Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MP21-159
DRn t t 4°j JJ� � 1 90 VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A. Klein (914) 939-0668 Christopher J. Bradbury www.iyebrook.org TRUSTEES BUILDING& FIRE INSPECTOR Susan R. Epstein Steven E. Fews Stephanie J. Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE March 26,2024 Robert Lewis& Deborah Lewis 30 Hillandale Road Rye Brook,New York 10573 Re: 30 Hillandale Road, Rye Brook,New York 10573 Parcel ID#: 130.77-1-10 This document certifies that the work done under Mechanical Permit#21-159 issued on 10/28/2021 for the installation of a new geothermal heating system has been satisfactorily completed. Sincerely, Steven E. Fews Building& Fire Inspector /to QyC QRC� A G tC4.jJVv C � v V OTC 190 VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook, N.Y. 10573 ADMINISTRATOR Jason A. Klein (914) 939-0668 Christopher J.Bradbury www.ryebrook.org TRUSTEES BUILDING& FIRE INSPECTOR Susan R. Epstein Steven E. Fews Stephanie J. Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE March 26,2024 Robert Lewis&Deborah Lewis 30 Hillandale Road Rye Brook,New York 10573 Re: 30 Hillandale Road, Rye Brook,New York 10573 Parcel ID#: 130.77-1-10 This document certifies that the work done under Plumbing Permit #24-037 issued on 3/15/2024 for the installation of a new electric water heater has been satisfactorily completed. Sincerely, Steven E. Fews Building&Fire Inspector /to QyE BRCZ), t7 >� �O /'• 1982� BUILDING DEPARTMENT ❑BUILDING INSPECTOR ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street . Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : �� 1 1 1 D J �G� k J L� DATE: PERMIT# ham, - J / ISSUED: /J " z y L I SECT: -%v',? BLOCK: / LOT: w LOCATION: 6 A-�P/, e- OCCUPANCY: 2 U ❑ Violation Noted THE WORK IS... lid' PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION❑ Natural Gas ❑ L.P. Gas ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION FINAL 1 OTHER f, 114.C QyE BR�k, O�` tim BUILDING DEPARTMENT ❑BUILDING INSPECTOR ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street • Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS : /�/ G a C G. l P (3 c, c4 DATE: -3 PERMIT# ?� Z L! _22 ISSUED: -/S '-Z- SECT: �,j�BLOCK: LOT: 14) "") \P� LOCATION: e OCCUPANCY: / ❑ Violation Noted THE WORK IS... E3- PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ Natural Gas Al E LJ e C o C L (.Jp Pc ❑ L.P.Gas ❑ FUEL TANK ❑ FIRE SPRINKLER ,FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL ❑ OTHER ■ s � ■ : L ■ rl ta ^ oar 52 1.4 iFr Ll G��] "��" W Ri U ■ pEno O ~' ■ 01 t 5 3 O 4 O [� r�1y C a > °i' F 1�� p L� ^ Q p c a p A ■ fTl 4.) CL co � °�i C � o T U © pp W DO am C b a o 0 0 W Lp Z © W In � � 00 4 ' � F-� v� �] ��� ram?/ d a ''" w ,• ,�° � � � A �CD v O ' vl MCI � � � w Q U � '" O a � a _ A O 0 rFnQ c n u V� F a, a E„ 601) E E O o H w A cam . •• A Q a �� a ° y N 0.0 a.a o 0 BUILD kRTMENT VILE E OF RYtdOOK OCT 5 2021 938 KING ET RYE BROOK, NY 10573 VILLAGE OF RYc BROOK (914)9�.. �914)939-5801 BUILDING DEPARTMENT wll4yv fitidk.orj APPLICATION FOR PERMIT TO INSTALL AND/OR REMOVE HEATING, VENTILATION AND/OR AIR CONDITIONING E QUI/PMENT FOR OFFICE USE ONLY: PERMIT#: ! — Approval Date: OCT 2 a, Permit Fee:$ Approval Signature: Other: Disapproved:______AV ___-- (fees are.non-relmidahle) REO UIRENIENTS FUR RELEASE 01:PERMIT&CERTIFICAu OF COMPLIANCE: I. Properly completed&Signed Application. 2. Site/Staging Plan if Required by the Building Inspector. 3. Copy of Licensed Contractor's Liability Insurance.(Village of Rye Brook must he listed as eenitic:ate holder)& Workers Compensation Insurance on a NYS Board form(Form#C 105.2 or Form is 1.126.3/or NY State Workers Coinpimsation Waiver) 4. Payment of Fees/Unit: RESIDENTIAL -$I00.00/unit -COMMERCIAL =$350.00/unit. 5. Inspection by the Building Department for removal and/or installation.(48 hour notice required) b. Electrical work requires a separate Electrical Permit& Electrical Inspection. 7. Plumbing/Gas work requires a separate Plumbing Permit& Plumbing Inspection. Application dated. WWI is hereby made to the Building Inspector of the Village of Rye Brook for a permit for the installation and or removal of the HVAC equipment as listed below.The applicant and property owner.h� signing this document agrees that said equipment will he installed and/or removed in contbrmunec%%ith all applicable Local.Counq.State&Federal laws.codes.rules and regulations. I. Address: 30 Hlllandale Rd, Rye Brook, NY 10573, USA SBL: 130.77-1-10 Zone: 2. Property Owner: Robert Lewis Address: 30 Hillandale Rd,Rye Brook,NY 10573,USA Phone#: (917)373-7631 Cell C (917)373-7631 email: rlewisny@gmail.com 3. Contractor. Dandelion Energy Address: 333 North Bedford Rd Suite 220 MI Kisco NY 10549 Phone#: 845 649 6073 Cell#: 845 649 6073 email: ldevore@dandelionenergy.com 4. Applicant: John DeVore of Dandelion Energy Address: 333 North Bedford Rd Suite 220 MI Kisco NY 10549 Phone#: 845 649 6073 Cell#: 845 649 6073 email: jdevore@dandelionenergy.com 5. Scope of Work:New Installation( )•Replacement( )-Remo\al( )-Other( Install 4 and 5 ton Geothermal heat pomp closed loop system 6. List Equipment: 4 ton Packaged and 5 ton Split geothermal heat pumps closed loop system 7. Location of Fquipment: Basement/Mechanical room x. Method ol'Installation/Removal(list all equipment needed to perfonn ioh): I 3/21119 STATE OF NEW YORK.COUNTY OF WF.STCl1ESTER ) as: John oeyore .being duly sworn.deposes and states that he/she is the applicant above named. (print narm of individual signing as the applicant) and further states that(s)he is the legal owner ot'the property to which this application pertains,or that(s)he is the Agent for the legal owner and is duly authorized to make and file this application. (indicate architect,contractor,agent.attorney.etc.) That all statements contained herein are true to the best oi'his/her knowledge and belief and that any work performed.or use conducted at the above captioned property will he in contbrmance with the details as set firth and contained in this application and in any accompanying approved plans and specifications.as well as in accordance with the Nea York State t Iniform Fire Prevention& Building Code.the Code of the Village of Ryc Brook and all other applicable laws.ordinances and regulations. State of Florida,County of Orange Sworn to before me this AIr Sworn to before me this 13th day of 20 _ day of trtober 20 Sign to of P y Owner Signature of Applicant Robert Lewis a,►{Y 14.<^ KARL BERRY JOSE- John DeVore NaeryPubc-StetolFbNae Comms9bn k ww 23.2 Print Name of Property M-mer Print Name of Applicant E.Pe.,en otary Pubt c AL �RAH RSHALL Notary Public Karl Berry Joseph Notary Public,State of New York Type of ID Produced:Driver License No.O1FR6363711 Notarized online using audio-video communication Quallfled In Westchester County CommIssfon Expires August 28,202�i `this application must be properly completed in its entirety and must include the notarized signature(s)of the legal owner(s)of the subject property, and the applicant of record in the spaces provided. Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void and will be returned to the applicant. z 3121119 fil U O U m O o = VoFlo l a � � z N � � Q N 8 ` � • "� 0 z E..y Z C 7 . rI' o d oG 00 04 w A cz W o OEM rA cz . � M� Q O E.., pe � p., W Z p Q g z 0.4 xi V W z Q 0ON IL fil 444444to44M444f#:4tolAtots$644444444to6�������������+ 939 KI\G STREI-T Rl'F BROOK. NY I Oi73 D r— /a (914)939-06ftVAX(914)939-5WI � ELECTRICAL PERMIT APPt.ic. TlO\ OCT 2 � 202� 0 N estchester Count% Master Electrician% I.icense uir _ gVILLAGE OF RYE BROOK FOR OFFICE USE O\I. E:p#: BUILDING DFPARTMENT acT z s 10 ,�- Appro%al Date: Permit Fee: S L y A �—pproval Signature: ���— / I Disapproved: Itee,are non-refundabted Application dated, ar28.2' is hereby made to the building Inspector of the Village of Rye Brook NY. Iirr the issuance of a Permit to install and or remove electrical equipment. wiring. tixturec .or to perform ether high or logy %oltage electrical %%ork a, per the detailed statement described beloti. The applicant & property owner. b� signing this document agree that all electrical \u,rk performed will be in conformance"ith all applicable Federal. State.('ounty and local ('ode% 1.Address: 30 Hillandale Rd, Rye Brook, NY 10573, USA SB : 130.77-1-10 1„11t k—aS- 2.Property(hvncr: Robert Lewis Address: 30 Hillandale Rd, Rye Brook, NY 10573, USA Phone tt: (917) 373-7631 ('ell L: (917) 373-7631 email. dewisny@gmail.com 3.\taster Electrician: doe Covias Address. 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 Lie. _: 1768 Phone::: 845 649 6073 Cell 845 649 6073 e1nail: idevore@dandelionenergy.com ('ompany Name: Dandelion Energy Address 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 4.Proposed Electrical \\,,rk I nture('oust: Install 4 and 5 ton geothermal heat pump closed loop system,400 amp service upgrade main panel upgrade. 80 gal electric water heater STATE OF NEVI )'ORK.('O('N 1'l'OF\1'EST('I IESI ER I as. Joe Covias being dul% ,ssurn.deposes and,late,dial he she d,the apphc.uu al'm L n.on,eoi..uul,6�,Uudhed ,1, Electrician ,rate that oche is the legal owner of the property to which this application pertain,.or that t sdhe is te h __. I'jr the legal owner and is duly authorized to make and file this application. ,"Idic nr nr;b�--., r..niracl„r .,errn nni,mr, The undersigned further states that all statement,contained herein:ere true to the best of his her kno%%ledge and helict.and that am %cork performed.or use conducted at the ahmc captioned property will be in conformance%enh the details as set turth and cont:rrncd m tht, application and inam accompanNing approved plans and specifications.as,%ell as in accordance%.dth the C" fork State I nit0rn1 I ire Pre%ention&Building('axle.the('odc of the\illage of R\c Bnx,k and all other applicable la",.ordinance,and regulanon,. Sworn to jtctire me this 4t' _2fA Sworn to hcfi.rc tide this day ul .20 day of Odo a.- _. 0 01 Sigmaturc of Pro erty Owner •tturc of Applicant Robert Lewis 4 e-6(t'q,r Print Name of Property Owner Print Name of Applicant utar\ Publican c ALEXANDRA H.MARSHALL Notary Public,State of New York No.O1FR6363711 �uallfled In Westchester County^ ALEXANDRA H.MARSHALL Commission Expires August 28,20 Notary Public,State of New York No.01FR6363711 Qualified In Westchester County Commisslon Expires August 28,20a`S • STATEWIDE INSPECTION Service With IntegritY lIl Main Street, Fishkill, NY 12524 1 email.office@swisny.com SWIS JOBAPPLICATION ;. 12.7224 I fax9l4.219.10621 • • • Office Use Elect. Permit# Date Bldg Permit# Utility ID# Final Certificate# City/Village Zip Township County Address Cross Street Section Block Lot Owner Name/Address(If different than above) Contact Number ❑Basement ❑ 1 St Fl. ❑2nd FI. ❑3rd FI. ❑More Than 3 FI. ❑Garage ❑Attic ❑Outside ❑Residential ❑Commercial Receptacles Special Recept GFCI AFCI Switches Dimmers Smoke Alarms Carbon Monox Hood Trash Compact Amt Amps Range(s) Cooktop(s) Oven(s) Dishwashers Refrigerator Disposal Microwave Warm Draw Incandescent Fluorescent SERVICE Amperage Voltage 1 P 3P #Meters #Disconnect ❑Underground ❑New ❑Reconnect ❑Overhead ❑Change ❑Visual Re-Inspection ❑ Safety Re-Inspection ❑ Re-Inspection Additional Information i OCT 21 2021 VILLAGE OF RYE BROOK BUILDING DEPARTMENT This application is valid for one(1)year from the date received by SWIS.This application is intended to cover the above listed items to be inspected,if at any time of inspection additional items have been installed,you are authorized to make the inspection and adjust thefee for the additional items inspected.The applicant declares that there is no open applications for the above address with any other inspection company.The applicant,owner or authorized agent agrees to all the above terms and conditions as set forth for the application. Inspector Date Finalized Inspector# Company Name Date Signature Address City/State Zip Code License# Phone# State Wide Inspection Services 1080 Main Street _ Fishkill, NY 12524 U A 845 Phone I Muff 914-2194-219-1062 Fax STATE WIDE INSPECTION SERVICES Email: officeCd)swisny.com Service With Integrity Website: www.swisny.com BY THIS CERTIFICATE OF COMPLIANCE STATE WIDE INSPECTION SERVICES CERTIFIES THAT: Upon the application of: Upon Premises Owned by: Dandelion Energy Robert Lewis Joe Covais 30 Hillandale Road 1 Corporate Drive Rye Brook, NY 10573 Peekskill, NY 10566 Located at:30 Hillandale Road, Rye Brook, NY 10573 Section: Block: Lot: Electrical Permit Number: EP21-271 130.77 10 Certificate Number: 2021-6649 MP Permit Number: MP21-159 A visual inspection of the electrical system was conducted at the Residential occupancy described below.The electrical system consisting of electrical devices and wiring is located in/on the premises at:30 Hillandale Road, Rye Brook, NY 10573 The Basement and Exterior were inspected in accordance with the NYS and NFPA 70-2017 and the detail of the installation,as set forth below,was found to be in compliance on the 28th day of April 2022. Name Quantitv Rating Circuit Type Geothermal System 02 Electric Water Heater 01 Service 01 400Amp Meter 01 Panels 02 Grounding and bonding of service to current codes. Officer: Frank!. Farina This certificate may not be altered in any way and is validated only by the presence of a seal at the location indicated.This certificate is valid for work performed on the date of inspection only. , A ! i L M c N ■ �1 M M M � f,..l ' u O CA �\ N W (n w to ■ �--� u z x W ao x W o E O z C:) w W \ O O Q (A� ■ ! •I^I^. F 0 11 g � i u z z W z a w cn MM z p ' ►� a M W 64)- w W o ca ! U P-Mz z � Y ! H U w ,�,z 00 A ow V - w Z o A zcn , z w � z en cN O � a' V ^ W .-, A oo Z 0., u w x W • 1-4 MM GIN Q' w �"a � F I4 h+�l W U a a ° eq w o � Z W � P.., x p 0-4 o �� w w off o w as O 1 a V H8 Cl) o z w M A w z [ op .. ,� o w _ a° w x � Y L= U ` BUIL WENT MAR 13 2024 VIL E OF RPB , OK 938 KIN ET RYENY 10573 VILLAGE OF RYE BROOK BUILDING r)FPnRTI\1F1\IT PLUMBING PERMIT APPLICATION FOR OFFICE USE ONLY - PP �j.� Z Approval Date: ✓\�/S Permit Fee: $ &-)�5-- Approval Signature: Disapproved: (fees are non-refundable) DO NOT START WORK or CONSTRUCTION UNTIL A PERMIT HAS BEEN ISSUED BY THE BUILDING INSPECTOR THE ADMINISTRATIVE FEE FOR WORK PROGRESSED OR COMPLETED WITHOUT A PERMIT IS 12%OF THE TOTAL COST OF CONSTRUCTION WITH A MINIMUM FEE OF$750.00 Application dated,3- 3 c)y is hereby made to the Building Inspector of the Village of Rye Brook NY,for the issuance of a Permit to install and/or remove Plumbing as per detailed statement described below.The applicant&property owner,by signing this document agree that said plumbing work will be in conformance with all applicable Federal,State,County and Local Codes.nn I.Address: 30 Hillandale Rd Rye Brook, NY 10573 SBL: 130.77-1-10 Zone;/f_Cls 2.Proposed work: Install / replace water hater with 80 gal electric water heater 3.Property Owner: Robert Lewis Address: 30 Hillandale Rd Rye Brook, NY 10573 Phone#: Cell#: email: 4.Master Plumber: John Daclud Address: 333 North Bedford Rd Suite 220 Mt Kisco NY 10549 Lic.#: 1504 Phone#: 845-649-6073 Cell#: email: Plumbing@dandelionenergy.com g Company Name: Address: Dandelion Plumbing LLC333 North Bedford Rd Suite 220 Mt Kisco NY 10549 INDICATE FIXTURES&LINES TO BE INSTALLED AS PER THE FOLLOWING SCHEDULE: Location Water Urinals Drinking Sinks Showers Bath Laundry Domestic Fire Sanitary Natural/ Other* Total Closets Fountains Tubs Tubs Service Service Sewer LP Gas Basement WH 1 1st Floor 2nd Floor 3`d Floor 4a'Floor 5t'Floor Exterior 5.•List Other Equipment/Provide Details: 80 gal electric heat pump water heater (Notarized Signatures Required Next 2 Pages) STATEOF NEW YORK•COi)NTY(W WEST('HE51'ER ) r. ` nWuodbcatg duty.*,um.dcpotc,nd states thx bc't)2e a the appiicvtnt nbave maned. (prx2 rurx of►od.�ilAut�iu�t an t�:Cr,.t::snb and further states that(s)nc 6 tltc 1,-Wer Plunb—for the lepl ounce arri is duly assiiw:iced to make and file this application. That all swcmcntti contained herein are rtue a)t.;e best of his%hcr kmwleditc and belier,and thin any wotit performed or use conducted at the abDve caplivred p.-qe-i}wilt be in t.*c dctaiL•as act faith mod rnntained in this application urd in any accvm;kmyirc upprmat plan;and 5bxciVca6on%as we13 as is xco:ci c wlh the New York S11tc Untfimn F"ar Pt>~veotiim fi Bulk'. g Code_the Ccdc of tin-V i3ian of Rye Brook al='sB office aFwlicablc laws ordlnanccs and rcgulatians Sworn to befo;c me this ` Swaw!o befc^m m-e*-b� day of 0w 2D �of W .21D 2 _ l V Si re of ucr ofAppraMM Robert Lewis Print Namc of Proprm Ostncr iPlillot altulev Ap�lioett -%, L.,��IAO Nam'PubhWM ntt:t.ttio Rotary Rjws - State oi'lr++YeA FILOMENA MANGANIELLO No.O1ME6i60063 NOZARY PUBUC.STATE OF NEW YOU ,Iua; ted in Wo;tch^ster scanty &COMstioM Va 01MA497162 r ss oil cX:�rcS January 29.2 gail�d It�W A*aa CaRaq Oommhi M EWaa Ocaoba 31.XV This application must be properly eompictcd in its entirety and must include the wiarizcd signature(s)of the legal o-viner(s)of the subject property_:rd the appEcam of record in the sp.ces provided..Applications not properly completed in it,-,entirety anWor nol proxrly signed shr11 be deem::d null and void and will be returned to the applicant. Scanned with CamScanner BUU,UIKJDP.PAR1 ij7ENT D W L� V1LUA F OF IRYi'\ ROOK MAR 13 2024 938 KIND;Sy'"' i r RYA:Bkgc ' NY I U573 f9a9J• 'UhbB VILLAGE OF RYE BROOK rw71G°m BUILDING DEPARTMENT rf�+�►frfr�far►s�►►frti...►�a-..�N..rf+•a.�k.ar a.*r�►.rr►.f rr..rr.►.rr►...r.e.r.rr�ti rfrr.►f Nf1NH Kif• AFFIDAVIT OF COMPLIANCE, VILLAGE Com.-U 16 f S'roR,%,I SMERS AND SANITARY SFIA-1.?,S TFas Arr=AvIT um >47Cm T ur MoTmt=D sztsv►wr o7 TU 7SCAr. PR-M.Ml � 1— A30 is Stua7!'Ct ALOM Wn% ANY ===G OR PLOAZM Pln=. APntCATT0r9. Aunt Na=—'Va Olt rz'aQ,..,= penaz A1'P=CAPI0N SUMGT ID WXTSWT ?HIS Co1CPLs'l9CD XW No-,MUM FOIRW MI:S 1a XjrMx= " 0= APfr.T1J . . STATT; OF NEW YORK.COUNTY OF WESi'CHESTER ) as: 3, Robert Lewis residing at. 30 Hillandale Rd, Rye Brook, NY 10573. USA being duly sworn.deposes and states that(s)he is the applicant above named.and further slates that(sole is she legal owner of the property to which this Affidavit of Compliance pertains at; 30 Hillandale Rd, Rye Brook, NY 10573, USA (j .� N 'r" Further that all statements contained herein are true,and that to the best of hister know ledge and lief, that there are no known illegal cross-connections concerning either the storm sewer or sanitary sewer,and further That there are no roof drains,sump pumps,or other prohibited storm%ater or groundwater c)nncctiorts or swoccg of inflow or infiltration of any kind into the sanitary sewer fmm the subject property in accordance:with all State. County and Village Codes. Robert Lewis Sworn to before me this SHAttr ANLIIIA Wa�1 PUbliC Smote Of twri York No 011dt<61em 'tUJ u,vo in N*5tCriwstq Coumtty }. '.w aiwn FApW_)anu4q 29.20-L-7 e Scanned with CamScanner BRADFORD WHITE Featuring conn¢ct1 W A T E R H E A T E R S AeroTherm° Series Heat Pump Water Heater AeroThermO Heat Pump Model Features: ENERGY STAR®Qualified—Meet or exceed requirements for ENERGY STAR®per the latest ENERGY STAW criteria revision,as well as most utility rebate programs. • Bradford White Connect'"—Turns a Bradford White Water Heater into a smart,connected appliance that can be conveniently controlled from a smart phone or device via an app. • The AeroTherm®Series Control Panel—Provides detailed diagnostic information including water heater fault codes,tank codes,need-to-assess codes,and heat pump codes. Additional functions allow you to monitor the status of temperature sensing thermistors and heating components. -User-Friendly,Easy to Read Display. -LED's Cleary Indicate the Current Operating Mode. - Display Communicates Current Status,Mode and Set Point,and Displays Error Messages (� When Applicable. • Operating Modes Offer Flexibility. -Heat Pump(Only)Mode—Maximizes consumer savings.The most energy-efficient mode as it only utilizes the heat pump. -Hybrid Standard Mode—Saves while experiencing fast recovery. Hybrid mode is the factory setting combining heat pump efficiency and savings with recovery rates of standard electric when needed. - Hybrid Plus Mode—Utilizes bottom heating element as needed. -Electric(Only)Mode—Operates like a standard electric water heater,and eliminates the air flow and sound from the heat pump system when preferred(fastest recovery time,but least energy efficient). -Vacation Mode—Adjusts the temperature set point down to 50°F(10°C)for extended periods of time. • Vitraglas®Lining with Microban®—An exclusively engineered enamel formula that provides superior tank protection from the corrosive effects of water;and with Microban®antimicrobial product protection to help prevent the growth of bacteria,mold and mildew on the surface of the -00 tank lining. • Can Be Laid Down for Easier Transportation—Easy-to-open,protective packaging. • Easily Accessible Top Mounted Washable Air Filter—User is automatically alerted when the air filter needs to be cleaned. • Operating air temperature range of 35-120°F(2-49°C)for the Heat Pump—(Unit operates in Standard/Electric Mode outside of this range). Photo is of • Backup Electric Heating Elements. RE2H50S10 • Direct Heat Transfer with Immersed Elements—Transfers heat directly and efficiently to the water.Screw-in style. FEATURING. • Insulation System-2"(51 mm)Non-CFC foam insulation covers the sides and top of the tank, reducing heat loss.This results in less energy consumption,improved efficiencies,and jacket rigidity. • Water Connections—374"(19mm)NPT factory-installed true dielectric fittings extend water heater MicROBran life and simplify water line connections. • Factory-installed Heat Traps—Design incorporates a flexible disk that reduces heat loss in piping BRADFORD WHITE and eliminates the potential for noise generation. conn¢ct1 • Protective Anode Rod—Provides added protection against corrosion for long-term,trouble-free service. • T&P Relief Valve—Installed. • Low Restrictive Brass Drain Valve—Durable tamper proof design. • Meets Requirements for Tier 4 of Advanced Water Heating Specification(AWNS)—Demand ;► response ready with built-in CTA-2045 port. • Optional Ducting Kit—Maximum duct length of 75 feet(23m)combined between inlet and exhaust. All models ship with Bradford White Connect'"kit from the factory.No need to purchase separate kit. 6 or 10-Year Limited Tank Warranties/6 or 10-Year Limited Warranty on Component Parts. For more information on warranty,please visit www.bradfordwhite.com c e For products installed in USA,Canada,and Puerto Rico.Some states do not allow limitations on warranties. ® C f ® See complete copy of the warranty included with the heater. O C us Microban®antimicrobial product protection helps prevent the growth of bacteria,mold and mildew that may affect the product. The built-in antimicrobial properties do not protect users or others from disease-causing organisms. MANUFACTURED TINDER ONE OR MORE OF THE FOLLOWING U.S.PATENTS:5,682,666;7,634,976;5,660,165;5,954,492;6,056,542;6,935,280;5,372,185;5,485,879:5,574,822;7,971,560;7,992,526;6,684,821;7,334,419; 7,866,168;7,270.087:7,007,748;5,596,952;6,142,216:7,699,026,5,341.770;7,337,517;7,665,211;7,665,210;7,063,132;7,063,133;7,559,293;7.900,589;5,943,984;8,082,888;5,988,117;7,621,238;7,650.859;5,761,379; 7,409,925;5,277.171:8,146,772;7,458,341;2,262,174.OTHER U.S.AND FOREIGN PATENT APPLICATIONS PENDING.CURRENT CANADIAN PATENTS:2.314,845:2,504,824;2,108,186;2,143,031;2,409,271;2,548,958;2,112,515; 2,476.685;2,239,007;2,092,105;2,107.012.YltraWW is a registered tradnnark of Bradford White Corporation.Microban•is a registsred tradenzwk of Microban Products Co aga ny. 1901-G-1222 Heat Pump Water Heater i Featuring connect. AeroThermO Model C E C.Listed Model Rated DOE First Uniform Recovery at 901 Rise' A B C D E F G Approx. Number Nominal Rated Hour Energy Floor Jacket Floor C/L of Floor Floor Water Shipping Volume Storage Rating Factor U.S.GPH Imp.GPH to Top Dia. to Water to to Conn. Weight Volume of Water Conn. T&P Condensate Size U.S. Imp. Compressor Compressor Compressor Compressor Heater Conn, Conn. Conn. NPT Gal. Gal. Gal. Gal. Only +Element Only +Element in. in. in. in. in. in. in. lbs. *RE2H50S10-CON 50 42 45 65 3.44 6 24 5 20 59sh6 213/4 603/r 8 195 •RE2H65T10-CON 65 54 65 79 3.64 ;,4 5 20 631/4 25 651h H ?13 t RF1H80T10-00fI Bn 57 '5 88 3.59 6 24 5 20 701a/1e 25 731h 8 0 58 2:i9 Model Rated DOE First Uniform Recovery at 50'C Rise' A B C D E F G Approx. Number Nominal Rated Hour Energy Floor Jacket Floor C/L of Floor Floor Water Shipping Volume Storage Rating Factor to Top Dia. to Water to to Conn. Weight Liters Hour Volume of Water Conn. T&P Condensate Size Compressor Compressor Heater Conn. Conn, Conn. NPT Liters Liters Liters Only +Element mm. mm. mm. mm. mm. mm. mm. kg. it RE2H50S10-CON 189 170 246 3.44 23 91 1503 552 1543 203 987 1189 19 88 *RE2H65T10-CON 246 246 299 3.64 23 1619 635 1664 203 1216 1305 19 107 •RE2HBOT10-CON 303 284 333 3.59 23 91 1799 635 1867 203 1280 1491 19 117 Based on Hybrid Standard Mode with 67.5°F ambient temperature and 50%relative humidity(RH). For 6 year models,change suffix from"10"to"6'; G 6 year models may not quality for some local rebates. B 6 year models quality for AWHS Tier 1. Uniform Energy Factor and First Hour Rating is based on the latest AHRI directory listings. ,tr=ENERGY STAR!Qualified. PARTS1110W0® C A RE2H50S10-00N a F Ote AdWtar omeloRcrAaapra E e�QMy L_ir" suawa 16) screws 1e1 G W Duce F,1. e'Nma Damps IA Optional Ducting Kit: B I —. Part No.415-52820-00 D Kit installation also requires-8" , (203mm)insulated flexible ducting, ducting support hangers and exterior wall vents for inlet&outlet. Additional clearances required for ducting,refer to ducting kit instructions. C q BRADFoao WHITE RE2H65T10-CON F E connect. RE2H80T10-00N �••+ Scan QR code to learn about more about Bradford White 01 F+. Connect" Q General Meets NAECA Requirements.All models are UL listed.These heaters are wired inter-locking(Non-Simultaneous,Single Phase)240V with 4000W upper element and 4000W lower element. All water connections are 3/4"(19mm)NPT and electrical connections are 1/2"(13mm)NPT.All models certified at 300 PSI test pressure(2068 kPa)and 150 PSI working pressure(1034 kPa.)Dimensions and specifications subject to change without notice in accordance with our policy of continuous product improvement. Suitable for Water(Potable)Heating.Toxic chemicals,such as those used for boiler treatment, shall NEVER be introduced into this system.This unit may NEVER be connected to any existing heating system or component(s)previously used with a non- potable water heating appliance. —BRADFORD WHITE 15— AMSERICAN Sales:800-523-2931 •Fax 215-641-1612 STRONG- 2417 Technical Support:800-334-3393 w Email techserv@bradfordwhite.com Products made by Bradford White are manufactured in the United States using the finest raw materials and components from around the world. Built to be the Best 1901-G-1222 ©2022,Bradford White Corporation,USA.All rights reserved. Printed in U.S.A. § go B® - § ! §a x � o = <5 /c 2 §f - E S 0 }\ N §2B $) < ° [£) `` / 2 e�§A « o z T>. : z R _ �!!Q%R § 5 r \ \§SIP` o < z� s of 6 a z�®®§I ) ± 2 # §]{f;( W - ¥ ( m!|Iq: 0 k§) Of )}§\\§ \\ �- - - —- -—-—- !!2»£; ix §wwke» }\0 . . . . . { a= } k 0 J Z } / § [k 2 _ )§ /§ LU (k \ a b \ § / ) k / w ` / ° Q. x E §§ « § s , § \ Mn 2 / « £ ) � ) § d Cc M > di3 ® * 2 � / § 5 \ 2 o ( b \ § ) x § \ e ! $ / \Z / 7 � ® k ! «` § 2 `B f + . W «� )§ \ � 2 u\ 3 ƒ2 \ 0 j w ) p { ) > >aatwOJt�7cw�Nz OJg aZz w JLL U OmYovJaa- T, M. K W. FSOzom~ oQwK ��P"'_''.T,•a_�zt^g'"•..Y/:,. ��Oj O i 14zO ZNw Zo nuigZwO -a N~ N o OS z Ha0 LLO a2 W v~ <,zz2 wmp 70 X°wn2ua o , Oww zxitwo�O��OOwoOz�Naam~UwwOwFW�axwNZwn� ZOU'- aU�ONz-+�OUZUo�ooxmaz�Zw�mw ~a3z~Uw�i * LI s J(ynJ w rwwc�Zr°Jape>°o�tn�Nlnox�a�oxxa�wgZwzNac�p3 ao KFLLU. N U�aZ�aNLLf FmOf OF N ol >gw� °EZO'p�OA<N W LLm Z OF p �O�xw�zmg� N la � a OoO= ozzznzm- �jnUUO° � v � awp aaraaUUaZaaLw��a �0a aaz� o,uo5- Owo3 Qt fuoW aaW ZaLLO Z (nN5ZP: - - ni W Y OaFa ,-O J ~coRzmwWmZ >� a irOpzU°OOM -mmF-U�OFa �mzOmmw3 zaOU SO << : zEOZaw~o.a a°aa�w(.; UviUU> wx0aDO u0ui6u fr owo N N z z z w O a_ w a ' 1 O o a t Q Z o Z 0 CM " is tI J IX O,t w } w e Ln Ln j: • I s} w o - J Z p W W t O O a a 1 Z } !. Vr w Z w Z APo�a7t'b� N ¢ ] o z w r a; z!S , o U Q Z < ° O H N Z O w U > H LL 0 111 rl 0 Q a. H X Z ;I, W Q I K V O d N m m w ui �- N N � W � J k(yy Q rn y a �j F ___ _____==- o Z w 0 w 0: 3 H w d O art 2- 0 a w VVi 10 -T W~ __ rrb 3 O S 7 gg 0 0 v M O GS 1 1 m ww C) ;:p Fi O Ln J } 1 v2 Q Z Z u�+3 J O G - J_ cr ,7 G S m N n x N�Q yr O W (n ti W N IY O _ O N a C U O N - 0 w p H N O�� ►' y a 0 ? ^ W N 00 Ln N N W o m O ,y a. N to w N O co } J Q N N Q a W 0 ui N W C) < W p Z Z O V W J Y d U U v ~ cr O Q V 0 0 a w O -i m W Z a a S U LL z � g �� * N��� o P M W LL .Z—.. (n S 2 W (n cn W U M o 0 x a F C~7 > F w p o W 'm m 0 w W Z 0 3 LL w a J d 0 < .� O o S a cn a Q o CL 0 � m a Z w U 2 a CMo O Z a Q U z F W J Z p 0 W 2 J d' � �I O Z < w Ir H Q 2 0 w O 2 O w U > \ - / « Ll - - = a j m / % ) 2 \ ) Ix § w e a § w §§ Q. \ j} ( j �m A 0 . §B k \ §§> !E)R §\ w ) ;|\§ 2® }(§\ g G §t(/ Lli � gn §{ §� § :r � § im q aƒ § 66 x k _ zx \§ §/ 8 : �j a( � LU LU LU k a) § �0 _ � CM I Sw -i < 2 « z § .. > a b b Q 0 0 < IL Q. wEr LU L § § u \ \ b @ m ] § § / \ / O e _ I 2 w = a s z w w z ~ w LLJ L w w I � § d Z § / E / E k § � ) 2 { \ \ ° ° � ) § a- \ 2 a z _ § ) § @ f o ] 2 ( _ ( k g § \ ) - § E E _ @ § _ . w ■ w R \ 2 a ) § �| § x k ƒ a ƒ a § { / 2 LL A 2 ° § ? 2 E ( ) LL 4 i ° f � .c 0 _ aad2. . 0 « "yam//) « o =( x ] k \ w id ix N 2 w) . \ ( . | § cn CD Ln cn / z k \ §�I « e ± !|�| _� §/t; az._. - Rd 014 o E °x Ir \/ . - a z \(§{ §/ 2 I :! � 2 . §§ _ .. � q §\. ~ ) d § § of 8 \ B § § c k o a : - ... � LU § � ) d + b b u � � § % Z § 2 m O_ ( $LLI » .. p ; Lu IL S Z $ k ® /_ @ 2 d ! f z ( 0 0 —� E ± §��| \ « o = « \ * v �ri nriniri+riinn a r x Z W o o g z z5 w o W ¢ z �w r Qa �3 w_� w ���4tR7Cs�^ o m 0IT X w CO Z �I w S2 e Q N V� RASS �I Z W d F ❑ - Y QQ pSpS SSpppp pS QQ " z Of U) v, y 0 0 0 o O o O O o O O O F $ < a S n R a Fx Ix O Z Fe wo o a o f f O Z Z U a S o u u c 'o i z Z 0 0 W z o $ g m } o u Z p>uz ' i Y mrc a z a a O Zo u�w a w w 05 W W W W z z T 0w c z z a a c Q #y3�di N a a F f f i 3 z v = o fC O s ^ r- b o Z = d � yrb o¢ F N m M o 0 If #l\CEASE z o 0 w ❑ z z= 0 za a Ow O a: S K O Z Z N U W Z Q w C9� o - w ¢ mw Q a�0 rL KD s 0 z� ❑ 0 ❑z W ¢p W z O p cNL p f U W z o �o `� 5z w mw 'o w v r LL �� y °HZ� i Z zZ i a 0 w o w w1 i g i-w o zo a N U w m z wo w N=Yo 0, wci �� z ¢ 5 C K X N W w z z W� w m N ~J W 2w O j- W w Z ❑- W�4 ❑� wm IUD w0 >K a V j0 O�Q v�1i❑�a Ox vri OY ZO W= 2a w :rC>KOO= Va z U� W NLL U3 OVN Q f v7j�p wo030wW ?p O UK W �W W Z7ZZWZIri�VG '^Z Ill m 2 W m a Q r w X H J D ❑ KO N 7 W a p aH�V jNmlriw ag a0 K Z O W r K d N¢O W N Q m 3 W X H a m D5 U'W U� �2 2Nw OmzN�23 K? O r� ¢z w0 Zm N�a U��v�00p aW ~ J 00 ¢� wp 30 �❑=awrayw aF ❑p KU 03 gyw t:0' Oj ❑ 4 N w� wp03c�F a1¢0 w� zZ Q<w pzwy WOK �p O p ?00 cgzyra"�'¢z� 'aW a Q' wpZaf°N NNa U'�p>a JW O W N w '^J wo�Qa OWZZrO ama;oa 1 ❑ Q O Z ? U Q p LL d'O is J Z J wWj Z K Z Y N W z Z O 5 C d =J L rwr a 2 a QQ K�2—'Z w z ri V V ❑ O I 5-6 -Zp gH w,%z 20❑0 Wi 0 arc owzw°°mw�o�°owo=aww a a a5 m N>C OzJ r W W z W�fp W 4r 5m Qo w V r2J m 2 a Z�rU(7a O K a�jN Z O¢ LL r r d N a 7 a w N W=W U o w fii J-waaw0 Boa¢ x xa ww w 3 r a a w 3�Q❑N Q Q N r?r N r w s y J 0x <4a z am r Zz i� x 0� o¢ Nr Z K co _n �a 0 z ZOV Q WUU_ wW =Z u >zPS I Z m 0 KO '^ 7N W Q O a w w p Z N K f W,W O Q j Z w N Z m 0 r y Z W Q U i v w LL 4 a O U y � d N z 7 �U U z o am0- CD W rr ^ d o o 5 Z X g � N o zo +oo z U O c<Y<i ap p��W Q m > W Ill U 7 m Q z w m _z N 0 W O V ry 2 = O ll —III III—I I—I I—IIIN&I z V F a Z a Our O 000� w V rJ N z O Z N r = a ° Z ° Z < ZUWx Ou W O zFl z 25 W Z *L\CE i t I—III—III—III—III—�I I—I l a w z o g —I i I—I C I—I��—I i I—I C I—��I N W 0G 1 wj�m 00 x xV NW N m Q ui a o m - D z v) co o - a = M 7 U = 10 =0 d j V N w d Cl) O 2 0 Q pV In z z W N N Zia O I Z O W 3 Ou F o a N 0co zo w I z 0. p c7 a j W m a N Y K Wa F O p U a z w x a J a O � c ti ra z a p � a W as \ ^ w w N x N z w p 3 J m U > 2 0 a a�W �N W W \ U � � QQ vi \ U K~U Z W W N W - > Q 0 z Q p W K W o: O 3z �z �� d ��a <OU U0wO Srca aW za� z c�Qzuj U m W U D O z D Z {/�z N nW J p UU D :3 OW QQ D)wd vi Cai a� r 0 0 W U~ O m N O 0o o ao .0 u n J F z� =p z z lz7 U W x W W ~ 2 K lai> O p 47 aw Up S vd 7 3 U O'a W 0 lf� x O O =Q > Oxp UW Ka zN Q' W z z z I na < Fw < aw w< p W lil N zi O w a l �w w j< N W j K i w m 0 m z O w� OaOV wj Kaw. F H o Woo = tE A W W Z w � azN �=) a o 0 O Z g J W O z 2 0 Q' U Q H z -,z 000 a a d¢ yj Q O m O K Op z(A QQ a p N t O O O Z Z O U K p J 5 p,W J zZ o 0 o ap G x p W w o o g\o z 3 S w z W 4 Z W U O. N U Q U CJ _K f d w o a a a Z a a a Z m o x Z N 5 � O zr 8 a a ~ r Q z ..r J 9 (j Vl d dj wW z ON p N z m z r7 W00 ac'� oo�ow5O za a N .0 Wzm �00 d O� Nt3I V) w W z < ¢ z w 0 m w z K W N w Q a x ~ Q Q Q x N 7 U O N N W.K N K Z Z V i Z 2 J N J w W a 0 O a < « � � ?� xatwna F- Q > U>6 Z O N Z cr 0 j # o $ b \o CY) \ 20 � �' L 0 LN—; §( \j w-i \ }jd }\ / cli ) �\Uk)} .x#�°`/ 2 k 0§96w§ ) }j r E - z \ )>,O w Lu/ #2! § ƒ CO)` �!S@!f <z0 ■|e-., l-2ww §> k�dRj( / §§ �- -�—- ----- »$|zzm t a� m BrwQ/§ 0 "Wl— L § . . . . . f k � ) / E � ` [\ \ \ � � 4 z� wo am » \7 § C.) o § \ LU ¢ ( k S{ k �� ' a.; W 7 ( O 0 5 k � ` ) \ # § $ � § k � ��'� � � ■ | �| §■ $ � � _ \ 7 � | �§ 2c § � . W \ a / §§ 00 �� 3 § m b § go > ) / § v w L FmM $ e O a � W � m• iV N b m Q � X Z Z S F J O m Za Qa w �Z ~> w O (o a¢ a¢ o p �s mo r. r vt u+. 2 K 0 aw Uw aFU ¢F¢ xR Ri ry v u u Z ul L)�Y �w mr OJ LL J _ N w� a H J N a F- w m m 2 0< K > > U O a U d m W O m z w y Z wo m0 l s[ a JLL aw�M, x F,s COW CO Z am zm xs r ZQ Q O O �- S Q w U U V) J (n =a X0 x V F-2 Z W dof W Z m p WLL wW ~z J c3 � L�' � s� � � L)OZQ w a¢ < wO� a z 0 U N d Q m m m m m } x Z 2 a W W p ° U p O Z Q p ¢ > > U O a y coV QOm a °Zdu T p p ¢ =p I m- ry _� a p > > p o o i Z� a~ti N <_ �6 U — <`7 00 w o o z {{{YYY a 0 Lii U' o C > O F w a a o ZJ O < ♦ m ry 0 z X W g Q� *B3jN�jy f g ti "oo a vi m N n n .rvr N 6 a o J00 .e LO ey �� m a w o 0 w w N �.- u w � w o� m N a 0D u /- U F- F z ° a w U i� U w o a ti N w z w �LLw� O O 5 o a a N a a y m -'m W w u7 ON=F2p m0 W w ° w -UOwLLo p w �U-Z WOZ N VVV Y�z-aa 5 ' 0 o mUam W Cy w J�j H _ i W ° U w a K W L" 4 W xiMxww� w a o w �5xm O rvP' r z Z wm30zww wvi¢ > o N H 1 yJ m o d R o O 2 m � m m m m O w U > . r # ) h 4 E \/ x _ § / S) co e�� ) § §2 / w®) z P N ]y§{ 1) _ - z f/ m #°§ § k 2 Z �ooLT LT � , § ) / (O>z m�« / « 2 _ ®� � § moo e j 5zoW. \ rw2w \ L= } 3 /|e _ § k g § max. ) « / k m_a �/ § �! \k / k = » § f Z ) )k f k!%`ffi 2`Q:\ g / >( §« §Sep©)2§| § \ % ) cr )\§§k) k \ _ 2°0\;2a§! z c e - G}§a§2|q! ` f ¢ \ !¥/)\|/� ; B � ° §k�wW§k� .) k § [&!/{/ems=0 2 Q§!/§! § 2 . . . . . . . ( k \ � ■ ■ ; ■ Q; ; ; ; : ; ; - ` q0. ( ` ( § 6 k ; � t, k | . § 7 E§ !§§ 2 �§§ E � � � ) � ` " � ) k $ K ! e » � ; & ! � � ) 04 , § % \ 1222 § ( } ( G G @@ ; ; ; ; @ ;;2 ; ! ! w § ( § k 2§ 1. § 7 § \ ) | �) §B P)| �k $§ ! Z a i§ ) � �� § O § %2 % %§ t§ § % 2 } \ 2 � 2 k � e !20 W § §) k2 §2 � § d2 § ©� � � � \ 0 ) = \ / / v W LL a 0 L)Y N Q U O e yypp yypp Z� N ° S Z X io 0 z z d d W '0 KQx m Q Z ppp D O O¢ L 0 W ° 3 o O 0, Wz w t(ii j O m7 W _2 Q x V1 III III=1�1=1�—1�1= I �� a zoZo fG O oF�oW z o O v�i LL O W HN Z J \\\\\\\\\\\/.`.•` Xz W � ~ W H N N z Z z N w CL Q 3�>w p�OK Z LL U J 8 o a a Q $ W O Of 0;1-4 f 0 z W U M N \ \ \ \ ? U N O W U Z Q f o a K za.: LL W Q =b o \\ \\ \\ \\ =C z25 a f = 'f �5'�° III—III—III—III—III—III Z x 0, Y #ucE III—III—III—I I—III—III—I l a O w z o 8 N W A F~ N p Z m p Q w 7 V,W N Z 2 r N m ¢ < O cc O C D O V co �� a � WO "'Z U _ LO U � N D. M O w z Q 2 p [ w 0 ¢z Z w z tq N 3�< d7 o 0 N oho Zo w a Z z = p Cl)me N a w 3 ¢ a a a p x a ¢ 0 , z W a ci ¢ 0 CL F p U, a p W Q \ VI W W V7 = w N it w ait U H N Q I_rN 6 �-:F z W w W U 0 M 0 ¢ p z Q O W a W Wp W O 3 0 <Z 7 a' rw 2 W z Q ^ Q U Q-I W O grca aw Z 'p 2 O N Wp � 1- a 2 m p Z p N O WO N w Q O 4 N N a$ 0a N z1- Z V,N y NZ mpw U Om 1;F J 00 ¢z Uut xW(wrF w0 ¢ Op N a� uo S -a. 3c�7 -0zcr O O x p w z H ? z �a Q a W a r a p W W. N rco m p � W n � I a m a pz i Nz� w�w A z w O p � o aOV pOO:wFQ� H U H p m 0 yq F m pp S U U 8O w Op Ir Sm I QN > ui Z f N Q Z N 0_ U U 0 Zg J is 0-. 2300 a a U O ¢ Z y..Z 4 J O p no =p o 0 o cn Waom Fa 0Cl*z z U a p g 5 p o- zzz Oog\Oo Vl v O 3 n > 2 K O a_ a_go zI o wmzp = a z N g a a N a P N g a Z Nw z oNpOw -0 �z �a 0 .u0 aj p W w O 0 U a de 0 jr LU N w p ¢ z m K rx- N a j N LLl qQqQ w 7 a 0 ¢ Z a W o Qm =NZ 2 0:7 V N J J W Z i~ ¢ O u i w0 7 U Z z J 1~/1 J a W W 0 x O a z h < ¢ 7 ?w xx< V)0. N >N U 0 Z z Of z Of o > U # ) h ]� Cl) §gMw E E B� w5 § X §m ¢§ g j )� R§ b d 0 § �Z 14 e £� 2 } m a w wu (k|@� 2 §\w�,/ 2 / E _§\ w� } § § . e k \kf)f Lu S )7 / § §2)k`} � #§S-!� ! ()§�ƒ§ / �\ - -�--�----- !! ■K bi 2� § )§pQ/§ 2 o\� co _ . . . . . f k � j_ \ ( [k \ _ §¢ ® § ) {! k\ ( / G e LU ) k B k k � ` 0-4 ■ K 2` §§ ©� tL k / ■ .. 7 B }` ) § k u & ( ) ) § � ■ � � ƒ | \ ( � �� «k ■ K ' 2 | § § E9 2c � «L* . W f } 15 ® 2§ 22 \ ) § § c \ 0 > # L /| ■ ■ ; ■ ■ § O «81j, w w w § ! � - 2 § • � § x 0 < CL Au \z _) -� �g� = d§ ~ k0 §2 �2) ° R§- < d| §�■ - ƒE z |[ ($ ■ \k( \f 2 k© � . . . [)k% 2 \ ° \ Cj � U)w D . 72 § ■■a | § \ w ay / � ` k 2§ ? $ � � < k�k* t $ 0, } 9 Ip LD c a ( � ) � B / § �m ■ ■ ° � (D § Ln ow ® �(_ � - , - |- _ | k § § $) - § § § §; ; 2 ; p ( § )§ \ § }§ § CL | ; 2 94 Z �0m0 3 Cl )§�(!� §~■ ■ ■■ ■ � l=Y 3! W p § «r| » 2 & k2()§kK §9 ! $ § / d ) D . . . § } 0 1 » DANDELION March 25,2019 RE: Insulation requirements for shallow header trench installations To whom it may concern: Dandelion requires excavation and header pipe installation to a minimum depth of 4 ft.below grade,and that depth be maintained from the ground loop location to the building entry point.This requirement is consistent with industry-accepted best practices. However,there are cases where the minimum trench depth cannot be achieved without excessive complication,labor or cost.Dandelion has developed an alternative procedure for such cases,which is outlined in our Design&Installation Standards: When the site conditions prevent the header trench from being excavated to the minimum 4 ft.depth, the exterior header piping shall be insulated with closed-cell pipe insulation.Additionally,foam board insulation(min. R10)shall be installed directly above and along the outer edges of the piping in the bottom of the trench for additional freeze protection. The width of the foam board insulation shall be sufficient to completely cover the header piping so that it cannot be seen from above prior to backfill. The thermal conductivity of subsoil is typically on the order of 0.50-1.00 Btu/hr-ft-'F,depending on composition,density and moisture content.The thermal resistance of foam board insulation is R=5 hr-ft'-°F/Btu(per inch of thickness). Using the steady-state conduction equation to calculate thermal equivalence(R=L/kA),it can be shown that adding 2 inch (1110)foam board insulation is comparable to adding 60 inches of soil depth,at minimum. Although it is not ideal to install header piping at depths less than 4 ft.from the surface,the installation of foam board insulation in accordance with our Design&Installation Standards will compensate for the deficiency from a thermal performance and more importantly,from a freeze protection standpoint. If you have any questions,feel free to contact me at rcarda@dandelionenerev.com. Sincerely, F NEW Y 9 Ryan Carda,P.E. yPN J CA96 Principal Engineer Q' Dandelion Energy, Inc. 0= 100136 F IN March 25,2019 0 335 Madison Ave,4th Floor New York,NY 10017 DANDELION September 15, 2020 RE: Compliance with applicable codes and regulations To whom it may concern: Dandelion requires that all design and installation methods and materials comply with all applicable codes and standards, including ANSI/CSA/IGSHPA C448 Series-16(Design and installation of ground source hear pump systems for commercial and residential buildings) and 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. We provide a set of internal Design & Installation Standards, Permit Drawings, and Master Service Agreements to enforce this requirement with third party contractors and internal installation crews alike. Therefore,to the best of my knowledge, belief and personal judgment, our permit drawings, design and installation requirements and scope of work comply with 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. If you have any questions,feel free to contact me at rcarda@dandelionenergy.com. Sincerely, Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc OF NE O * 5 QyPN J Cq9 O A r � �2 w 100136 OAROF S NP � 09-15-2020 O335 Madison Ave,4th Floor New York,NY 10017 DANDELION Re:Sediment control practices for permit application to install a ground loop as part of a geothermal heating and cooling system installation To whom it may concern: This letter summarizes Dandelion Energy's sediment control practices as part of our permit application for geothermal heating and cooling system installation. Dandelion implements industry accepted sediment control methods during drilling and trenching activities in general accordance with New York State Department of Conservation Standard Specifications for Erosion and Sediment Control. The sediment control method(s) implemented on each project vary depending on site-specific conditions, but include one or more of the following measures: • Mud Processor - Equipment used to manage and process drilling spoils by separating solid and fluid materials removed from the borehole. • Containers - Drilling spoils are typically discharged directly into containers such as heavy-duty woven polypropylene sacks, impermeable 3-ply plastic pools, geotextile filter bags or lined roll-off containers during drilling. • Stockpile Methods - In some instances,drilling spoils or excavated materials from trenching may be temporarily stockpiled and contained using silt fences and/or straw bale dikes to prevent runoff. Excavated material is typically returned to the trench on the same day. • Dust Control - Water is sprayed to wet drilling spoils or excavated materials for dust control as needed. These practices have been developed and are employed to ensure that the highest level of environmental protection is achieved as a normal part of system installation. Thanks in advance for your consideration. Sincerely, �EOF NEItiY z 100136 ROFEssroNP�' Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc 0 335 Madison Ave,4th Floor New York,NY 10017 Dandelion Heat Pump Split Unit Performance Ease of Maintenance • One-stage(BS models)and two-stage(BT • Aluminum microchannel air coil which • models)Copeland®UltraTech®compressor eliminates the potential for failure due to with efficiency values up to 3.9/19.9 corrosion,enhancing reliability and efficiency a�EL10N (COP/EER) • Slide-out blower assembly,removable cabinet • Unique compressor isolation technology panels and removable control box providing and high-density foam cabinet insulation for easy access to internal components. ultra-quiet operation q P Corrosion-proof plastic drain pan and • EnergyStar certified and made in the USA condensate overflow sensor to protect against • Qualifies for the federal tax credit and other potential overflows due to clogged conden- state/local incentives sate drains • ® • 3-year workmanship warranty and 10-year ' limited parts warranty Simple Installation • Multi-position,field selectable air handler • Variable speed,constant cfm ECM blower configurations for maximum installation designed to adapt to connected ductwork flexibility in the field.Supports upflow, and operate at a fraction of the cost of a downflow and horizontal air patterns conventional blower motor • Compact cabinet design allowing for easy • Digital controls which provide a variety of access for attic and/or crawlspace installations field selectable settings for each installation, • Universal connection sizes for ground loop, and advanced safety controls to protect the desuperheater and condensate connections equipment • Factory-installed soft start which reduces the • Optional field-installed internal auxiliary start-up power of the heat pump by 70%. heating Performance Ratings Heating Cooling MODEL LOAD SIZE CAPACITY(BTU/HR) COP CAPACITY(BTU/HR) EER Breaker Size(AMPS) Full 14,600 3.6 20,400 18.9 BS-018 Part 1.5 Ton 20 Full 18,200 3.4 24,900 17.3 BT 024 Part 2 Ton 15,400 3.9 20,300 22.2 25 BT 036 Full 3 Ton 28,700 3.8 35,200 17.1 30 Part 22,900 4.3 27,600 26 Full 37,300 3.9 51,500 19.9 BT-048 Part 4 Ton 30,900 4.4 40,500 28.8 40 Full 45,900 3.7 62,300 17.6 BT 060 Part 5 Ton 37,800 4.1 49,200 25.5 50 Full 52,000 3.4 69,900 16.4 BT 072 Part b Ton 43,800 3.8 56,700 23.2 60 Amp Rated in accordance with AHRI/ISO standard 13256-1,which includes pump penalties www.dandelionenergy.com Dimensions 0 FRONT VIEW BACK VIEW --------------- POWER SUPPLY VAPOR LINE ------------ ---------' EXTERNAL P LIQUID LINE -----"" PUMP SUPPLY HOT WATER ---------- T-STAT T'STAT IN CONNECTION CONNECTION HOT WATER DESUPERHEATER OUT PUMP ON/OFF SWITCH SOURCE EXTERNAL WATER OUT PUMP SUPPLY -- SOURCE POWER SUPPLY WATER IN TOP VIEW A Enertech Recommends a Minimum of 2 to 2 1/2 feet of Service Area Clearance For Installation and Maintenance. Unit Dimensional Data MODEL CABINET WATER LINE-SET ELECTRICAL SIZE OVERALL CONNECTIONS CONNECTIONS KNOCKOUTS A B C D E F G H J K L M N O P Q 018-072 26.000 26.000 21.000 3.000 8.000 11.125 13.875 16.375 18.875 13.875 15.625 17.625 4.625 6.625 10.625 15.875 Notes: All desuperheater connections are 3/4 FPT. All electrical knockouts are sized 112"or 3/4"conduit. All measurements are in inches. All drawings are typical,individual models may vary. www.dandelionenergy.com Dandelion Heat Pump Packaged Unit Performance Ease of Maintenance • Two-stage Copeland®UltraTech® • Real-time performance monitoring and compressor with efficiency values up to advanced diagnostic capabilities with home wifi 4.5/20.9(COP/EER) connection.Comes standard with every unit. • Unique compressor isolation technology • Removable cabinet panels and removable and high-density foam cabinet insulation control box providing easy access to internal for ultra-quiet operation components. • EnergyStar certified and made in the USA • Aluminum microchannel air coil which eliminates • Qualifies for the federal tax credit and the potential for failure due to corrosion, j Et other state/local incentives enhancing reliability and efficiency • Corrosion-proof plastic drain pan and conden- sate overflow sensor to protect against potential overflows due to clogged condensate drains • 3-year workmanship warranty and 10-year Simple Installation limited parts warranty L--- -� • Vertical air supply with multi-position, • Digital controls which provide a variety of field field-selectable left or right side return selectable settings for each installation,and • Universal connection sizes for ground loop, advanced safety controls to protect the desuperheater and condensate connections equipment • Variable speed,constant cfm ECM blower • Factory-installed soft start which reduces the designed to adapt to connected ductwork start-up power of the heat pump by 70%. and operate at a fraction of the cost of a • Optional field-installed internal auxiliary heating conventional blower motor Performance Ratings Heating Cooling MODEL LOAD SIZE CAPACITY(BTU/HR) COP CAPACITY(BTU/HR) EER BREAKER SIZE(AMPS) Full 19,000 4.3 27,100 19.9 YT 024 2 Ton 30 Part 15,200 4.8 21,400 28.2 Full 29,100 4.5 41,200 20.9 YT-036 3 Ton 40 Part 23,300 5.1 31,500 31.3 Full 39,900 4.3 53,300 20.2 YT 048 4 Ton 40 Part 32,000 4.9 42,600 29.6 Full 49,200 4.1 64,300 19.3 YT 060 5 Ton 50 Part 37,700 4.6 50,000 28.0 YT 072 Full 6 Ton 56,200 3.8 71,900 18.0 60 Part 45,800 4.4 58,500 24.8 Rated in accordance with AHRI/ISO standard 13256-1,which includes pump penalties www.dandelionenergy.com Dimensions 1.00 ---------- '�--� 4.70 ° ' --�- 4�e a o 25 _ 16.0 �----- TYP 0 0 O L -- ----- ---- ----- - - Enartach Recommendse Minimum of 2 to 2.5 feet of Sery Ani"alladon __________ Access at Front and Air Coll side. TOP VIEW 16.0 TOP VIEW Showing Optional Filter Rack ,ter 1.00 0 SOURCE HWG WATER WATER IN OUT SOURCE I HWG WATER N WATER IN OUT CONFIGURED AS CONFIGURED AS ---------- t SIDE DISCHARGE BACK DISCHARGE ; Note:Side and Back Discharge configurations are only available in 036 through 072 models. LEFTVIEW FRONT VIEW Unit Dimensional Data MODEL WITHOUT WITH RETURN SUPPLY OPTIONAL CONTROL BOX CONTROL BOX AIR FLANGE AIR FLANGE FILTER RACK Al *B C A2 D E F G H J K L M N P R 024 46.0 23.0 26.5 53.25 25.0 20.0 19.1 1.92 3.63 11.62 12.5 7.44 1.05 2.34 3.00 3.63 036-048 54.0 25.4 30.5 61.2 28.0 26.0 23.7 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 060-072 58.4 25.4 30.5 65.6 32.0 26.0 24.0 2.34 2.25 16.0 16.0 7.26 1.60 2.34 3.29 2.25 Notes: All measurements are in inches. Electrical connect.are 1"for high voltage, 112"for low voltage. 'B(Unit Width)excludes field installed factory supplied flanges. araamlea, wma'au ve" Performance Monitoring _3819are -- Heat pump comes standard with real-time monitoring to provide the installer '3°`Sa l•' and homeowner with remote insight into system performance.This includes e6 u real-time efficiency,energy usage,and status of the refrigerant,air,and . . JJ ground loop circuits. 2.42 - 34.25 fawaratlrne www.dandelionenergy.com r , BuildingAnalysis Job: 214054584 DANDELION Y Date: 10/1/21 Entire House By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Mout Kisoo,NY 10549 Phone:833•GEO-4ALL Email:desigr@dardelionerergycom Web:v wtdardelionenergy.mm Project • • For. Robert Lewis 30 Hillandale Rd,Rye Brook,NY 10573 Design Conditions Location: Indoor: Heating Cooling Westchester Court AP,NY,US Indoor temperature(OF) 72 72 Elevation: 3 ft Design TD(OF) 59 14 Latitude: 41°N Relative humidity(%) 30 50 Outdoor. Heating Cooling Moisture difference(grAb) 26.5 36.3 Dry bulb(OF) 14 86 Infiltration: Daily range(OF) - 17 ( M ) Method Simplified Wet bulb(OF) - 72 Construction quality Semi-loose Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) • Component BtuhAtz Btuh %of load Walls 5.2 24340 25.3 Ducts Glazing 33.6 21477 22.3 wall Doors 22.8 1837 1.9 Ceilings 2.9 6953 7.2 Floors 2.3 5640 5.9 Infiltration 5.9 22981 23.8 Infiltration Ducts 13143 13.6 Piping 0 0 Humidification 0 0 Ventilation 0 0 Glazing Adjustments 0 1 Floors Total 96371 100.0 other Ceilings Component Btuh/t2 Btuh %of load Walls 1.7 8097 13.0 Walls Internal Gains Glazing 46.4 29663 47.8 Doors 10.7 862 1.4 Ducts Ceilings 2.5 6056 9.8 Floors 0.3 702 1.1 Infiltration 0.7 2711 4.4 Infiltration Ducts 11131 17.9 Ventilation 0 0 Internal gains 2850 4.6 Ceilings Blower 0 0 Glazing Other Adjustments 0 Total 62072 100.0 Latent Cooling Load=7220 Btuh Overall U-value=0.104 Btuh/ftz--°F Data entries checked. A. _rk wriightsoft- 2021-Oct-0117:00:39 »»' Right-Sdte®thi%ersal 2021 21.0.08 RSLI65165AM Pagel .:105-1584DDesigrkD2lRobert Lewis Heal Load.r p Calc=MJ8 Frort Door faces:NW r BuildingAnalysis Job: 21-105-1584 DANDELION System1 y Br ScottSchmidt Dandelion Energy 333 North Bedford Road,Sute 220,Moot Kisco.NY 10549 Phone:833-GEO-4ALL Email:design@dandelionenergymm Web:w.w¢dandelionenergy.mm Project For: Robert Lewis 30 Hillandale Rd,Rye Brook,NY 10573 Design Conditions Location: Indoor: Heating Cooling Westchester County AP,NY,US Indoor temperature(OF) 72 72 Elevation: 379 ft Design TD(OF) 59 14 Latitude: 41 ON Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(grAb) 26.5 36.3 Dry bulb(OF) 14 86 Infiltration: Daily range(OF) - 17 ( M ) Method Simplified Wet bulb(OF) - 72 Construction quality Semi-loose Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) • Component Btuh/ftz Btuh %of load Walls 5.0 15018 30.6 Glazing 33.7 14734 30.0 Infiltration Doors 22.8 1837 3.7 Walls Ceilings 2.9 1122 2.3 Floors 2.1 4180 8.5 Infiltration 5.9 12175 24.8 Ducts 0 0 Piping 0 0 Floors Humidification 0 0 Ceilings Ventilation 0 0 Doors Adjustments 0 Glazing Total 49065 100.0 • • • Component Btuh/ft2 Btuh %of load Walls 1.4 4105 13.9 Internal Gains Glazing 45.4 19860 67.1 Walls Infiltration Other Doors 10.7 862 2.9 Ceilings Ceilings 2.5 977 3.3 Doors Floors 0.2 420 1.4 Infiltration 0.7 1436 4.9 Ducts 0 0 Ventilation 0 0 Internal gains 1930 6.5 Blower 0 0 Adjustments 0 Glazing Total 29590 100.0 Latent Cooling Load=2441 Btuh Overall U-value=0.112 Btuh/ft2-°F Data entries checked. w righ tsoft- 2021-Oct-01 17:00.39 ""-•"' • �•� Right-SuteU Uriversal 2021 21.0.08 RSU65165 Page 2 �� _.-1 OS1584rD sign\MlRobert Lewis Heat Load rip Calc=MJ8 Front Door faces.NW Building Analysis Job: 21-105-1584 Date: 10/1121 DANDELION System 2 By. Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220.Mount Kisco,NY 10549 Phone'.833-GEO-4ALL Email.design@dardelionenergycom Web:wmvdardelionenergy.com Project Information For: Robert Lewis 30 Hillandale Rd,Rye Brook,NY 10573 Design Conditions Location: Indoor: Heating Cooling Westchester County AR NY,US Indoor temperature('F) 72 72 Elevation: 379 ft Design TD(°F) 59 14 Latitude: 41°N Relative humidity(%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 26.5 36.3 Dry bulb(°F) 14 86 Infiltration: Daily range(°F) - 17 ( M ) Method Simplified Wet bulb(°F) - 72 Construction quality Semi-loose Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi-loose) • Component Btuh/ft1 Btuh %of load Walls 5.7 9322 19.7 Glazing 33.3 6743 14.3 Walls Doors 0 0 0 Ducts Ceilings 2.9 5832 12.3 Floors 3.1 1460 3.1 Infiltration 5.9 10806 22.8 Glazing Ducts 13143 27.8 Piping 0 0 Humidification 0 0 Ventilation 0 0 Infiltration Adjustments 0 Ceilings Total 47306 100.0 Floors • • • Component Btuh/ft2 Btuh %of load Walls 2.4 3992 12.3 Walls Internal Gains Glazing 48.5 9803 30.2 Doors 0 0 0 Ceilings 2.5 5079 15.6 Ducts Floors 0.6 282 0.9 Infiltration 0.7 1275 3.9 Ducts 11131 34.3 Glazing-- Ventilation 0 0 Internal gains 920 2.8 Blower 0 0 Infiltration Adjustments 0 other Total 32482 100.0 Ceilings Latent Cooling Load=4779 Btuh Overall U-value=0.093 Btuh/ffz-'F Data entries checked. _ _"k wrightsoft- 2021-Oct-0117:00:39 /4C(:�k "•°••••^•"•^•_••'•^W, Rigtt-Sute011mersal202121.0.OBRSu65165 Page ...-105-15841\13esigrfJXVRobert Lewis Heat Load.rLp Galc=MJ8 Front Door faces.NW Right-,1 Form 8® F J1 Job: 21-105-1584 DANDELION Entire House Date: 10f1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road.Stile 220,Mount Kisco,NY 10549 Phone.833-GEO-4ALL Email.desigrtr?a dandeliorenergycom Web.wvti¢dardelionenergy.com 1 NameofRoom Entire House Systeml 2 Running Feet of Exposed Wall 683.0 ft 437.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.8 It 10335.0 ft' 8.0 ft 7090.8 f' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 5669.6 fF 3635.1 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 5669.6 ft 0 3635.1 fF Typeof ConsL Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Healing SCIg L-Clg Heating SCIg L-Clg 6 V)Jall 12B-09N ne 5.67 2.43 541 2767 1185 215 1021 437 az 1 D-c2ow ne 33.35 42.74 33 1114 1428 15 494 634 oor 11DO ne 22.81 10.71 20 456 214 20 456 214 all 15A11-Ooow-6 ne 4.26 0.48 383 1613 183 383 1613 183 11 az 1D-c2ow ne 33.35 42.74 4 144 184 4 144 184 all 129-Osw 9e 5.67 2.43 1100 4516 1934 504 1646 705 az 10B-w se 35.10 27.75 18 624 493 18 624 493 az 1 D-2ovd se 33.35 52.73 80 2668 4218 80 2668 4218 az 1 D-c2o6v se 33.35 52.73 206 6884 10885 116 3869 6118 Sall 15A11-0oav-6 sr 4.13 042 458 1748 176 458 1748 176 laz 1 D-claw se 33.35 5273 16 525 830 16 525 830 oor 11DO se 22.81 1071 20 445 209 20 445 209 126-0sw sa 5.67 2.43 740 3492 1495 413 1787 765 az 1013-w Sw 35.10 27.75 67 2340 1850 67 2340 1850 az 1 D-c2ow 9w 33.35 52.73 57 1915 3028 32 1056 1670 Wall 15A11-O00w-6 sv 4.28 0.49 308 1318 152 308 1318 152 l 126-0sw rrw 5.67 2.43 1052 5007 2144 456 2007 859 all az 1D-Qow rtw 33.35 42.74 150 4996 6404 82 2747 3521 oor 11DO rrw 22.81 10.71 20 456 214 20 456 214 Wall 15A11-0oov-6 nw 4.22 046 250 1022 112 250 1022 112 Glaz 1D-c2ow nw 33,35 42.74 8 267 342 8 267 342 1 all 12Mm 5.67 1.42 524 2857 715 524 2857 715 oor 11DO n 22.81 10.71 21 479 225 21 479 225 Ceil 1613-19ad 2.87 2.50 2418 6930 6036 383 1099 957 Cell 166-19ad 2.87 2.50 8 23 20 8 23 20 Flor 19A-0bswp 6.48 1.60 20 128 32 0 0 0 Fla 19A-0bsvp 6.48 1.60 263 1707 420 263 1707 420 Flor 19A-Obswp 6.48 1.60 3 19 5 0 0 0 Flor 20P-19w 2.92 0.55 449 1313 246 0 0 0 Flor 21A-24w 146 0.00 1691 2473 0 1691 2473 0 Infiltration Heating Load(Bhrh) 0.61 22981 12175 Effect WAR ✓VAR 12 Sensible Load(Btuh) ACH 1.00 2711 1 00 1436 029 Latent Load(Btuh) 4229 2241 Internal a Occupants at 230 and 20O Btuh 5 1150 1000 230 200 b Scenano number 1700 1700 13 c DefaultAdjustrnents d Custom Appliances 0 0 0 0 e Plants 0 0 14 Sub1ctals Sum lines through 12 83228 50941 5229 49055 29590 2441 Dud EHLF&ESGF 0.158 0219 13143 11131 0 0 15 Loads ELG 1991 0 16 Ventilation Loads Vent Cfm 0 E Cfm 0 0 10 0 0 0 0 17 Winter Humidification Load Gal/Day 0 0 0 18 Piping Load 0 0 19 BlawerHeat 0 0 20 AED Excursion&Latent Nloisture fvigration Load 0 0 21 Total Load Sum lines 13 through 19 96371 1 62072 7220 49065 1 29590 2441 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. - wr�ghtsoft- 2021-Oct-0117:00:39 A-K -"""""' Right-Sutet Uriversal 2021 21.0.08 RSU65165 Page 1 ..:105-1584]1D sigr#M\Roben Lewis Heat Load.n NW Calc=MJ8 Frort Door faces.N 9 Right-J8® F J1 Job: 21-105-1584 DANDELION Form Entire House Date: 1011121 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Mood Kisco,NY 10549 Phone.833-GEO-4ALL Email:destgniienergyoam Web:w.wvdandelionenergy.mm 1 Name of Room System 2 2 Running Feet of E)posed Wall 246.0 It 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.5 It 3243.8 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgPt) 2034.5 ff' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 2034.5 ft' Type of Cont. Panel HTM Area or Btuh Area or Btuh E)posure Number Faces Length Length Htg Clg Heatng S-Clg L-Clg Healing S-Clg L-Clg 6 all 12B-0sw ne 5.67 2A3 326 1746 748 az 1 D-c2ow ne 33.35 42.74 19 620 794 oor 11 DO ne 22.81 10.71 0 0 0 V�! 15A11-Ooaµ6 e 4.26 0.48 0 0 0 1 1 t Glaz 1 D-c2ow 33.35 42.74 0 0 0 r�a-z 1015-w se 5.10 7.75 590 2870 1220106-w se 35.10 27.75 0 0 0az 1 D-c2o%d se 33.35 52.73 0 0 0 1 D-c2ow se 33.35 52.73 90 3015 4767 Wall - 15A11-Ooaµ6 se 4.13 0.42 0 0 0 E- Iaz 1D-c2ow se 33.35 52.73 0 0 0 _poor 11 DO se 22.81 10.71 0 0 0 VjJall 12130m sv 5.67 2.43 326 1705 730 az 1OB-w sw 35.10 27.75 0 0 0 az 1 D-c2ow sw 33.35 52.73 26 859 1358 Wall 15A11-Ooont6 9N 4.28 0.49 0 0 0 wall 1213-09w nw 5.67 2A3 596 3001 1285 az 1 D-c2ow rrr 33.35 42.74 67 2249 2882 oa 11 DO rnv 22.81 10.71 0 0 0 Wall 15A11-DooAr6 IM 4.22 0.46 0 0 0 �laz 1D-c2ov rry 33.35 42,74 0 0 0 WJall ill 5.67 1.42 0 0 0 oor 11 DO n 22.81 10.71 0 0 0 Cal 1613-19ad 2.87 2.50 2035 5832 5079 Ced 16B-19ad 2.87 2.50 0 0 0 Flor 19A-Obswp 6.48 1.60 20 128 32 Flor 19A-0bsW 6.48 1.60 0 0 0 For 19A-Obswp 6.48 1.60 3 19 5 Flor 20P-19w 2.92 0.55 449 1313 246 Flor 21A-24w 146 0.00 0 0 0 Infiltraton Heating Load(Btuh) 061 10806 Effect WAR 12 Sensible Load(Btuh) ACH 100 1275 029 Latent Load(Btuh) 1989 Internal a Ooaj nts at 230 and 200 Btuh 4 920 800 b Scenano number o 13 c Default Adjustments d Cus4om Appliances 0 0 e Plants 0 14 Subtotals Sum lines 6 through 12 34163 21350 2789 Dud EHLF&ESGF 0.385 0,521 13143 11131 15 Loads ELG 1991 16 Ventlation Loads Vent Cfm 0 E Cfm 0 0 0 0 17 Winter Humidification Load Gal/Day 0 0 18 Piping Load 0 L21 Blo%erHeat 0 AED Excursion&Latent Mbisture Migration Load 0 Total Load Sum lines 13 through 19 47306 32482 4779 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. Fill- 2021-Oct-01 170039 ACZ`►. "'""'"'"""' '""" Right-SuteQ0 Unversal202121.0.08RS1165165 Page 2 ...-105-1584rDesigrdD2URoben Lewis Heat Load.np Calc=MJB Frond Door faces:NW n Right-,18® Form J1 Job: 21-105-1584 DANDELION System 1 Date: 10/1/21 y By: Scott Schmidt Dandelion Energy 333 North Bedford Road.Sute 220,Mount Kisco,NY 10549 Phone.833-GEO-4ALL Email:design@dardelionenergycom Web:~-idaridelionenergy.com 1 NameofRoom System Dining 2 Running FeetofE)posed Wall 437.0 ft 30.5 ft 3 Ceiling Ht("and Gross Wall Area(SgFt) 8.0 ft 7090.8 T 8.0 ft 652.0 fe 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 3635.1 ft' 15.3 x25.5 ft 388.9 T 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 3635.1 ft' 0 388.9 ft Typeof Const, Panel HTM Area or Btuh Area or Btuh E)posure Number Faoes Length Length Htg Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 all 12B-Osw ne 5.67 2.43 215 1021 437 0 0 0 az 1D-c2ow ne 33.35 42.74 15 494 634 0 0 0 oor 11DO ne 22.81 10.71 20 456 214 0 0 0 V�Jall 15A11-Ooaw6 e 4.26 0.48 383 1613 183 0 0 0 11 L-Glaz 1D-c2ov ne 33,35 42.74 4 144 184 0 0 0 all 12B-09w se 5.67 2.43 504 1646 705 122 238 102 laz 108-w se 35.10 27.75 18 624 493 0 0 0 I��Glaz 1D-c2oW se 33.35 52.73 80 2668 4218 80 2668 4218 az 1D-c2ow se 33.35 52.73 116 3869 6118 0 0 0 WI all 15All-Oooµ6 se 4.13 0.42 458 1748 176 0 0 0 I-- laz 1D-c2aw a 33,35 5273 16 525 830 0 0 0 L_poor 11 DO se 22,81 1071 20 445 209 0 0 0 r'Al 12B-09ry sw 5.67 2.43 413 1787 765 0 0 0 laz 1OB-w sw 35.10 27.75 67 2340 1850 0 0 0 az 1 D-c2ow sw 33.35 52.73 32 1056 1670 0 0 0 Wall 15All-Ooaw6 sw 4.28 0.49 308 1318 152 0 0 0 V�Jall 12B-0av rr�v 5.67 2.43 456 2007 859 122 503 215 l;��laz 1D-c2ow rrw 33.35 42.74 82 2747 3521 13 445 570 oor 11DO r>w 22.81 10.71 20 456 214 20 456 214 all 15A11-0ocw-6 rnv 4.22 046 250 1022 112 0 0 0 laz 1 D-c2ow nW 33.35 4274 8 267 342 0 0 0 In126-0sw 5.67 1.42 524 2857 715 0 0 0 oor 11DO n 22.81 10,71 21 479 225 0 0 0 Cal 16B-19ad 2.87 250 383 1099 957 0 0 0 Cell 166-19ad 2.87 250 8 23 20 0 0 0 Flor 19A-Obswp 0.00 000 0 0 0 0 0 0 Flor 19A-Obswp 6.48 160 263 1707 420 98 632 156 Flor 19A-0bsnp 0.00 000 0 0 0 0 0 0 Flor 2OP-19w 0.00 0.00 0 0 0 0 0 0 Flor 21A-24w 1,46 000 1691 2473 0 0 0 0 Infiltration Heating Load(Btuh) 056 12175 1429 Effect WAR WAR 12 Sensible Load(Btuh) ACH 100 1436 012 169 027 Latent Load(Btuh) 2241 Intomal a Occupants at 230 and 200 Btuh 230 200 0 0 0 b Scenario number 1700 0 13 c DefauttAdjustnents d CustomApplianoes 0 0 0 0 e Plants 10 0 14 Subtotals Sum lines through 12 49065 29590 2441 6371 5797 Duct EHLFBESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cim 0 E Cfm 0 0 0 0 17 Writer Humidification Load GaVDay 0 0 18 Piping Load 0 19 BlcvRr Heat 0 f2l AED Excursion&Latent fvbislure Mgration Load 0 153 Total Load Sum lines 13 through 19 49065 29590 1 2441 6371 5797 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. _ �}� wrlyF�tsoTt 2021-Oct-0117:00:39 '-_""" Rigtt-Sute®llnversa12021 21.0.08 RSU65165 Page 3 ...-1 0 5-1 5841tD gn\D2YRobert Lewis Heat Load.np Calc=MJ8 Front Door faces.NW Right-J8® orm F J1 Job: 21-105-1584 DANDELION System 1 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road.Sute 220,Mount Kisco.NY 10549 Phone.833-GEO-4ALL Email.design @dandelionenergycom Web:w�wdandelionenergy.com 1 Name of Room Entry Game Room 2 Running Feet of Exposed Wall 18.8 ft 78.8 It 3 Ceiling Ht(P)and Gross Wall Area(SgFt) 8.0 ft 350.0 f' 7.7 ft 808.5 it= 4 Room Dimensions(Ft)and Floor Plan Area(SgPt) 8.5 x 10.3 ft 87.1 fF 1.0 x 567.2 ft 567.2 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SqP) 0 87.1 ft2 0 ° 567.2 fle Type of ConsL. Panel HTM Area or Bbih Armor Btuh Exposure Number Faces Length Length Htg. Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 all 12B-O w ne 5.67 2.43 32 68 29 0 0 0 az 1 D-c2ow ne 33.35 42.74 0 0 0 0 0 0 oor 11 DO ne 22.81 10.71 20 456 214 0 0 0 V�a l 15A11-Oo-6 ne 4.26 0.48 0 0 0 194 806 90 1 1 1 D-c2ow ne 33.35 42.74 0 0 0 4 144 184 12B se 5. 2. 0 0 0 0 0 0 10B-w-w se 35.10 10 27.75 75 0 0 0 0 0 0 az 1 D-c2ovd se 33.35 52.73 0 0 0 0 0 0 T�a-z 1 D-c2ow se 33.35 52.73 0 0 0 0 0 0 Wall 15A11-000v6 se 4.13 0.42 0 0 0 210 762 72 E�laz 1D-c2ow se 33.35 52.73 0 0 0 3 100 158 oor 11 DO se 22.81 10.71 0 0 0 20 445 209 vyal 1213-09w sw 5.67 2.43 0 0 0 0 0 0 az 1OB-w 9N 35.10 27.75 0 0 0 0 0 0 az 1 D-c2ow sw 33.35 52.73 0 0 0 0 0 0 Wall 15A11-Ooav-6 sus 4.28 0.49 0 0 C 187 799 92 12B-09w rw 5.67 2.43 68 311 133 0 0 0 laz 1D-c2ow rrw 33.35 42.74 13 442 566 0 0 0 t�oor 11DO rrri 22.81 10.71 0 0 0 0 0 0 Wa l 15A11-Ooorr& nw 422 0,46 0 0 0 15 66 8 Glaz 1D-c2ow nr; 3335 42.74 0 0 0 0 0 0 Wall 12B-09N 5.67 1.42 50 284 71 0 0 0 Door 11DO n 22.81 10.71 0 0 0 0 0 0 Cell 16B-19ad 2.87 2.50 70 201 175 0 0 0 Ceil 168.19ad 2.87 2.50 0 0 0 1 2 2 Flor 19A-0bwnp 0.00 0.00 0 0 0 0 0 0 Flor 19A-0bwjp 6.48 1.60 0 0 0 0 0 0 nor 19A-0bw�p 0,00 0.00 0 0 0 0 0 0 Flor 20P-19w 0.00 0.00 0 0 0 0 0 0 Flor 21A-24w 146 000 0 0 0 567 830 0 Infiltration Healing Load(Btuh) 056 586 1245 Effect WAR WAR 12 Sensible Load(BWh) ACH 005 69 010 147 0.27 Latent Load(Btuh) Internal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 to Soenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 2347 1450 5198 944 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cfm 0 E Cfin 0 17 Wmffir Humidification Load GaVDay 0 18 Piping Load 19 Bloner Heat 20 AED Excursion&Latent Moisture Mgrabon Load 193 -17 21 Total Load Sum lines 13 through 19 2347 1450 5198 944 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -if- 9 sort- 2021-Oct-0117:00:39 �ZcA wr '- t'"""" Rigrt-SuiteCJUn"ersal2021 21.0.08 RSL165165 ...-1 O5-1584y si 9 r*D2\Robert Levns Heat Load.rup Calc=MJ8 Frort Door faces:NW Page 4 /\ J ob: 21-105-1584 DANDELION Right-MR) Form J1 System 1 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220.Mom Kisco,NY 10549 Phone 833-GEO-4ALL Email.design@dardelionenergy.00m Web:vv&Adarclelionenergy.com 1 NarreofRcom Kftd)en Laundry 2 Running Feet of Exposed Wall 42.3 It 22.8 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 8.0 ft 933.0 ft' 7.7 ft 508.2 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SqR) 1.0 x 513.8 ft 513.8 111 6.8 x 16.3 ft 272.2 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 513.8 ft 0 272.2 ft' Type of Const, Panel HTM Area or Bti,h Area or Btuh Exposure Number Faces Length Length Htg. Clg Heating SCIg L-Clg Heating SCIg L-Clg 6 �[allaz 1213-09N ne 5.67 2.43 0 0 0 0 0 0 1 D-c2av ne 33.35 42.74 0 0 0 0 0 0 oor 11 DO ne 22.81 10.71 0 0 0 0 0 0 V�Jall 15All-Oooµ6 rle 4.26 0.48 0 0 0 46 198 23 1 1 L-Glaz 1 D-c2ow ne 33.35 42.74 0 0 0 0 0 0 1013-w se 5.10 7.75 94 231 99 0 0 0 10B-w se 35.10 27.75 18 624 493 0 0 0 az 1 D-c2ovd se 33.35 52.73 0 0 0 0 0 0 17�a-z 1 D-c2ow se 33.35 52.73 36 1186 1875 0 0 0 Wall 15A11-O00w6 4.13 042 0 0 0 0 0 0 �laz 1D-c2ow e 33.35 52.73 0 0 0 0 0 0 ocy 11 DO se 22.81 10.71 0 0 0 0 0 0 12B-09N -IN 5.67 2.43 126 505 216 0 0 0 az 10B-w sw 3510 27.75 33 1170 925 0 0 0 az 1 D-c2ow 91v 33.35 52.73 4 122 193 0 0 0 Wall 15All-Oooµ6 s%•: 4.28 049 0 0 0 0 0 0 V+/all 1213-096v rry 5.67 2.43 0 0 0 0 0 0 �L--0GIaz 1D-c22av "w 33.35 42.74 0 0 0 0 0 0 oor 11DO nW 22.81 10.71 0 0 0 0 0 0 Wall 15A11-Oooµ6 nw 4.22 0.46 0 0 0 129 504 52 �laz 1D-c2ow nw 33.35 42.74 0 0 0 8 267 342 yJall 126-Osv 5.67 1A2 118 550 138 0 0 0 00 11 DO n 22.81 10.71 21 479 225 0 0 0 Ceil 1613-19ad 2.87 2.50 35 101 88 0 0 0 Ceil 168-19ad 2.87 2.50 0 0 0 0 0 0 Ror 19A-0bw 0.00 0,00 0 0 0 0 0 0 Fla 19A-0b9W 6.48 1.60 0 0 0 0 0 0 Flor 19A-0bsrp 0.00 0.00 0 0 0 0 0 0 Fla 20P-19w 0.00 0.00 0 0 0 0 0 0 Ror 21A-24w 1,46 0,00 0 0 0 272 398 0 Infiltration Heating Load(Btuh) 056 1289 360 Effect WAR I'VAR 12 Sensible Load(BWh) ACH 0,11 152 003 42 027 Latent Load(Btuh) Internal a Occupants at 230 and 200 Bluh 1 230 200 0 0 0 b Scenario number 1200 500 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 6257 5685 1726 1071 Duct EHLFBESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads VentCfm 0 ECfrn 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 BlomerHeat 20 AED Excursion 8 Latent Moisture lVigration Load 49 21 Total Load Sum lines 13 through 19 6257 5685 1726 1071 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -ri- 2021-Od-0117:00:39 Right-SuleO)Lhversal202121.0.08RSU65165 Pages ..:105-1584j1D grfM\Robert Lewis Heat Load.np Calc=MJ8 Front Door faces:NW /\ J ob: 21-105-1584 DANDELION Right-J8® Form J1 System 1 Date: 1011/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road.Sute 220,Mount Kisoa,NY 10549 Phone.833-GEO-4ALL Email:design dandelionenergycom Web:wwadandelionenergy.com 1 Name of Room Living Room Office 2 Running Feet of Exposed Wall 59.5 ft 22.3 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFQ 8.0 ft 680.0 fF 8.0 ft 488.0 fF 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 17.0 x 25.5 ft 433.5 f' 16.3 x 14.3 ft 231.6 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 433.5 ft' 0 231.6 IF Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg Clg Heating S-Clg L-Clg Heating S-Clg L-Clg 6 iit!all2 12B4)9w ne 5.67 2.43 0 0 0 48 188 81 az 1 D-c2ow ne 33.35 42.74 0 0 0 15 494 634 oor 11 DO ne 22.81 10.71 0 0 0 0 0 0 all 15A11-0o6 ne, 4.26 0.48 0 0 0 0 0 0 11 laz caµ 1D-c2av ne 33.35 42.74 0 0 0 0 0 0 1213-09N se 5.67 2.43 136 535 229 0 0 0 az 10B-w se 35.10 27.75 0 0 0 0 0 0 az 1 D-Qovcd se 33.35 52.73 0 0 0 0 0 0 �az 1 D-c2ow se 33.35 52.73 42 1389 2197 0 0 0 (Wall - 15A11-OooN6 se 4,13 042 0 0 0 0 0 0 �-L laz 1 D-c2 se 33.35 52.73 0 0 0 0 0 0 oor 11D0 se 22.81 1071 0 0 0 0 0 0 12B-Om Sw 5.67 2A3 204 999 428 0 0 0 az 1013-w SIN 35.10 27.75 0 0 0 0 0 0 az 1D-c2cw sw 33.35 52.73 28 934 1476 0 0 0 Wall 15A11-0oav6 SaV 4.28 0.49 0 0 0 0 0 0 all 12B-09w nw 5.67 2.43 136 538 230 130 655 280 az 1 D-c2ow rrw 33.35 42.74 41 1373 1760 15 488 625 oor 11 DO nw 22.81 10.71 0 0 0 0 0 0 Wall 15A11-co0w-6 Rw 4.22 0.46 0 0 0 0 0 0 �---rSlaz 'I D-c2ow nw 33.35 42.74 0 0 0 0 0 0 Wall 12B-0Om 5.67 1.42 0 0 0 0 0 0 oor 11 DO n 22.81 10.71 0 0 0 0 0 0 Cell 16B-19ad 2.87 2.50 0 0 0 0 0 0 Cell 1613-19ad 2.87 2.50 0 0 0 0 0 0 Flo( 19A-0bsap 0.00 0.00 0 0 0 0 0 0 Flor 19A-0bswp 6.48 1.60 166 1075 265 0 0 0 Flor 19A-0bsvp DDO O.DO 0 0 0 0 0 0 Flor 20P-19w 0.00 0.00 0 0 0 0 0 0 Flor 21A-24w 146 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.56 2788 043 Effed WAR NAR 12 Sensible Load(Btuh) ACH 0.23 209 123 0.27 Latent Load(Btuh) Internal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 9631 6737 2868 1698 Dud EHLFBESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cfm 0 E Cfm 0 17 Whiter Humidification Load Galuay 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -177 -45 21 Total Load Sum lines 13 through 19 9631 6737 2868 1698 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -ri- wrlgFftsolt- 2021-Od-01170039 AZZ5K Rigq-SuteA)Unoersal202121.0.08RSU65165 Page6 ..:105-1584rDesigrfDDRobert Lewis Heat Load.rp Calc=MJ8 Front Door faces.NW /\ J ob: 21-105.1584 DANDELION Right-J8® Form J1 System 1 Date: 1011121 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Moat Kisco,NY 10549 Phone.833-GEO-4ALL Email:design dardelionenergycom Web.vwmdardelionenergy.cvm 1 Name of Room RecRoom Stairs 2 Running Feet of Exposed Wall 83.3 ft 14.5 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.7 ft 1335.9 ft' 7.7 ft 298.4 fP 4 Room Dimensons(Ft)and Floor Plan Area(SgFt) 1.0 x 713.0 ft 713.0 R' 4.8 x 9.8 ft 46.3 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 713.0 fP 0 46.3 ft' Type of Const. Panel HTM Area or Bluh Area or Btuh Exposure Number Faces Length Length Htg Clg Heating S-Clg L-Clg Heating S-Clg L-Clg 6 all 128-0Ow ne 5.67 2.43 0 0 0 0 0 0 az 1 D-c2ow ne 33.35 42.74 0 0 0 0 0 0 cor 11DO ne 22.81 10.71 0 0 0 0 0 0 all 15A11-Oocaµ6 re 4.26 0.48 64 272 °' 0 0 0 1 1 az 1 D-c2ow ne 33.35 42.74 0 0 0 0 0 12B- se 5. 2. 0 0 0 0 0 0 1�4z 10B-w se 3510 10 27.75 75 0 0 0 0 0 0 1 D-c2oW se 33.35 52.73 0 0 0 0 0 0 1 D-c2ow se 33.35 52.73 0 0 0 0 0 0 Wall 15A11-Oocw-6 se 4.13 0.42 248 986 104 0 C 0 l az 1 D-c2a v se 33.35 52.73 13 425 672 0 0 oor 11D0 se 22.81 1071 0 0 0 J 0 0 1213-09N sw 5.67 2.43 0 0 0 0 0 0 az 1OB-w 9N 35.10 27.75 0 0 0 0 0 0 az 1 D-c2aw sw 33.35 52.73 0 0 0 0 0 0 Wall 15A11-OooN-6 sw 4.28 049 121 519 60 0 0 Sall 12B-09N r%v 5.67 2A3 0 0 0 0 0 0 az 1 D-c2ow rrw 33.35 42.74 0 0 0 0 0 0 oor 11 DO rnw 22.81 10.71 0 0 0 0 0 0 (WIall __ 15A11-Ooaµ6 rrw 4.22 0.46 0 0 0 37 156 18 L- I az 1 D-c2ow nw 33.35 42,74 0 0 C 0 0 0 wJall 128-09N 5.67 1 A2 208 1180 295 75 426 107 oor 11DO n 22.81 10.71 0 0 0 0 0 0 Cal 16B-19ad 287 2,50 0 0 0 0 0 0 Ced 16B-19ad 2.87 2.50 4 12 10 0 0 0 Flor 19A-Obswp 0.00 0.00 0 0 0 0 0 0 Fla 19A-0bswp 6.48 1.60 0 0 0 0 0 0 Flor 19A-Obswp 0.00 ODD 0 0 0 0 0 0 Ror 2OP-19w 0.00 0.00 0 0 0 0 0 0 Flor 21A-24w 146 0,00 713 1043 0 46 68 0 Infiltration Heating Load(Btuh) 056 890 75 Effect WAR WAR 12 Sens ble Load(Btuh) ACH 007 105 001 9 027 Latent Load(Btuh) Internal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 5325 1338 725 130 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG o 0 16 Ventilation Loads VentCfn 0 E Cfm 0 17 Winter Humidification Load GaVDay 0 18 Piping Load 19 BlovnerHeat 20 AED Excurson&Latent Nbis4ue Migration Load 59 -3 21 Total Load Sum lines 13 through 19 5325 1338 725 130 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wrlWhtsoTt- 2021-0d-011700.39 """"-"-",-,* Right-Sute0i Unversal 2021 21.0.08 RSU65165 Page 7 ...-105-1584PDesgr#D2\Robert Lewis Heat Load.np Calc=MJ8 Front Door faces.NW Right-J80 Form J1 Job: 21-105-1584 DANDELION System 1 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Moot Kisco.NY 10549 Phone.833-GEO-4ALL Emadl.des4gn@dandeliorieriergy.com Web.wmvdandelionenergy.mm 1 Name of Room Storage TV Room 2 Running Feet of Exposed Wall 19.3 ft 45.3 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFQ 7.7 ft 296.5 ft' 9.8 ft 754.6 fF 4 Room Dimensions(Ft)and Floor Plan Area(SqR) 9.0 x 10.3 ft 92.3 fF 1.0 x 289.4 ft 289.4 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 92.3 ft' 0 289.4 ft' Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg Clg Heating S-Clg L-Clg Heating S-Clg L-Clg 6 all 12B-Osv ne 5.67 2.43 0 0 0 135 765 327 az 1 D-2av ne 33.35 42.74 0 0 0 0 0 0 oor 11 DO ne 22.81 10.71 0 0 0 0 0 0 W1all 15A11-Ooow-6 ne 4.26 0.48 79 338 39 0 0 0 11 L-Glaz 1 D-c2av ne 33.35 42.74 0 0 0 0 0 0 wall 12B-09m se 5.67 2.43 0 0 0 152 642 275 az 10B-w se 35.10 27.75 0 0 0 0 0 0 az 1 D-c2ovd se 33.35 52.73 0 0 0 0 0 0 az 1 D-c2ow se 33.35 52.73 0 0 0 39 1294 2046 Wall 15A11-OooAL6 se 4.13 0.42 0 0 0 0 0 0 laz 1D-c2ow se 33.35 52.73 0 0 0 0 0 0 oor 11DO se 22.81 1071 0 0 0 0 0 0 Wall 126-0sw sv 5.67 2.43 0 0 0 83 284 121 I; GGllaz 1OB-w 9v 35.10 27.75 0 0 0 33 1170 925 az 1 D-c2ow sw 33.35 52.73 0 0 0 0 0 0 Wall 15A11-000nt6 94 4.28 049 0 0 0 0 0 0 1213O9w rrw . 2. 0 0 0 0 0 0 az 1 D-c2ow rtw 333.3535 42.74 74 0 0 0 0 0 0 oor 11 DO nw 22.81 10.71 0 0 0 0 0 0 V)✓all 15A11-O00A 6 nw 422 0.46 69 296 34 0 0 0 az 1 D-c2ow nw 33.35 4274 0 0 0 0 0 0 V►Jall 12B-Osw 5.67 1.42 0 0 0 74 417 104 L-Door 11DO n 22.81 10.71 0 0 0 0 0 0 Ceil 1613-19ad 2.87 2.50 2 6 5 276 791 689 Cell 16B-19ad 2.87 2.50 3 9 8 0 0 0 Flor 19A-ObsAp 0.00 0.00 0 0 0 0 0 0 Flor 19A-0bswp 6.48 1.60 0 0 0 0 0 0 For 19A-0bsip 0.00 0.00 0 0 0 0 0 0 Flor 20P-19w 0.00 0.00 0 0 0 0 0 0 Flor 21A-24w 146 0.00 92 135 0 0 0 0 Infiltration Heating Load(Btuh) 0.56 304 2167 Effect WAR WAR 12 Sensible Load(Btiuh) AC H 003 36 018 256 0.27 Latent Load(Btuh) Intemal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum fines 6 through 12 1088 119 7529 4622 Dud EHLF&ESGF 0 0 0 0 0 0 15 Loads ELG 0 0 16 Ventilation Loads Vent Cf n 0 E Cfin 0 17 Winler Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat r20 AED Excursion&Latent Nbisture Mgraton Load 3 -122 21 Total Load Sum lines 13 through 19 1088 119 7529 4622 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. t �"�- wrlgF�tsoTtt-"� ""' `'-" Riga-SuIeC+J Universal 2021-Oct-0117:00:39 versa1202121.0.O8 RSU65165 PageB ..:105-1584DDesigri,D2V2obert Lewis Heat Load.rup Calc=MJ8 Front Door faces.NW n Right-MR) Form J1 Job: 21-105-1584 DANDELION System 2 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Mont Kisco,NY 10549 Phone.833-GEO-4ALL Email.design damehonenergycom Web.wwwdandelionenergy.com 1 Name of Room System 2 Master 2 Running Feet of Exposed Wall 246.0 It 90.0 It 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.5 ft 3243.8 IF 7.5 ft 866.3 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 2034.5 ft' 32.3x25.5ft 822A ft 5 Caling Slope(Deg.)and Gross Caling Area(SgFI) 0 2034.5 ft' 0 8224 ft' Type of Const, Panel HTM Area or Bl uh Area or Btuh Bposure Number Faces Length Length Htg Clg. Heating S-Clg L-Clg Heating SCIg L-Clg 6 all 1213-09N ne 5.67 2.43 326 1746 748 0 0 0 az 1 D-c2av ne 33.35 42.74 19 620 794 0 0 0 oor 11DO rie 0.00 0.00 0 0 0 0 0 0 �gJall 15A11-000i ne 0.00 0.00 0 0 0 0 0 0 11 L_-aaz 1D-c2orr ne 0.00 0.00 0 0 0 0 0 0 12B-09yv se 5.67 2. 59 2870 122 242 1094 468 V�-az 10B-w se 0.00 0.0000 0 0 0 0 0 0 0 0 az 1 D-c2M se 0.00 0.00 0 0 0 0 0 0 1DQav se 33.35 52.73 90 3015 4767 49 1638 2589 (Wall 15A11-0ooN-6 se OAO 0,00 0 0 0 0 0 0 I-- laz 1D-c2av se 0,00 000 0 0 0 0 0 0 L-poor 11D0 se 0.00 coo 0 0 0 0 0 0 t 2 12B-Oew SN 5.67 2.43 326 1705 730 191 1010 433 az 10B-w SIN 0.00 0.00 0 0 0 0 0 0 az 1D-c2ow sw 33.35 52.73 26 859 1358 13 442 699 Wall 15A11-0oaµ6 sw 0.00 0.00 0 0 0 0 0 rI 12B-09v rnnr 5.67 2.43 596 3001 1285 242 1147 491 -0(�laz 1D-c2ow nw 33.35 42.74 67 2249 2882 40 1325 1699 00 11 DO nw 0.00 0.00 0 0 0 0 0 0 WI all 15All-OoaWB rry 0.00 000 0 0 0 0 0 0 LLGI. 1 D-c2av nw 0.00 0,00 0 0 0 0 0 0 1WJall 12B-09N 0.00 0.00 0 0 0 0 0 0 1--Door 11 DO n 0.00 0.00 0 0 0 0 0 0 Cal 16B-19ad 287 2.50 2035 5832 5079 822 2357 2053 Cal 1613-19ad 0.00 0.00 0 0 0 0 0 0 Flor 19A-Ob%w 6.48 1.60 20 128 32 0 0 0 Fla 19A-01b9W 0.00 0.00 0 0 0 0 0 0 Flor 19A-0b%w 6.48 1.60 3 19 1, 0 0 0 Flor 20P-19w 2.92 0.55 449 1313 246 0 0 0 Flor 21A-24w 0.00 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 067 10806 3953 Effect WAR WAR 12 Sensible Load(Btuh) ACH 1 00 12-5 237 466 032 Latent Load(Btuh) 1989 Internal a Occupants at 230 and 20O Btuh 4 920 800 2 460 400 b Scenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subiptals Sum lines through 12 34163 21350 2789 12967 9356 Duct EHLF&ESGF 0,385 0.521 13143 11131 4988 4878 15 Loads ELG 1991 805 16 Ventilation Loads VentCfm 0 E Cfm 0 0 0 0 17 Winter Humidification Load GahDay 0 0 18 Piping Load 0 19 Blower Heat 0 20 AED Excursion&Latent Moisture Mgraton Load 0 -2 21 Total Load Sum lines 13 through 19 47306 32482 4779 17955 14234 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. fi 2021-Od-0117:00:39 Right-Sulei+Universal 2021 21.0.08 RS1165165 Page 9 ...-105-1584"sigrAD2YRobert Lewis Heat Load.np Calc=MJ8 Front Door faces.NW 9 Right-J80 Form J1 Job: 21-105-1584 DANDELION System 2 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Suite 220,Mount Kisco,NY 10549 Phone.833-GEO-4ALL Email.design dardelionenergycom Web:wwtdandelionenergy.com 1 NameofRoom Bonus Room Bed 2 Running Feet of Exposed Wall 72.3 ft 35.8 ft 3 Ceiling Ht(Ft)and Gross WallArea(SgFt) 7.5 ft 671.3 ft' 7.5 ft 562.5 fF 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 1.0x470.0ft 470.0 ft' 1.0x314.9ft 314.9 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 470.0 ft2 0 314.9 fF Type of Const. Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Heating SCIg L-Clg Heating SCIg L-Clg 6 VjJ� az 12B-09v ne 5.67 2.43 169 923 395 51 287 123 - 1 D-c2av ne 33.35 42.74 6 203 260 0 0 0 oor 11 DO ne 0.00 0.00 0 0 0 0 0 0 all 15A11-OocA-6 ne 0.00 0.00 0 0 0 0 0 0 1 1 az 1 D-c2ow ne 0.00 0.00 0 0 0 0 0 0 all 1213-09ni se 0. 2.43 16 827 354 122 57 247 10B-w se 0.0000 0 0 0.00 0 0 0 0 0 0 az 1 D-c2o%d se 0.00 0.00 0 0 0 0 0 0 1��a-z 1 D-c2ow se 33.35 52.73 21 703 1112 20 674 1066 (Wall _ 15A11-Ooav-6 se 0.00 0.00 0 0 0 0 0 0 �laz 1D-c2av se 0.00 0.00 0 0 0 0 0 0 oor 11 DO se, 0.00 0.00 0 0 0 0 0 0 V[Vall az 126-09N sw 5.67 2.43 39 223 96 96 472 202 10B-w sw 0.00 0.00 0 0 0 0 0 0 az 1 D-c2av 9N 33.35 52.73 0 0 0 13 417 660 Wall 15A11-Ooaµ6 9w 0.00 0.00 0 0 0 0 0 0 V all 128-09N nw 5.67 2.43 167 865 370 0 0 0 az 1 D-c2ow rrw 33.35 42.74 14 482 617 0 0 0 00 11 DO rnv 0.00 0.00 0 0 0 0 0 0 aV IV 5A11-Ooau6 nw 0.00 0.00 0 0 0 0 0 0 I-Glaz 1D-c2ow nw 0.00 0.00 0 0 0 0 0 0 tal 1 12B-09N 0.00 0.00 0 0 0 0 0 0 tDoor 11DO n 0.00 000 0 0 0 0 0 0 Cal 16B-19ad 2.87 2.50 470 1347 1173 315 903 786 Cal 16B-19ad 0.00 0.00 0 0 0 0 0 0 Flor 19A-Obswo 648 1.60 20 128 32 0 0 0 Flor 19A-0ba W 0.00 0.00 0 0 0 0 0 0 Flor 19A-Obswp 6.48 160 0 0 0 0 0 0 Flor 20P-19w 2.92 0.55 449 1313 246 0 0 0 Flor 21A-24w 0.00 0.00 0 0 0 0 0 0 Infltraton Heating Load(Btuh) 0.67 3174 1570 Effect WAR WAR 12 Sensible Load(Btuh) AC H 0,29 374 015 185 0.32 Latent Load(Btuh) Internal a Occupants at 230 and 200 Bbuh 0 0 0 1 230 200 b Scenario number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Sublotals Sum lines6 through 12 10188 5028 4900 3499 Dud EHLFBESGF 0385 0.521 3919 2621 1885 1824 15 Loads ELG 460 308 16 Ventlaton Loads VentCfm 0 EC" 0 17 Winter Humidifiraton Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion 8 Latent Nbisture Migraton Load 1 21 Total Load Sum Imes 13 through 19 14108 7649 1 6786 5323 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. �'�►- wrlgF�tsoTt- 2021-Od-011700-.39 """" Righ-Sulu Uriversal 2021 21.0.08 RSU65165 Page 10 ...-105-1584rDesigrfDD2Vtobert Lewis Heat Load.ry� Calc=MJ8 Frond Door faces.NW 9 n DANDELION Right-J80 Form J1 Job: 21-105-1584 System 2 Date: 10/1/21 By: Scott Schmidt Dandelion Energy 333 North Bedford Road.Suite 220,Mount Kisco,NY 10549 Phone.833-GEO-4ALL Email.deslgn@dandelionenergycom Web:wwwdardelionenergy.00m 1 NameofRoom Bed Bath 2 Running Feet of Exposed Wall 25.5 ft 17.5 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.5 ft 423.8 ft' 7.5 ft 390.0 ft' 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 11.3 x 17.0 ft 191.3 ft 8.8 x 17.3 ft 150.9 ft 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgF0 0 191.3 fF 0 150.9 ft Typeof Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. CIg Heating S-Clg L-Clg Heating S-Clg L-Clg 6 1all az 12B-09v ne 5.67 2.43 107 535 229 0 0 0 1 D-c2ow ne 33.35 42.74 13 417 535 0 0 0 cor 11 DO ne 0,00 0.00 0 0 0 0 0 0 V�!a l 15A11-0o-,6 re ODO 0.00 0 0 0 0 0 0 11 I-Glaz 1 D-c2ow ne &00 0.00 0 0 0 0 0 0 12B-w se 5.67 . 0 0 0 66 372 150 10B-w se 0 0 .00 .00 00 0 0 0 0 0 0 az 1 D-c2oA se 0.00 0.00 0 0 0 0 0 0 1�a-z 1 D-c2ow se 33.35 52.73 0 0 0 0 0 0 all 15A11-000nf6 se 0.00 0,00 0 0 0 0 0 0 az 1 D-c2ow se 0.00 0.00 0 0 0 0 0 0 o0r 11 DO se D.00 0,00 0 0 0 0 0 0 12B-09N sw 5.67 2.43 0 0 0 0 0 0 az 1OB-w sw 0.00 0.00 0 0 0 0 0 0 az 1 D-c2ow sN 33.35 52.73 0 0 0 0 0 0 Wall 15A11-0oau6 sw 0.00 0,00 0 0 0 0 0 0 12BO-w rHv 5.67 2.43 84 404 173 66 372 159 az 1 D-c2ow r?w 33.35 42.74 13 442 566 0 0 0 noor 11DO nw O. O 0.00 0 0 0 0 0 0 Wall 15A11-Ooow6 rw D00 0,00 0 0 0 0 0 0 az 1 D-c2ow r,w 0.00 0.00 0 0 0 0 0 0 Wall 12B-09w 0.00 0.00 0 0 0 0 0 0 oor 11 DO n 0.00 0.00 0 0 0 0 0 0 Cell 16B-19ad 287 2.50 191 548 47? 151 433 377 Ceil 16B-19ad 0.00 0.00 0 0 0 0 0 0 nor 19A-Obsnp 6.48 1.60 0 0 0 0 0 0 Flor 19A-0bs W 0.00 0.00 0 0 0 0 0 0 Flor 19A-ObW 6.48 1.60 0 0 0 3 19 5 Flor 20P-19w 2.92 0.55 0 0 0 0 0 0 Flor 21A-24w 0.00 0.00 0 0 0 0 0 0 Infiltraton Heating Load(Btuh) 067 1120 769 Effect WAR WAR 12 Sens ble Load(Btuh) AC H 0.10 132 ^07 91 0.32 Latent Load(BWh) Intemal a Occupants at 230 and 200 Btuh 1 230 200 0 0 0 b Scenano number 0 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines6 through 12 3467 2347 1965 791 Dud EHLF&ESGF 0,385 0521 1334 1224 7% 412 15 Loads EEG 187 148 16 Ventilation Loads Vent Cfm 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent 1vtoisture Migration Load 5 0 21 Total Load Sum lines 13 through 19 4800 3571 2721 1203 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. t* wrlgntsollY 2021-Oct-0117.00:39 .41EX k Right-SuteO Universal 2021 21.0.08 RSU65165 Page 11 ..:105-1584P1 a gn\=Robert Lewis Heat Load.rup Dalc=MJ8 Front Door faces.NW g �\ J ob: 21-105-1584 DANDELION Right-J8® Form J1 System 2 Date: 10/1121 By: Scott Schmidt Dandelion Energy 333 North Bedford Road,Sute 220,Moul Kisco,NY 10549 Phone.833-GEO-4ALL Email:design dardelionenergycom Web:w.wv.dardelionenergy.com 1 NameofRoom Hall 2 Running Feetof Exposed Wall 5.0 ft 3 Ceiling Ht(Ft)and Gross Wall Area(SgFt) 7.5 ft 330.0 ft 4 Room Dimensions(Ft)and Floor Plan Area(Sql`) 5.0 x 17.0 ft 85.0 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(Sql`) 0 85.0 IF Typeof Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg 6 1gJall 12B-Osry ne 5.67 2A3 0 0 0 I-D-:Jaz 1D-c2av ne 33.35 42.74 0 0 0 cor 11DO ne 0.00 0.00 0 0 0 V�.�all 15A11-Ooo+t6 ne 0.00 0.00 0 0 0 1 1 I�laz 1 D-c2ow ne 0.00 0,00 0 0 0 12B se . 2.43 0 0 0 az 10B-w-w se 0 0.0000 0.00 0 0 0 az 1 D-c2ovd se 0.00 0.00 0 0 0 az 1 D-c2ow se 33.35 52.73 0 0 0 WI all _ 15A11-Oocau6 se 0.00 000 0 0 0 E2I-- Iaz 1 D-c2ow se- 0.00 0.00 0 0 0 0or 11 DO se 0.00 0.00 0 0 0 I 126-0sw sw 5.67 2.43 0 0 0 az 10B-w Sw 0.00 0.00 0 0 0 az 1 D-c2ow sw 33.35 52.73 0 0 0 Wall 15A11-OooN-6 sv 0.00 0.00 0 0 0 �1all 1D-c2o rry 3.35 2.74 38 213 91 L�(p�laz 1D-c2ow rrN 33.35 42.74 0 0 0 aor 11 DO r?w 0.00 0.00 0 0 0 Wall 15A11-O00w-6 nw 0.00 0.00 0 0 0 az 1 D-c2ow nw 0.00 0.00 0 0 0 Wall 12B-0s�v 0.00 0.00 0 0 0 -Door 11 DO n 0.00 0.00 0 0 0 Ceil 1613-19ad 2.87 2.50 85 244 212 Cell 168-19ad 0.00 0.00 0 0 0 Flor 19A-Obw 6.48 1.60 0 0 0 Flor 19A-Obswp 0.00 0.00 0 0 0 Flor 19A-Obswp 6.48 1,60 0 0 0 Flor 20P-19w 2.92 0.55 0 0 0 Flor 21A-24w 0.00 ODD 0 0 0 Infiltration Heating Load(Btuh) 0.67 220 Effect WAR 12 Sensible Load(Btuh) ACH 0.02 26 0.32 Latent Load(Btuh) Internal a Occupants at 230 and 200 Btuh 0 0 0 b Scenario number 0 13 c Default Adjustments d Custom Appliances 0 0 e Plants 0 14 Subtotals Sum lines6 through 12 676 329 Dud EHLF&ESGF 0.385 15 Loads 0.521 260 172 ELG 83 16 Ventilation Loads Vent Cfrn 0 E Cfm 0 17 Winter Humidification Load Gal/Day 0 18 Piping Load L21 Blo�ner HeatAED Excursion&Latent Moisture Nfgraton Load 0 Total Load Sum lines 13 through 19 936 501 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - wrig F�tsoTt' .` 2021-Oct-01 1700.39 /IC^' 5K -15 Right-SuteJ 9 Universal 2021 21.0.08 RSU65165 Page 12 ..:105 �D2U2obert Lewis Heat Load.rup Calc=MJ8 Front Door faces:NW Below Grade Ga—RM, Rec Room Storage Laundry Stars Meth Room Job#: 21-105-1584 Dandelion Energy Scale: 1 : 133 Performed by Scott Schmidt for: Page 1 Robert Lewis 333 North Bedford Road,Suite 220 Right-Suite®Universal 2021 30 Hillandale Rd Mount Kisco, NY 10549 221 0-OctRS 1�70605 Rye Brook,NY 10573 Phone:833-GEO-4ALL www.dandelionenergy.com design@dandelionenergy.00m gn\D2\RobertLewis Fie-at Load.rup lvk First Floor N Room Kitchen C)InM LN,n9 Room Entry Office Job#: 21-105-1584 Dandelion Energy Scale: 1 : 133 Performed by Scott Schmidt for: Page Robert Lewis 333 North Bedford Road,Suite 220 Right-Suited Universal 2021 30 Hillandale Rd Mount Kisco, NY 10549 21.0.08 RSU65165 Rye Brook,NY 10573 Phone:833-GEO-4ALL 2021-Oct-01 17 01 05 ..gn\D2%Robert Lewis Heat Load.rup www.dandelionenergy.com design@dandelionenergy.com Second Floor Bed 2 Bath Bonus Room Maste, Bed+. Fiat Job#: 21-105-1584 Dandelion Energy Scale: 1 : 133 Performed by Scott Schmidt for: Page Robert Lewis 333 North Bedford Road,Suite 220 Rght-Suite®Universal 2021 30 Hillandale Rd Mount Kisco. NY 10549 21.0.08 RSU65165 Rye Brook,NY 10573 Phone:833-GEO-4ALL 2021-Oct-01 17 0105 gn\D2tRobert Lewis Heat Load.rup www.dandelionenergy.com design@dandelionenergy.com Dandelion Energy GSHP Design Report Project: Robert Lewis [21-105-1584] (Project ID:27171) Prepared: 01-Oct-2021 Prepared By: Scott Schmidt by C—Connections.Inc Dandelion Energy System Loads System Loads or Peak Loads are calculated based on a variety of details for an individual residence. Assumed occupancy levels, the number of appliances operating, the number of doors & windows and the tightness of the construction all contribute to the amount of energy required to maintain the thermostat set points given the historical extreme weather conditions in your area. The peak loads used in this report were provided as listed in the following table. 1 kBtu/hr= 1,000 Btu/hr Total Total Heating Load Cooling Load Zone (kBtu/hr) (kBtu/hr) Zone SHF System 1 49.06 32.03 0.920 System 2 47.31 37.26 0.870 Total 96.37 69.29 1 of 10 New York Dandelion Energy Equipment Schedule Based on the provided loads, the recommended heat pump schedule for this system is as follows: High Cap. Low cap. 1 kBtu/hr= 1,000 Btu/hr Heat' Cool ' Water 2 Air 3 Cap. Cap. Flow Flow Zone GSHP QTY (kBtu/hr) (kBtu/hr) (GPM) (CFM) Dandelion Energy- Enertech 49.30 62.00 15.0 1,960 System 1 Multi-Position Vertical YT-060 1 40.40 50.06 Dandelion Energy- Enertech 45.70 59.90 15.0 1,850 System 2 Indoor Split BT-060 1 39.80 49.92 High Capacity Totals 95.00 121.90 30.0 Low Capacity Totals 80.20 99.99 - 1. All capacities shown are total. 2. When applicable,hydronic equipment source and load water flows are assumed equal. 3. Air flow rates are reported on a per heat pump basis. For total air flow in a zone,multiply the reported air flow by quantity. 2of10 New York Dandelion Energy System 1 Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 49,065 Btu/hr Peak Cooling Load 32,031 Btu/hr Heating Set Point 72 OF Cooling Set Point 72 OF Heating Offset 0 Btu/hr Space SHF 0.920 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Enertech Multi-Position Vertical YT-060 Heat Pump Type Water to Air Capacity Dual Capacity # Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 49,300 Btu/hr Total Cooling Capacity 62,000 Btu/hr % Sizing 100.5% Sensible Cooling Capacity 46,500 Btu/hr % Energy From Geo 100.0% % Oversizing 57.8% Installed COP 3.92 Balance Point Temp. 11.8 OF Installed EER 15.27 Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 40,400 Btu/hr Total Cooling Capacity 50,062 Btu/hr % Sizing 82.3% Sensible Cooling Capacity 37,546 Btu/hr Installed COP 4.42 % Oversizing 27.4% Installed EER 22.37 3of10 New York Dandelion Energy System 1 Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtime 467 hrs High Capacity Runtime 0 hrs Low Capacity Runtime 1,950 hrs Low Capacity Runtime 667 hrs Supplemental Bin Hours 0 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Use 6,960 kWh Heat Pump Energy Use 1,620 kWh Pumping Energy Use 563 kWh Pumping Energy Use 155 kWh Supplemental Energy Use 0 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost Breakdown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cost $1,670.52 HP Cost $388.82 Supplemental Cost $0.00 Pumping Cost $37.35 Dual Fuel Cost $0.00 Total Cost $426.17 Pumping Cost $135.23 Total Cost $1,805.75 M 74.8% HP Heating Cost M 6.1% Pumping Cost-Heating 17.4% HP Cooling Cost 1.7% Pumping Cost-Cooling 4of10 New York Dandelion Energy Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type None Zone Load and Operating Profile 900 81 m 800 72 a 700 63 ,o � 600 5¢,0a _ c 500 - ---- 4'02 W ro m t '�•r 400 _ _ _ _ _ _ _ _ _ _ _ _ _ 3GE 7 T� 300 27z c Q � 200 18 a a 100 9 °LI 0 p p 0 I I . Temperature(°F) — Heating Load — Low Capacity Heating Operation High Capacity Heating Operation — Cooling Load — Low Capacity Cooling Operation High Capacity Cooling Operation 1 GSHP Heating 1 GSHP Cooling Heating Cooling Heating Start OAT 57.0 OF Cooling Start OAT 65.0 OF High Capacity Runtime 467 hr High Capacity Runtime 0 hr Low Capacity Runtime 1,950 hr Low Capacity Runtime 667 hr Supplemental Bin Hours - 5of10 New York Dandelion Energy System 2 Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 47,306 Btu/hr Peak Cooling Load 37,261 Btu/hr Heating Set Point 72 OF Cooling Set Point 72 OF Heating Offset 0 Btu/hr Space SHF 0.870 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Enertech Indoor Split BT-060 Heat Pump Type Water to Air Capacity Dual Capacity # Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 45,700 Btu/hr Total Cooling Capacity 59,900 Btu/hr % Sizing 96.6% Sensible Cooling Capacity 44,925 Btu/hr % Energy From Geo 99.4% Oversizing 38.6% Installed COP 3.58 Balance Point Temp. 13.2 OF Installed EER 14.50 Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 39,800 Btu/hr Total Cooling Capacity 49,925 Btu/hr % Sizing 84.1% Sensible Cooling Capacity 37,443 Btu/hr Installed COP 4.22 % Oversizing 15.5% Installed EER 21.68 6of10 New York Dandelion Energy System 2 Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtime 471 hrs High Capacity Runtime 4 hrs Low Capacity Runtime 1,909 hrs Low Capacity Runtime 766 hrs Supplemental Bin Hours 131 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Use 7,060 kWh Heat Pump Energy Use 1,934 kWh Pumping Energy Use 698 kWh Pumping Energy Use 226 kWh Supplemental Energy Use 175 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost Breakdown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cost $1,694.61 HP Cost $464.23 Supplemental Cost $42.16 Pumping Cost $54.33 Dual Fuel Cost $0.00 Total Cost $518.56 Pumping Cost $167.62 Total Cost $1,904.39 M 69.9% HP Heating Cost 6.9% Pumping Cost-Heating 1.7% Supplemental Heating Cost M 19.2% HP Cooling Cost 2.2% Pumping Cost-Cooling 7of10 I , New York Dandelion Energy Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type Electric Resistance COP 1.0 Zone Load and Operating Profile 900 72 W 800 64 a 700 56 3 600 - _ qg a 0 _ = o� 500 40_ my 400 - - - -- - 32Z° o � 3v 300 24=-C Q 200 16 a 100 8 0 pp pp p p o o N 0 .Ni N n n V d voi in O t0 n n O ao R T Temperature(OF) — Heating Load — Low Capacity Heating Operation High Capacity Heating Operation — Cooling Load — Low Capacity Cooling Operation High Capacity Cooling Operation Supplemental Heating I GSHP Heating I GSHP Cooling Heating Cooling Heating Start OAT 57.0 OF Cooling Start OAT 65.0 OF High Capacity Runtime 471 hr High Capacity Runtime 4 hr Low Capacity Runtime 1,909 hr Low Capacity Runtime 766 hr Supplemental Bin Hours 131 hr 8of10 New York Dandelion Energy Vertical Bore 15ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( TG) 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.62 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade __ Grout T.C. 1.20 Btu/hr ft OF ------ :-::%:--:-::....::-:-::: :: ::_:. ---- EWT MIN30.0 OF E] Backfdl :. -_-_ D Formation EWT MAX90.0 OF Granular Backfill 7 _-=- Ej Grout Bore Diameter(DB) 5.00 in GHEX Pipe 1.25"DR 11.0 HDPE 4710 nrows(4 max.) 11 2 Bores in Series (NBIS) 1 E 0 0 ==- LB Layout Rows (n ) 1 rows �-SB� ;_ S Bores per Row 2 6 2 0 �- ______-B_ Number of Bores 2 a SB ==- Bore Spacing (SB) 15.0 ft m De� TOP VIEW DETAIL Design Depth (LB) 461 ft (GENERIC) (GENERIC) Header Pipe 2.00"DR 11.0 HDPE 4710 9of10 New York Dandelion Energy Vertical Bore 18ft cc Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( TG) 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.62 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade _____ Grout T.C. 1.20 Btu/hr ft OF E .1 Backfill -- __ MIN 1 Formation = EWT MAX90.0 OF [] Granular Beddin JZ Grout =-== - Bore Diameter(DB) 5.00 in GHEX Pipe 1.25'DR11.0HDPE4710 nrms(4 max.) M F1_ 2 ... Bores in Series (NBIS) 1 1 0 (1) LB Layout Rows (n ro ) 1 ws �—SB� S Bores per Row 2 2 DO OO _ _ Number of Bores 2 o- $D SB - - == Bore Spacing (SB) 18.0 ft m 3...0 DB I TOP VIEW DETAIL Design Depth (LB) 454 ft (GENERIC) (GENERIC) Header Pipe 2.00'DR 11.0 HDPE 4710 10 of 10 New York �-111111N DANDENE-01 RMAND L .44cOR0 CERTIFICATE OF LIABILITY INSURANCE FMTE(MM/DD/YYYI� �� 10/18/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER COME:NTACT York International PHONE FAX 500 Mamaroneck Ave (A/C,No,Ext):(914)376-2200 (A/c,No):(914)376-2891 Suite 220 A DD RILESS:info@yorkinti.com Harrison,NY 10528 INSURERS AFFORDING COVERAGE NAIC 0 INSURER A:Hamilton Insurance Designated Activity Company INSURED INSURER B: Dandelion Energy Plumbing,LLC INSURER C: 333 N Bedford Rd,Suite 220 INSURER D: Mount Kisco,NY 10549 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLIC YYYY EFF POLICY EXP LIMITS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR ENVPKGH1803226-01 9/8/2023 9/8/2024 DAMAGE TO RENTED 50,000 X PREMISES occurrence) $ MED EXP(Any oneperson) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X JE El LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: AUTOMOBILE LIABILITYCOMBINED SINGLE LIMIT i ANY AUTO BODILY INJURY Perperson) OWNED SCHEDULED AUTOS ONLY AUTOS BODILY Ep BOODILY INJURY Per accident AUTOS ONLY AUOTOS ONNLY Werraccdent SAGE A X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 1,000,000 EXCESS LIAB CLAIMS-MADE ENVXSH1207528-01 9/8/2023 9/6/2024 AGGREGATE $ 1,000,000 DED I X I RETENTION$ 10,000 WORKERS COMPENSATION PER TE OTH- AND EMPLOYERS'LIABILITY Y/N —ISTATU ANY FFICER/M IM OR EXCLUDED?ECUTIVE ❑ NIA A p E gE E.L.EACH ACCIDENT $ (Mandatory In NH)If yes,describe under E.L.DISEASE-EA EMPLOYE $ DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached fl more space Is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village of Rye Brook THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 938 King Street ACCORDANCE WITH THE POLICY PROVISIONS. Rye Brook,NY 10573 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD NEW Workers' ._� STATE COMpe§`5a 1 ft • •.�w�, BoardCERTIFICATE OF NYS WORKERS' COMPENSATION INSURANCE COVERAGE 1 a. Legal Name&Address of Insured(use street address only) 1 b.Business Telephone Number of Insured ADP TotalSource CO XXIII,Inc. 8334364255 5800 Windward Parkway Alpharetta,GA 30005 1 c.NYS Unemployment Insurance Employer UC/F: Registration Number of Insured Dandelion Energy Plumbing, LLC 45-17531 7 333 N BEDFORD RD 1d.Federal Employer Identification Number of Insured or Social Security Mt Kisco,NY 105490000 Number Work Location of Insured(Only required if coverage is specifically limited to certain locations in New York State,i.e., a Wrap-Up Policy) 821328341 2.Name and Address of Entity Requesting Proof of Coverage 3a. Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) New Hampshire Insurance Co. 3b.Policy Number of Entity Listed in Box"l a" Village of Rye Brook WC 034302915 NY 938 King Street All worksite employees working for Dandelion Energy Inc Rye Brook,NY 10573 paid under ADP TOTALSOURCE,INC's payroll,are covered under the above stated policy. 3c. Policy effective period 07/01/2023 to 07/01/2024 3d.The Proprietor,Partners or Executive Officers are to included.(Only check box if all partners/officers included) ❑all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box"3"insures the business referenced above in box"la"for workers'compensation tinder the New York State Workers'Compensation Law.(To use this form,New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers'compensation insurance policy).The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"T'. The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate.(These notices may be sent by regular mail.)Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box"3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder.This certificate does not amend,extend or alter the coverage afforded by the policy listed,nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note:Upon cancellation of the workers'compensation policy indicated on this form,if the business continues to be named on a permit,license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers'Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers'Compensation Law. Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Michael Price (Print name of aut onzed representative or licensed agent of insurance carrier) Approved by: u,.:�t� = = n<:�-- I94ocT-2023 (Signature) (Date) Title: CEO North America Telephone Number of authorized representative or licensed agent of insurance carrier: 800-7438130 Please Note:Only insurance carriers and their licensed agents are authorized to issue Form C-105.2.Insurance brokers are NOT authorized to issue it. C-105.2 (9-17) Certificate Number: wutiv.wcb.ily.gov •,,nrry������,'��'�$o• ..^� �� � � "p^wp 1g � V/'_- „47S A !8,y�.•�/(•`vR1 .-� ��4V. �� � no ht'� tl,o/� ''r'�•f(r'Y `¢of „N n'�/N�' OA .iO 1i4'�'•�rM1I' 0 •,`.;' .'! i dpM 1 fl- n tr 't rA•l( yF`N�YYy'r'r. 1 F � \ 4Vj� Ia1>I �f1� 1gg �Iai>11, 1�/)1 ))gy�pp f 1>I>/' `� �( 1/•1•1 v N 1 ,w 1 a>�1 �'3�! �l1. rll 1/1�1 �'"ci,���,rj1111�r 'E{�!E-•�� r11111j11 �P,�iI j r�l l li�� � ri/1/1//11 rj1/11111rr' c.!.~.� ,•: taco)► �,.:_�_,,N 11i r e -,.�e:, r+.�.!r�!=+�`.�a:� �/i.�:_�:. i>'�:tilllr: •€Fr� at.�;...,1/�lr ti=. .::s�: r�llr�:.:;• .:s�:,r�_!���-___�_, <cis)►; 0 CN N Lu ou LA 1 U Ca r;J: W O 7 VJ <cis)>° 4� �`y •~ z Z W (D v cr W > ection r•: W Z • W F- E W O Q v E �i�. o +' Z O J u o w c G7 t bikP U o v W O O w cu f� O J U w w N L.L . J all E z W a n o �, �e ap _ WOOU •p � O ,". Q a� ' is} > A �= • _. v �. co E L' wy►y Tr Q) o 0 G• . v (�ao)► t,�i ill 1 sF is r r tt r i E •'a 7r tt r-:E'-4t" r��r AacO») r1 lMr .d'1111', rrrr�e— 'rll/,/ll', ��y] r�rl,/lr'r ; ii„� , 1 : �i►ti�'F' 1>6, �3f(n' �f /!� f ��1 : �A� r1i1>Ir i►0)g1 /i11(� ��i tr i/�1�1i ��°. i 11 tii 111 Vi ,► i to `v11 •N 1, 4 i► !, h �. Lw R _ -> DANDENE-01 EPRZEBIEGLEC ACORO CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DDlYrrr)9/10/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER C MTACT York International Agency,LLC HONE 500 Mamaroneck Avenue (A//CC,No,EXt):(914)376-2200 (AA/C,No):(914)376-2891 Suite 220 E-M R'L .certificate@yorkinti.com Harrison, NY 10528 INSURERS AFFORDING COVERAGE NAIC# INSURER A:Hamilton Insurance Designated Activity Company INSURED INSURER B:Merchants Mutual Ins.Co. 23329 Dandelion Energy,Inc. INSURER C: 335 Madison Avenue,4th Floor INSURERD: New York,NY 10017 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS N WV M A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE FX]OCCUR ENVPKGH1803226 9/8/2021 9/8/2022 DAMAGE TO RENTED 50,000 $ MED EXP(Any oneperson) 5,000 PERSONAL BADVINJURY 1,000,UUU GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 2,000,UUU X POLICY PRef LOC PRODUCTS-COMP/OP AGG 2,000,000 OTHER: $ B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident)X ANY AUTO CAP1079447 7/5/2021 7/5/2022 BODILY INJURY Per on $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILYBOODILY INJURY Per accident $ X AUTOS ONLY X AUUTOO�ONLY PPerOacEcRi�nt AMAGE $ $ UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAIMS-MADE AGGREGATE DIED RETENTION$ $ WORKERS COMPENSATION PER OTH- STATUTE ER AND EMPLOYERS'LIABILITY Y/N ANY PROPRIIMTgOER EXCLUDED?ECUTIVE ❑ N/A E.L.EACH ACCIDENT $ (Mandatory IIt NH) E.L.DISEASE-EA EMPLOYE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Village of Rye Brook THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN g Y ACCORDANCE WITH THE POLICY PROVISIONS. 938 King Street Rye Brook, NY 10573 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD YORK Workers' CERTIFICATE OF STATE Compensation Board NYS WORKERS' COMPENSATION INSURANCE COVERAGE la.Legal Name 8 Address of Insured(use street address only) 1 b. Business Telephone Number of Insured Dandelion Energy Inc. 845-649-6073 1 Corporate Dr 1 c. NYS Unemployment Insurance Employer Registration Number of Peekskill,NY 10566 Insured Work Location of Insured (Only required if coverage is specifically limited to 1 d.Federal Employer Identification Number of Insured or Social Security certain locations in New York State,i.e.,a Wrap-Up Policy) Number 82-1328341 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) Indemnity Insurance Co.of North America 3b. Policy Number of Entity Listed in Box"1 a" Village of Rye Brook 938 WLR_C68967284 King Street Rye Brook NY 10573 3c.Policy effective period 3/1/2021 to 3/1/2022 3d.The Proprietor,Partners or Executive Officers are © included.(Only check box if all partners/officers included) ❑ all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box"T'insures the business referenced above in box 1 a"for workers' compensation under the New York State Workers'Compensation Law. (To use this form, New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers' compensation insurance policy). The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"2". The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate. (These notices may be sent by regular mail.)Otherwise, this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box "3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note: Upon cancellation of the workers'compensation policy indicated on this form, if the business continues to be named on a permit, license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers' Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers' Compensation Law. Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Lynne Boone (Print name of authorized representative or licensed agent of insurance carrier) Approved by: Wwte- 80-0-fu- 3/1/2021 (Signature) (Date) Title: APM Telephone Number of authorized representative or licensed agent of insurance carrier:214-288-3012 Please Note: Only insurance carriers and their licensed agents are authorized to issue Form C-105.2. Insurance brokers are NOT authorized to issue it. C-105.2 (9-17) www.wcb.ny.gov Laura Petersen From: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> Sent: Friday, January 28, 2022 7:35 AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DSNY) ****REGULAR**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken: 01/28/2022 07:34 To: VIL RYE BROOK PRIMARY Transmitted: 01/28/2022 07:35 00001 Ticket: 01282-000-081-00 Type: Regular Previous Ticket: ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 30 To: Name: HILLANDALE RD Cross: From: To: Name: Offset: ------------------------------------------------------------------------------ Locate: ENTIRE PROPERTY NearSt: KING ST Means of Excavation: MINI EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: N Work Type: GEOTHERMAL INSTALLATION Estimated Work Complete Date: 02/02/2022 Depth of excavation: Site dimensions: Start Date and Time: 02/02/2022 07:00 Must Start By: 02/16/2022 ------------------------------------------------------------------------------ Contact Name: JOHN MURPHY Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 845-332-5378 Fax: Email:johnny@dandelionenergy.com Field Contact: JOHN MURPHY Alt Phone: 845-332-5378 Email: johnny@dandelionenergy.com Working for: HOMEOWNER ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA BELL-VALHALLA / WSCHSTR CONED SUEZ WTR WESTCHESTER TEN GAS-HDS VLY VIL RYE BROOK 1