Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
07.23.2021 2b_List of Drawings_20210723
900 King Street List of Drawings Number Sheet/ Figure/ Document Title Prepared by Date/Revised C-000 COVER SHEET JMC PLLC 7/2/2021 C-010 NOTES & LEGENDS JMC PLLC 7/2/2021 C-100 EXISTING CONDITIONS JMC PLLC 7/2/2021 C-110 DEMOLITION PLAN JMC PLLC 7/2/2021 C-120 EXISTING STEEP SLOPES MAP JMC PLLC 7/2/2021 C-130 TREE REMOVAL/PROTECTION PLAN JMC PLLC 7/2/2021 C-131 TREE REMOVAL/PROTECTION CHART JMC PLLC 7/2/2021 C-200 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 1)JMC PLLC 7/2/2021 C-201 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 2)JMC PLLC 7/2/2021 C-202 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 3&4)JMC PLLC 7/2/2021 C-203 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 5)JMC PLLC 7/2/2021 C-204 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 6)JMC PLLC 7/2/2021 C-205 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 7)JMC PLLC 7/2/2021 C-300 LAYOUT AND STRIPING PLAN JMC PLLC 7/2/2021 C-310 ROAD PROFILES JMC PLLC 7/2/2021 C-311 ROAD PROFILES JMC PLLC 7/2/2021 C-320 FIRE TRUCK, EMERGENCY VEHICLE & TRUCK TURNING PLAN JMC PLLC 7/2/2021 C-321 ON-SITE FIRE PROTECTION PLAN JMC PLLC 7/2/2021 C-330 INTERSECTION SIGHT DISTANCES JMC PLLC 7/2/2021 C-400 GRADING PLAN JMC PLLC 7/2/2021 C-410 EXCAVATION CROSS SECTION JMC PLLC 7/2/2021 C-500 UTILITIES PLAN JMC PLLC 7/2/2021 C-510 STORM SEWER PROFILES JMC PLLC 7/2/2021 C-520 SANITARY SEWER PROFILES JMC PLLC 7/2/2021 C-600 LIGHTING PLAN JMC PLLC 7/2/2021 C-900 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-901 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-902 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-903 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-904 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-905 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-906 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 Page 1 of 2 7/23/2021 900 King Street List of Drawings Number Sheet/ Figure/ Document Title Prepared by Date/Revised C-907 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-908 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-909 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 C-910 CONSTRUCTION DETAILS JMC PLLC 7/2/2021 BA-000 COVER & SHEET INDEX Perkins Eastman 7/2/2021 BAS-100 ARCHITECTURAL SITE PLAN Perkins Eastman 7/2/2021 BA-100 PARKING PLAN Perkins Eastman 7/2/2021 BA-101 FIRST FLOOR PLAN Perkins Eastman 7/2/2021 BA-102 SECOND FLOOR PLAN Perkins Eastman 7/2/2021 BA-103 THIRD FLOOR PLAN Perkins Eastman 7/2/2021 BA-104 FOURTH FLOOR PLAN Perkins Eastman 7/2/2021 BA-105 ROOF PLAN Perkins Eastman 7/2/2021 BA-111 TOWNHOUSE PLANS Perkins Eastman 7/2/2021 BA-200 OVERALL ELEVATIONS Perkins Eastman 7/2/2021 BA-201 OVERALL ELEVATIONS Perkins Eastman 7/2/2021 BA-202 ELEVATIONS Perkins Eastman 7/2/2021 BA-203 ELEVATIONS Perkins Eastman 7/2/2021 BA-204 ELEVATIONS Perkins Eastman 7/2/2021 BA-205 ELEVATIONS Perkins Eastman 7/2/2021 BA-211 TOWNHOUSE ELEVATIONS Perkins Eastman 7/2/2021 BA-303 SECTIONS Perkins Eastman 7/2/2021 BA-304 SECTIONS Perkins Eastman 7/2/2021 L-300 PLANTING PLAN MPFP 7/23/2021 L-301 WETLAND BUFFER PLANTING PLAN ON-SITE MPFP 7/23/2021 L-302 WETLAND BUFFER PLANTING PLAN ENLARGEMENT MPFP 7/2/2021 L-303 WETLAND MITIGATION PLANTING PLAN OFF-SITE MPFP 7/2/2021 L-304 PLANTING DETAILS MPFP 7/2/2021 Page 2 of 2 7/23/2021