Loading...
HomeMy WebLinkAboutBP21-283PERMIT #4 Cam/ SECTIONi TYPE OF WORK, a eI JOB LOCATION _ r OWNER CONTRACTOR EST. COST 47 11' VCO # r TCO # IIIIIIIIIIIIIIIb DATE' �� IXP: FEE_ Its - 'DATE FEE DATE ` INSPECTION RECORp I DATE INSP FOOTI N G FOUNDATION FRAMING RGH FRAMING INSULATION PLUMBING O RGH PLUMBING GAS ED SPRINKLER ELECTRIC LOW -VOLT ALARM n AS BUILT EO FINAL OTHER APPROVALS ARB �7Tj/ e�0, �)Q� PB ZBA OTHER O` yS N U�'J 'yG t C+�4.na rJv 404 Clrtr kwma V VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A. Klein (914) 939-0668 Christopher J. Bradbury www.ryebrook.or TRUSTEES BUILDING & FIRE INSPECTOR Susan R. Epstein Michael J. Izzo Stephanie J. Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE April 11,2022 Weili Chen&Ying Chen 2 Wilton Road Rye Brook,New York 10573 Re: 2'Wilton Road, Rye Brook,New York 10573 Parcel ID#: 135.58-1-14 Building Permit#21-283 issued on 11/1/2021 for a Rooftop Solar Array This certifies that the rooftop solar array,installed under the above captioned permit have been satisfactorily completed. Sincerely, Michael J. Izzo Building&Fire Inspector /to D ' BUILD R ENT For office use only: PERMIT# 3 MAR 15 2022 VIL OF RYE OK ISSUED:1�_�_a� 38 KING STRE YE BROOK, YORK 10573 DATE: VILLAGE OF RYE BROOK 9 -06 0 FEE: A CIO- PAID„K BUILDING DEPARTMENT W APPLICATION FOR CERTIFICATE OF OCCUPANCY,CERTIFICATE OF COMPLIANCE, AND CERTIFICATION OF FINAL COSTS TO BE SUBMITTED ONLY UPON COMPLETION OF ALL WORK, AND PRIOR TO THE FINAL INSPECTION #t####i Riiifii#ifif#itf#tik#tti###tt#i###tf###4#ttf RiifYttiitf kOff ikliitkkiiki#ff##it!####ktiti4ifttikk####44fi#lint#iftt##4 Address: 2 Wilton Rd Rye Brook,NY 10573 Occupancy Us�esidential Parcel ID#: 135.58-1-14 Zone: Owner: Weili Chen Address: 2 Wilton Rd Rye Brook,NY 10573 P.E./R.A.or Contractor: Tesla Energy Operations Address: 15 Tarkett Dr Unit 4 New Windsor,NY 12553 Person in responsible charge: Address: Application is hereby made and submitted to the Building Inspector of the Village of Rye Brook for the issuance of a Certificate of Occupancy/Certificate of Compliance for the structure/construction/alteration herein mentioned in accordance with law: STATE OF NEW YORK, COUNTY OF WESTCHESTER as: Weili Chen being duly sworn,deposes and says that he/she resides at 2 W olton Rd (Print Name of Applicant) (No.and Street) in Rye Brook in the County of Westchester in the State of NY that (City/Town/Village) he/she has supervised the work at the location indicated above,and that the actual total cost of the work,including all site improvements, labor,materials,scaffolding,fixed equipment,professional fees,and including the monetary value of any materials and labor which may have been donated gratis was:$ 16,728.00 for the construction or alteration of: solar on roof Deponent further states that he/she has examined the approved plans of the structure/work herein referred to for which a Certificate of Occupancy/Compliance is sought,and that to the best of his/her knowledge and belief,the structure/work has been erected/completed in accordance with the approved plans and any amendments thereto except in so far as variations therefore have been legally authorized,and as erected/completed complies with the laws governing building construction.Deponent further understands that it shall be unlawful for an owner to use or permit the use of any building or premises or part thereof hereafter created,erected,changed,converted or enlarged,wholly or partly,in its use or structure until a Certificate of Occupancy or Certificate of Compliance shall have been duly issued by the Building Inspector as per§250-10.A.of the Code of the Village of Rye Brook. O Sworn to before me Jth,�is � Sworn to before me this day of nJ\^',, ' y , 20_7 day of , 20 '0-�Signature of Property Own Signatu •A ica Weili Chen Frank S I dino - Tesla Energy Print N e o ro rtr OwnerQ 1111111 i 11/ Print Name of A licant Fl RAPblicNQ<01RA63f2i68<� Notary Public ALIFIED IN eRONXCotJNry — AMY M.CONN DOMM EXP NOTARY PUBLIC,STATE OF NEW YORK09-29 2022 Registration No.01CO6327155 ����9��c �VBL1C,.• Q,k�.��� Qualified inOrangeCounty i//�i//OFI NIEW t�o�\\\\ Commission Ex fires June 29,20 QyE BRC�v�. • �9�2 BUILDING DEPARTMENT BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAX (914) 939-5801 www.ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - -- -- -- - - - - - - - - - - ADDRESS:—!/ 1/ "I l'r�N� ! T' DATE: PERMIT# I '� ? 0`�ISSUED: ?s^ Z SECT: /�fl-43 BLOCK:_LOT: ' t LOCATION: lc.--'7-7lF rJJ.r�� L,A/L OCCUPANCY: ❑ VIOLATION NOTED THE WORK IS... ACCEPTED ❑ REJECTED/REINSPECTION ❑ SITE INSPECTION ` REgUMED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ NATURAL GAS ❑ L.P. GAS .� n ❑ FUEL TANK - ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION FINAL ❑ OTHER a ■ a ■ � II' ■ Go e a ■ � N N .a � '� 3 a� - � p O g O �? p O a A. yS O .Jq ■ ■ Q J 3 g ° F > � d � F o �I a' ■ O W INC Q M W .� r a a O o F � w04 o rram�'' U E ... ■ W M� [ O� ^ t�+ z dam' v < e c u o U ■ W W Q �.., o > ooE � � t41 as � �r illi��. `n fir. � e,, .e o 0 Icy © O d h �.o ''2,.n a � F O F.i •• m � c � � -o u � � o z o w U §tgn 5y H Vl > W W 42 > > as BUIL TMENT REVjsED COACT 1 3 2021 VI E OF RY OOK 2 2 2U21 AppL1CAT 938 KING EET RVE BR NY 10573 JUL DATED. (914)9 8 x t 39-5801 VILLAGE OF RYE BROOK BUILDING DEPARTMENT FOR OFFICE USE ONLY: } [�, Approval Date: OCT 2 5 261 Permit Q`—c-W Application Approval Signature: ARCHITECTURAL REVIEW BOARD: Disapproved: C Date: OCT 2 0 2021 BOT Approval Date: Case# Chairman: I vL PB Approval Date: Case# Secretary: ZBA Approval Date: Case# Other: Application Fees b Permit Fees: APPLICATION TO INSTALL PHOTOVOLTAIC SOLAR ARRAY Application dated: 07/02/2021 is hereby made to the Building Inspector of the Village of Rye Brook,NY,for the issuance of a Permit for the installation of a Photovoltaic Solar Array as per detailed statement described below. 1. Job Address: 2 Wilton Road SBL: 135.58-1-14 Zone: R-10 2 Type,kW&Location of Array,(use additional sheets if necessary): 13.6kW rooftop solar PV array consisting of forty (40) 340 watt Hanwha Q-Cells Q. Peak DUP BLK-G6+ panels on the existing roof. Twenty four panels on the front of the house in a rectangle, sixteen panels on the rear. 3.Property Owner: Weili Cheri Address: 2 Wilton Rd, Rye Brook, NY 10573 Phone#646-255-0886 Cell# e-mail weiii.chen.usa@gmail.com 4.Applicant: Justine Cognato of Tesla Energy Operations, InC. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 Cell#845-395-6040 e-mail jcognato@tesla.com 5. Design Engineer: Humphrey Kariuki, P.E. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 Cell# e-mail hkkariuki@equiluxengineers.com 6.Solar contractor: Tesla Energy Operations, Inc. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 Cell# e-mail jcognato@tesla.eom 7. Occupancy;(I-Fam..2-Fam.,Commercial.,etc...)Pre-construction: 1—Fam Post-construction:1-Fam 8. If building is located on a corner lot,which street does it front on: 9. N.Y.State Construction Classification: N.Y.State Use Classification: 10. Construction Type&Location:()Typical Western Lumber Frame;( )Timber Frame[TC];( )Wood Truss[TT]; ( )Pre-engineered wood[PW];Located;( )Floor Framing[F];( )Roof Framing[R];{)Floor&Roof Framing[FR];Other: 11. Number of stories: 1 Roof Style:(hip,shed,mansard,etc...) 12. Will a New Roof Be Installed: No 6 Yes ❑ (a separate roofing permit is required to re-roof an existing building) 13. Roofing Material&Number of Layers: t 3/21/19 14, Will the proposed project disturb 400 sq.ft.or more of land,or create 400 sq.ft.or more of impervious coverage requiring a Stormwater Management Control Permit as per§217 of Village Code? No: i� Yes: ❑ Area: 15. Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code? No: 1A Yes: ❑ (If yes,applicant must submit a Site Plan Application,&provide detailed drawings) 16, Will the proposed project require a Tree Removal Permit as per§235 of Village Code?No:1A Yes: ❑ (If yes,applicant must submit a Tree Removal Permit Application) 17. Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? No: 11 Yes: ❑ Indicate:TIER 1:TIER[I: TIER III: (ifves,a home Occupation Permit Application is required) 18. What is the total estimated cost of construction: $ 16,728 (Note:The estimated cost shall include all site improvements,labor,material,scaffolding,fixed equipment,professional fees,including any material and labor which may be donated gratis.If the final cost exceeds the estimated cost,an additional fee will be required prior to issuance of the CIO). 19. Start Date: Approx.2-3 Weeks after permit issuance Completion Date: Approx. 1 Week after start *«******,�***,v*******�********,r*+r�r*,ter,r,a,r***,a*****••*******����,v*****�****ar****�***,vt***��***sr�r�r�r,r�r�r�ra*,a*�� This application must bear the notarized signature(s)of the legal owner(s)of the subject property,and the applicant of record in the spaces provided.Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void and will be returned to the applicant.Please note that application fees are non-refundable. STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as: I, Justine Cognato ,being duly sworn,deposes and states that he/she is the applicant above named, (print name of individual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the, Contractor for the legal owner and is duly authorized to make and file this application. (indicate architect.contractor,agent,attorney,etc.) That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this Sworn to before me this .24 day of ,20 day of ,20 3 f Notary Public Notary Public `Please see attached Power of Attorney Signature of Property Owner Sign t 're fApplican Print Name of Property Owner Print Name of Applicant AMY M.CONN NOTARY PUBLIC,STATE OF NEW YORK Registration No.01 C06327155 2 Qualified in Orange County Commission Expires June 29,20 Y21/19 BUIL TMENT v .F OF RV 00rATED EVIS %nIj I 938 KING Em, RyF, B ,NMNS O(\C7��7T 1 3 2021 (9I4)9 > 8 x 8 39 7 L OK BUILDING DEPARTMENT FOR OFFICE USE ONLY: Approval Date: Permit# Application# Approval Signature: ARCHITECTURAL REVIEW BOARD: Disapproved: Date: BOT Approval Date: Case# Chairman: PB Approval Date: Case# Secretary: ZBA Approval Date: Case# Other: Application Feer 6 Permit Fees: APPLICATION TO INSTALL PHOTOVOLTAIC SOLAR ARRAY Application dated: 07/02/2021 is hereby made to the Building Inspector of the Village of Rye Brook,NY,for the issuance of a Permit for the installation of a Photovoltaic Solar Array as per detailed statement described below. 1. Job Address: 2 Wilton Road SBL: 135.58-1-14 Zone: R-10 2 Type,kW&Location of Array,(usc additional sheets if necessary): 13.6kW rooftop solar P g of forty (40) 340 watt Hanwha Q-Cells Q. Peak DUP BLK-G6+ panels on the existing roof. Twenty four panels on the front of the house in a rectangle, sixteen panels on the rear. 3.Property Owner: Weili Chen Address: 2 Winton Rd, Rye Brook, NY 10573� Phone#646-255-0886 Cell# e-mail weili.chen.usa@gmail.com 4.Applicant: Justine Cognato of Tesla Energy Operations, InC. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 Cell#845-395-6040 e-mail ]cognato@tesla.Com 5. Design Engineer: Humphrey Kariuki, P.E. Address:1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 Cell# e-mail hkkariuki@equiluxengineers.com 6.Solar contractor: Tesla Energy Operations, Inc. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 Phone#845-275-6011 cell# e-mail jcognato@tesia.com 7. Occupancy-,(I-Fam.,2-Farn_Commercial.,etc...)Pre-construction: 1-Fam Post-construction: 1-Faro 8. if building is located on a comer lot.which street does it front on: 9. N.Y.State Construction Classification: N.Y.State Use Classification: 10. Construction Type&Location:()Typical Western Lumber Frame;()Timber Frame[TC];( )Wood Truss[TT]; ( )Pre-engineered wood[PW];Located;()Floor Framing[F];()Roof Framing[R];{}Floor& Roof Framing_[FR];Other: 11. Number of stories: 1 Roof Style:(hip,shed.mansard.etc 12. Will a New Roof Be Installed: No&6 Yes L!(a separate roofing permit is required to re-roof an existing buildi*Y,"' 13. Roofing Material&Number of Layers: a '�'i''l BDita7S;? yir n t 3/21119 14. Will the proposed project disturb 400 sq.ft.or more of land,or create 400 sq.ft.or more of impervious coverage requiring a Stormwater Management Control Permit as per§217 of Village Code? No: 0 Yes: ❑ Area: 15. Will the proposed project require a Site Plan Review by the Village Planning Board as per§209 of Village Code? NO: iA Yes: ❑ (Ifyes,applicant must submit a Site Plan Application,&provide detailed drawings) lb. Will the proposed project require a Tree Removal Permit as per§235 of Village Code?No: V Yes: ❑ (if yes,applicant must submit a Tree Removal Permit Application) _,( 17. Does the proposed project involve a Home-Occupation as per§250-38 of Village Code? No: KI Yes: ❑ Indicate:TIER I:—TIER Il:—TIER Ill:_ (if yes,a Home Occupation Permit Application is required) 18. What is the total estimated cost of construction: $25,430 (Note:The estimated cost shall include al}site improvements,labor,material,scaffolding,fixed equipment,professional fees,including any material and labor which may be donated gratis.If the final cost exceeds the estimated cost,an additional fee will be required prior to issuance of the C/O) 19. Start Date: Approx.2-3 Weeks after permit issuance Completion Date: Approx. 1 Week after start This application must bear the notarized signature(s)of the legal owners)of the subject property,and the applicant of record in the spaces provided.Any application not properly completed in its entirety andlor not properly signed shall be deemed null and void and will be returned to the applicant. Please note that application fees are non-refundable. STATE OF NEW YORK,COUNTY OF WESTCHEST R ) as: Jti 1, �v�1 I eing duly sworn,deposes and states that he/she is the applicant above named, (print name of individual signing as the applicant) and further states that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the, ( for the legal owner and is duly authorized to make and file this application. (indicate architect,contractor,agent,attorney,etc.) That all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code.the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this PX Sworn to before me this day of 061&� ,20 2.4 day of&A ear .20 sZ I otary he Notary blie Signature of Property Owner '11 rtur ofAppli t it Ir Print Name of Property Owner Not Name of AprVant JOHN M SUOZZO NOTARY PUBLIC, STATE OF NEW YORK AMY M.CONN Registration No. 01 SU6070919 NOTARY PUBLIC,STATE OF NEW YORK Registration No.01CO6327155 Qualified In Westchester County - Oualified in Orange County My Commission Expires March 11, 2022 Commission Expires June 29,20 3/21/19 f w m 1 ;V N OC U r4 IW `a � tn N 000-4 3 E- i O pp V1 O > •y w tn } ` G do 6- W w 'tn n A N N U � O _ � w ° zo o � � � �z 9L mug M� A 0400 -let Z MCI M iil (�` U °\ E~ Z a w x Q oMo Z V A 3 N z 3 _ a I- F- O � Q 3 F C7 tn ° o .-4 a o 0 Ni z w Zn V z Q 0c .. 0 W 0. W E I m a .a � � Li = vim.• yE aRnv� 3D BUIL E MENT D ECM DEC 2 7 2021 V1L E OF RYE OK 938 KIN ET RYE B ,NY 10573 VILLAGE OF RYE BROOK (914)9 939-5801 , BUILDING_, DEPARTMENT or ELECTRICAL PERMIT APPLICATION Westchester County Master Electricians License Required `7 FOR OFFICE USE ONLY BP#: ��� �� EP#: �— 3 8 Approval Date: DE 9 Permit Fee: $ � AL Approval Signature: Other: Disapproved: (fees are non-refundable) ************************************************************************************************** Application dated, 11/17/2021 is hereby made to the Building Inspector of the Village of Rye Brook NY, for the issuance of a Permit to install and/or remove electrical equipment,wiring, fixtures,or to perform other high or low voltage electrical work as per the detailed statement described below. The applicant & property owner, by signing this document agree that all electrical work performed will be in conformance with all applicable Federal,State,County and Local Codes. 1.Address: 2 Wilton Road SBL: 135.58-1-14 Zone: R-10 2.Property Owner: Weili Chen Address: 2 Wilton Road, Rye Brook, NY 10573 Phone#: 646-255-0886 cell#: email: weili.chen.usa@gmail.com 3.Master Electrician: Frank Saladino Address: 1073 Rt 94,Unit 4,New Windsor,NY 12553 Lic.#: 1814 Phone#: 845-275-6011 Cell#: email: fsaladino@tesla.com Company Name: Tesla Energy Operations, Inc. Address: 1073 Rt 94, Unit 4, New Windsor, NY 12553 4.Proposed Electrical Work/Fixture count: Installation of a 13.6kW rooftop solar PV array and associated wiring and equipment. STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as: Frank Saladino ,being duly sworn,deposes and states that he/she is the applicant above named,and does further (print name of individual signing as the applicant) Contractor state that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the for the legal owner and is duly authorized to make and file this application. (indicate architect,contractor,agent,attorney,etc.) The undersigned further states that all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this Sworn to before me this 17 day of ,20 day of 20 ; / Signature of Property Owner Signa o Applicant Fran Saladino Print Name of Property Owner Print Name of Applicant Notary Public T 6&Pu JUSTINE CO©NATO NOTARY PUELIC,STATE OF NEW YORK Registration No,01 C06347737 Qualified in Orange County Commission Explres September 12,2ojy 3/21/19 INSPECTIONSTATEWIDE Service With hitegrity 0•0 SWIS JOBAPPLICATION0. Office Use Elect.Permit# Date Bldg Permit# ��� Utility ID# Final Certificate# City/Village C roQ`/ Zip /� CS73 Township C 13rLkj-�- County Address 2 W�'�n 4a Cross Street Sect�9 S-"3 tl Block Lot i U 7 � Owner Name/Address(if different than above) C e)`l r / r I j Contact Number6(� -Z� ep l/ ❑Basement fA1st Fl. ❑2nd FI. ❑3rd FI. ❑More Than 3 FI. [A Garage ❑Attic ❑Outside 0 Residential ❑Commercial Receptacles Special Recept GFCI AFCI Switches Dimmers Smoke Alarms Carbon Monox Hood Trash Compact Amt Amps Range(s) Cooktop(s) Oven(s) Dishwashers Refrigerator Disposal Microwave Warm Draw Incandescent Fluorescent SERVICE Amperage Voltage 1 P 3P #Meters #Disconnect ❑Underground ❑New ❑Reconnect ❑Overhead ❑Change ❑Visual Re-Inspection ❑ Safety Re-Inspection ❑ Re-Inspection Additional Information lowkii,4o o-�r, rQ4-YY au� � FRDD c�C Eov� VIC . NOW So�� �l ID1 o w I���� rS DEC 27 Ml Z �0 VILLAGE OF RYE BROOK 441p � i S Cp11�1�Gk BUILDING DEPARTMENT Dd f r This application is valid for one(1)year from the date received by SWIS.This application is intended to cover the above listed items to be inspected,if at any time of inspection additional items have been installed,you are authorized to make the inspection and adjust the fee for the additional items inspected.The applicant declares that there is no open applications for the above address with arty other inspection company.The applicant,owner or authorized agent agrees to all the above teens and mnditions as set forth for the application. Inspector f Date Finalized Inspector# Company Name j�U f��Cr��l(t ; f U ( i i `:rfc ;'r) %t., .j Date ! l�-Z r Signatur��t Address 2 4114 N, �rLL City/State Zip Code License# c� ,l T Phone# v. State Wide Inspection Services 1080 Main Street Fishkill, NY 12524 a845 202-7224 Phone VIA Uff 914-219-1062 Fax STATE WIDE INSPECTION SERVICES Email: office@swisny.com Website: www.swisny.com Service With Integrity BY THIS CERTIFICATE OF COMPLIANCE STATE WIDE INSPECTION SERVICES CERTIFIES THAT: Upon the application of: Upon Premises Owned by: Solar City DBA Tesla Energy Weili&Ying Chen 15 Tarkett Drive- Unit 4 2 Wilton Road New Windsor, NY 12553 Rye Brook, NY 10573 Located at: 2 Wilton Road, Rye Brook, NY 10573 Section: Block: Lot: Electrical Permit Number: EP 21-338 135.58 14 Certificate Number: 2022-0863 Building Permit Number: BP 21-283 A visual inspection of the electrical system was conducted at the Residential occupancy described below.The electrical system consisting of electrical devices and wiring is located in/on the premises at: 2 Wilton Road, Rye Brook, NY 10573 The Photovoltaic System was inspected in accordance with the NYS and NFPA 70-2017 and the detail of the installation, as set forth below,was found to be in compliance on the 1st day of March 2022. Name Quantity Rating Circuit Type PV Modules 40 340W Inverters 02 7600 W Disconnect 01 100AM P Load Center 01 125AMP Officer: Frank J. Farina This certificate may not be altered in any way and is validated only by the presence of a seal at the location indicated.This certificate is valid for work performed on the date of inspection only. 3 M Version#s4A AR 15 2022 Pil VILLAGE OF RYE BROOK NAS BUILDING DEPARTMENT Project/Job# 1054677 RE: Installation Approval Letter Project: Weili Chen Residence 2 Wilton Rd Rye Brook,NY 10573 Date of Review 3/2/2022 Permit# BP 21-283 Date of Install 3/1/2022 AHJ Village of Rye Brook SC Office New Windsor,NY Design Criteria: Applicable Codes=Structure:2020 EBCNYS;PV:2020 RCNYS/BCNYS with 2020 NYSLICS,ASCE 7-16,and 2018 NDS Risk Category=II Wind Speed=120 mph(3-s Gust-Vutt),Exposure Category C,Partially/Fully Enclosed Method Ground Snow Load=30 psf To Whom It May Concern, I have reviewed the PV installation that was specified for this project to verify that the installation was completed in conformance with the permitted plans and specifications.The review is limited to mounting hardware and the loading on the structure directly supporting the installed array(s).Permitted plans and certification letter were stamped and signed by a professional engineer. The layout that is currently installed sufficiently complies with the code and permitted plans,and any minor structural or layout changes are also compliant with the referenced code(s). Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me. of NEh' YO Digitally signed by Cl) �,'KA"'J., HUMPHREYHUMPHREYK ; � KARIUKI * Z K KARI U KI Date: 2022.03.01 ry z? 18:59:14 -05'00' IV twin Tesla,Inc. T = 5 L n Version#93.2-1 PIL NAS July 19,2021 RE: CERTIFICATION LETTER Project/Job#1054677 Project Address: Chen Residence 2 Wilton Rd Rye Brook,NY 10573 AHJ Rye Brook Village SC Office New Windsor Design Criteria: -Applicable Codes=Structure:2020 EBCNYS;PV:2020 RCNYS/BCNYS with 2020 NYSLICS,ASCE 7-16,and 2018 NDS -Risk Category=II -Wind Speed=120 mph(3-s Gust-Vult),Exposure Category C,Partially/Fully Enclosed Method -Ground Snow Load=30 psf -MP1: Roof DL=9 psf,Roof LUSL=20.8 psf(Non-PV),Roof LUSL= 11.8 psf(PV) -MP2: Roof DL=9 psf,Roof LUSL=20.8 psf(Non-PV),Roof LUSL= 11.8 psf(PV) Note: Per IBC 1613.1; Seismic check is not required because Ss=0.281 <0.4g and Seismic Design Category(SDC)=B<D To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Based on this evaluation,I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Installer shall verify existing roof framing is in suitable condition and does not exhibit any signs of structural damage which may diminish the capacity of its members or connections prior to commencement of PV installation.Installer verification of the mounting planes noted above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report. OF N E 111 ),o Ar Q� 4 H U M P H R EY Digitally signed by HUMPHREY K KARIUKI * i W K KARIUKI Date: 2021.07.20 06:31:45 z -04'00' �25, ;?�' F�j A SS`O�Q�, SrRUCTI:ML O Tesla,Inc. T = S L Fi Version#93.2-1 PIL NAS HARDWARE DESIGN AND STRUCTURAL EVALUATION RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 72" 24" 41" NA Staggered 77.2% MP2 72" 24" 41" NA Staggered 77 2% Portrait Hardware-Portrait Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 48' 18" 69" NA Staggered 86.9% MP2 48" 18" 69" NA Staaaered 86.9% Roof Pitch Qualification Results Mounting Plane (Degrees) Member Evaluation Results MP1 36 Member Impact Check OK MP2 36 Member Impact Check OK Tesla,Inc. T = 5 L n n Building Permit Check List&Zoning Analysis Address: SBL• Zone-t Use: 21 Const.Type k Other. Submittal Date: t -L Revisions Submittal Dates: Applicant: Nature of Work l� — cv •� (, Reviews:23A: OCT 1 4 2Q21 PB: BOT: Other. OK ( ( ) FEES:Filing. 7-C' BP: 7--5�N� - � C/O: Legalization: ( ) (•5-'XPP: Dated Notarized. __/SBL: -Truss I.D. Cross Connection: ✓ H.O.A.: ( ) ( ) Scenic Roads: Steep Slopes: Wetlands: Storm Water Review: Street Opening- ) ENVIRO:Long. Short: Fees: N/A: ( ) ( ) SITE PLAN:Topo: Site Protection S/W Mgmt.: Tree Plan. Other. ( ) ( ) SURVEY:Dated- Current Archival Sealed: Unacceptable: PLANS:Date Stamped: ✓Sealed: `-' Copies: '7 Electronic / Other. ( ) (� License: ✓ Workers Comp: Liability: �mp.Waiver. Other. CODE 753#: Dated: N/A: ( ( ) HIGH-VOLTAGE ELECTRICAL-Plans: Permit: N/A Other. ( ) ( ) LOW-VOLTAGE ELECTRICAL-Plans: Permit: N/A Other. ( ) ( ) FIRE ALARM/SMOKE DETECTORS:Plans: Permit H.W.I.C.:_Battery-_Other. ( ) ( ) PLUMBING Plans: Permit Nat.Gas: LP Gas: N/A/: Other. ( ) ( ) FIRE SUPPRESSION:Plans: Permit: N/A Other. ( ) ( ) H.V.A.C.: Plans: Permit: N/A Other. ( ) ( ) FUEL TANK:Plans: Permit: Fuel Type: Other. ( ) ( ) 2020 NY State ECCC: N/A: Other. ( ) ( ) Final Survey Final Topo: RA/PE Sign-off Letter. As-Built Plans: Other. ( ) ( ) BP DENIAL LETTER C/O DENIAL LETTER: Other. Other. ( ARB mtg.date approval 72 1 notes: ( )ZBA mtg.date: approval• notes: ( )PB mtg.date: approvaL• notes: REQUIRED EXISTING PROPOSED NOTES APPROVED A=: _ e. OCT 2 5 7091 Cir . Front: sue: &Mr. Main Qv Accs,Co r Ft.H/Sb Sd.H/Sb: SEA: Tot,Imp Ft.Imp E /A stoaes notes: FE I ri PD BUILD MENVI E OF RY OK OCT 13 2021 938 KING ET RYE BR ,NY -- _ (914)9 9 39-5801 V I L L K o BUILDING DEPARTMENT ARCHITECTURAL REVIEW BOARD CHECK LIST FOR APPLICANTS This form must be completed and signed by the applicant of record and a copy shall be submitted to the Building Department prior to attending the ARB meeting. Applicants failing to submit a copy of this check list will be removed from the ARB agenda. Job Address:2 Wilton Road Date of Submission: 7/2/2021 Parcel ID#: 135.58-1-14 Zone: R-10 Proposed Improvement(Describe in detail): APPLICANT CHECK LIST: Installation of a 13.6kW solar PV array consisting of MUST BE COMPLETED BY THE APPLICANT The following items must be submitted to the Building forty (40) 340 watt panels on the existing Department by the applicant-no exceptions. roof. No roofing work is proposed. 1. (-f Completed Application 2. (✓)Two(2)sets of sealed plans. (one full size(maximum Property Owner:Weili Chen allowable plan size=36"x 42") and one 11"xi 7") Address: 2 Wilton Rd, Rye Brook, NY 10573 3. ( )Two(2)copies of the property survey. 4. ( ✓ rwo(2)copies of the proposed site plan. Phone#646-255-0886 5. (✓`One electronic/disc copy of the complete Applicant appearing before the Board: application materials. 6. (✓✓'Filing Fee. Justine Cognato of Tesla Energy Operations, Inc. 7 ( )Any supporting documentation. 1073 Rt 94, Unit 4, New Windsor, NY 12553 8. ( ) HOA approval letter.(ifopplicable) Address: 9. ( Photographs. Phone#845-395-6040 10.( )Samples of finishes/color chart. (a sample board or model may be presented the night of the meeting) Architect/Engineer: Humphrey Kariuki, P.E. Phone#845-275-6011 By signature below, the owner/applicant acknowledges that he/she has read the complete Building Permit Instructions&Procedures, and that their application is complete in all respects. The Board of Review reserves the right to refuse to hear any application not meeting the requirements contained herein. Sworn to before me this L' Sworn to before me this ZZ day of t , 20 �- _ day of QeloJtr . 20 P-t Signature of Property Owner Sie rc c Applicant Justine Cognato Print Name of Property Owner Print Name of Applicant (" ma otary c Now% Public JOHN M SUOZZO NOTARY PUBLIC, STATE OF NEW YORK ReRegistration No. 01 SU6070919 AnnC M.CONN g � NOTARY PUBLIC,STATE OF NEW YORK �U ` Registration No.01C06327155 Qualified in Westchester County / g Qualified in Orange Count Vo Commission Expires March 11, 2022 y Y P Commission Expires June 29,20 a 3/21/19 VILLAGE OF RYE BROOK BUILDING DEPARTMENT 938 KING STREET, RYE BROOK,NY 10573 (T) 939-0668 (F) 939-5801 ARCHITECTURAL REVIEW BOARD Wednesday, October 20, 2021 ANNOUNCEMENT: PER THE GOVERNOR'S EXECUTIVE ORDER THIS MEETING WILL BE HELD VIRTUALLY THROUGH THE ZOOM PLATFORM. THE PUBLIC CAN ACCESS THE MEETING THROUGH THE FOLLOWING LINK: https://us02web.zoom.us/a/89381834463 OR BY OPENING ZOOM AND ENTERING THE MEETING ID: 893 8183 4463 NAME&LOCATION TYPE OF APPLICATION MOTION SECOND APPROVED REJECTED APPL.# 31 Mohegan Lane 4'- 0" High Black Consent 5628 (Polay) Aluminum Fence Agenda 2 Tamarack Road Roof Top Solar Array Consent 5629 (DiCostanzo) System Agenda 541 Westchester Roof Top Solar Array Consent 5630 Ave(Galvez) System Agenda 104 Country Ridge New Hot Tub On Concrete Consent 5631 Drive(Savitt) Patio Agenda 2 Wilton Road Roof Top Solar Array Consent 5632 (Chen) System Agenda 980 King Street Amendment Legalization 5260 (Perez) To Prior Approval (Window, Door& Fence) 13 Knollwood Drive Amendment to Rear Patio Consent 5633 (Luceno) Location Agenda 5 Little Kings Lane New Masonry Terrace 5634 (Nathan) W/Planters& Steps to Grade 24 Beechwood Blvd Amendment to Prior 5635 (Moore) Approval(Exterior Site Work) 7 Holly Lane 2nd Story Addition(Master 5636 (Chalfen) Suite) ML v NM MR SE JM ,/ SF AC MI KC C/ VILLAGE OF RYE BROOK BUILDING DEPARTMENT 93 8 KING STREET, RYE BROOK,NY 10573 (T) 939-0668 (F) 939-5801 ARCHITECTURAL REVIEW BOARD Wednesday, ctober 20, 2021 167 Country Ridge Amendment To Prior 5637 Drive(Hugon) Approval(Exterior Work) 17 Wilton Circle 2nd Story Addition, Front 5638 (Tabakhov) Portico, Rear Patio& Interior Alterations 9 High Point Circle Exterior Changes, (Slomiak) Retaining Wall Ext, Regrade Yard. Stairs @ Driveway ML NM MR SE JM SF AC MI KC POWER OF ATTORNEY 1. Weili Chen , of Rye Brook New York am the owner of the property located at 2 Wilton Road 10573 hereby appoint Tesla. its agents, servants and employees, to act as my agent for purposes of the following: (1) The preparation, execution and submission of a permit application on my behalf to install a solar system on my property: (2) Authorizing agents of the municipality to enter and inspect the work being performed pursuant to such permit on my property; and (3) Undertaking such other and further actions on my behalf as may necessary to effectuate the installation of a solar system on my property. This Power of Attorney shall be effective for 12 months from the date of execution, and shall be deemed expired thereafter. In Witness Whereof I have hereunto signed my name on the day of . 20 Z 1 STATE OF NEW )YORK ) COUNTY OF nn ,, n the dL6day o Od"( before me, the undersigned, personally appeared W4. t , personally known to me or proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed to the within instrument and acknowledged to me that he/she executed the same in his/her capacity, and that by his/her signature on the instrument, the individual, or the person upon behalf of which the individual acted, executed the instrument. DIANNE ROJq N Public Notary Public-Sire Of New York Qualified inO�OO127547 ' ►►m+aeien&Oirss�y 23,2025 DC C FW l OCT - 6 2021 VILLAGE OF RYE BROOK L BUILDING DEPARTMENT NYS POA 20130109 v.I � 7IN • ��t�y��, ., i���4�� : -.4. tY,Yl 1� f�fli...:flid�:.4` 'y ?��1 1 .. .4 1 • � r z C c a � c v _ n O > c zEn = 7 O O + Y .• _ G co ^� v ° C ,rr 6. 4� V1 c �ito)s Z Cn >, aCA N <c � C S Elf C r ection Of l p O ° Y z 3si� V Of y p � _ 0 Z H �. .� � i6, ✓' r.r Q Z > ' O • p y Cd w u 8 ol 00 ip i C R C z 0) ct ' rn M W J C t) U U ti t 4339) WWO !!,.. .' � pQ ,. DATE(MM/DDYYY) A�" CERTIFICATE OF LIABILITY INSURANCE /Y vo112o21 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kayla Ferrell MARSH RISK 8 INSURANCE SERVICES FOUR EMBARCADERO CENTER,SUITE 1100 n/cNri Ext: 415 743 8025 FAX No CALIFORNIA LICENSE NO.0437153 E-MAIL SAN FRANCISCO,CA 94111 ADDRESS: Attn:SanFrancisco.Certs@marsh.com I FAX 212-948-0398 INSURERS AFFORDING COVERAGE NAIC tF CN104275261STND-GAWUE-21- INSURER A:Zurich American Insurance Company 16535 INSURED Tesla Energy Operations,Inc. INSURERS:Steadfast Insurance Company 26387 901 Page Avenue INSURER C:American Zurich Insurance Company 40142 Fremont,CA 94538 INSURER D:WA WA INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-003420547-22 REVISION NUMBER: 4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR I TYPE OF INSURANCE ADDL SU POLICY NUMBER POLICY EFF POLICY(MI/EXP LIMITS A X COMMERCIAL GENERAL LIABILITY GLO 1074588-04 10/31/2021 10/31/2022 EACH OCCURRENCE $ 2,500,000 CLAIMS-MADE X❑OCCUR Includes Host Liquor Liability a 2,500,000 PREMISES Ea occurrence $ X SIR:$750,000 MED EXP(Any one person) $ 5,000 B X Tort Contrac Uab,No XCU Exd SXS-7426362-02(Excess GL- 10/31/2021 10/31/2022 PERSONAL&ADV INJURY $ 2,500,000 GEN'L AGGREGATE LIMIT APPLIES PER Limit:$6,750,000 excess of primary GENERAL AGGREGATE $ 20,000,000 X POLICY❑JECT PRO- LOC GL limits on right,applies to PRODUCTS-COMP/OP AGG $ 6,000,000 OTHER: Solar Products Only) $ A AUTOMOBILE LIABILITY BAP 1074586-04 10/31/4021 COMBINED SINGLE LIMIT Ea accident $ 10,000,000 A1NY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED (Per accident)AUTOS ONLY AUTOS )BODILY INJURY(Pd $ HIRED NON-OWNED PROPERTYDAMAGE AUTOS ONLY AUTOS ONLY Per accid $ X UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LL18 HCLAIMS-MADE AGGREGATE $ DIED I I RETENTION $ C WORKERS COMPENSATION WC 1074583-04(AOS) 10/31/2022 X PERSTA X ER A AND EMPLOYERS'LIABILITY V/N ANYPROPRIETOR/PARTNER/EXECUTIVE WC 1074584-04(MA,WI) 10/31/2021 10/31/2022 1000000 A OFFICER/MEMBEREXCLUDED9 ❑N N/A E.L.EACH ACCIDENT $ (Mandatory in NH) CA XSWC EWS 1074585-04($50M is XS 10/31/2021 10/31/2022 E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If es,describe under $10M SIR;$1M EE/EA is XS$lOM SIR DESCRIPTION OF OPERATIONS below ) E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Evidence of insurance. CERTIFICATE HOLDER CANCELLATION Village of Rye Brook SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 938 King Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Rye Brook,NY 10573 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE xvid Rak &IN40tuce Smgi eQ ©1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD PORK Workers' CERTIFICATE OF STATE Compensation NYS WORKERS' COMPENSATION INSURANCE COVERAGE Board 1a.Legal Name$Address of Insured(use street address only) 1b.Business Telephone Number of Insured 650-963-5100 Tesla Energy Operations,Inc. 901 Page Avenue 1c.NYS Unemployment Insurance Employer Registration Numberof Fremont,CA 94538 Insured 49-892777 Work Location of Insured(Only required if coverage is specifically limitedto 1d.Federal Employer Identification Number of Insured or Social Security certain locations in New York State,i.e.,a Wrap-Up Policy) Number 02-0781046 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) American Zurich Insurance Company City of Rye Brook 3b.Policy Number of Entity Listed in Box"la" 38 King Street WC 1074583-04 Rye Brook, NY 10873 3c.Policy effective period 10/31/2021 to 10/31/2022 3d.The Proprietor,Partners or Executive Officers are ®included.(Only check box if all partners/officers included)all ❑excluded or certain partners/offcersexcluded. This certifies that the insurance carrier indicated above in box"3"insures the business referenced above in box"la"forworkers' compensation under the New York State Workers'Compensation Law. (To use this form, New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers'compensation insurance policy).The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"2". The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate. (These notices may be sent by regular mail.)Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box"3c",whichever isearlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder.This certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note: Upon cancellation of the workers'compensation policy indicated on this form, if the business continues to be named on a permit,license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers'Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers'Compensation Law. Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Susan B. Kendziora (Print name of authorized representative or licensed agent of insurance carrier) Approved by: 10/31/2021 (Signature) (Date) Title:Vice President-Enterprise Support Operations Telephone Number of authorized representative or licensed agent of insurance carrier:800-382-2150 Please Note:Only insurance carriers and their licensed agents are authorized to issue Form C-105.2.Insurance brokers are NOT authorized to issue it. C-105.2(9-17) www.wcb.ny.gov INTERNAL USE ONLY AEBREVIATIONS ELECTRICAL NOTES. JURISDICTION NOTES A AMPERE AC ALTERNATING CURRENT BLDG 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED BUILDING CONC CONCRETE DC DIRECT CURRENT POWER—CONDITIONING INVERTER. EGC EQUIPMENT GROUNDING CONDUCTOR (E) 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. EXISTING EMT ELECTRICAL METALLIC TUBING FSB 3. A N ATI ONALLY—RECOGNIZED TESTING LABORATORY FIRE SET—BACK GALV GALVANIZED GEC GROUNDING SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ELECTRODE CONDUCTOR GND GROUND HDG HOT ART. 110.3. DIPPED GALVANIZED I CURRENT Imp CURRENT AT 4. WHERE ALL TERMINALS OF THE DISCONNECTING MAX POWER Isc SHORT CIRCUIT CURRENT kVA MEANS MAY BE ENERGIZED IN THE OPEN POSITION, PERMR# KILOVOLT AMPERE kW KILOWATT LBW LOAD A SIGN WILL BE PROVIDED WARNING OF THE BEARING WALL MIN MINIMUM (N) NEW NEUT HAZARDS PER ART. 690.17. SBL# 1 3SO-SeD NEUTRAL NTS NOT TO SCALE OC ON CENTER PL 5. EACH UNGROUNDED CONDUCTOR OF THE _9CJ__;77Pj021 PROPERTY LINE P01 POINT OF INTERCONNECTION MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY DATE APP V -D _ PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS PHASE AND SYSTEM PER ART. 210.5. STEEL STC STANDARD TESTING CONDITIONS TYP 6. CIRCUITS OVER 250V TO GROUND SHALL COMPLY TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V WITH ART. 250.97, 250.92(B). BUILDING 1 PJ5,Village of Rye Brook NY VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE 7• DC CONDUCTORS EITHER DO NOT ENTER BUILDING AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. Vtfiage cf Rye Brook9. MODULE FRAMES SHALL BE GROUNDED AT THE UL—LISTED LOCATION PROVIDED BY THE Architec��CTl �evejeTard MANUFACTURER USING UL LISTED GROUNDING .......... Approval Date: HARDWARE. Chairman:_ 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE t BONDED WITH EQUIPMENT GROUND CONDUCTORS. VICINITY MAP INDEX Sheet 1 COVER SHEET Sheet 2 SITE PLAN Sheet 3 AERIAL AND STREET VIEW Sheet 4 STRUCTURAL VIEWS LICENSE GENERAL NOTESF-AM 0 sheet 5 UPLIFT CALCULATIONS • Sheet 6 THREE LINE DIAGRAM 1. ALL WORK SHALL COMPLY WITH THE 2020 NYS • Cutsheets Attached UNIFORM CODE. � • 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRIC CODE. ~` 3. ALL WORK SHALL COMPLY WITH THE 2020 NYS FIRE CODE. MODULE GROUNDING METHOD: ZEP SOLAR 4. ALL WORK SHALL COMPLY WITH THE 2020 - AHJ: Rye Brook Village BUILDING CODE OF NYS. REV BY DATE COMMENTS 5. ALL WORK SHALL COMPLY WITH THE 2020 REV a CG 07/19/21 NEW SYSTEM SIZE&ADDRESSING PERMIT CRITE RESIDENTIAL CODE OF NYS. 6. ALL WORK SHALL COMPLY WITH THE 2020 UTILITY' Consolidated Edison EXISTING BUILDING CODE OF NYS. CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-1054677 00 «UST�� °E�'Pn°": ��«�: R: �A� Chris Guine T � 5 L n CONTAINED SHALL NOT BE USED FOR THE YYel�l Chen 13.6 KW PV ARRAY y BENEFIT OF ANYONE EXCEPT iESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 wFlashing—Insert 2 Wilton Rd PART TO OTHERS OUTSIDE THE RECIPIENT'S MODULES: Rye Brook, NY 10573 n�iEAs�E¶nNuus��In�E�svCEcn��TM (40) Hanwha Q—CELLS # Q.Peak DUO BLK—G6+ 340 y TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: NAME: SHEET: REV: DATE: PERMISSION OF iESL4 INC. (2) 7.6 kW Tesla Inc 1538000-00—E 240V 6462550886 COVER SHEET 1 a 7/19/2021 PITCH: 361 (9:12) ARRAY PITCH:360 (9:12) PV CIRCUIT BREAKER OR SWITCH GENERATOR MP1 AZIMUTH:89 ARRAY AZIMUTH:89 MUST BE LOCATION MATERIAL:Comp Shingle STORY: 2 Stories LABELED `89L'OR `GENERATOR PITCH: 360 (9:12) ARRAY PITCH:360 (9:12) DISCONNECT SWITCH' MP2 AZIMUTH:269 ARRAY AZIMUTH: 269 Lc MATERIAL:Comp Shingle STORY: 2 Stories Account Number: 55-5604-2012-003-03-5 Inv Inv AC M 3' FSB ,��-�� 3' FSB I �-�° I ACCESS TO ROOF L I B 7CE FROM GROUND SV _ I I ACCESS TO ROOF I I FROM GROUND I I I I LEGEND I I I I° 1 - I Q (E) UTILITY METER & WARNING LABEL Front Of House INVERTER W INTEGRATED DC DISCO I 9/2 Inv / 0 I � & WARNING LABELS I Dc 1 DC DISCONNECT & WARNING LABELS IU3SV I I ® AC DISCONNECT & WARNING LABELS 1616 I I O DC JUNCTION/COMBINER BOX & LABELS ACCESS TO ROOF D S BU I ( I TRI TI 0N PAN EL & L E AB LS FROM GROUND �-- —� 3' FSB 3' FSB I LOAD CENTER & WARNING LABELS I M DEDICATED PV SYSTEM METER Cl T'- N E IA/ RSD o (E)DRIVEWAY ,� }� RAPID SHUTDOWN 0 o- �Q' �y� " STANDOFF LOCATIONS 3 FSB �� � CONDUIT RUN ON EXTERIOR ACCESS TO ROOF CONDUIT RUN ON INTERIOR FROM GROUND w GATE/FENCE 0 HEAT PRODUCING VENTS ARE RED ,V' L_,J INTERIOR EQUIPMENT IS DASHED srRUCIWAL U HUMPHREY K Digitally signed b HUMPHREY K SITE PLAN " g Y g Y KART U KI Scale: 3/32" = 1' W E KARIUKI Date: 2021.07.20 06:32:15 -04'00' 01' 10' 21' 11 S CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-1054677 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE We i l i Chen 13.6 KW PV ARRAY Chris Gu in ey BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: T n SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Flashing—Insert 2 Wilton Rd PART TO ORGANIZATION,OTHERS OUTSIDE IIN CONNECTION WITH MODULES: Rye Brook, NY 10573 -THE SALE AND USE OF THE RESPECTIVE (40) Hanwha Q-CELLS # Q.Peak DUO BLK—G6+ 340 PAGE NAME: SHEET: REV. DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. (2) 7.6 kW Tesla Inc 1538000-00—E 240V 6462550886 SITE PLAN 2 a 7/19/2021 .yy,z 1 i +r Y: v t M omit& PIT NNW - - `fi CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-1054677 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE We I I I Chen 13.6 KW P V ARRAY Chris Gu iney BENEFIT SHALL OF ANYONE DISCLOSED IN WHOLEAOR IN NOR MOUNTING SYSTEM: 2 Wilton R d Tn PART TO OTHERS OUTSIDE THE RECIPIENT'S ZS Comp V4 w Flashing—insert MODULES: Rye Brook, NY 10573 ORGANIZATION, EXCEPT IN CONNECTION WITH - --- -----THE SALE AND USE OF THE RESPECTIVE (40) Hanwha Q—CELLS # Q.Peak DUO BLK—G6+ 340 PAGE NAME: SHEET: REV: DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. (2) 7.6 kW Tesla Inc 1538000-00—E 240V 6462550886 AERIAL AND STREET VIEW 3 a 7/19/2021 S1 (N) PV MODULE (E) MOUNTING PLANE (MP) SV TYPICAL PV SIDE VIEW NHS PV MODULE 5/16"x1.5" BOLT WITH 5/16" FLAT WASHER INSTALLATION ORDER ZEP LEVELING FOOT LOCATE RAFTER, MARK HOLE ZEP ARRAY SKIRT (1) LOCATION, AND DRILL PILOT HOLE. --------- --- -------- ZEP MOUNTING BLOCK (4) ATTACH FLASHING INSERT TO ZEP FLASHING INSERT (2) MOUNTING BLOCK AND ATTACH (3) TO RAFTER USING LAG SCREW. 0F NE lit 1' y (E) COMP. SHINGLE '�� KAN,/ (1) 2-"MIN. INJECT SEALANT INTO FLASHING �P �� � y (E) ROOF DECKING (2) � r(3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE ROOF PENETRATION. ui 5/16" DIA STAINLESS LOWEST MODULE SUBSEQUENT MODULES �; �' z STEEL LAG SCREW INSTALL LEVELING FOOT ON TOP (4) OF MOUNTING BLOCK & (E) RAFTER SECURELY FASTEN WITH BOLT. SS STANDOFF S� STRUCTUMLO\. Scale: 1 1/2" = 1' CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-1 054677 00 ���ER-. DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Welli Chen 13.6 KW PV ARRAY Chris Guiney BENEFIT OF ANYONE EXCEPT TESLA INC.,NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 wFlashing—Insert 2 Wilton Rd PART TO OTHERS OUTSIDE THE RECIPIENT'S M�u�s Rye Brook, NY 10573 n�+E�s�n�u u�E�In�E��Ecn��TM (40) Hanwha Q—CELLS # Q.Peak DUO BLK—G6+ 340 y iESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: SHEET: REN. DALE: PERMISSION OF IESLA INC. (2) 7.6 kW Tesla Inc 1538000-00—E 240V 6462550886 STRUCTURAL VIEWS 4 a 7/19/2021 Jobsite Specific Design Criteria Design Code ASCE 7-16 Risk Category II Table 1.5-1 Ultimate Wind Speed V—Ult 120 Fig. 1609A Exposure Category C Section 26.7 Ground Snow Load pg 30 Table 7-1 Edge Zone Width a 6.5 ft Fig. 30.3-2A to I MP Specific Design Information MP Name MP1 MP2 Roofing Comp Shingle Comp Shingle Standoff ZS Comp V4 w ZS Comp V4 w Flashing—Insert Flashing—Insert Pitch 36 36 SL/RLL: PV 11.8 11.8 SL/RLL: Non—PV 20.8 20.8 Standoff Spacing and Layout MP Name MP1 MP2 Landscape X—Spacing 72 72 Landscape 24 24 X—Cantilever Landscape Y—Spacing 41 41 Landscape Y—Cantilever Portrait X—Spacing 48 48 0� N E!v �,0 Portrait X—Cantilever 18 18 V,A �+ Portrait Y—Spacing 69 69 Portrait Y—Cantilever — — j Layout Staggered Staggered � Y 99 99 i C? X and Y are maximums that are always relative to the structure framing that supports the PV. X is across rafters and Y is along rafters. STRUCTURAL 0: . CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-1054677 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Weill Chen 13.6 KW PV ARRAY Chris Guiney BENEFIT SHALL ANYONE IN WHOLEAOR IN NOR MOUNTING SYSTEM: 2 Wilton R d � n PART TO OTHERS OUTSIDE THE RECIPIENT'S ZS Comp V4 wFlashing—Insert MODULES: Rye Brook, NY 10573 ORGANIZATION, EXCEPT IN CONNECTION WITH - -- - --- ----- -- -- --THE SALE AND USE OF THE RESPECTIVE (40) Hanwha Q-CELLS # Q.Peak DUO BLK—G6+ 340 PAGE NAME: SHEET: REV DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. 2 7.6 kW Tesla Inc 1538000-00—E (240V) 6462550886 UPLIFT CALCULATIONS 5 a 7/19/2021 GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #6 GEC TO (N) GROUND ROD Panel Number:HOMC42UC Inv 1: DC Ungrounded INV 1 - (1) 7.6 kW Teslo Inc 15380DO-00-E(240V) - (40)Hanwha Q-CELLS#Q.Peok DUO BLK-G6+ 340 AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:44925264 Inv 2: DC Ungrounded PV Module; 340W, 318.1 PTC, 4OMM, Black Fr, MC4, ZEP, 1000V Underground Service Entrance Tie-In: Supply Side Connection INV 2- (1) 7.6 kW Tesla Inc 15MOOO-00-E(240V) Voc: 40.66 Vpmax: 33.94 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER E 200A MAIN SERVICE PANEL Inverter 1 IND E 20OA/2P MAIN CIRCUIT BREAKER 89L AC SQUARE D (E) WIRING Disconnect 7.6 kW Tesla Inc 1538000-00-E (240V) 8 7 (N) 125A Load Center 5 240V B 80A C 40A/2P A L1 Tesla B L2 1 200A/2P DC q DC+ �(E) DC- 3 Dc- DETACHED GND — — EGC _-- DC+ DC+ MP 1: 2X8 I DISTRIBUTION DC- pC_ I PANEL&5.76 1 KW GENERATOR J 1 Z GND EGC— — ----------- ---,---- ---- EGC-----------------� ---- �_ LTJ♦ I L_L: I I I Inverter 2 IND N I ; 7.6 kW Tesla Inc 1538000-00—E (240V) I I z z I I 6 z4ov I I i 40A/2P It GEC I I Ll Tesla 2 -------t I L2 DC+ DC+ TO120/240V i i DC- 4 A DC- SINGLE PHASE I L EGC DC+ DC+ MP 2: 2X12 1 UTILITY SERVICE 1 — ---------------------------- — ---� QC_ DC- I I 1 GND EGC— — ———————————----'---- ———— EGC ————————————————— � I I I —1— EGC ON ROOF TO BE ROUTED WHERE NOT SUBJECT TO Account Number: 55—5604—2012—003—03—5 PHYSICAL DAMAGE. WHEN ROUTED SUBJECT TO PHYSICAL DAMAGE THE SIZE MUST BE INCREASED TO #6 SOLID BARE COPPER. THE GATEWAY WILL REMAIN OPEN WHEN THE SYSTEM LOSES CONTACT WITH THE UTILITY GRID V0C* — MAX VOC AT MIN TEMP GD Please see MCI wiring detail page for more information pOI (1)Gro/rd Roo B (1)CUTLER—HAMMER #DG223NRB A (2)Teslo #_4J; 4 STRING JUNCTION BOX 5 8 x 8, C per Disconnect; 10OX 24OVac, Fusible, NEMA 3R AC UNFUSED, GROUNDED, Black— Diag DIN Rail DC —(2)ILSCO IPC 4,70-2/0 —(1)CUTLER—HAMMER #DG100NB Insulation Piercing Connector; Main 4/0-2, Tap 2/0-6 GroundNeutral Kit; 60-100A, General Duty(DG)— 1)OUTLER—HAMMER �S16FK PV MCI, TESLA, 600V, 13A (14)1550379-00—D ( S SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE Class R Fuse Kit AS SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. —(2)FERRAZ SHAWMUT#TR80R PV BACKFEED OCP Fuse; 80A, 250V, Class RK5 C (1)SQUARE D#HOM12241_125PRB Load Center,,125A,Convertible,NEMA3R,12sp/24Cir,120v/240v,10kAIC,Surface —(2)SQUARE D##H M240 Breaker, 4'bA2P, 2 Spaces — (1)AWG#4, THWN-2, Black 1 AWG#8, THWN-2, Black (1)AWG#8, THWN-2, Black Voc* =366.56 VDC Isc =21.04 ADC (4)AWG #10, PV VAre, 60OV, Black Voc* =366.56 VDC Isc =10.52 ADC 7 (1)AWG#4, THWN-2, Red 5 ( )AWG THWN-2 Red Vm =271.52 VDC Im 20.04 ADC 1 AWG Solid Bare Copper EGC Vmp =271.52 VDC Im 10.02 ADC (1)AWG#8, THWN-2, Red � 1 #8, P P= � 1 � ( ) �. PP p p= (1)AWG#8, THWN-2, Green EGC Vmp =240 VAC Imp=64 AAC (1)AWG#8, THWN-2, Green EGC Vmp =240 VAC Imp=32 AAC (1)AWG#6, Solid Bare.Copper EGC -(1)Conduit Kit; 3/4' EMT . . . . . . .-(1)Conduit Kit; 3/4".EMT. . .. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .-.(1)Conduit Kit; 3/4",EMT (1)AM#8, THWN-2, Black Voc* 549.84VDC Isc =21.04 ADC (4)AWG #10, PV Wire, 60OV, Black Voc* =549.84VDC Isc =10.52 ADC . . . . . . . . . . . (1)AWG#4, THWN-2, Black (1)AWG#8, THWN-2, Black 4 (1)AWG#8, THWN-2, Red Vmp =407.28VDC Imp=20.04 ADC (1)AWG#6, Solid Bare Copper EGC Vmp =407.28VDC Imp=10.02 ADC 8 6F(1)AWG#4, THWN-2, Red 6 (1)AWG#8, THWN-2, Red (1)AWG#6, Solid Bare Copper. EGC. . . .-(1)Conduit Kit;.3/4 EMT (1)AWG A Solid Bare Copper GEC Vmp =240 VAC Imp=64 AAC (1)AWG#8, THWN-2, Green EGC Vmp =240 VAC Imp=32 AAC . . . . . . .-�I)Conduit Kit;.1"_EMT . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .-�j)Conduit Kit;.3/4" EMT. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: JB-1054677 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE We I l I Chen 13.6 KW PV ARRAY Chris Gu in ey BENEFIT OF ANYONE LE SHALL IT BE DISCLOSED VNiO OR IN NOR MOUNTING SYSTEM: n 2 Wilton Rd � PART TO OTHERS OUTSIDE THE RECIPIENT'S ZS Comp V4 w Flashing—Insert MODULES: Rye Brook, NY 10573 ORGANIZATION, EXCEPT IN CONNECTION WITH - -THE SALE AND USE OF THE RESPECTIVE (40) Hanwha Q—CELLS # Q.Peak DUO BLK—G6+ 340 PAGE NAME: SHEET: REV: DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. (2) 7.6 kW Tesla Inc 1538000-00—E 240V 6462550886 THREE LINE DIAGRAM 6 0 7/19/2021 WARNING:PHOTOVOLTAIC POWER SOURCE PHOTOVOLTAIC SYSTEM ! • • ••" EQUIPPED WITH RAPID ••" ••" .•� SHUTDOWN ••l , i 1 0•1 • PHOTOVOLTAIC DC DISCONNECT '" •'" : ' CAUTION '• DUAL POWER SOURCE '- ••- ' SECOND SOURCE IS � MAXIMUM VOLTAGE -•" • • PHOTOVOLTAIC SYSTEM MAXIMUM CIRCUIT CURRENT ._ • MAX RATED OUTPUT CURRENT ••, OF THE CHARGE CONTROLLER OR DC-TO-DC CONVERTER WARNING (IF INSTALLED) • INVERTER OUTPUT CONNECTION • DO NOT RELOCATE .•- • • THIS OVERCURRENT WARNING DEVICE ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED '• NORMALLY GROUNDED CONDUCTORS MAY BE .•- • • UNGROUNDED AND ENERGIZED � WARNING ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE s- • • UNGROUNDED AND PHOTOVOLTAIC AC A '• MAY BE ENERGIZED DISCONNECT SOLAR PV SYSTEM . _ . EQUIPPED WITH RAPID MAXIMUM AC A ' SHUTDOWN 0,91 . • OPERATING CURRENT MAXIMUM AC V ••1 1 OPERATING VOLTAGE ' SOLAR 1 • 1 •• ELECTRIC 1 PV PANELS WARNING - ELECTRIC SHOCK HAZARD ••1 , , - ;, DO NOT TOUCH TERMINALS _ TERMINALS ON BOTH LINE AND ' LOAD SIDES MAY BE ENERGIZED • IN THE OPEN POSITION powered by MECHANICAL SPECIFICATION al DUO/ Format 68 5 x 40.6 x 157in(including frame) (1740 x 1030 x 40 mm) (154°m) s65"(1740mm) 374•(950 min) 15 6'(395 min) Weight 47.4lbs(21.5kg) 1 6 x Grounding points o 016'(4 min) 1 7 09'(180 mm) Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass z43 _ with anti-reflection technology 4 Drainage 3�1r00 Frame Back Cover Composite film 38("(981mm) Frame Black anodized aluminum ® 40 55'(1030 mm) Cell 6 x 20 monocrystalline Q ANTUM solar half cells rq,J. oo Junction Box 2.09-3.98 x 1 26-2 36 x 0 59-0.71in(53-101 x 32-60 x 15-18mm). � Label � Protection class IP67,with bypass diodes Cable 4mm2 Solar cable;(+)>_43.3in(1100mm),(-)>-43.3in(1100 mm) B.o36mi x8mag y 4 r<Fastening points(DETAIL A) 0 14•x 31'(3 6 min><B im Connector Staubli MC4;IP68 1 57'(40 mm) DETAIL A 0,47"(121 mm) PP 1 1063'(27 min) �TO 354•(9 min) � � . • = . ELECTRICAL CHARACTERISTICS POWER CLASS 330 335 340 345 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC (POWER TOLERANCE+5W,/-0 W) Power at MPPI PMI [W] 330 335 340 345 .' . QCELLS E Short Circuit Current' ISC, [A] 10.41 10.47 10.52 1058 YalnSE«XtITY Open Circuit Voltage VOc IV] 4015 4041 4066 4092 �. pMPgr •.• .•. E Q Current at MPP IMPo [A] 9.91 9.97 10.02 10.07 ;TOP BRAND PV Voltage at MPP VMt,P IV] 33.29 33.62 33.94 34.25 • Product and -- -- EUROPE Performanc warranty C Efficiency' r] [%] >_18.4 >_18.7 >_19.0 >_19.3 Fi0 `�v 2019 •• QCELLS MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT" cOMPP► Power at MPP PMI. [W] 247.0 250.7 254.5 258.2 E Short Circuit Current Ise [A] 8.39 8.43 8.48 8.52 E- Open Circuit Voltage VQc IV] 37.86 3810 3834 38.59 .S Q.ANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY 2 Current at MPP IMPp [A] 7.80 7.84 7.89 7.93 Higher yield per surface area,lower BOS costs,higher Voltage at MPP VMPP IV] 31.66 31.97 32.27 32.57 power classes,and an efficiency rate of up to 19.5%. 'Measurement tolerances P,.,,,±3%;l,,•;V(,c±5%at STC-1000W/m 25±2°C,AM 15 according to IEC 60904-3-1800W/m2,NMOT,spectrum AM 15 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE INNOVATIVE ALL-WEATHER TECHNOLOGY 100 u0 --T---- ----n-----r-----� �''° At least 98%of nominal power during } I I hWUYn Slur,d.,rd 1pr ln,•,:r Y:d,rl:Av'S I Optimal yields,whatever the weather with W Ind.S•r/iwd;,rdhule4'dNaL first year Thereafter max 0 54% z % U >t6 ----------------------------- W I excellent low-light and temperature behavior. LL o degradation per year At least 93 1°0 �,100 __--____ __-_____I;- W of nominal power up to 10 years At W I z 90 -------------- least 85%of nominal power up to W o > I I I I ;�; ENDURING HIGH PERFORMANCE W a 25 years. J 90 - zt z .s W Long-term yield security with Anti LID and Anti PID Technology', ° All data within measurement toleranc- J Hot-Spot Protect and Traceable Quality Tra.QTM a .0 es.Full warranties in accordance with °0 zoo 4000 600 800 1000 14�I a the warranty terms of the Q CELLS IRRADIANCE[W/m=J 0 75 sales organization of your respective o 0 6 so >o° 26 county. N ZEP COMPATIBLET""FRAME DESIGN $Ir, nu•a.I;.rnNcchr,M 1,rP1 c^,p,n.•- YEARS y Typical module performance under low irradiance conditions into ",`nn,,.a,pt.•x,xur""°r"�.,:.,�.t le:st.,d Tb- ", comparison to STC conditions(25°C.1000 W/m2) r High-tech black Zep Compatible"'frame,for improved aesthetics, o easy installation and increased safety. TEMPERATURE COEFFICIENTS Temperature Coefficient of Isc a [%/K] +0.04 Temperature Coefficient of Voc 0 [%/K] -0.27 20 A RELIABLE INVESTMENT Temperature Coefficient of Pm, y [%/K] -0.36 Normal Module Operating Temperature NMOT [OF] 109±5.4(43±3°C) ILI m eYEARS Inclusive 25-year product warranty and 25-year o l� 2 m warrant linear performance wa a ty. PROPERTIES FOR SYSTEM DESIGN Q U_ Maximum System Voltage Vsys IV] 1000(IEC)/1000(UL) Protection Class II o STATE OF THE ART MODULE TECHNOLOGY Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 1703 C(I EC) 2(UL) W Q.ANTUM DUO combines cutting edge cell separation o ( / Max.Design Load.Push/Pull(UL) [Ibs/ft] 50(2400Pa)/50(2400Pa) Permitted Module Temperature -40 Fupto+185o 0 F O and innovative wiring with Q.ANTUM Technology. 0 Max.Test Load,Push/Pul!(UL)' [Ibs/ft] 75(3600 Pa)/75(3600Pa) on Continuous Duty (-40°C up to+85°C) :'See Installation Manual 'APT test conditions according to IEC/TS 62804-1:2015.method B(-1500 V,168 h) See data sheet on rear for further Information QUALIFICATIONS AND CERTIFICATES i U N UL 1703,CE-compliant,IEC 61215:2016,IEC 61730:2016, 5 Application Class II,U.S.Patent No 9,893,215(solar cells) D Q�°,1P41�6 THE IDEAL SOLUTION FOR: pVE $A CE UL 1703 AC.°MPAtO GUi coot Rooftop arrays on <_„tit _ _.� v°i :om l and ndustrial tr�al buildings Note:Installation Instructions must be followed See the Installation and operating manual or contact our technical service department for further Information on approved installation and use of this product Hanwha 0 CELLS America Inc. Engineered in Germany OCELLS 400 Spectrum Center Drive,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiry@us q-cells corn I WEB www q-cells us T = SLn GENERAL NOTES DRAWING OF STANDARD MCI WIRING DETAIL FOR ANY GIVEN STRING LENGTH GD • IF INITIATED, RAPID SHUTDOWN OCCURS WITHIN 30 SECONDS OF ACTIVATION AND LIMITS VOLTAGE ON THE ROOF TO NO GREATER THAN 165V (690.12.B.2-1) • MID CIRCUIT INTERRUPTER (MCI) IS A UL 1741 PVRSE CERTIFIED RAPID SHUTDOWN DEVICE (RSD) DC+ d—eox J—BOX J—BOX J—BOX d—eox J—BOX LMCI MCI RETROFIT PV MODULES DC.- MCIS ARE LOCATED AT ROOF LEVEL, JUST UNDER THE PV MODULES IN ACCORDANCE WITH 690.12 REQUIREMENTS 1 • THE QUANTITY OF MCIS PER STRING IS DETERMINED BY STRING LENGTH — NUMBER OF MODULES BETWEEN MCI UNITS = 0-3 — MAXIMUM NUMBER OF MODULES PER MCI UNIT = 3 J—aox J—BOX J—BOX d—eox — MINIMUM NUMBER MCI UNITS MODULE COUNT/3 MCI PLEASE REFER TO MCI CUTSHEET AND PVRSA INSERT FOR O � (z)gWG, PV Wire, 600V, Black DC MORE INFORMATION T = 5Ln GENERAL NOTES • DRAWING OF STANDARD MCI WIRING DETAIL FOR ANY GIVEN STRING LENGTH • IF INITIATED, RAPID SHUTDOWN OCCURS WITHIN 30 SECONDS OF ACTIVATION AND LIMITS VOLTAGE ON THE ROOF TO NO GREATER THAN 165V (690.12.B.2-1) GD • MID CIRCUIT INTERRUPTER (MCI) IS A UL 1741 PVRSE CERTIFIED RAPID SHUTDOWN DEVICE (RSD) DCi4 FDIODE M�f DIODE DICOE DIODE g00E qWE DC -------- - SOLAR ROOF TIES 9 MCIS ARE LOCATED AT DECK LEVEL, JUST UNDER THE 1 owoc nooc oiooe oiox moos owoe oiooe Ntl TILES IN ACCORDANCE WITH 690.12 REQUIREMENTS • THE QUANTITY OF MCIS PER STRING IS DETERMINED BY STRING LENGTH — NUMBER OF TILES BETWEEN MCI UNITS = 0-10 Dime oKoe owx w«c woos oiooe oieme ua — MAXIMUM NUMBER OF TILES PER MCI UNIT = 10 — MINIMUM NUMBER MCI UNITS TILE COUNT/10 pWE g00E 400E DpOE v T PLEASE REFER TO MCI CUTSHEET AND PVRSA INSERT FOR Tj (2)AWG, PV Wire, 600V, Black DC MORE INFORMATION SOLAR INVERTER SOLAR SHUTDOWN DEVICE The Tesla Solar Shutdown Device is part of the PV system rapid ' Tesla Solar Inverter provides DC to AC conversion and integrates with the Tesla ecosystem, shutdown(RSD)function in accordance with Article 690 of the including Solar Panels,Solar Roof,Powerwall,and vehicle charging,to provide a seamless - sustainable energy experience. applicable NEC.When paired with the Tesla Solar Inverter,solar array shutdown is initiated by any loss of AC power. oe KEY FEATURES • Integrated rapid shutdown,arc 2x the standard number of MPPTs for fault,and ground fault protection high production on complex roofs • No neutral wire simplifies installation ELECTRICAL SPECIFICATIONS MECHANICAL SPECIFICATIONS Nominal Input DC Current Rating(IMP) 12 A Electrical Connections MC4 Connector Maximum Input Short Circuit Current(ISM) 15 A - - ---- -- ---- - -- -- - - -- -- - - -------- -- Plastic ELECTRICAL SPECIFICATIONS MECHANICAL SPECIFICATIONS Housing Maximum System Voltage 600 V DC Dimensions 125 mm x 150 mm x 22 mm MODEL NUMBER 1534000-xx-y 1538000-xx-y Dimensions 660 rnrn x/I11 rnrn x 158 MIT)(26 in x 16 in x 6 in) (5 in x F)in x 1 in) OUTPUT(AC) I�,�f Weight 52 Its' RSD MODULE PERFORMANCE Weight 350 g(0.77 lb) Mounting Options ZEP Home Run Clip Nominal Power 3.800 W 7,600 W Mounting options Wall rnouril(brac:I<el) Maximum Number of Devices per String 5 M4 Screw(#10) Maximum Apparent Power 3.328 VA at 208 V 6,656 VA at 208 V 'Door and b,ac,kuL c j—be removed l'o,(i)i nounLlnu we U-1.o'37 lb. Control Power Line Excitation M8 Bolt(5/16") 3,840 VA at 240 V 7,680 VA at 240 V Nail/Wood screw Maximum Continuous Current 16 A 32 A oo Passive State Normally open 0o Maximum Power Consumption 7 W Breaker(Overcurrent Protection) 20 A 40 A o0 mm o Va �' oN Warranty 25 years Nominal Power Factor IMV[RT[R 1 -0.9(leading lagging) 00 CIM THD(at Nominal Power) <5% o0 00 250 mm INPUT(DC) 660 mm o0 COMPLIANCE INFORMATION MPPT 2 4 0 00 4 0 0o M4 Screw Input Connectors per MPPT 1-2 1-2-1-2 Certifications UL 1741 PVRSS o e PVRSA(Photovoltaic.Rapid Maximum Input Voltage 600 VDC Shutdown Array) 650 mm 150 mm M8 Bolt DC Input Voltage Range 60-550 VDC DC MPPT Voltage Range 60-480 VDC;' PVRSA e o Nall/ Maximum Current per MPPT(imp) 13 A Loss of AC power Wood Screw Maximum Short Circuit 411 mm 158 RSD Initiation Method 15 A MITI Compatible Equipment Tesla Solar Inverter Current per MPPT(ISM) ENVIRONMENTAL SPECIFICATIONS PERFORMANCE SPECIFICATIONS Operating Temperature -300C to 450C(-220F to 113°F) ENVIRONMENTAL SPECIFICATIONS Peak Efficiency 98%at 208 V 98.4%at 208 V Operating Humidity(RH) Up to 100%.condensing 125�r�rr� 98.1%at 240 V 98.6%at 240 V Ambient Temperature -400C l0 SU�C(-40"F l0 122°F) 22 mm Storage Temperature -300C to 700C(-220F to 158°F) CEC Efficiency 97.5%at 208 V 97.5%at 208 V Storage Temperature -300C to 7011C(-22uF le 1581F) 97.5%at 240 V 98.0%at 240 V Maximum Elevation 3000 m(9843 ft) Enclosure Rating `.EMA 4/IP65 Allowable DC/AC Ratio 1.7 Environment Indoor and outdoor rated Customer Interface Tesla Mobile App Enclosure Rating Type 3R Internet Connectivity Wi-Fi(2.4 GHz,802.11 b/g/n), Ingress Rating IP55(Wiring compartment) Ethernet,Cellular(LTE/4G)' Pollution Rating PD2 for power electronics and terminal wiring SOLAR SHUTDOWN DEVICE REQUIREMENTS PER MODULE AC Remote Metering Support WI-Fi(2.4 GHz.802.11 b/g/n), compartment,PD3 for all other components RS-485 Operating Noise @ 1 m <40 db(A)nominal,<50 db(A)maximum The following modules have been certified as part of a PV Rapid Shutdown Array(PVRSA)when installed together with the Tesla Solar Inverter and Tesla Protections Integratod arc far,lt circuit interrupter Solar Shutdown Devices.See the Tesla Solar Inverter Installation Manual for guidance on installing Tesla Solar Inverter and Solar Shutdown Devices with (AFCI).Rapid Shutdown For the 7.6 kW Solar Inverter,performance may be de-rated to 6.2 kW at Diner modules. 240 V or 5.37 kW at 208 V when operating at temperatures greater than Supported Grid Types 60 Hz,240 V Splil Prase 450(, Brand Model Required Solar Shutdown Devices 60 Hz,208 V Wye Required Number of Tesla Solar See Solar-Shutdown Device COMPLIANCE INFORMATION Tesla Solar Roof V3 1 Solar Shutdown Device per 10 modules Shutdown Devices per Solar Module Requirements per Module on page 3 Hanwha Q.PEAK DUO BLK-G5 1 Solar Shutdown Device per 3 modules Grid Certifications UL 17/11,UL 17/11 SA.IEEE 15,17,IEEE 15,17.1 Warranty 12.5 years Hanwha Q.PEAK DUO BLK-G6+ 1 Solar Shutdown Device per 3 modules Safety Certifications UL 1699B,UL 1741,UL 1998(US) Maximum cur,ent. 'Cellular connectivity subject-o network operator Service cove,age and,signal Emissions EN 61000-6-3(Residential),FCC 47CFR15.109(a) s:rungl.i I. I LSLA.0 0M/_Nl-R(;Y I L.SL:�.�:UM/LNLI�C,Y QGpMPA l� ROOFING SYSTEM SPECIFICATIONS • GROUND ZEP LEVELING FOOT AcOMP Listed to UL 2703 Listed to UL 2703 DESCRIPTION PV mounting solution for composition shingle roofs. Part#850-1511 Part#850-1397 Works with all Zep Compatible Modules. Auto bonding UL-listed hardware creates structural and electrical bond. 0 SPECIFICATIONS Designed for pitched roofs. Installs in portrait and landscape orientations. DC WIRE CLIP HOME RUN CLIP Engineered for spans up to 72"and cantilevers up to 2411. Listed to UL 1565 Listed to UL 1565 Part#850-1509 Part#850-1510 ZS Comp has a UL 1703 Class"A" Fire Rating when installed using modules from any manufacturer certified as"Type 1" or"Type 2". Attachment method UL listed to UL 2582 for Wind Driven Rain. \ ZS Comp supports 50 psf(2400 Pa)front and up to 72 psf(3450 Pa) rear side design load rating for Portrait module orientation per UL 2703. ZS Comp supports 50 psf(2400 Pa)front side and up to 72 psf(3450 Pa) rear side design ARRAY SKIRT END CAP load rating for Landscape module orientation. Listed to UL 2703 Listed to UL 2703 Engineered for compliance with ASCE 7-05, 7-10, and 7-16 wind load requirements. Part#850-1608 Part#850-1586(Left) g p a Part#850-1588(Right) Zep wire management products listed to UL 1565 for wire positioning devices. ZS Comp grounding products are listed to UL 2703 and UL 467. ZS Comp bonding products are listed to UL 2703. <jj MOUNTING BLOCK FLASHING INSERT SKIRT GRIP INTERLOCK Listed to UL 2703 Listed to UL 2703 and UL 2582 for Wind Driven Rain Listed to UL 2703 Listed to UL 2703 Part#850-1633 Part#850-1628 Part#850-1606 Part#850-1613 op IE) �l 0 i CAPTURED WASHER LAG HYBRID INTERLOCK Part#850-1631-002 and#850-1631-004 Listed to UL 2703 Part#850-1281 i fl O PVRSA Model:ZS Rapid Shutdown Array PVRSA Model:Solarglass Roof Rapid Shutdown Array (Applicable to ZS Comp,ZS Span,ZS Ramp,and ZS Seam) Category QIJR,Report Date:2021-03-05 Category QIJR,Report Date:2021-03-05 Table of Essential Elements Table of Essential Elements Firmware Firmware Versions Certification Versions and Certification Function Manufacturer Model No. and Checksums Standard Function Manufacturer Model No. Checksums Standard PVRSE Mid Circuit Tesla MCI-1 N/A UL 1741 PVRSE PVRSE Mid Circuit Tesla MCI-1 2 N/A UL 1741 PVRSE Interrupter(MCI) 15503792 Interrupter(MCI) 1550379 7.6 kW:15380002 V1 D85CAB80 UL 1741 1998 7.6 kW:15380002 V1 D85CAB80 UL 1741 1998 Inverter Tesla 3.8 kW:15340002 V1,8A3CA3F2 PVRSS/PVRSE Inverter Tesla 3.8 kW:15340002 V1,8A3CA3F2 PVRSS/PVRSE PV Module Tesla SR60T1 N/A UL 61730 Q.PEAK DUO BLK-G5/SC315 Diode Harness Tesla SRDTH N/A UL 9703 Q.PEAK DUO BLK-G5/SC320 SR-BJ2X PV Module Hanwha Q.PEAK DUO BLK G6+/SC330 N/A UL 1703 Q-CELLS Q.PEAK DUO BLK-G6+/SC335 PV Wire Jumper(s) Tesla SR-BJ3X N/A UL 9703 Q.PEAK DUO BLK-G6+/SC340 SR-BJ4X Q.PEAK DUO BLK-G6+/SC345 SR-BJ M in i ZEP 850-1613-001 Pass-Through Box Tesla SRPTB-4 N/A UL 1741 Interlock Tesla ZEP 850-1388-001 N/A UL 2703 PVRSA Initiator' ZEP 850-1281-001 (See installation Non-Specific N/A N/A N/A Ground Zep Tesla ZEP 850-1511-001 N/A UL 467 requirements below) 1 1 1 1 ZEP 850-1172-002 UL 2703 1 Dedicated PV system AC circuit breaker or AC disconnect switch,labeled per NEC 690.12 requirements. ZEP 850-1509-001 DC Wire re Clip p Tesla ZEP 850-1448-001 N/A U L 1565 2 Applies to variations of this part number with suffix of two numbers and one letter. Note:PVRSA installation requirements may reduce the effective equipment and component ratings below the individual Homerun Wire Clip Tesla ZEP 850-1510-001 UL 1565 equipment and component PVRSE ratings in order to achieve PVRSA shock hazard reduction requirements. PVRSA Initiator' (See installation Non-Specific N/A N/A N/A PVRSA Installation Requirements requirements below) Max System Voltage 600 Vdc 1 Dedicated PV system AC circuit breaker or AC disconnect switch,labeled per NEC 690.12 requirements. Max Array Internal Voltage After Actuation 165 Vdc(cold weather open circuit) Applies to variations of this part number with suffix of two numbers and one letter.. Max Series-Connected Panels between MCIs: 10 Note:PVRSA installation requirements may reduce the effective equipment and component ratings below the individual equipment and component PVRSE ratings in order to achieve PVRSA shock hazard reduction requirements. Other Installation Instructions: 1. An MCI must be connected to one end of each series string or mounting plane sub-array string. PVRSA Installation Requirements 2. Verification that MCIs are installed with 10 or fewer modules between MCIs shall be documented for Max System Voltage 600 Vdc inspection,by voltage measurement logs and/or as-built string layout diagrams. Max Array Internal Voltage After Actuation 165 Vdc(cold weather open circuit) 3. The dedicated PV system AC circuit breaker or PV system AC disconnect switch shall serve as the PVRSA Max Series-Connected Panels between MCIs: 3 initiator and shall be sized and installed in accordance with NEC requirements. The specific part shall be Other Installation Instructions: identified on the as-built system drawings. 1. An MCI must be connected to one end of each series string or sub-array string. 2. Verification that MCIs are installed with 3 or fewer modules between MCIs shall be documented for inspection,by voltage measurement logs and/or as-built string layout diagrams. u3. The dedicated PV system AC circuit breaker or PV system AC disconnect switch shall serve as the PVRSA Certification Mark of UL on the installation instructions is the only method provided by UL to identify products i n installed in accordance with NEC requirements. The specific art shall be manufactured under its Certification and Follow-Up Service.The Certification Mark for these products includes initiator and shall be sized and sta ed q p p • � identified on the as-built system drawings. the UL symbol,the words CERTIFIED and SAFETY, the geographic identifier(s),and a file number. Certification Mark of UL on the installation instructions is the only method provided by UL to identify products manufactured under its Certification and Follow-U Service.The Certification Mark or these products includes L fpf the UL symbol,the words"CERTIFIED"and"SAFETY,"the geographic identifier(s),and a file number."