K J W O Q W O Q O WON " Q v a 7 3 U a W W U o a > o w Zw o ? lL i 0 w z r < z l g < J a r W d� L I o w W N E 0 O N d I K W g JQ W j 2 N W D'2 W a Z m z W o w 0 U m U U a m U 0p = S x 0 r N W W go Z �wa oo:Na O O J~ a ~ Z^ Zoo a a �o � Is w< 0 m F XW o M * z w< o 0 0 >z z o o o g S a o w o � o0 3 o 0 o N 5 Z a u z W o f w� adz 0.z > W r g z O z� w N 80 a a c j N N a F y a o w a o a O w J x 00 N z 3 Z K a F to a 7 0 J w 0 w U z w - U o o Q ^ < 1.1.1 O z K Q U O O K x r a w N Ir/I Q W Q=u= w m a 0 z a W 0 W ao m w Q Z w'f W N J J K Z x r Q O a_ 2 N � U i W O U J Ia" J a 0 W N O Z N J J Z Z N 7 W J W 0 O N z Z w < Q 3 O w S< N w F Q > w Q z > O a w U > . . # < b § IL e n k� - N » I' o ; k� 2 R§ §\ / §2 W/ ¢ - _ / m .10 Qk �km§k 2 _|/ § o § \\kM)} \ §) § 0', § (k \ § §�cr $/S2!) > !®! z ! \§5"X $ k� - - -- ----- e! } \ ' / \\ \ (�/ � k ( \ \ | § p E2 m Lo 22 } §\ w z ( < ( � 2 2 N k §\ $K�' )\ ■ § �/ § - ) B\� C� §! ` k 2 co7 ¥ R o ! ■ 6 k § $ § § §@ § ®~ i § k` § § �\ ( ) iL § ` � , ¥ k $ « % f \ ( f 7� r § |2 CO z � ^ o $ � . W z 2 \ \ §2 \ ) |� 00 ) \ \ > # % § b .& , ■ ■ ■ ■ # e Lu ) \ - 2 § ■ gym 2�§ \ §(If ^ o S §. _ �2 � § \ )§ m k§ 1B2 W « z , =Ez 2� )/q § , . . , /\�U n ■&k© . _ _ - Eon% # (§ § o ; (W§j $ § $ $§§ ■ cm�� / � (§ § % � � § ` § a ■ � / ) co I§ / 9 f �� \ !I* 0 CO o5 \\/ 0 w \ q [ I LU j } § B r § m ■ s � © \ . ` £. � . � . 6 � Q�� ^ ■, � E rEl�& ok2 � k £ E / \ § ' - , ®-_ 3 E § k7� A;■^ }� \ ) / » zi § § ;;2&p \ \ § §( \ i ! §w § ( ) k -- !& � ` ; ; � §R\ f O §)W" §~ ■■ ■ ■ ■ W -rg;,f �§ § §§§ # p a §G§E&2$ k ( 23§kk 2�» �# � ) D / //�ƒ°`\` § k » o « DANDELION February 3,2022 RE:Insulation requirements for shallow header trench installations To whom it may concern: In general,Dandelion requires excavation and header pipe installation to a minimum depth of 4 ft. below grade,and that depth be maintained from the ground loop location to the building entry point.This requirement is consistent with industry-accepted best practices. However,there are cases where the minimum trench depth cannot be achieved without excessive complication,labor or cost. Dandelion has developed an alternative procedure for such cases,which is outlined in our Design&Installation Standards: When the site conditions prevent the header trench from being excavated to the minimum 4 ft. depth, the exterior header piping shall be insulated with foam board or spray foam insulation(min R10), which shall be installed directly above and along the outer edges of the piping in the bottom of the trench for additional freeze protection. Foam board insulation(if used)shall be expanded polystyrene(EPS)to avoid degradation over time. Specifically,extruded polystyrene(XPS)foam board insulation is not acceptable for use in buried applications. The width of the foam board insulation shall be sufficient to completely cover the header piping so that it cannot be seen from above prior to backfill. Spray foam insulation(if used)shall be rated for direct burial and applied in accordance with manufacturer specifications. The minimum allowable burial depth for insulated header piping shall be 12 inches. The thermal conductivity of subsoil is typically on the order of 0.50-1.00 Btu/hr-ft-°F,depending on composition,density and moisture content. Using the steady-state conduction equation to calculate thermal equivalence(R=L/kA),it can be shown that adding R10 insulation is comparable to adding 60 inches of soil depth,at minimum. When site conditions force us to install header piping at depths less than 4 ft,the installation of insulation in accordance with our Design&Installation Standards will compensate for the difference from a thermal performance and more importantly,from a freeze protection standpoint. If you have any questions,feel free to contact me at rcardaPdandelionenergy.com. Sincerely, Ryan Carda,P.E. P`�pF NEW yo Principal Engineer �t N t q 9� Dandelion Energy, Inc. R�9 2/9/22 i 1; �yrFO 10013" �y►V� 333 North Bedford Road,Ste 220 A '�OFESS10Na� O Mount Kisco,NY 10549 DANDELION September 15, 2020 RE: Compliance with applicable codes and regulations To whom it may concern: Dandelion requires that all design and installation methods and materials comply with all applicable codes and standards, including ANSI/CSA/IGSHPA C448 Series-16 (Design and installation of ground source hear pump systems for commercial and residential buildings) and 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. We provide a set of internal Design & Installation Standards, Permit Drawings, and Master Service Agreements to enforce this requirement with third party contractors and internal installation crews alike. Therefore,to the best of my knowledge, belief and personal judgment, our permit drawings, design and installation requirements and scope of work comply with 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. If you have any questions,feel free to contact me at rcarda@dandelionenergy.com. Sincerely, Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc OF NEWY 9 O SQyPNJ Cg9O9 �r * A r Cr �2 w 100136 O � AgOF sSl N 09-15-2020 O335 Madison Ave,4th Floor New York,NY 10017 DANDELION Re:Sediment control practices for permit application to install a ground loop as part of a geothermal heating and cooling system installation To whom it may concern: This letter summarizes Dandelion Energy's sediment control practices as part of our permit application for geothermal heating and cooling system installation. Dandelion implements industry accepted sediment control methods during drilling and trenching activities in general accordance with New York State Department of Conservation Standard Specifications for Erosion and Sediment Control. The sediment control method(s) implemented on each project vary depending on site-specific conditions, but include one or more of the following measures: • Mud Processor - Equipment used to manage and process drilling spoils by separating solid and fluid materials removed from the borehole. • Containers - Drilling spoils are typically discharged directly into containers such as heavy-duty woven polypropylene sacks, impermeable 3-ply plastic pools, geotextile filter bags or lined roll-off containers during drilling. • Stockpile Methods - In some instances,drilling spoils or excavated materials from trenching may be temporarily stockpiled and contained using silt fences and/or straw bale dikes to prevent runoff. Excavated material is typically returned to the trench on the same day. • Dust Control - Water is sprayed to wet drilling spoils or excavated materials for dust control as needed. These practices have been developed and are employed to ensure that the highest level of environmental protection is achieved as a normal part of system installation. Thanks in advance for your consideration. Sincerely, NEW Y 14) 36 � '°Ro�siopP� Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc O335 Madison Ave,4th Floor New York,NY 10017 Dandelion Heat Pump Packaged Unit Performance Ease of Maintenance • Two-stage Copeland®UltraTech® • Real-time performance monitoring and compressor with efficiency values up to advanced diagnostic capabilities with home wifi 4.5/20.9(COP/EER) connection.Comes standard with every unit. • Unique compressor isolation technology • Removable cabinet panels and removable and high-density foam cabinet insulation control box providing easy access to internal for ultra-quiet operation components. • EnergyStar certified and made in the USA • Aluminum microchannel air coil which eliminates • Qualifies for the federal tax credit and the potential for failure due to corrosion, other state/local incentives enhancing reliability and efficiency • Corrosion-proof plastic drain pan and conden- sate overflow sensor to protect against potential overflows due to clogged condensate drains • 3-year workmanship warranty and 10-year Simple Installation limited parts warranty • Vertical air supply with multi-position, • Digital controls which provide a variety of field i field-selectable left or right side return selectable settings for each installation,and • Universal connection sizes for ground loop, advanced safety controls to protect the desuperheater and condensate connections equipment • Variable speed,constant cfm ECM blower • Factory-installed soft start which reduces the designed to adapt to connected ductwork start-up power of the heat pump by 70%. and operate at a fraction of the cost of a • Optional field-installed internal auxiliary heating conventional blower motor Performance Ratings Heating Cooling MODEL LOAD SIZE CAPACITY(BTU/HR) COP CAPACITY(BTU/HR) EER BREAKER SIZE(AMPS) Full 19,000 4.3 27,100 19.9 YT 024 2 Ton 30 Part 15,200 4.8 21,400 28.2 Full 29,100 4.5 41,200 20.9 YT-036 3 Ton 40 Part 23,300 5.1 31,500 31.3 Full 39,900 4.3 53,300 20.2 YT 048 Part 4 Ton 32,000 4.9 42,600 29.6 40 Full 49,200 4.1 64,300 19.3 YT O60 5 Ton 50 Part 37,700 4.6 50,000 28.0 YT 072 Full 6 Ton 56,200 3.8 71,900 18.0 60 Part 45,800 4.4 58,500 24.8 Rated in accordance with AHRI/ISO standard 13256-1,which includes pump penalties www.dandelionenergy.com Dimensions 1--- r- i 4.70 16.0 ----• 16.0r 7.25- !TI,P.; TYR O 0 T o I 6.56 -------- ------- - O __ _____ ____ ____ _ __ Enerteeh Rewmmends•Minims ' of2to2.5feetof ServiMnstallecon ---------- A-M Front and Air Coil Side. TOP VIEW 16.0 TOP VIEW Showing Optional Filter Rack A , 1.00 0 SOURCE HWG WATER WATER IN OUT SOURCE HWG WATER WATER IN OUT ® ------------ CONFIGURED AS CONFIGURED AS -------------- SIDE DISCHARGE BACK DISCHARGE Note:Side and Back Discharge configurations �® ! FRONTVIEW are only available in 036 through 072 models. LEFTVIEW Unit Dimensional Data MODEL WITHOUT WITH RETURN SUPPLY OPTIONAL CONTROL BOX CONTROL BOX AIR FLANGE AIR FLANGE FILTER RACK Al *B C A2 D E F G H J K L M N P R 024 46.0 23.0 26.5 53.25 25.0 20.0 19.1 1.92 3.63 11.62 12.5 7.44 1.05 2.34 3.00 3.63 036-048 54.0 25.4 30.5 61.2 28.0 26.0 23.7 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 060-072 58.4 25.4 30.5 65.6 32.0 26.0 24.0 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 Notes: All measurements are in inches. Electrical connect.are 1"for high voltage,1/2"for low voltage. *B(Unit Width)excludes field installed factory supplied flanges. Cw taw wrcd r-vn.m Performance Monitoring _38.19 Heat pump comes standard with real-time monitoring to provide the installer and homeowner with remote insight into system performance.This includes e66 a. real-time efficiency,energy usage,and status of the refrigerant,air,and ground loop circuits. _2.42 - -4 94.25 "°•�•""" www.dandelionenergy.com -O�MOEIgA GSHP Design Report Project: Eric Hammer 22-105-0065 (Project ID:28545) Prepared: 26-Mar-2022 Prepared By: Ameed Azar �k LT, L.- inc System Loads System Loads or Peak Loads are calculated based on a variety of details for an individual residence. Assumed occupancy levels, the number of appliances operating, the number of doors & windows and the tightness of the construction all contribute to the amount of energy required to maintain the thermostat set points given the historical extreme weather conditions in your area. The peak loads used in this report were provided as listed in the following table. 1 kBtu/hr= 1,000 Btu/hr Total Total Heating Load Cooling Load Zone (kBtu/hr) (kBtu/hr) Zone SHF Whole house 48.85 34.24 0.857 Total 48.85 34.24 1 of 7 New York Equipment Schedule Based on the provided loads, the recommended heat pump schedule for this system is as follows: High Cap. Low cap. 1 kBtu/hr= 1,000 Btu/hr Heat Cool ' Water 2 Air 3 Cap. Cap. Flow Flow Zone GSHP QTY (kBtu/hr) (kBtu/hr) (GPM) (CFM) Dandelion Energy- Enertech 49.30 62.00 15.0 1,960 Whole house Multi-Position Vertical YT-060 1 40.40 50.06 High Capacity Totals 49.30 62.00 15.0 Low Capacity Totals 40.40 50.06 - 1. All capacities shown are total. 2. When applicable,hydronic source and load water flows are assumed equal. 3. Air flow rates are reported on a per heat pump basis. For total air flow in a zone,multiply the reported air flow by quantity. 2 of 7 New York Equipment Efficiencies The following efficiencies are for air systems, hot water generation efficiencies can be found on the hot water generation page. NOTE: GSHP efficiencies shown below are system wide averages which include pumping and applicable resistance energy. Efficiencies for individual GSHP zones can be found on the zone pages. Heating Cooling GSHP (COPAvc) 3.91 GSHP (EERAvG) 17.29 Electric Resistance (COP,) 1.00 A/C (SEER) 15.00 ASHP (HSPF) 6.00 ASHP (SEER) 15.00 Natural Gas (AFUE) 88.00% Old GSHP (EER) 10.00 Propane (AFUE) 90.00% Fuel Oil (AFUE) 80.00% Old GSHP (COP) 2.80 3 of 7 New York Whole house Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 48,855 Btu/hr Peak Cooling Load 34,241 Btu/hr Heating Set Point 72 OF Cooling Set Point 72 OF Heating Offset 0 Btu/hr Space SHF 0.857 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Enertech Multi-Position Vertical YT-060 Heat Pump Type Water to Air Capacity Dual Capacity # Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 49,300 Btu/hr Total Cooling Capacity 62,000 Btu/hr % Sizing 100.9% Sensible Cooling Capacity 46,500 Btu/hr % Energy From Geo 99.6% /o o 0 Oversizing 58. /o 5 Installed COP 3.92 Installed EER 15.27 Balance Point Temp. 11.7 OF Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 40,400 Btu/hr Total Cooling Capacity 50,062 Btu/hr % Sizing 82.7% Sensible Cooling Capacity 37,546 Btu/hr Installed COP 4.42 % Oversizing 28.0% Installed EER 22.37 4of7 New York Whole house Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtime 457 hrs High Capacity Runtime 0 hrs Low Capacity Runtime 1,942 hrs Low Capacity Runtime 711 hrs Supplemental Bin Hours 50 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Use 6,904 kWh Heat Pump Energy Use 1,726 kWh Pumping Energy Use 559 kWh Pumping Energy Use 165 kWh Supplemental Energy Use 111 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost Breakdown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cost $1,657.00 HP Cost $414.36 Supplemental Cost $26.69 Pumping Cost $39.81 Dual Fuel Cost $0.00 Total Cost $454.17 Pumping Cost $134.25 Total Cost $1,817.94 72.9% HP Heating Cost C7 5.9% Pumping Cost-Heating 1.2% Supplemental Heating Cost 18.2% HP Cooling Cost 1.8% Pumping Cost-Cooling 5 of 7 New York Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type Electric Resistance COP 1.0 Zone Load and Operating Profile 900 81 W 800 72 c N r 600 54-o 0 _ ... p soo _ _ ' -- - - - - 459x 00 b 400 300 27C 3 a � 200 18 n a 100 90. 0 p p pp yy pp yy pp o Temperature(IF) - Heating Load - Low Capacity Heating Operation High Capacity Heating Operation - Cooling Load - Low Capacity Cooling Operation High Capacity Cooling Operation Supplemental Heating I GSHP Heating I GSHP Cooling Heating Cooling Heating Start OAT 57.0 OF Cooling Start OAT 65.0 OF High Capacity Runtime 457 hr High Capacity Runtime 0 hr Low Capacity Runtime 1,942 hr Low Capacity Runtime 711 hr Supplemental Bin Hours 50 hr 6of7 New York Vertical Bore 15 ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( TG) 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.62 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade Grout T.C. 1.20 Btu/hr ft OF _ = EWT MIN30.0 OF Formation EWT MAX90.0 OF Q Granular Backfill - Grout ---- -______ Bore Diameter(DB) 5.00 in GHEX Pipe 1.25"DR 11-0 HDPE 4710 n.,,(4 max.) 1 21. ... _ _ Bores in Series (Nall) 1 -- - �0 (0 LB Layout Rows (nr,,,) 1 �—SB—� 2 s- -` Bores per Row 2 OQ -_ Number of Bores 2 a F SB Bore Spacing (SB) 15.0 ft m3...0 O-�— _______ _ _____________ _ DB- TOP VIEW DETAIL Design Depth (LB) 275 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4710 7 of 7 New York 4 Vertical Bore 18 ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( TG) 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.62 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade __ Grout T.C. 1.20 Btu/hr ft OF Backfill ,:_ EWTMIN 30.0 F Formation ==_= _=_= EWTMAX 90.0 OF Q Granular Backfill - _{ ® Grout ________ Bore Diameter(DB) 5.00 in GI'••IEX Pipe 1.25"DR 11.0 HDPE 4710 mows(4 max.) X 1 2 __=_ Bores in Series (NBIS) 1 to 'i .. r _ ___ ::_� ___:___ = LB Layout Rows (nroWs) 1 0 L—S e� _:_ ,__- Bores per Row 2 � 2 ____ E- ;-___ Number of Bores 2 __ _____ Bore Spacing (SB) 18.0 ft m 3...0 TOP VIEW DETAIL Design Depth (LB) 265 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4710 8 of 7 New York +�- wrightsoft' Building Analysis Job: . 22-1050065 Entire House By. Dandelion Energy 333 North Bedford Road,Sute 220,Moot Kisco,NY 10549 Phone:833-GEO-4ALL Email:design@dardelionenergycom Web:wAwdardelionenergy.com Project Information For: Eric Hammer 25 Old Orchard Rd,Rye Brook,NY 10573 Design Conditions Location: Indoor: Heating Cooling Westchester County AR NY,US Indoor temperature(°F) 72 72 Elevation: 379 ft Design TD(T) 59 14 Latitude: 41°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 26.5 36.3 Dry bulb(T) 14 86 Infiltration: Daily range(°F) - 17 ( M ) Method Simplified Wet bulb(°F) - 72 Construction quality Semi-loose Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) • Component Btuh/ft2 Btuh %of load Walls 6.6 8436 17.3 Walls Du-ts Glazing 33.5 9101 18.6 Doors 22.8 479 1.0 Ceilings 1.9 3685 7.5 Floors 5.2 10031 20.5 Infiltration Infiltration 8.0 11279 23.1 Glaz,n Ducts 5845 12.0 Piping 0 0 Humidification 0 0 Ventilation 0 0 other Adjustments 0 Ceilings Total 48855 100.0 Floors • • Component Btuh/ft2 Btuh %of load Walls 2.6 3321 11.3 Walls Internal Gains Glazing 53.2 14454 49.2 Ducts Doors 10.7 225 0.8 nfiltration Ceilings 1.7 3209 10.9 Floors 1.3 2457 8.4 Floors Infiltration 0.9 1237 4.2 Ducts 2329 7.9 Ventilation 0 0 Internal gains 2120 7.2 Ceilings Blower 0 0 Glazing Adjustments 0 other Total 29354 100.0 Latent Cooling Load=4887 Btuh Overall U-value=0.181 Btuh/ft2-'F Data entries checked. wrightsoft` 2022-Mar-2619:03:29 ^'�-_ ^^•°• •^^•--�• Rigtt-SuteO)Unversal202121.0.O8RSU28723 Page 1 ...esigN22-105-0065EricHanvrterl-Heat Load.np Calc=MJ8 FronlDoorfaces.W wrightsoft• Right-J8® Form A Job: 22-105-0065 Entire House Date: By: Dandelion Energy 333 North Bedford Road,Sute 220,Moot Kisco,NY 10549 Phone.833-GEO-4ALL Email.design@dandelionenergycom Web:vrmvd and eli onenergy.com 1 NameofRoom Ent re House Room2 2 Running Feet of Exposed Wall 200.2 ft 12A It 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 2419.7 ft2 5.0 ft 120.8 ft2 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1920.9 iF 1.0 x 13.9 ft 13.9 fe 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 1920.9 ft2 0 13.9 ft' Type of Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg Clg. Heating SCIg L-Clg Heating SCIg L-Clg 6 V[Jall 126-09N n 5.67 2A3 206 982 420 0 0 0 az 1 D-c2ov n 33.35 18.97 12 400 228 0 0 0 oor 11 DO n 22.81 10.71 21 479 225 0 0 0 V�.� 12B-09N e 5.67 2.43 464 1929 826 0 0 0 11 I Claz 1D-c2ov e 33.35 60.91 85 2834 5177 0 0 0 laz 1 D-Qovd e 33.35 60.91 39 1300 2375 0 0 0 W,all 12B-Osw s 5.67 2.43 334 1734 743 0 0 0 az 1 D-c2ov s 33.35 31.89 28 947 906 0 0 0 12B sw-09N 5.67 2.43 13 28 12 13 28 12 allInlaz 1D-c2ov sw 33.35 52.73 8 267 422 8 267 422 all 12B-09N w 5.67 2.43 386 1673 716 34 59 25 az 106-v w 35.10 31.74 20 684 619 0 0 0 az 1 D-c2ov w 33.35 60.91 72 2401 4386 24 800 1462 1Nall 12B-0sw nw 5.67 2.43 15 40 17 15 40 17 �Glaz 1 D-c2ov nw 33.35 42.74 8 267 342 8 267 342 Wall 12A-09N 14.04 4.02 146 2050 587 0 0 0 Ceil 16B-19ad 2.87 2.50 567 1625 1416 14 40 35 Ceil 16B-38ad 1.52 1.32 1354 2059 1793 0 0 0 Flor 19A-Obs W 6.48 1.60 1354 8777 2161 0 0 0 Fla 19&Oc%v 1.91 OA7 553 1D54 260 0 0 0 Flor 20P-2w 14.39 269 14 200 37 14 200 37 Infiltration Heating Load(Btuh) 0.70 11279 495 Effect WAR WAR 12 Sensible Load(Btuh) ACH 1.00 1237 &04 54 031 Latent Load(Btuh) 1930 Intemal a Oowpantsat 230 and 200 Btuh 4 920 800 0 0 0 b Scenario number 1200 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 10 0 14 Subtotals Sum lines through 12 43011 27024 2730 2195 3333 Duct EHLF&ESGF 0.136 0.086 5845 2329 512 439 15 Loads ELG 2156 50 16 Ventilation Loads VentCfm 0 E Cfin 0 0 0 1 0 17 W nter Humidification Load Gal/Day 0 0 18 Piping Load 0 19 Blover Heat 0 20 AED Excursion&Latent Moisture Nlgration Load 0 926 21 Total Load Sum lines 13 through 19 48855 29354 4887 2707 3772 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. ` -10- 2022-Mar-2619:03:29 AEZA """-'' ""''"-"'- meRigh 9 t-SuteO Universal 2021 21.0.08 RSU28723 Page 1 ...esigN22-105-0065 Eric Hamrl-Heat Load.ny Calc=MJ8 Front Door faces.W wrightsoft Right-J80 Form A Job: 22-105-0065 Entire House Date: sj: Dandelion Energy 333 North Bedford Road,Suite 220,Mount Kisco,NY 10549 Prone:833-GEO-4ALL Email:design@dardelionenergyoom Web:wwwdandelionerergy.com 1 NameofRoom Room4 Room5 2 Running Feet of E)q)osed Wall 116.0 ft 71.8 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 1430.0 fF 8.0 It 836.0 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1.0 x 1353.9 ft 1353.9 fF 14.8 x 37.5 ft 553.1 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SqQ 0 1353.9 ft' 0 553.1 fF Type of Const, Panel HTM Area or Btuh Area or Bu11 Eire Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 I_---D 12B-OsN n 5.67 243 168 766 328 38 216 92 az 1 D-c2ov n 33.35 18.97 12 400 228 0 0 0 cor 11 DO n 22.81 10.71 21 479 225 0 0 0 gall 12B-0sw e 5.67 2A3 346 1441 617 118 488 209 11 F-Glaz 1 D-c2ov e 33.35 60.91 53 1767 3228 32 1067 1949 laz 1D-c2oed e 33.35 60.91 39 1300 2375 0 0 0 V all 12B-09w s 5.67 2.43 34 193 83 300 1541 880 az 1 D-c2ov s 33.35 31.89 0 0 0 28 947 906 V�Jall 12B-0sw s+v 5.67 2,43 0 0 0 0 0 0 L-llaz 1D-c2ov sv 33.35 52.73 0 0 0 0 0 0 12B-09N w 5.67 2.43 234 1081 463 118 533 228 az 1OB-v w 35.10 31.74 20 684 619 0 0 0 az 1 D-c2ov w 33.35 60.91 24 800 1462 24 800 1462 aV)J II 12B-09N nw 5.67 2.43 0 0 0 0 0 0 az 1 D-c2ov nw 33.35 42.74 0 0 0 0 0 0 Wall 12A-09N 14.04 4.02 146 2050 587 0 0 0 Ceil 16B-19ad 2.87 250 0 0 0 553 1586 1381 Ceil 16B-38ad 1.52 1.32 1354 2059 1793 0 0 0 Flor 19A-Obsw 6.48 1.60 1354 8777 2161 0 0 0 Flor 19B.Oamp - 1.91 0.47 0 0 0 553 1054 260 Flor 20P-2w 14.39 269 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0,70 6219 4565 EffectWAR WAR 12 Sensible Load(Btuh) ACH 0,55 682 0.40 501 0.31 Latent Load(Btuh) Internal a Oocupantsat 230 and 200 Btuh 4 920 800 0 0 0 b Scenario number 1200 0 13 c DefaultAdjust ments d Custom Appliances 0 0 0 0 e Plants 10 0 14 Sut>lolaIs Sum lines 6 through 12 28018 16332 12797 7360 Duct EHLF&ESGF 0.136 0.086 3661 1303 1672 587 15 Loads ELG 1495 611 16 Ventilation Loads Vent Clim 0 E Cfim 0 17 Wing Humidification Load GaVDay 0 [21 8 Piping Load 9 Blower Heat 0 AED Excursion&Latent Muisfure Ntgration Load -639 -288 Total Load Sum lines 13 through 19 31679 17635 14469 7947 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -r}f wriaP%t mcvrt- 2022-Mar-2619:03:29 " Right-Sute®Unversal 2021 21.0.08 RSU28723 Page 2 esigrt(22-105-0065 Eric Hammer]-Heat Load.np Calc=MJ8 Front Door faces:W N First Floor Room4 Room5 Garage Room2 Job#: 22-105-0065 Dandelion Energy Scale: 1 : 125 Performed for: Page 1 Eric Hammer 333 North Bedford Road,Suite 220 Right-Suite®Universal 2021 25Old Orchard Rd Mount Ksco, NY 10549 21.0.08 RSU28723 Rye Brook,NY 10573 Phone:833-GEO-4ALL 2022-Mar-2619:03:51 www.dandelionenergy.com design@dandelionenergy.com 065 Eric Hammer]-Heat Load.rup A` � '• R`£� "� . $ w raj '�qy. ``�• '� .`w ,�°�.'�, ^^► �' j�1p,. .w. .�� •.A t¢'w^$v'b'�s A .s O •4xP' � ._O ��•�� �.. lWitt 1i1/'�'11,�/.tfyt, ■A� a � : v,b� 11 !trt�- t{c��.• _. 't 11 Ili t. y•�Il�lllfa �' "� /,.. .•. 1'�.3M „ '0 y •� N 1'' ate.. NCIS 0 t'A N E U Ca 0 d O y vujf W0.Z � _J � •L W h � U :� s LQ { ►- J Z W o» 0 Z X o o f •�` tc:y y acai :r� s�:>: ,,,•�wyy � v � ` Ito)>� r N.. A ,. r v v c0cl .' cc O e. (01 L" lA �CYo #u k— 1/ 11 .y.+ �3Mr/11 NC itt=.+'�";�'sJ', Z/41 11111y1 /IIII1111 1111/1�1\ ,`i�111,111,� - 1,1/�111 -#> j 111 111,\ i�!!� 4• lf.� .R �i��':` s+' '��# � �I�'_it W!'11 D�,>✓� OPI' �il y A a Vi A `f 1 v3 A F 8 ,� �: ! , �, ! 1S � W .. � • ' � �O�t:a t! �+ 1��O� •f y! rrTO�y W�'�kl� �:r �� hl�"� !��\ ` .� JO�, �� �?��(�.�'tt; /O, ,�� DANDENE-01 EPRZEBIEGLEC . *. O CERTIFICATE OF LIABILITY INSURANCE DATE 91012/10/2 02D/Y1 ' 1 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAMTACT York International Agency,LLC PHONE FAX 500 Mamaroneck Avenue (A/c,No,Ext):(914)376-2200 (A/c,No):(914)376-2891 Suite 220 ADoRIE ,certificate@yorkinti.com Harrison,NY 10528 INSURERS AFFORDING COVERAGE NAIC# INSURER A:Hamilton Insurance Designated Activity Company INSURED INSURER B:Merchants Mutual Ins. Co. 23329 Dandelion Energy,Inc. INSURER C: 335 Madison Avenue,4th Floor INSURER D: New York,NY 10017 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR IN SD WV D/YYYY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S 1,000,000 CLAIMS-MADE a OCCUR ENVPKGH1803226 9/8/2021 9/8/2022 DAMAGE TO RENTED 50 000 PR (Ea E occurrence $ MED EXP(Any oneperson) $ 5,000 PERSONAL&ADV INJURY $ 1,000,600 GEN'L AGGREGATE LIMIT APPLIES PER. GENERAL AGGREGATE $ 2,000,000 PRO- 2,000,000 X POLICY JECT LOC PRODUCTS-COMP/OP AGG $ OTHER: S B AUTOMOBILE LIABILITY COMBINEDISINGLE LIMIT S 1,000,000 X ANY AUTO CAP1079447 7/5/2021 7/5/2022 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ X HIRED X NON-AWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident $ $ UMBRELLA LIAR OCCUR EACH OCCURRENCE S EXCESS LIAR HCLAIMS-MADE AGGREGATE S DED I I RETENTIONS $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N TAT T R ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT S OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE S If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village of Rye Brook THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 9 y ACCORDANCE WITH THE POLICY PROVISIONS. 938 King Street Rye Brook, NY 10573 AUT HORIZED ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Y R Workers'Compensation srArE CERTIFICATE OF Board NYS WORKERS' COMPENSATION INSURANCE COVERAGE 1 a.Legal Name&Address of Insured(use street address only) 1 b.Business Telephone Number of Insured ADP TotalSource CO XXIII,Inc 8334364255 10200 Sunset Drive Miami,FL 33173 UC/F 1 c.NYS Unemployment Insurance Employer Registration Number of Dandelion Energy Inc Insured 333 N Bedford Rd 4517531 7 Mt Kisco,NY 10549 1d.Federal Employer Identification Number of Insured or Social Security Work Location of Insured(Only required if coverage is specifically limited to Number certain locations in New York State,i.e.,a Wrap-Up Policy) 821328341 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) New Hampshire Ins Co Village of Rye Brook 3b.Policy Number of Entity Listed in Box"la" 938 King Street WC 038394824 NY Rye Brook,NY 10573 II worksite employees working for Dandelion Energy Inc paid under ADP TOTALSOURCE,INC's payroll, re covered under the above stated policy. 3c.Policy effective period 1/1/2022 to 7/1/2022 3d.The Proprietor,Partners or Executive Officers are ®included.(Only check box if all partners/officers included) ❑ all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box"Y'insures the business referenced above in box"la"for workers'compensation under the New York State Workers'Compensation Law.(To use this form,New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers'compensation insurance policy).The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"T'. The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate.(These notices may be sent by regular mail.)Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box"3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder.This certificate does not amend,extend or alter the coverage afforded by the policy listed,nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note:Upon cancellation of the workers'compensation policy indicated on this form,if the business continues to be named on a permit,license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers'Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers'Compensation Law. Linder penalty of perjury,I certify that I am an authorized representative referenced above and that the named insured has the coverage as depicted on this form. Approved by: Kristin Daly (Print name of��uthorized representative or licensed agent of insurance carrier) Approved by: XAA:at� 1/21/2022 (Signature) (Date) Title: Account Specialist I Telephone Number of authorized representative or licensed agent or':....•...neeearriei=. 800-743-8130 Please Note:Only insurance carriers and their licensed agents are authorized to issue Form C-105.2.Insurance brokers are NOT authorized to issue it. C-105.2(9-17) Certificate Number: 48294 www.wcb.ny.gov Laura Petersen From: Mike Izzo Sent: Friday, September 9, 2022 7:04 AM To: Laura Petersen; Steven Fews;Tara Orlando Subject: FW: Message from UDig NY From: UDig NY Exactix <tickets@exactix.udigny.org> Sent: Friday, September 9, 2022 7:04:17 AM (UTC-05:00) Eastern Time (US & Canada) To: Mike Izzo Subject: Message from UDig NY ****LATE**** DIG REQUEST from UDig NY for: VIL RYE BROOK Taken: 09/09/2022 07:03 To: VIL RYE BROOK PRIMARY Transmitted: 09/09/2022 07:04 00003 Ticket: 09062-002-790-01 Type: Late Previous Ticket: ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 25 To: Name: OLD ORCHARD RD Cross: From: To: Name: Offset: ------------------------------------------------------------------------------ Locate: ENTIRE PROPERTY NearSt: CROSSWAY & WINDINGWOOD RD N Means of Excavation: DRILL RIG Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: U Work Type: WELL DRILLING Estimated Work Complete Date: 09/09/2022 Depth of excavation: 400 FEET Site dimensions: Length 80 FEET Width 80 FEET Start Date and Time: 09/09/2022 07:00 Must Start By: 09/23/2022 ------------------------------------------------------------------------------ Contact Name: NICOLAS TALBOT Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 518-478-5022 Fax: Email: nic-talbot@hotmail.com Field Contact: AMBER CARDA Alt Phone: 605-695-8155 Email: acarda@dandelionenergy.com 1 Working for: HOMEOWNER ------------------------------------------------------------------------------ Comments: BOREHOLES ARE LOCATED IN THE FRONT YARD Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED SUEZ WTR WESTCHESTER TEN GAS-HDS VLY VIL RYE BROOK WESTCHESTER CTY SWR 2 Laura Petersen From: Mike Izzo Sent: Tuesday, September 6, 2022 4:37 PM To: Laura Petersen; Steven Fews; Tara Orlando Subject: FW: Message from UDig NY From: UDig NY Exactix <tickets@exactix.udigny.org> Sent: Tuesday, September 6, 2022 4:36:28 PM (UTC-05:00) Eastern Time (US & Canada) To: Mike Izzo Subject: Message from UDig NY ****REGULAR**** DIG REQUEST from UDig NY for: VIL RYE BROOK Taken: 09/06/2022 16:35 To: VIL RYE BROOK PRIMARY Transmitted: 09/06/2022 16:36 00005 Ticket: 09062-002-790-00 Type: Regular Previous Ticket: 08032-000-780-01 ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 25 To: Name: OLD ORCHARD RD Cross: From: To: Name: Offset: ------------------------------------------------------------------------------ Locate: ENTIRE PROPERTY NearSt: CROSSWAY & WINDINGWOOD RD N Means of Excavation: DRILL RIG Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: U Work Type: WELL DRILLING Estimated Work Complete Date: 09/09/2022 Depth of excavation: 400 FEET Site dimensions: Length 80 FEET Width 80 FEET Start Date and Time: 09/09/2022 07:00 Must Start By: 09/23/2022 ------------------------------------------------------------------------------ Contact Name: NICOLAS TALBOT Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 518-478-5022 Fax: Email: nic-talbot@hotmail.com Field Contact: AMBER CARDA Alt Phone: 605-695-8155 Email: acarda@dandelionenergy.com 1 Working for: HOMEOWNER ------------------------------------------------------------------------------ Comments: BOREHOLES ARE LOCATED IN THE FRONT YARD Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED SUEZ WTR WESTCHESTER TEN GAS-HDS VLY VIL RYE BROOK WESTCHESTER CTY SWR 2