Loading...
HomeMy WebLinkAbout900 King Street AKRF Letter to BOT 2021-7-23 Environmental, Planning, and Engineering Consultants 34 South Broadway Suite 300 White Plains, NY 10601 tel: 914 949-7336 fax: 914 949-7559 www.akrf.com Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut July 23, 2021 Honorable Paul S. Rosenberg, Mayor Members of the Village Board 938 King Street Rye Brook, NY 10573 Re: 900 King Street: Site Plan Application Dear Mayor Rosenberg and Members of the Village Board: On behalf of the Applicant, we are pleased to transmit additional materials, listed below, with respect to the Site Plan Application for the redevelopment of 900 King Street. We also note that the Applicant has responded to the letter from the Arbors HOA regarding the Site Plan submission and, as described below, has agreed to almost all of the requests contained therein. A copy of this letter was sent to the Village Administrator and Village Attorney and can be considered part of the record for this application. Additional Materials Included herein are the following additional materials: 1. Updated architectural renderings of the Independent Living (“IL”) building, prepared by Perkins Eastman Architects, that illustrate the main entry of the IL building as viewed from within the Project Site. The renderings also show the approach proposed to address the comments from the Architectural Review Board with respect to the design of the IL building. Of note, the scale of the balconies on the three-story wings was reduced, Juliet balconies were added to the portions of the four-story section, the windows were adjusted, and a larger porte cochere was added to complement a slightly reconfigured, and grander, entry sequence. These changes do NOT affect the main roofline of the IL building; it remains the same height as included in the July 2, 2021 submission. 2. Revised Planting Plan, Sheet L-300, changed certain trees between the proposed townhouses and the Arbors to evergreen species, as requested by the Arbors HOA. Additionally, 29 new evergreen trees were added to the Planting Plan between the townhouses and the Arbors. As the plantings are also shown on the “Wetland Buffer Planting Plan,” Sheet L-301 is also being submitted. 3. Revised Construction Management Plan. The CMP has been updated to reflect the following commitments by the Applicant, as requested by the Arbors HOA: a. Construction Trucks shall not be allowed to idle on-Site (previously, a three-minute limitation was included); b. A designated construction management staff member will be responsible for monitoring and repairing Arbor Drive, as needed, during construction; c. The Applicant will resurface Arbor Drive upon completion of the Project from King Street to the southwest corner of the Project Site; d. A three-dimensional “faux ivy,” or similar, covering will be installed on the exterior of the Arbor Drive noise barrier. Mayor Rosenberg and Village Board 2 July 23, 2021 We look forward to appearing before your Board for the public hearing on the Site Plan application on July 27, 2021. Sincerely, AKRF, Inc. Peter Feroe, AICP Sr. Technical Director | Planning cc: Leslie Snyder, Esq.; on behalf of Arbors HOA 900 King Street: Site Plan Application Contents DRAFT 1 07/23/2021 This outline lists the documents, materials, and analyses required to be included in the Final Site Plan for the 900 King Street Project. Each submission made by the Applicant during the Site Plan, Wetland, and Steep Slope permit review processes will contain this list, which will be annotated to reflect the status of the various documents as well as whether the documents were updated since the previous submission. 900 King Street Site Plan Required Contents Requirement Updated from Prior 7/2/21 Submission Notes Site Plan Application Form No February 2021 is latest Exterior Building Permit Application No February 2021 is latest Engineering Plans No 7/2/2021 is latest SWPPP / ESCP No February 2021 is latest Architectural Plans No* * Updated renderings provided showing approach to addressing ARB comments. Roofline (height) remains the same as 7/2/2021 submission. Landscape Plans Yes Revision to Sheet L-300, “Planting Plan,” as requested by Arbors HOA. L-301 shows planting plan, was also revised. Other sheets remain the same (7/2/21) Project Description No 7/2/2021 is latest. MEP Design Narrative No March 5, 2021 is latest HVAC Acoustical Analysis No April 14, 2021 is latest Construction Management Plan Yes Updates as requested by Arbors HOA Construction Phasing & Staging Plans No February 2021 is latest Construction-Period Noise Barrier Acoustical Analysis No May 24, 2021 Wetland Permit Application Form No February 2021 is latest (to PB only) Steep Slope Permit Application Form No February 2021 is latest (to PB only) 900 King Street List of Drawings Number Sheet/ Figure/ Document Title Prepared by Date/Revised C-000 COVER SHEET JMC PLLC 7/2/2021 C-010 NOTES & LEGENDS JMC PLLC 7/2/2021 C-100 EXISTING CONDITIONS JMC PLLC 7/2/2021 C-110 DEMOLITION PLAN JMC PLLC 7/2/2021 C-120 EXISTING STEEP SLOPES MAP JMC PLLC 7/2/2021 C-130 TREE REMOVAL/PROTECTION PLAN JMC PLLC 7/2/2021 C-131 TREE REMOVAL/PROTECTION CHART JMC PLLC 7/2/2021 C-200 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 1)JMC PLLC 7/2/2021 C-201 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 2)JMC PLLC 7/2/2021 C-202 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 3&4)JMC PLLC 7/2/2021 C-203 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 5)JMC PLLC 7/2/2021 C-204 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 6)JMC PLLC 7/2/2021 C-205 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 7)JMC PLLC 7/2/2021 C-300 LAYOUT AND STRIPING PLAN JMC PLLC 7/2/2021 C-310 ROAD PROFILES JMC PLLC 7/2/2021 C-311 ROAD PROFILES JMC PLLC 7/2/2021 C-320 FIRE TRUCK, EMERGENCY VEHICLE & TRUCK TURNING PLAN JMC PLLC 7/2/2021 C-321 ON-SITE FIRE PROTECTION PLAN JMC PLLC 7/2/2021 C-330 INTERSECTION SIGHT DISTANCES JMC PLLC 7/2/2021 C-400 GRADING PLAN JMC PLLC 7/2/2021 C-410 EXCAVATION CROSS SECTION JMC PLLC 7/2/2021 C-500 UTILITIES PLAN JMC PLLC 7/2/2021 C-510 STORM SEWER PROFILES JMC PLLC 7/2/2021 C-520 SANITARY SEWER PROFILES JMC PLLC 7/2/2021 C-600 LIGHTING PLAN JMC PLLC 7/2/2021 C-900 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-901 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-902 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-903 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-904 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-905 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-906 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 Page 1 of 2 7/23/2021 900 King Street List of Drawings Number Sheet/ Figure/ Document Title Prepared by Date/Revised C-907 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-908 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-909 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-910 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 BA-000 COVER & SHEET INDEX Perkins Eastman 7/2/2021 BAS-100 ARCHITECTURAL SITE PLAN Perkins Eastman 7/2/2021 BA-100 PARKING PLAN Perkins Eastman 7/2/2021 BA-101 FIRST FLOOR PLAN Perkins Eastman 7/2/2021 BA-102 SECOND FLOOR PLAN Perkins Eastman 7/2/2021 BA-103 THIRD FLOOR PLAN Perkins Eastman 7/2/2021 BA-104 FOURTH FLOOR PLAN Perkins Eastman 7/2/2021 BA-105 ROOF PLAN Perkins Eastman 7/2/2021 BA-111 TOWNHOUSE PLANS Perkins Eastman 7/2/2021 BA-200 OVERALL ELEVATIONS Perkins Eastman 7/2/2021 BA-201 OVERALL ELEVATIONS Perkins Eastman 7/2/2021 BA-202 ELEVATIONS Perkins Eastman 7/2/2021 BA-203 ELEVATIONS Perkins Eastman 7/2/2021 BA-204 ELEVATIONS Perkins Eastman 7/2/2021 BA-205 ELEVATIONS Perkins Eastman 7/2/2021 BA-211 TOWNHOUSE ELEVATIONS Perkins Eastman 7/2/2021 BA-303 SECTIONS Perkins Eastman 7/2/2021 BA-304 SECTIONS Perkins Eastman 7/2/2021 L-300 PLANTING PLAN MPFP 7/23/2021 L-301 WETLAND BUFFER PLANTING PLAN ON-SITE MPFP 7/23/2021 L-302 WETLAND BUFFER PLANTING PLAN ENLARGEMENT MPFP 7/2/2021 L-303 WETLAND MITIGATION PLANTING PLAN OFF-SITE MPFP 7/2/2021 L-304 PLANTING DETAILS MPFP 7/2/2021 Page 2 of 2 7/23/2021