Loading...
HomeMy WebLinkAboutMP21-100 w c w VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook, N.Y. 10573 ADMINISTRATOR Paul S. Rosenberg (914) 939-0668 Christopher J. Bradbury www.r•ebrook.org TRUSTEES BUILDING& FIRE Susan R. Epstein INSPECTOR Stephanie J. Fischer Michael J. Izzo David M. Heiser Jason A. Klein CERTIFICATE OF COMPLIANCE February 23,2022 Richard Gasparino&Bridget Gasparino 6Jacqueline Lane Rye Brook, New York 10573 Re: 6 Jacqueline Lane, Rye Brook,New York 10573 Parcel ID#: 135.35-1-61 This document certifies that the work done under Mechanical Permit #21-100 issued on 7/19/2021 for the installation of a new geothermal heating system has been satisfactorily completed. Sincerely, Michael J. Izzo Building&Fire Inspector /tg o`` tim cu � 19E12 BUILDING DEPARTMENT BUILDING INSPECTOR ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAx (914) 939-5801 www.Uebrook.org - ----- - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS:- �^ ! ( �Q- L E1 DATE: { 6 �C-z E PERMIT# `' 121 io ISSUED: SECT: BLOCK: LOT: LOCATION: -� `� d `r 1�'i C s�� i 1 OCCUPANCY: ❑ VIOLATION NOTED THE WORK IS... ACCEPTED ❑ REJECTED/REINSPECTION ❑ SITE INSPECTION � f � REQUIRED ❑ FOOTING i ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ NATURAL GAS ❑ L.P. GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION ❑ FINAL OTHER o, I- C:,Q Q a a W wqqT 0" tin 00 C Z � aa � z o a - I c46 d z 0 z N �. a ►�'� Q x AC � z .-� � _ z � � W a CC r 00 y W a {7 0. C o U 3 a Q .� 'n F 8 • z w d e � Q G z 0. ' % E■ m � v z � � � �, �4I 0. .� ►.w Lim = rQn �4 JUL 19 2021 BUIL I�E� 'MENT VILLAGE OF RYE BROOK V[L ' E OF RYE �ipox BUILDING DEPARTMENT 938 KiNa ET RYE IBZ�439-5801 NY 10573 (914)93 wj t r ELECTRICAL PERMIT APPLICATION Westchester County Master Electricians License Required FOR OFFICE USE ONLY ! C 00 EP#: Approval Date: JUL 1 9 021 Permit Fee: S Approval Signature: Other: Disapproved: (fees are non-refundable) Application dated, / is hereby made to the Building Inspector of the Village of Rye Brook NY,for the issuance of a Permit to install an or remove electrical equipment,wiring, fixtures,or to perform other high or low voltage electrical work as per the detailed statement described below. The applicant & property owner, by signing this document agree that all electrical work performed will be in conformance with all applicable Federal, State,County and Local Codes. I.Address: 6 Jacqueline Ln, Rye Brook, NY 10573, USA SBL: 3S t3S '1 ' 4 .Zone:je—I0 2.Property Owner: Rich Gasparino Address: 6 Jacqueline Ln, Rye Brook, NY 10573, USA Phone 0: (914) 879-7507 Cell#: sail: rcgjr@me.com 3.Master Electrician: Joe Covais of Dandelion Energy Address: 333 North Bedford Rd Mt Kisco NY 10549 Lic.#: Phone#: Cell#: 845-649-6073 email: jdevore@dandelionenergy.com Company Name: Dandelion Energy Inc Address: 333 North Bedford Rd Mt Kisco NY 10549 4.Proposed Electrical Work/Fixture Count: Install 5 ton geothermal heat pump install closed loop system STATE OF NEW YORK,COUNTY OF WESTCHESTER ) as: Rich Gasparino ,being duly sworn,deposes and states that he/she is the applicant above named,and does further (print name ul'individnaki¢ning as the applicant) Owner state that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the for the legal owner and is duly authorized to make and file this application. (indical architect.contractor.a�rut,aitomcy,etc.) The undersigned further states that all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. Sworn to before me this 2 5— Sworn to before me this 2!r day of v ,20_2n'L_ day of it-e ,20 2( gnature of roperty Owner SignaWe of Applicant Rich Gasparino Joe Covais of Dandelion Energy Print Name of Property Owner Prin me of Applicant ry Public IA DEGIACOMO Public NOTARY PUBLIC,STATE OF NEW YO Registration No.01 DE6089490 Qualified in Westchester ou My Commission Expires: L`1nt z,3 3/21/19 INSPECTIONSTATEWIDE Service With Integrit-y 0:0 SWIS JOBAPPLICATIONt. Office Use Elect.Permit# Date Bldg Permit# Utility ID# Final Certificate# City/Village Zip Township County Address Cross Street Section Block Lot Owner Name/Address(if different than above) Contact Number ❑Basement ❑ 1st FI. ❑2nd FI. ❑3rd FL ❑More Than 3 FL [:]Garage ❑Attic ❑Outside ❑Residential ❑Commercial Receptacles Special Recept GFCI AFCI Switches Dimmers Smoke Alarms Carbon Monox (Hood Trash Compact Amt Amps Range(s) Cooktop(s) Oven(s) Dishwashers Refrigerator Disposal Microwave Warm Draw Incandescent Fluorescent SERVICE Amperage Voltage 1 P 3P #Meters #Disconnect ❑Underground ❑New ❑Reconnect ❑Overhead ❑Change El Visual Re-Inspection ❑ Safety Re-Inspection ❑ Re-Inspection Additional Information /0 6,00, r R C ��MC JUL 1 9 2021 VILLAGE OF RYE BROOK BUILDING DEPARTMENT This application is valid for one(1)year from the date received by SW IS.This application is intended to cover the above listed items to be inspected,if at anytime of inspection additional items have been installed,you are authorized to make the inspection and adjust the fee for the additional Items inspected.The applicant declares that there is no open applications for the above address with any other inspection company.The applicant owner or authorized agent agrees to all the above terms and conditions as set forth for the application. Inspector Date Finalized Inspector# Company Name Date Signature Address City/State Zip Code License# Phone# State Wide Inspection Services cok--> 10$0 Main Street Fishkill, NY 12524 4wus 845 1 Phone 914-2194-219- 062 Fax STATE WIDE INSPECTION SERVICES Email: office()swisny.com Website: www.swisny.com Service With Integrity BY THIS CERTIFICATE OF COMPLIANCE STATE WIDE INSPECTION SERVICES CERTIFIES THAT: Upon the application of: Upon Premises Owned by: Dandelion Energy Richard & Bridget Gasparino Joe Covais 6 Jacqueline Lane 1 Corporate Drive Rye Brook, NY 10573 Peekskill, NY 10566 Located at: 6 Jacqueline Lane, Rye Brook, NY 10573 Section: Block: Lot: Electrical Permit Number: EP 21-179 135.35 61 Certificate Number: 2022-0649 Mechanical Permit Number: MP 21-100 A visual inspection of the electrical system was conducted at the Residential occupancy described below.The electrical system consisting of electrical devices and wiring is located in/on the premises at:6 Jacqueline Lane, Rye Brook,NY 10573 The Basement and Garage were inspected in accordance with the NYS and NFPA 70-2017 and the detail of the installation, as set forth below,was found to be in compliance on the 14th day of February 2022. Name Quantity Rating Circuit Type Geothermal System 01 Officer. Frank J. Farina This certificate may not be altered in any way and is validated only by the presence of a seal at the location indicated.This certificate is valid for work performed on the date of inspection only. LL �WWazapa wp Q 0wWaLm x LL < o ©0 �m 1c 3ry� O z one O�OO�Om OE) Wz&Ow�� r4�U 005 rn�szzw�~' OY w Ulh3w Q M rY- OLL D Ur Y Z a l-��0 RZ2SJ J V)~=w ZaFwa�QF--F.rn 4'J�Op V a.�.l ��00 t �O� Q >Mw -o Qpd UFOJ�¢t7Uf1SF�a0a7001-FU' HwZ��wY- aag3ao ¢wvni3�ZZ LLa aOZZui� w3nawUa� a�agwo¢ Un wUJ Wm in0¢wugOy¢mFo-C9 va99Ywt_r�f-zU� 2VUOp�O o zva-a z�z_wz_m-wx a ,,0-z}z�u�- xagna xW,zaza> >�Op (7 oz=U° f W OOZ�H�� pILLL W�F--r�llaa���0¢ ruu1�ZZ waULLma 0J30 jrX�T� > 64 a 0wF�Q ?mLLo�OOfm�w0wzwW<m ~UJw0wF¢FwLLOaaW-Zvwiti .i U>¢ON (L ¢vlz JOQUZUjaK�O¢aO�Z(7nmZLL~Q~Z~-ZN> * L1 NS x z 3Ug Hruw�Z�¢nsn0o�`n� NOa�<oZL$u0�w'arn�ZN spa - i a 7 p 0 4 x w Z w=a r 6 O w H 0 H w d 0 F T a=0 0 U w M y J z, ml o-LLO>. M. ozga,LL2FmoM�H�wa�a�CZMZCYO-�-<<NWLLgz W �j V9 dr U 4 U a(D O� w OF Z U' -j V) W�tli a z O 0<=dU m o o z z o z Q 111 O�aaYwpa a�z¢LL¢pa?ZzwUww to7¢ ar^�-¢U�w�n�z�WZ d WLU �>¢�zF8azaNwOaOZFaQUOi�< ms��Ui wOwazO�mzOs (��' F- rCL w�_'J00�a Z UpO 7OLLI O o:O�aF- p'U O O_Un0 u�0am0¢¢�w4o' Fg�LL rrDw_z�a N z.4a-1waZ) <-uMOaaawva ZOO Oz2awNaaOui(6avratfwp m Z Z. w o W a w rr e W W w 0 n Z o J � w } Z Z N J c o � .r:. O 4 a o .lwe r' *fir m N I f i a < U CN N •' O O a 1 CD a o x fr�xw N: a N t.►* C7 F r U U w w 7 I O 0 rY ff a a U Z Y W Z w Z p Z g w rn O Z N Z a o a 0 umi U a 14 o w H � a r H X Z 'nI fV Q M r.1 fV d O CA a w Chi %D Ln tD o (f' NN (t) Ln w C . ~ O O O v z Z w 62 O d ° n U- C F v u a � N N ry o co Z Irff n 10 V —— —————————— -# J 'i W LA ., Z Z All u W Y C -- ----- ----------- 'a°o N am � N a r•, Ln N o LU rn o a L) O °w W O W o it a m a o V) z T W 17 �D unu.ia wccEss U N N RT Z N N Q � t N WI Q w fL W Z 0 f H U U W w O O a a = tJl O = LO w Q } C' a P s W Q0 W Q ❑ _w Jd LL-, �/ ; H C7 X ❑ F- Q r o W = Z Z LL W w 2 Q .1 w = ~ Z Z LU dU (f) waZC� HY ❑ � � O W 0 a u Z ❑ (YCYZcnQJ � UQ * u a Z � � fnL) � 3 = wHU (/? Y ❑ Z - Z -� o OLLF- GQw U = ❑ HZOwUOlw o c > J03 LLUw > Z � QLLw0 ❑ Oww' z ~ z o c�YS UO Ix -g2: wO � U (n � � H o N z w O > U v w LL aOP , a O �ag a � w X O ? O x x pa 1.3 M rc 1 o 10 a z wz a O wN a 2 o E _ rn Wp f @a 2 z z N O aO N Oa p ¢z w F Oa = '� U7 a s g z Q U 4 Q O N � N. O O a U Q� Q , mQ JaZ Z diveiaans k o z 5 o yy 2$4 a a8 Oz wa� d 0 I Q xz w o rZmO� 202 U) Y J E O U b Z W f7 p a O rr Z Z ZZ SS a0 I a Q O W u J um Z 0Q NIv NNnim g NVij azjW�o SO.C.O rriN4 2 -Zu��a W y�¢ZllaO mz0>02 UU O Q Z K(7NY U OZ aaz�OWZfn �wOw4^ Z op m, a rcYY yw�00_O^ay�w(LLaNw O NZ U aC4C��'a1 K W a7gS W U W W a Q Nd'C W Za d 2YUr wz7wN7 Q Z �LL'4N K � �w vWi wOa Op S0z T FMQ W Z 4Z N ooWmU F iN nv0 r � U N Z a ¢ O m a y LU C J O � ❑ y N 4 AP C co N i K M F a 7 (D o o ' a a z d co O No P<x W z Q O U, z Z Z 9x , zLL mz U _ So a o a J z w u ¢ O o z 4 0 4 O z Nv cv W v�i o ; w N w s W W z CO v_ f rc y r i f f z 3 z W CJ W 4 F a c r v F c o z � Z VOK z R 3 LL ~2 zO U z u Ill h 6 W W c '7 1 `o_ z z c L) o w LL aU� a 0 z U 'W ri 70 �W N o O 21 0Z x 0 o �I w �zz Z a d W uN r-z o f w ¢ pza m 3 O _ W p x VFW Q O x �a� 5 jE _ w o asa _ ui 7 Q v ¢Z O Q a Up w p W N r Z 0 Q ¢ mO Q 4 _ zoz f u �G 00 o z QN OZ N w V ]1.Q LL O j N ZU J m w m z a Z z a o _ o C) o 1 w In 7 4 a w o o cs 2 0 o o Oz zEn \\ \\ \\ \\ -Z W> Q Q III-III-11 III=ICI-ICI Z III, II—I;;;I�I�III�1��,�IIH � ��6Q QaW ZZSg. �` W W»E 11 M S izz t() O N ri } N Q Z 2 V7 O 0 a Q z ti D co0 N W � EL d W n W O � I Z D WIX C O 2 p R J N o w T z Il o y N O (n a x O G C6 U w 4 ¢ N K +D q aO ¢ U 3 f0 0 l a a O q Wa In O W Z w Z� a in a U N W 7 Ir qa � Zw In x 7 Ow rc a� x o c w �W At a v�y n ? Z. <. cas7oa� g�iv U m p ZV_ZII a O O z q O m O Z> N w U O m F N ax w cli W w 0 G p O p N S tL U C�xQ CAW ZapVl CDW �� � a� `j � LI.I 0 O Tw w N c z o m -o� w��am z a o gg � r az � o � �1 °J Eo� w C7 w �� z �^�'' z N0'3 �a p p 2 m Z g w o z 4 0 c °ot 0. 3 z Z 20 a a i Lj F'p' o �p Q g� W� IL 0 0 �Z z� cwi � i W5540 0 0 a o a a Z 7d' a a Z m a>a p w IN - J d� � 'd m A O C 0 � dJ apzIJ y nzpy �pp _ Zon 0, ¢ � FW z ?z w, a'aa E- O Z VT Z � qs W- w rpp 2 Q �' O Ve z 7 U Z Z .J q J W 0 C o S z a� � S ?� xafW/Id 0 c j ♦ C) O Z • • • • • • • • • • d+ N O f L W # $ A 4 \2 § § kj \ [ £: kK) ! e& /r§� e § § \/ (2$/ ) / uj - »x«§ w ) 7 ` § §§ %B[| §�& § $2■! F- z \§)( T-4 /co o Q: 2 o w . x) k§X. 1§w ( �R $ )§ �|)_ !® §§§],&|(2■ ) 2 j } § R>e■ak�■|x n § z ��\��\\ . /A / ! b\ §z 2 00 j2. BWa , , xz i5i ( a \�) } k\ - - ------- z ¥ d° i ;z a ƒ ¥ o§ - � \ D ( ` ' \ 7 § ------ K{ § cr \ § | 0. Ir } \ w \ q §z § \ §§ p § § � q 04 f j � � 2 + $ / b 7 \ § § LU ) ( k « « w2N! \ ■ . � } 0. § § ) S \ 0 > � ( h d & & tCL \ 7 ® � \ \ ; o \ - 2e 5 ALL .. ) § | j ! !&# ®K2 2# « a g§£on � ; \(\/ } _ , o \ §�o G / ) p F ( ; ( / ; ! ; $ 7 K( k| �)\ Ir _ { f $ �!« ) §z Er \0 } w # ` - 0U z ) °M , L) § \ d ( ( t ) § w f u \ k ° } w 2 0 ` ) F- 2 « t ! 2 ® 0 ( $ -. zcli \� � ; 2 ; /, ) P . $ { 6 E§ | 8 ) ) « { _ § §� i 1§ E j . Cal MOMS§§ Z { .\ ;|0 z .(z §///|--§ § )(!§(() z ` 9 . \ \ § § jjk\�§} ¥ ' ` } \ g / @ °, . . . g M W $ LL § / 0 $ 7 5LLJ u 0 / LJ z « \ \ } h % u ® § \ § z z 3 z \' g # 0 / / ® $ / \ § I /\ § U E § LJ z _ § t 0 5 a { § 2 2r, �» �- �/� //� z0 7/§ L iM / Lu( /\\ ( ) m z k 2$ / 2 S Lds u< _ e 00 \\ LLJ / \ 0§ 2z �= u < LLI = z°2 §/ k §/ /}Z \ o« e 2F z�< ®�0 E 0 0< z m c o u u �c�ez0 o \ \�/k\0 \ 0�Z e / §\7o3E §-< §2z$%§ �j��0 0070/L /I«§ 0E--J §ou§� /DJ\±- §§c/ 53\§/\ :ƒ(L �zMLLJ on u � u a <o - o = o wm \%uZE 3 §¢a . , )u\/%m -i— < fE/§ko ~�ULJ¥ �m=mu< 3-jV)Lu a %41 § h/°§k§ E§ojz 0 5kL50<0 < )z \ƒƒ\\Z§}\5 § ® � g < p-V) o=zI—< � § z§ _ 3 2@«5<@o�<�w� \ } § _ & W 4 ui \ 2 �� - LICE¥ � . DANDELION March 25,2019 RE: Insulation requirements for shallow header trench installations To whom it may concern: Dandelion requires excavation and header pipe installation to a minimum depth of 4 ft.below grade,and that depth be maintained from the ground loop location to the building entry point.This requirement is consistent with industry-accepted best practices. However,there are cases where the minimum trench depth cannot be achieved without excessive complication,labor or cost. Dandelion has developed an alternative procedure for such cases,which is outlined in our Design&Installation Standards: When the site conditions prevent the header trench from being excavated to the minimum 4 ft. depth, the exterior header piping shall be insulated with closed-cell pipe insulation.Additionally,foam board insulation(min.R10)shall be installed directly above and along the outer edges of the piping in the bottom of the trench for additional freeze protection. The width of the foam board insulation shall be sufficient to completely cover the header piping so that it cannot be seen from above prior to backfill. The thermal conductivity of subsoil is typically on the order of 0.50-1.00 Btu/hr-ft-*F,depending on composition,density and moisture content.The thermal resistance of foam board insulation is R=5 hr-ft'°F/Btu(per inch of thickness). Using the steady-state conduction equation to calculate thermal equivalence(R=L/kA),it can be shown that adding 2 inch (1310)foam board insulation is comparable to adding 60 inches of soil depth,at minimum. Although it is not ideal to install header piping at depths less than 4 ft.from the surface,the installation of foam board insulation in accordance with our Design&Installation Standards will compensate for the deficiency from a thermal performance and more importantly,from a freeze protection standpoint. If you have any questions,feel free to contact me at rcarda@dandelionenergy.com. Sincerely, OF NEW Y Ryan Carda, P.E. �QAPN S. Principal Engineer Dandelion Energy, Inc. fi 100136 A � F IN March 25,2019 O335 Madison Ave,4th Floor New York,NY 10017 DANDELION September 15,2020 RE:Compliance with applicable codes and regulations To whom it may concern: Dandelion requires that all design and installation methods and materials comply with all applicable codes and standards, including ANSI/CSA/IGSHPA C448 Series-16 (Design and installation of ground source hear pump systems for commercial and residential buildings) and 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. We provide a set of internal Design &installation Standards, Permit Drawings, and Master Service Agreements to enforce this requirement with third party contractors and internal installation crews alike. Therefore,to the best of my knowledge, belief and personal judgment, our permit drawings, design and installation requirements and scope of work comply with 2020 NYS Uniform Fire Prevention and Building Code and State Energy Code. If you have any questions,feel free to contact me at rcarda@dandelionenergy.com. Sincerely, Ryan Carda, P.E Principal Engineer Dandelion Energy, Inc F NEW Y I CAR 9� W 100136 A � N 09-15-2020 Q335 Madison Ave,4th Floor New York,NY 10017 DANDELION Re:Sediment control practices for permit application to install a ground loop as part of a geothermal heating and cooling system installation To whom it may concern: This letter summarizes Dandelion Energy's sediment control practices as part of our permit application for geothermal heating and cooling system installation. Dandelion implements industry accepted sediment control methods during drilling and trenching activities in general accordance with New York State Department of Conservation Standard Specifications for Erosion and Sediment Control. The sediment control method(s) implemented on each project vary depending on site-specific conditions, but include one or more of the following measures: • Mud Processor - Equipment used to manage and process drilling spoils by separating solid and fluid materials removed from the borehole. • Containers - Drilling spoils are typically discharged directly into containers such as heavy-duty woven polypropylene sacks, impermeable 3-ply plastic pools, geotextile filter bags or lined roll-off containers during drilling. • Stockpile Methods - In some instances, drilling spoils or excavated materials from trenching may be temporarily stockpiled and contained using silt fences and/or straw bale dikes to prevent runoff. Excavated material is typically returned to the trench on the same day. • Dust Control - Water is sprayed to wet drilling spoils or excavated materials for dust control as needed. These practices have been developed and are employed to ensure that the highest level of environmental protection is achieved as a normal part of system installation. Thanks in advance for your consideration. Sincerely, ,mF NE �P ON v Ac Q,9 t Q _ 2 1014 ro �2 v 9OFe3S1 Karen Acker, P.E. Drilling Operations Manager Dandelion Energy, Inc. Q335 Madison Ave,4th Floor New York,NY 10017 Dandelion Air Geothermal heat pump + Vertical air supply with left or right side return + 2-stage compressor with 3 speed ECM blower • COP 4.4/24.6 EER 14 or ij we ' + Built-in flow center for pressurized ground loop piping ,©� • Pre-installed auxiliary heating 7:� "�.•� • Domestic water preheating with integrated pump + MERV 10 air filter �.�r i 'loom ®IRS+•� Aluminum microchannel air coil + Aluminium cabinet for reduced weight f + Real-time performance monitoring with cellular connectivity • 10-year parts and 5-year labor limited warranty • Made in USA Performance Ratings Heating Cooling MODEL LOAD AIRFLOW FLUID FLOW CAPACITY COP AUXILIARY CAPACITY EER FUSE SIZE (CFM) (GPM) (BTU/HR) HEAT(KW) (BTU/HR) (AMPS) 24 Full 800 6.0 16,700 3.8 5 26,900 18.1 30 heat pump Part 600 4.0 12,500 4.0 19,900 22.7 30 aux heat 36 Full 1,200 9.0 27,500 3.9 10 37,400 16.7 40 heat pump Part 950 6.0 22,700 4.4 29,100 24.6 60 aux heat 48 Full 1,600 12.2 41,000 3.9 10 49,800 17.5 50 heat pump Part 1,250 9.3 33,100 4.0 38,200 21.5 60 aux heat 60 Full 2,000 15.0 47,900 4.2 10 61,500 16.9 60 heat pump Part 1,600 12.0 39,400 4.3 48,000 23.8 60 aux heat Tested to AHRI/ISO 13256-1 Heating capacity based on 68.0°F DB/59.0°F WB EAT All ratings based on 208.230V-60Hz-1ph operation Cooling capacity based on 80.6`F DB/66.2°F WB EAT AHRI Certified Single-stage ground loop pump(24,36,48,60) Additional ground loop pump with multi-stage adjustment(48,60) www.dandelionenergy.com N18.10 Dimensions TOP SUPPLY BACK RIGHT LEFT © BACK FRONT F--i y O AIR INTAKE (FILTERS) 0 LEFT RIGHT © DSH OUT " - DSH IN -- -------- - - CONDENSATE DRAIN(U) �q ------- -- - - FLUSHING CONNECTIONS' -- e WATER IN Q Q O - FRONT ___ ___ __ _ - WATER OUT CLEARANCE �I O �y Air Fluid MODEL CABINET SUPPLY RETURN GROUND LOOP DESUPERHEATER CONDENSATE WEIGHT AxBxC DxE F G HxIxJ K Ls M N O Pe Q R S T U0 V W (preliminary) 24 21 Y2 x 251/2 x 58 91%x 91A 9Y2 10Y4 3rA x 25'A x 39'/2 tbd 1/2 FPT 13/4 2 4 '/2 FPT 2Yr 2s/a 17N4 2'/a 3/4 FPT 14% 1rA 98 lbs. 36 21 Y2 x 25T/2 x 58 11'h x 103/4 8Y4 9'/4 3rA x 25%x 39Y2 173/4 Y4 FPT 13/4 2 41% '/2 FPT 2% 2% 173/4 2% Y4 FPT 57A 2 115 lbs. 48 24 x 29 x 60 11'/2 x 10% 121/4 9% 3rA x 25'1A x 47% 10rA 3/4 FPT 13/4 2 4 '/2 FPT 25A 2% 19Y4 2Y2 3/4 FPT 9 13/4 221 lbs. 60 24 x 29 x 60 11 Y2 x 103A 12'/4 9% 3rA x 25%x 475A 107A 1 FPT 13/4 2 4 '/2 FPT 2% 2% 19% 2'/2 Y4 FPT 9 13/4 229 lbs. All dimensions in inches. *2,3,and 4 ton flushing connections 3/4"FPT.5 ton flushing connections 1" FPT. Images show left side return,dimensions are mirrored for right side return. *2 ton flushing connections accessible on the heat pump exterior. Clearance for all models measures 24"front and 12"side. *3,4,and 5 ton flushing connections accessible inside the lower access panel. Performance Monitoring [I Dashboard The Dandelion Air comes with real-time monitoring and controls built in at no Monitoring extra cost to provide the installer and homeowner with remote insight into , system performance and streamline troubleshooting.An upcoming custom integration with the Nest Learning Thermostat and homeowner portal will KMB•� .,�. " ro. .,8,.>a."e ^� enhance homeowner's visibility into their energy savings. a He0"ene M•t"ewe owgA.ew• �81119I0.M1" Sr4,Cane•a+ Reach out to a representative to learn more at info@dandelionenergy.com www.dandelionenergy.com �ts.ta Dandelion Energy GSHP Design Report Project: Gasparino [20-105-2422] (Project ID:26484) Prepared: 24-Jun-2021 Prepared By: Paul Laviolette III LT Geo-Connections.Inc Dandelion Energy System Loads System Loads or Peak Loads are calculated based on a variety of details for an individual residence. Assumed occupancy levels, the number of appliances operating, the number of doors & windows and the tightness of the construction all contribute to the amount of energy required to maintain the thermostat set points given the historical extreme weather conditions in your area. The peak loads used in this report were provided as listed in the following table. 1 kBtulhr= 1,000 Btulhr Total Total Heating Load Cooling Load Zone (kBtulhr) (kBtu/hr) Zone SHF Whole House 55.60 28.01 0.900 Total 55.60 28.01 1 of 7 1(413)841-6622 335 Madison Ave,4th Floor I New York, New York 10017 Dandelion Energy Equipment Schedule Based on the provided loads, the recommended heat pump schedule for this system is as follows: High Cap. LOW Cap. 1 kBtu/hr= 1,000 Btu/hr Meat Cool ' Water z Air 3 Cap. Cap. Flow Flow Zone GSHP QTY (kBtu/hr) (kBtu/hr) (GPM) (CFM) Dandelion Energy -Air 060 56.12 60.00 15.0 1,900 Whole House 1 42.30 1 49.12 High Capacity Totals 56.12 60.00 15.0 Low Capacity Totals 42.30 49.12 - 1. All capacities shown are total. 2. When applicable,hydronic source and load water flows are assumed equal. 3. Air flow rates are reported on a per heat pump basis. For total air flow in a zone,multiply the reported air flow by quantity. 2of7 1(413)841-6622 335 Madison Ave, 4th Floor I New York, New York 10017 Dandelion Energy Whole House Zone Details The peak loads for each individual zone are used to calculate the total amount of heating & cooling capacity required for a space based on the set points and the climate data for your area. Peak Heating Load 55,601 Btu/hr Peak Cooling Load 28,012 Btu/hr Heating Set Point 70 OF Cooling Set Point 75 OF Heating Offset 0 Btu/hr Space SHF 0.900 GSHP Selection The ground source heat pump below has been selected to maintain comfortable heat- ing & cooling for this zone. Manufacturer Dandelion Energy Model Air 060 Heat Pump Type Water to Air Capacity Dual Capacity # Heat Pumps 1 Installed Capacity Check The installed capacity check describes the efficiency and total heating/cooling capacity of the selected ground source heat pump system. This information is used to ensure proper sizing of equipment based on the load represented by this zone. Heating (High Capacity) Cooling (High Capacity) Heating Capacity 56,125 Btu/hr Total Cooling Capacity 60,000 Btulhr % Sizing 100.9% Sensible Cooling Capacity 45,000 Btu/hr % Energy From Geo 99.6% % Oversizing 78.5% Installed COP 3.63 Balance Point Temp. 11.7 OF Installed EER 13.70 Heating (Low Capacity) Cooling (Low Capacity) Heating Capacity 42,300 Btu/hr Total Cooling Capacity 49,125 Btu/hr % Sizing 76.1%u Sensible Cooling Capacity 36,843 Btu/hr Installed COP 3.93 % Oversizing 46.1%% Installed EER 21.78 3of7 1(413)841-6622 335 Madison Ave, 4th Floor I New York, New York 10017 Dandelion Energy Whole House Zone Operating Summary The Zone Operating Summary describes equipment runtime and the total annual power consumption for the GSHP operating in this zone. Heating Cooling High Capacity Runtime 461 hrs High Capacity Runtime 0 hrs Low Capacity Runtime 2,099 hrs Low Capacity Runtime 592 hrs Supplemental Bin Hours 50 hrs Dual Fuel Bin Hours 0 hrs Heat Pump Energy Use 8,743 kWh Heat Pump Energy Use 1,421 kWh Pumping Energy Use 917 kWh Pumping Energy Use 212 kWh Supplemental Energy Use 126 kWh Dual Fuel Energy Use 0 kWh GSHP Operating Cost Breakdown for Zone Name Based on the annual power consumption of the system and the price per kilowatt hour in your area the estimated cost to maintain the set points for this zone are as follows: Heating Cooling HP Cost $2,098.34 HP Cost $341.10 Supplemental Cost $30.31 Pumping Cost $50.93 Dual Fuel Cost $0.00 Total Cost $392.03 Pumping Cost $220.14 Total Cost $2,348.80 M 76.6% HP Heating Cost 8.0% Pumping Cost-Heating M 1.1% Supplemental Heating Cost M 12.4% HP Cooling Cost M 1.9% Pumping Cost-Cooling 4 of 7 1(413)841-6622 335 Madison Ave, 4th Floor I New York, New York 10017 Dandelion Energy Back-Up System Details Supplemental System Details Supplemental systems operate at the same time as the geothermal heat pump and provide additional heat when the space load is greater than the system capacity. Supplemental System Type Electric Resistance COP 1.0 Zone Load and Operating Profile 900 90 co 800 so a 700 70 S r v O 600 6o--o Soo 506_ c - 400 -- - - - - - - - - -- � 7'G c 300 30=-3 a n 200 20 W d is 100 10 n 0 LLMMMJ 0 9 l I � Temperature (IF) — Heating Load — Law Capacity Heating Operation High Capacity Heating Operation — Cooling Load — Low Capacity Cooling Operation High Capacity Cooling Operation Supplemental Heating I GSHP Heating I GSHP Cooling Heating Cooling Heating Start OAT 57.0 OF Cooling Start OAT 65.0 OF High Capacity Runtime 461 hr High Capacity Runtime 0 hr Low Capacity Runtime 2,099 hr Low Capacity Runtime 592 hr Supplemental Bin Hours 50 hr 5 of 7 1(413)841-6622 335 Madison Ave, 4th Floor I New York, New York 10017 Dandelion Energy Vertical Bore 15 FT CC Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( TG) 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.61 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade _ ___ _ ____ Grout T.C. 1.20 Btu/hr ft °F - - -.....'.-..-: ._.. .,. .. .;., -- - EWTMw 35.0 OF Lj Backfill -- - _ -- Formation EWTM, 80.0 OF Granular Backfll Grout __ Bore Diameter(DB) 5.00 in jGHEX Pipe 1,25"DR 11.0 HDPE 4710 nr.r(4 max.) - 1 2 -------- Bores in Series (NBIs) 1 1 _ _ _____ LB Layout Rows (nrow) 1 S B� Bores per Row 2 2 (1) CC) _ = Number of Bores 2 SB l Bore Spacing (SB) 15.0 ft m 3...© Da I TOP VIEW DETAIL Design Depth (LB) 386 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4710 6of7 1(413)841-6622 335 Madison Ave,4th Floor I New York, New York 10017 Dandelion Energy Vertical Bore 18 FT CC Earth Temperature Data Location Deep earth (below 20ft) temperature is a function of the average annual air tempera- ture in your region and remains relatively constant regardless of season. Deep Earth Temp ( T j 55.0 OF Formation Details The thermal properties of your formation are based on the formation's composition and have a direct impact on the scale of your loopfield. Thermal Conductivity 1.61 Btu/hr ft OF GHEX Summary Heating is dominant. Grout is used inside of all bores in order to protect the deep earth environment from surface contaminants and to provide a more effective contact surface with GHEX piping that optimizes heat transfer between the fluid pumped through your GSHP and the earth. Grade Grout T.C. 1.20 Btu/hr ft OF Backfils is _ EWTMIN 35.0 OF 0 Formation = EWT MAX80.0 OF Q Granular BaWll =_ ® Grout Bore Diameter(DB) 5.00 in == GHEX Pipe 1.25"DR 11.0 HDPE 4710 mows(4 max.) — E1 2 Bores in Series (NBIS) 1 1 T� , !� LB Layout Rows (mows) 1 o SB1 = Bores per Row 2 2 ( -f- Number of Bores 2 CL U) SF Bore Spacing (SB) 18.0 ft m 3...0 DB i TOP VIEW DETAIL Design Depth (LB) 367 ft (GENERIC) (GENERIC) Header Pipe 1.50"DR 11.0 HDPE 4710 7 of 7 1(413)841-6622 335 Madison Ave, 4th Floor I New York, New York 10017 t ' Building Analysis Date: 204Jun 05 2422 21,021 wrightsoft® Entire House By: Dandelion Energy 335 MadisonAie,4th Floor.New*rk•NY 10017 Phone:833-GE©4ALL Email:design@dardelionenergy.com Web:vAmdardelionenergycom Project • • For: Rich Gasparino 6 Jacqueline Ln,Rye Brook,NY 10573 Phone:1(914)879-7507 Email:rcgjr@me.com Design Conditions Location: Indoor: Heating Cooling Westchester Co,NY,US Indoor temperature(°F) 72 75 Elevation: 397 ft Design TD(°F) 59 12 Latitude: 41'N Relative humidity(°/o) 30 50 Outdoor: Heating Cooling Moisture difference(grub) 26.9 31.4 Dry bulb(°F) 13 87 Infiltration: Daily range(T) - 17 ( M ) Method Simplified Wet bulb(°F) - 72 Construction quality Semi-loose Wind speed(mph) 15.0 7.5 Fireplaces 1 (Semi400se) • Component Btuh/ftz Btuh %of load Walls 5.7 12305 22.1 Ducts Glazing 33.7 7903 14.2 walls Doors 20.7 1305 2.3 Ceilings 1.9 3542 6.4 Floors 6.2 11600 20.9 Infiltration Infiltration 6.2 13433 24.2 Ducts 5514 9.9 Piping 0 0 Glazing Humidification 0 0 Ventilation 0 0 Doors Adjustments 0 Ceilings Floors Total 55601 100.0 Component BtuhfiF Btuh %of load Walls 2.0 4314 18.1 Glazing 26.5 6206 26.1 Walls nternal Gains Doors 8.6 539 2.3 Ceilings 1.5 2869 12.0 Floors 0.7 1394 5.9 ucts Infiltration 0.6 1190 5.0 Ducts 4288 18.0 Ventilation 0 0 Glazing Internal gains 3020 12.7 Infiltration Blower 0 0 Floors Adjustments 0 Doors Ceilings Total 23819 100.0 Latent Cooling Load=4193 Btuh Overall U-value=0.127 Btuhfft2--°F Data entries checked. wri�htsoft` 2021-Jur241220:44 �� ^••••^ ^•�^•-••^•w•••+ RighFSute®Uriver5a1202121.0.03ftSU28980 Pagel ...sparinoJ20-105-2422,Gasparino]Manal!-D.r p Cale=MJ8 Front Door faces:S wrightsoft° Right-J8® Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 By. Dandelion Energy 335 Madison Ave,41h Floor,New 1brk,NY 10017 Phone:833-GEO-4ALL Email:design@dardeliorierergy.wm Web:vmnnedandelionenergycom 1 NameofRoom Entire House Recreation Room 2 Running Feet ofBposedWall 305.0 ft 55.5 It 3 Ceiling Ht(Ft)and Grow Wa1lArea(SgFt) 8.0 It 6115.0 fF 8.0 ft 755.0 1F 4 Room Dimensions(R)and Floor Plan Area(SqP) 2169.8 fF 1.0 x 272.5 ft 272.5 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgF) 0 2169.8 fF 0 272.5 W Type of CorA, Panel HTM Area or Btuh Area or Btuh Exposure Number Faaes Length Leno Mg. Clg, Heating S-Clg L-Clg Heatng S-Clg L-Clg fi all 126-0sw n 6.74 214 680 3071 1144 152 632 235 az 1D-c2ov n 33.74 17.31 103 3485 1788 0 0 0 az 1 D-c2owl n 33.74 17.31 42 1417 727 42 1417 727 V�all 12B-Osa a 5.74 2.14 444 2397 893 100 531 198 11 I elaz 1D-r20v e 33.74 59.26 27 894 1570 8 253 444 1¢lall 12B-09N S 5.74 214 488 2369 882 0 0 0 az 1 D-e2ov $ 33.74 3023 54 1 B36 1645 0 0 0 oor 11 NO S 20.72 8,56 21 435 180 0 0 0 1Qlall 12B-0sw w 5.74 2.14 540 2934 1093 0 0 0 az 1 D-r2ov w 33.74 59.26 8 271 475 0 0 0 oor 11 NO w 2072 5.56 21 435 180 0 0 0 U►lall 12B-0sv - 5.74 1.13 288 1533 302 192 982 193 L_-D. 11 NO n 20.72 a.56 21 435 180 21 435 180 Ceil 1613-303d 189 1.53 1870 3542 2869 0 0 0 Hor 19A-Ob%W 6.56 1.27 am 5798 1126 0 0 0 Flor 19A-19hsm 2.27 0.44 28 63 12 0 0 0 Ror 19C-19cscp 1.01 020 66 86 17 0 0 0 Flor 20P-19w 296 0.40 600 1776 239 0 0 0 Flor 22A4pm 69.86 0.00 273 3877 0 273 3877 0 Infiltration Heating Load(Btuh) 0.72 13433 1573 Effect1R�AR WAR 12 Sensible Load(Btuh) ACH 1 00 1190 0.12 139 033 Latent Load(Btuh) 2011 Internal a Oampants at 230 and 200 Btuh 4 920 800 0 0 0 b Scenario number 2100 0 13 c DefaukAdjuslmenls d CustornApplianoras 0 0 0 0 e Plants 0 0 14 SubtAWs Sum lines6 through 12 50008 19532 2811 9700 2072 Duct EHLF&ESGF 0,110 0220 5514 4288 0 0 15 Loads ELG 1382 D 16 Ventilation Loads VentCfm 0 E Cfm 0 0 0 0 17 Winter Humidification Load GaWay 0 0 18 Piping Load 0 19 Blow Heat 0 20 AED E)mrsion&Laient Moisture Mgration Load 0 45 21 Total Load Sum lines 13 through 19 556C 1 23819 4193 1 9700 2072 Calculations approved byACCA to meet all requirements of Manual J 8tt1 Ed. -fw wrl�flttsoT[- 2021-Jur-241220:44 """"'" " RigtWSut&Mlhiversal202121.0.03RSU28980 Pagel sparinol20-105-2422,Gaspar€r»]Manual.LD.np Calc=MJB Front Ooor faces:5 + wrightsoft- Right-J80 Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 By- Dandelion Energy 335 Madison Ate,4lh Floor,New ibrk,NY10017 Phone:833-GEO-4ALL Email:design@dardelionerergy.00mWeb:Womdandelionenergyoom 1 NameofRoorn Bathroom Enclosed Porch 2 Running Feet ofExposed Wall 5.0 ft 22.5 ft 3 Ceiling Ht(FQ and Gross Wall Area(SqQ 8.0 ft 168.0 ft 8.0 ft 272.0 ft 4 Room Dimensions(Ft)and Floor Plan Area(SqR) 5.0 x 5.5 ft 27.5 T 11.5 x 5.5 fl 63.3 ft' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgF0 0 27.5 W 0 63.3 fF Type of Const, Panel HTM Area or Btuh Area or B1uh Exposure Number Faces Length Lengtil Htg. Clg. Healing S-Clg L-CI9 Heating S-CIg L-Clg 6 V�rall 12B4 w n 5.74 2.14 40 201 75 92 380 142 l{---CC��laz 1 D-c2ov n 33.74 17.31 5 169 87 26 871 447 az 1 D-d01d n 33.74 17.31 0 0 0 0 0 0 l•��''all 12B-0snr a 5.74 2.14 0 0 0 44 253 94 11 1 �Jaz 1D-c20v a 33.74 59.26 0 0 0 0 0 0 I'hv 12B-Oaw a 5.74 023 0 0 0 0 0 0 1 D4c2ov a 33.74 3023 0 0 0 0 0 0 11NO s 2072 8.56 0 0 0 0 0 0 din w 5.74 2.14 0 0 0 44 132 49 az 1D-c2ov w 33,74 59.26 0 0 0 0 0 0 oor 11NO w 20.72 8.56 0 0 0 21 435 180 "I 12B-096v - 5.74 1.13 0 0 0 0 0 0 L-Door 11NO n 20.72 8.56 0 0 0 0 0 0 Ceil 16B-30ad 1.89 1.53 0 0 0 63 120 97 Ftor 19A-0baw - 6.56 1.27 0 0 0 0 0 0 nor 19A-19bsm 227 0.44 28 63 12 0 0 0 nor 19C 19cscp - 1.01 0.20 0 0 0 63 64 12 Flor 20P-19w 2.96 0.40 0 0 0 0 0 0 Flor 22A-tpm 69.86 0.00 0 0 0 0 0 0 Infiltration Healing Load(BWh) 0.72 250 1124 Et1ed WAR WAR 12 Sensible Load(Btth) ACH 0,02 22 0.08 100 0.33 Latent Load(Bbih) Internal a Ooapantsat230 and 200Btuh 0 0 0 0 0 0 b Scenario number 0 0 13 c DefauttAdjtatrnents d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines 6 through 12 682 191 3378 1096 Dud: EHLF&ESGF 0.110 0.220 0 0 186 45 15 Loads ELG 0 47 16 Ventilation Loads Vent Cfm 0 ECfm 0 17 Winter Humiciftation Load GaVDay 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -4 -24 21 1 Total Load Sum tines 13 through 19 662 191 3563 1142 Calculations approved byACCAto meetall requirements of Manual J 8th Ed. 1 fi- wrtightsoTt� 2021-Jm-2412:20:44 '"""'""""""""""" Righl-Suite®Universal 2021 21.0.03 RSU28980 Page 2 ...spanrol20-105-2422.Gasparinol Manual J-D.rup Calc=MJ8 Front Door faces:S g + wrightsoft- Right-J$O Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 By: Dandelion Energy 335 Madison Am,4th Floor,New lbrk.NY10017 Phone.833-GED-4ALL Email:design'Mdardelionenergy.00mWeb:wwwdandeliorenwgymm 1 Name of Room Closet LivingRoom 2 Running Feet of Exposed Wall 10.0 ft 54.5 ft 3 Ceiling Ht("and Gross Wallkea(Sq" 8.0 ft 188.0 fF 8.0 ft 6320 1F 4 Room Dimensions(Ff)and Floor Plan Area(SqQ 6.5 x 3.5 ft 22.8 ft' 15.0 x 24.5 ft 367.5 T 5 Ceiling Slope(Deg.)and GrossCeiling Area(SgFt) 0 22.8 fF 0 367.5 fC Type of Cosst, Panel HTM Area or Btuh Area or Bhuh Eposure Number Faces Length Length Hig. Clg. Heating S-Gig L-Clg Heating S-Clg L-Clg 6 " 12609w n 5.74 214 0 0 0 120 515 192 az 1 D-c2ov n 33.74 17.31 0 0 0 30 1026 525 az 1 D-r2oW n 33.74 17.31 0 0 0 0 0 0 t! 12B,I- a 5.74 2.14 0 0 0 0 0 0 11 az 1 D-c2ov a 33.74 59.26 0 0 0 0 0 0 VJ 1 12BOsw s 5.74 2.14 52 261 97 120 495 185 az 1 D-r2ov s 33.74 30.23 7 219 197 34 1133 1015 oor 11NO s 20.72 8.56 0 0 0 0 0 0 t�aWj II 12Mahv w 5.74 2.14 0 0 0 196 1126 419 Iaz 1 D-c20v w 33.74 59.26 0 0 0 0 0 0 oor 11N0 w 20.72 8.56 0 0 0 0 0 0 y/all 12&Osv 5.74 1.13 26 161 32 0 0 0 �Dcor 11NO n 20.72 8.58 0 0 0 0 0 0 Ced 1513-30ad 1.89 1,53 23 43 35 368 696 564 Flor 19A-0bsnp 6.56 127 0 0 0 368 2411 468 Fla 19A-19bswp 227 0.44 0 0 0 0 0 0 Fla 19C-1 gc Kp 1.01 020 23 23 4 0 0 0 o,Fl 20P-19w 2.96 0.40 0 0 0 0 0 0 Flrx 22A-V n 69.86 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.72 325 2721 Effect WAR UVAF2 12 Sensible Load(Bhuh) ACH 002 29 020 241 0.33 LaW Load(Btuh) Intemal a Occupants at 230 and 200 B1uh 0 0 0 0 0 0 b Scenario number 0 900 13 c DefauftAdjustn e d Cusbm Appliances 0 0 0 0 e Plants o 0 14 Subbtals Sum lines 6 through 12 1032 440 10124 4635 Duct EHLF&ESGF 0.110 0.220 57 18 557 192 15 Loads ELG 17 272 16 Ventilation Loads VentClim 0 ECfm 0 17 Winter Humidification Load Gaicl 0 18 Piping Load 19 BloeerHeat 20 AED Excursion&Latent Moisture lAgration Load 46 124 21 Total Load Sum lines 13 through 19 1089 458 106W 4826 _ Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -41- wrlQhtsolt- 2021-JurQ412:2044 Right-SuteV Unversal 2021 21.0.03 RSU28980 Page 3 ...sp&nDj20-105-.2422,Gaspadno)Manual J•D.rp Calc=MJ8 FronlDoorfaces:S wrightsoft' Right-A@ Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 Dandelion Energy By. 335 MadisonA,e,4th Floor.New York.NY 10017 Prone:833-GEO-4ALL Email:desgr@dardeliorenergy.00m Web wwwdardelionenergycom 1 NameofRoom Dining Room Foy- 2 Running FeetofE)tosedWall 10.5 ft 20.0 ft 3 Ceiling Ht(FQ and Gross WallArea(SgFQ 8.0 ft 432.0 fF 8.0 ft 516.0 fF 4 Room Dimensions(Rand Floor Plan Area(SgPQ 10.5 x 16.5 ft 173.3 fF 1.0 x 153.3 ft 153.3 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFQ 0 ° 173.3 fF 0 153.3 fF Type of Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg, Clg. Heating S-Clg L-Clg Heating S-Clg L-Clg fi 4fell 1 D-c2ovr n 3.74 2.31 16 541 178 0 0 0 I{-Cq��� 1 D-Qov n 33.74 17.31 18 541 278 0 0 0 1 D-c2M n 33.74 17.31 0 0 0 0 0 0 1glall 126- - a 5.74 2.14 0 0 0 0 0 0 11 L_(,laz 1D-t2cv a 33.74 59.26 0 0 0 0 0 0 YNall 1213-09w s .74 0 0 0 a 12 591 220 at 1 D-c2av a 33.74 3023 023 0 0 0 0 0 0 11NO s 20.72 8.56 0 0 0 21 435 180 all 126-09w w 5.74 2.14 0 0 0 0 0 0 az 1D-c2ov w 33.74 59.26 0 0 0 0 0 0 oor 11NO w 20.72 3.56 0 0 0 0 0 0 1q�all 126-0Sry - 5.74 1.13 0 0 0 36 207 41 r Door 11NO n 20.72 8.56 0 0 0 0 0 0 Cell 16B-30ad 1.89 1.53 173 328 2&-, 153 290 235 fior 191A-0bwp 6.58 1.27 173 1137 221 153 1005 195 Flor 19A-19bswp 227 0.44 0 0 0 0 0 0 Fla 19t;r19®cp - 1.01 020 0 0 0 0 0 0 Flor 20P-19w 2.96 0.40 0 0 0 0 0 0 Ror 22AA" - 69A6 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.72 524 774 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0.33 0.04 46 0.06 69 Lateral Load(Bluh) Internal a Occupants at 230 and 200 Btuh 0 0 0 0 0 0 b Scisnado number 0 0 13 c DefaultAdjusbnenls d Custom Appliances 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines through 12 2920 936 3303 920 Dud EHLFBESGF 0.110 0220 161 39 182 38 15 Loads ELG 128 113 16 Ventilation Loads VerACfm 0 E Cfrri 0 17 'WinterHumidificatonLoad Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED E)=rson&L Art Moisture Mgrabon Load -21 -20 21 1Total Load Sum lines 13 through 19 1 1 3081 1 974 3485 958 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. {}� wrl�FstsaaTt- 2021-JuQ41220,44 Riga-SuieS Universal 202121.0.03RSU28980 Page4 sperinoy20-10 -2422.Gasparino]Martel J-D.np Calc=MJ8 FrordDoor faces:S wrightsoft' Right-J8® Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 By: Dandelion Energy 335 Madison Ave,41h Floor,Newlbrk NY 10017 Phone:833-GEO-4ALL Email.design 7o dandeliommrgy.cvm Web.wwwdandelionenergywm 1 NanleofRoom Ktchen Bedroom 2 Running Feetof Exposed Wall 4.0 ft 28.5 ft 3 Ceiling Ht(Fl)and GrossWallArea(Sgl`) 8.0 ft 480.0 ft' 8.0 ft 456.0 iF 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 11.5 x 16.5 ft 189.8 ft 1.0 x 176.8 ft 176.8 R' 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 189.8 ft' 0 176.8 ft 7ypeof Const, Panel H7M Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg Clg. Heating S-Clg L-Cig Heating S-Clg L-Clg 6 all 12B-0 n 5.74 2.14 0 0 0 0 0 0 az su 1 D-c2ov n 33.74 17.31 0 0 0 0 0 0 az 1 D-c20vd n 33.74 17.31 0 0 0 0 0 0 a l 12B-09N e 5.74 214 0 0 0 0 0 0 1 1 I Claz 1 D-c2ov e 33.74 5926 0 0 0 0 0 0 1�fall 12B-09v s 5.74 2.14 0 0 0 96 505 168 az 1D-c2ov IS 33.74 3023 0 0 0 8 271 242 aor 11'NO s 20.72 B.56 0 0 0 0 0 0 all 12M!;N w 5.74 2.14 0 0 0 132 712 265 az 1 D-c2ov w 33.74 5926 0 0 0 8 271 475 oor II NO w 2072 B.56 0 0 0 0 0 0 19Jall 12B-Dw 5.74 1.13 32 184 36 0 0 0 oor 11NO n 20.72 8.56 0 0 0 0 0 0 Cell 16B-30ad 189 1.53 190 359 291 177 335 271 Flor 19A-0bsrop 6.56 1.27 190 1245 242 0 0 0 Flor 19A-19bsn.W 2.27 0.44 0 0 0 0 0 0 Hor 19C-19cscp 1.01 020 0 0 0 0 0 0 Flor 20P-19w 2.96 0,40 0 0 0 177 523 70 Flor 22A-tpm 69.86 0.00 0 0 0 0 0 0 InNtrabon Heating Load(Btuh) 0.72 0 1423 Effect WAR WAR 12 Sensible Load(Btuh) ACH 0 0 0.11 126 033 Latent Load(Btuh) Internal a Oocupantsat 230 and 200 Btuh 0 0 0 1 230 200 b Scenario number 1200 0 13 c Default Adjustments d Custom Appliances 0 0 0 0 e Plants 0 0 14 Submals Sum lines6 through 12 1788 1731 4039 1972 Dud EHLF&ESGF 0,110 0,220 98 72 1006 1020 15 Loads ELG 140 131 16 Ventilation Loads Vent Cfm 0 E Cfrn 0 17 W ri Humidification Load Gal/Day 0 18 Piping Load 19 Blower Heat 20 AED Excursion&Latent Moisture Migration Load -38 103 21 Total Load Sum lines 13 through 19 1886 1803 5045 2991 Calculations approved byACCAto meetall requirements of Manual J Bth Ed. �� wr�gF�tsofY- R 2021-Ju}2412.20.44 ghl-Sole 3Utiversal 2021 21.0.03 RSU28989 Page 5 sparnroy20-t O5.2422.Gasparinol Marwl J-D.np Calc=MJB Frorri Door faoes S +} wrightsoft Bight-J&D Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 Dandelion Energy By. 335 Madison Are.4th Floor,Newlbrk,NY10017Phone 833-GEO-4ALL Email:design@dandelionerergy.00mWeb:vwwrtdandeliorenergymm 1 Name of Room Bedroom 2 Masker Bedroom 2 Running Feet of Exposed Wall 28.0 It 32.0 ft 3 Ceiling Ht(R and GrossWallkea(SgPf) 8.0 It 448.0 fF 8.0 It 512.0 fY 4 Room Dimensions(Ft)and Floor Plan Area(SqN 1.0 x 175.0 It 175.0 fF 13.5 x 18.5It 249.8 R 5 Ceiling Slope(Deg.)and Gr=CeilingArea(SgFQ 0 175.0 fP 0 249.8 fF Typeof Const, Panel HTM Area or Btuh Area or Btuh Exposure Number Faces Lwo Leno Htg. Clg. Healing S-CIg L-Clg Healing S.CIg L-CIg 6 WaII 1 D-C20 r n 3.74 7.31 0 0 0 108 541 278 11---[Cd4a�z 1 DQov n 33.74 17.31 0 0 0 18 541 278 1 D-c2ovd n 33.74 17.31 0 0 0 0 0 0 y�rall 12B-0swr a 5.74 2.14 128 680 253 148 795 296 11 I �Jaz 1Dt2ov a 33.74 59.26 10 321 563 10 321 563 VL 126-0av a 3.74 023 96 214 192 0 0 0 l~_-Dlo�or 1 Dt2ov a 33.74 3023 8 214 191 0 0 0 11 NO a 20.72 8.56 0 0 0 0 0 0 rb 12B-0sw w 5.74 2.14 0 0 0 0 0 0 az 1I}r2ov w 33.74 5926 0 0 0 0 0 0 oor 11NO w 20,72 8.56 0 0 0 0 0 0 VNall 12B-09w - 574 1.13 0 0 0 0 0 0 Door 11 NO n 2D.72 8.58 0 0 0 0 0 0 Ceil 16B30ad 1.89 1.53 175 332 269 250 473 383 Flor 19A Obawp - 8.58 127 0 0 0 0 0 0 Fla 19A-19bswp 227 0.44 0 0 0 0 0 0 Fox 19C-19cKp - 1.01 02D 0 0 0 0 0 0 Flor 20P-19w 2.96 0.40 175 518 70 81 240 32 F" 22A rpm 89.86 0.OD 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0.72 1398 1598 Effect WAR WAR 12 Sensible Load(Bluh) ACH 0.10 124 0.12 142 0.33 Laf rtt load(Bluh) Inlernal a Occupants at 230 and 200 Biuh 1 230 200 2 460 400 b Scenario number 0 0 13 c DefaultAdjusfinerts d CuslxmApplianoes 0 0 0 0 e Plants 0 0 14 Subtotals Sum lines6 trough 12 3977 1851 4496 2300 Dud EHLF&ESGF 0.110 0.220 991 957 1120 1189 15 Loads ELG 129 185 16 Ventilation Loads Ve int Cfm 0 E Cfm 0 17 Winter Humidification Load Garay 0 18 Piping Load 19 Blower Heat 20 AED Fxmjrson&Latent Moisture Mgration Load -41 -50 21 Total Load Sum lines 139rough 19 4968 2808 5616 3489 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. Ad- 2021-Juf2412:2044 AM ""-"""--"'""--"' RI®FESute®lkiversal202121.0.03RSU28980 Page6 3parinoy20-105 2422,Gasparinol Marvel J•D.np talc=MJ8 Frort Door tces:S + wrightsoft Right-J80 Form A Job: 20-105-2422 Entire House Date: Jun 21,2021 By: Dandelion Energy 335 Madison Ave,4th Floor,New lbrk,NY 10017 Phone:833-GEO-4ALL Email:design@dandelionenergy.00m Web:vmwdandelionenergymm 1 Name of Room Walk In Closet Spare Room 2 Running Feet of Exposed Wall 3.0 It 3.5 ft 3 Ceiling Ht(H)and Gross Wall Area(SgFQ 8.0 ft 224.0 fF 8.0 ft 304.0 IF 4 Room Dimensions(P)and Poor Plan Area(SgFk) 1.0 x 38.0 ft 38.0 fF 1.0 x 71.8 ft 71.8 fF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt 0 38.0 ft 0 71.8 ft' Type of Const., Panel HTM Area or Btuh Area or Btuh Exposure Number Faoes LerVI Length H�. Clg. Heating S-Olg L-Clg Heating S-Olg L-Clg 6 all 12B4)av n 5.74 Z14 0 0 0 0 0 0 az 1D-C2ov n 33.74 17,31 0 0 0 0 0 0 az 1 D-2o%d In 33.74 17.31 0 0 0 0 0 0 V all 12B-0sw a 5.74 2.14 24 138 51 0 0 0 11 -rlaz 1D-r2ov a 33.74 59.26 0 0 0 0 0 0 V)Jal! 128-09v s 3.74 0Z1423 0 0 0 0 0 0 ; GIaz 1D�2ov s 33.74 3023 0 0 0 0 0 0 t-D oor 11 NO s 20.72 8.56 0 0 0 0 0 0 12B-09w w 5.74 2.14 0 0 0 28 161 60 laz 1D-2cv w 33.74 59.26 0 0 0 0 0 0 oor 11 NO w 20.72 8.56 0 0 0 0 0 0 lglali 12B-Osv 5.74 1,13 0 0 0 0 0 0 �--.Door 11 NO n 20.72 8.56 0 0 0 0 0 0 Cell 16B-30ad 1,89 1,53 38 72 58 72 136 110 Hor 19A4lbw 6-% 127 0 0 0 0 0 0 Flor 19A-19baw 227 0.44 0 0 0 0 0 0 Flor 19C-19cecp 1.01 020 0 0 0 0 0 0 Hor 20P-19w 2.96 0.40 38 112 15 40 119 16 Flor 22A-tpm 69.86 ODD 0 0 0 0 0 0 InfittrA- on Heating Load fth) 0.72 150 175 Effect WAR WAR 12 Sensible Load(Btuh) AC H 0.01 13 001 15 0.33 Laler t Load(Btuh) Internal a Oavpantsat230 and 200Btuh 0 0 0 0 0 0 b Scenario number 0 0 13 c DefaultAd]ustrnenls d CustomAppliarlees 0 0 0 0 e Plants 0 0 14 Subtolals Sum lines 6 through 12 472 135 591 197 Dud EHLF&ESGF 0.110 0220 118 70 147 102 15 Loads ELG 28 53 16 Ventlabon Loads VentCh 0 ECIm 0 17 Winter Humidification Load C.O y 0 18 Piping Load 19 Blow"Heat 20 AED Excursion&Lalert Moisture Migration Load -3 1 21 Total Load Sum lines 13 through 19 590 205 738 299 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -�}� w_ rlflFNtsot`t- 2021-Jur•241220:44 RighFSute(,)U"versal 202l 2l.O.O3 RSU28980 Page 7 ...sparinoJ20-105-2422,Gaspa6m]Manual J-D.rrp Calc=MJ8 Front Door faces:S +�-- wrightsoft Right-J89 Form A Job: 20-105-2422 Entire House Data: Jun 21,2021 By: Dandelion Energy 335 Madison Ave.4th Floor,New lbrk.NY 10017 Phone:833-GEO-4ALL Email:desigr4dardelionerergy.mm Web:v wwdardelionenergycom 1 Name of Room Bathroom 2 Hall 2 R unning Feet of Exposed WWI 23.5 It 4.5 ft 3 Ceiling Ht(Ft)and Grass Wall Area(SgfR) 8.0 It 376.0 1F 8.0 It 352.0 fill 4 Room Dimensions(Fq and FI=Plan Area(SgFQ 1.0 x 101.5 It101.5 fF 1.0 x 87.3 ft 87.3 IF 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 0 ° 101.5 fF 0 87.3 fF Type of Cork[, Penal HTM Area or Btuh Area or Btuh Exposure Number Faces Length Length Htg. Clg. Healing S-Clg L-Clg Heating S-Clg L-Clg 6 1pfa11 12B-09N n 5.74 2.14 84 425 158 0 0 0 t(pyaz 1D-c2ov n 33.74 17.31 10 337 173 0 0 0 az 1 D-c2ad n 33.74 17.31 0 0 0 0 0 0 19Vall 12B-0sw a 5.74 2.14 0 0 0 0 0 0 11 az 12D c2ov e 33.74 59.26 0 0 0 0 0 0 1R1el1 126-09w a 5.74 2.14 0 0 0 0 0 0 ffi 1 D-r2ov a 33.74 30-23023 0 0 0 D 0 0 11 N O s 20.72 8.56 0 0 0 0 0 0 49Vall 12M9N w 5.74 2.14 104 597 222 36 207 77 }L--Cp�taz 1 D-r2ov w 33.74 59.26 0 0 0 0 0 0 oor 11N0 w 20.72 8.56 0 0 0 D 0 0 1�ei1 12M9N - 5,74 1,13 0 0 0 0 0 0 hoar 11N0 n 20.72 a,58 0 0 0 0 0 0 Cell 6B-30ad 1.89 1,53 102 192 156 87 165 134 faa 19A-01bWp 6.68 127 0 0 0 0 0 0 Flor 19A-19bgw 2.27 0.44 0 0 0 0 0 0 Flor 19C-19cgcp - 1.01 020 0 0 a 0 0 0 Flor 20P-19w 2.96 0.40 2 5 1 87 258 35 Flor 22A-tpm 69.a6 0.00 0 0 0 0 0 0 Infiltration Heating Load(Btuh) 0,72 1173 225 Efted WAR WAR 12 Sensible Load(Btuh) ACH 0.09 104 0.02 20 0.33 Latent Load(Btuh) Inlernal a Occupants at 230 and 200 Bluh 0 0 0 0 0 0 b Soanario number 0 0 13 a DefaultAdju*rlents d Cusb m Appliances 0 0 0 0 e Plants 0 0 14 Subbtals Sum lines through 12 2731 797 855 260 Duct EHLF&ESGF 0.110 02M 680 412 213 134 15 Loads ELG 75 04 16 Ventilation Loads VentCfm 0 E Cfm 0 17 Winier Humiditiration Load Gal/Day 0 18 Piping Load 19 8lclaer Heat 20 AED Exxursan&L.ale NbsMre Mgraton Load -17 -6 21 Total Load Sum lines 13 through 19 13411 1209 1068 394 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -!}d- wrlglhtsolFlt` 2021-1uf2412:20:44 Rigid-SuteO Universal 202121.0.03RSU28980 Page ._spahnol(20-105-2422,GaspaNno]Manal,LD.np Calc=MJ8 FrontDoorfaces:S N Below Grade Basement Job M 20-105-2422 Dandelion Energy Scale:l :102 Perfiormed for. Page 1 Rich Gasparino 335 Madison Ave,4th Floor RightSuiteO Universal 2021 6 Jacqueline Ln New York,NY 10017 21.0.03 RSU28980 Rye Brook,NY 10573 Phone:833-GE04ALL 2021Jun-24 12:20:53 Phone: 1(914)879-7507 www.dandelionenergy.can desgr@cfarriefonenergy.com ..-2422,Gasparinol Wnual J-0.rup rc it me.com N First Floor R 64 cfrn Enclosed Porch 64 cfm 101 cfm 1�111 cfrn 25 cfm 116 c#r Bathroom 76 cfm 373 cfrn 101 cfm IILL�rr Recreation Room Dining Room Kitchen 116 cfm 116 cfm Living RoomF 76cfm 453 ctrn 407 cf n 101 cfm Foyer 101 cfm 63 cfm 63 cfm CWt N cfm Garage Job#: 20-105-2422 Dandelion Energy Scale:1 :102 Performed for: Page 2 Rich Gasparino 335 Madison Ave,4th Floor RghtSuite®Universal 2021 6 Jacqueline Ln New York,NY 10017 21.0,03 RSU28980 Rye Brook,NY 10573 phone:833-GEO-4AL.L 2021-Jun-24 12:20:53 Phone:1(914)879.7507 www.darldelionenergy.ccm desgn@dardelorenergy.com •• 2422,Gasparino]Manual J-D.rup rc it me.com Second Floor 961 cfm 98 cfm Bathroom 2 61 cfm 98 cfm Master Bedroom ®_ 412cfm Spare Robfri cfm 98 cfm CK38cfm Fall 65cfm Walk In Closet 21 cfm 251 cfm IZ 4236 cfm 79 cfi„ 84 cfrn Bedroom 1 Bedroom 2 !9 cfm 84 efin 84 cfm 79 cfm Job#: 20-105-2422 Dandelion Energy Scale:1 102 Performed for. Page 3 Rich Gasparino 335 Madison Ave,4th Floor RightSuiteO Universal 2021 6 Jacqueline Ln New York,NY 10017 21.0.03 RSU28980 Rye Brook,NY 10573 Phone 833GEO-4ALL 2021-Jun-24 12:20:53 Phone: 1(914)879-7507 www.dandelionenergy.ccm desgr@dandefonenerT.com 2422•Gasparno]Manual J-D.rup rroirannF,.cam 4 i d' '" Ijl 111 l�lli/1/1i: 1/11�1/ 111• { h111111A111 1111�11 {#1�u 11 11 i�� �� . dt )s �}�1/ 1� a= ..a9.�}3�>::ISI�I_ � .- 111 ,��r,_ �s�`�hyllll/�t�rf-` ��r'n 4�� �i4��r ,��� �k'a�1h1 �'�r: ,.,•c�ii)� CN •�'� it q c .. o u N E U o cr C� . e,n'• •r.r U W � W .. aa)l s Cy ++ Z LO o W LU }-ui w }� Z O F— ? a JQ' Go W Z � —� � •�, W 1f � t..) •�>�`a �"' � of Y W O W • Sk co ire � � � � • N N N (� ' !{ mil { .�11j 11 asm `` 3i,; I�`jll ;-,'t��,�l .Iljl�ll •: -1"""1 - .,71�'�j :"'1'� it0)f➢ 11 ?f '�iyli ������1�#11',, (t! Af s ;r,�1111//�F�:. t'�..k1. '4i11��� �? 1 } •,1,11+`I'It 1 .:..s /lhl. d 'Sr 1 �wt •♦ �PA��vI�� ,1• ''�� ! ��!' j�.,c 1 1 �� jt a s+�t ,G �4 tli �, 'IC�14 fl`�1�}' i. s ti I �J y 1^ 1♦ wj •� ^4 •• ,i� +A► Iit1 I A IRS is t .S �; ` 1,?�ititi�u D 4,4'a` D fi a'• ! ti� ^I�°+� r\ w } ^�n DANDENE-01 MVARGA CERTIFICATE OF LIABILITY INSURANCE DATE 9/8/2020 MMIDDIYY") THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. It SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER C NTACT York International Agency,LLC PHE FAx 500 Mamaroneck Avenue ,CON Ne,1(914)376-2200 (A/C,No):(914)376-2891 Suite 220 iffiXiss.certificate@yorkinti.com Harrison,NY 10528 INSURERS AFFORDING COVERAGE NAIC 0 INSURERA:Admiral Insurance Company 24856 INSURED INSURER B:Travelers Casualty Insurance Company of Americ 19046 Dandelion Energy,Inc. INSURER C:Federal Insurance Co. 20281 335 Madison Avenue,4th Floor INSURERD: New York,NY 10017 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXPLTR LIMITS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE �X OCCUR CA000028168-03 9/812020 9/812021 DAMAGE TO RENTED $ 300,000 MED EXP LAny oneperson) S 5,000 PERSONAL&ADV INJURY $ 1,000,600 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE S 2,000,000 X POLICY❑jPQ7 LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: S I'3 AUTOMOBILE LIABILITY COMBI�JEDSINGLELIMIT 1,000,000 S X ANY AUTO BA8N124299 7/5/2020 7/5/2021 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY p BODILY INJURY Per accident S X AUTOS ONLY Ix AR O�ONN PPe�acatlent AMAGE $ $ UMBRELLALIAB HOCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE S DIED RETENTION$ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y I N STA LITE ER ANY PROPRIETOR/PARTNERIEXECUTIVE F_ NIA E.L.EACH ACCIDENT $ �FFICandEWMEMSER EXCLUDED? ( atoryInNH) E.L.DISEASE-EA EMPLOYEE S If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ C Inland Marine 06691718 5/2/2020 5/2/2021 Leased/Rented Equip. 100,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Certificate Holder is included as an additional insured as required by a written,signed contract. CERTIFICATE HOLDER CANCELLATION Village of Rye Brook SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 938 King Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Rye Brook,Street 10573 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25(2016103) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD YORK Workers' CERTIFICATE OF STATE Compensation NYS WORKERS' COMPENSATION INSURANCE COVERAGE Board la, Legal Name&Address of Insured(use street address only) 1 b. Business Telephone Number of Insured Dandelion Energy Inc. 845-649-6073 1 Corporate Dr 1c.NYS Unemployment Insurance Employer Registration Number of Peekskill, NY 10566 Insured Work Location of Insured(Only required if coverage is specifically limited to 1 d Federal Employer Identification Number of Insured or Social Security certain locations in New York Siate,i.e.,a Wrap-Up Policy) Number 82-1328341 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) Indemnity Insurance Co.of North America 3b.Policy Number of Entity Listed in Box"1a" Village of Rye Brook WLR_C68967284 938 King Street Rye Brook, NY 10573 3c.Policy effective period 3/1/2021 to 3/1/2022 3d.The Proprietor,Partners or Executive Officers are © included.(only check box if all partnersloflicers included) ❑ all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box"3"insures the business referenced above in box"la"for workers' compensation under the New York State Workers'Compensation Law. (To use this form, New York(NY)must be listed under Item 3A on the INFORMATION PAGE of the workers'compensation insurance policy). The Insurance Carrier or its licensed agent will send this Certificate of Insurance to the entity listed above as the certificate holder in box"2". The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate. (These notices may be sent by regular mail.) Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box"3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note: Upon cancellation of the workers'compensation policy indicated on this form,if the business continues to be named on a permit,license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers' Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers'Compensation Law. Under penalty of perjury, I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Lynne Boone (Print name of authorized representative or licensed agent of insurance carrier) Approved by: WK4,-- gape 3/1/2021 (Signature) (Date) Title: ARM Telephone Number of authorized representative or licensed agent of insurance carrier:214-288-3012 Please Note: Only insurance carriers and their licensed agents are authorized to issue Form C-105.2. Insurance brokers are NOT authorized to issue it. C-105.2 (9-17) www.wcb.ny.gov Laura Petersen From: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> Sent: Monday,January 10, 2022 8:36 AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DENY) ****REGULAR**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken: 01/10/2022 08:35 To: VIL RYE BROOK PRIMARY Transmitted: 01/10/2022 08:36 00002 Ticket: 01102-000-272-00 Type- Regular Previous Ticket: ------------------------------------------------------------------------------ State: NY County- WESTCHESTER Place- RYE BROOK Addr: From: 6 To: Name: JACQUELINE LN Cross: From: To: Name: Offset: ------------------------------------------------------------------------------ Locate: ENTIRE PROPERTY NearSt: ROCK RIDGE DR Means of Excavation: MINI EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: N Work Type: GEOTHERMAL INSTALLATION Estimated Work Complete Date: 01/13/2022 Depth of excavation: Site dimensions: Start Date and Time: 01/13/2022 07:00 Must Start By: 01/28/2022 ------------------------------------------------------------------------------ Contact Name: JOHN MURPHY Company- DANDELION ENERGY, PEEKSKILL Addr1: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 845-332-5378 Fax: Email:johnny@dandehonenergy.com Field Contact: JOHN MURPHY Alt Phone: 845-332-5378 Email:Johnny@dandelionenergy.com Working for: HOMEOWNER ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED : SUEZ WTR WESTCHESTER VIL RYE BROOK : WESTCHESTER CTY SWR i Laura Petersen From: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> Sent: Thursday,January 13, 2022 7:01 AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DSNY) ****LATE**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken: 01/13/2022 07:00 To: VIL RYE BROOK PRIMARY Transmitted: 01/13/2022 07:01 00002 Ticket: 01102-000-272-01 Type: Late Previous Ticket: State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 6 To: Name: JACQUELINE LN Cross: From: To: Name: Offset: ---------------------------------------------------------- ------------------- Locate: ENTIRE PROPERTY NearSt= ROCK RIDGE DR Means of Excavation: MINI EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: N Work Type: GEOTHERMAL INSTALLATION Estimated Work Complete Date: 01/13/2022 Depth of excavation: Site dimensions: Start Date and Time: 01/13/2022 07:00 Must Start By: 01/28/2022 ------------------------------------------------------------------------------ Contact Name: JOHN MURPHY Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 845-332-5378 Fax: Email: johnny@dandelionenergy.com Field Contact: JOHN MURPHY Alt Phone: 845-332-5378 Email: johnny@dandelionenergy.com Working for: HOMEOWNER ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED SUEZ WTR WESTCHESTER VIL RYE BROOK WESTCHESTER CTY SWR i Laura Petersen From: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> Sent: Thursday, December 30, 2021 11:18 AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DSNY) ****REGULAR**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken- 12/30/2021 11:17 To: VIL RYE BROOK PRIMARY Transmitted: 12/30/2021 11:18 00002 Ticket: 12301-000-430-00 Type: Regular Previous Ticket: 12101-000-385-00 ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 6 To: Name: JACQUELINE LN Cross: From: To: Name: Offset: Locate: WE WILL BE DRILLING AND TRENCHING FOR A GEOTHERMAL SYSTEM IN THE FRONT : LEFT SIDE OF THE YARD. NearSt: ROCK RIDGE DR & ROCK RIDGE DR Means of Excavation: DRILL RIG, EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: U Work Type: GEOTHERMAL INSTALLATION Estimated Work Complete Date: 01/05/2022 Depth of excavation: 400 FEET Site dimensions: Length 40 FEET Width 40 FEET Start Date and Time: 01/05/2022 07:00 Must Start By: 01/20/2022 ------------------------------------------------------------------------------ Contact Name: NICOLAS TALBOT Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 518.478-5022 Fax: Email: nic-talbot@hotmail.com Field Contact: NICOLAS TALBOT Alt Phone: 518-478-5022 Email: nic-talbot@hotmail.com Working for: DANDELION ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED : SUEZ WTR WESTCHESTER VIL RYE BROOK 1 Laura Petersen From: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> Sent: Thursday, December 30, 2021 11:1 S AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DSNY) ****REGULAR**** DIG REQUEST from. DSNY for: VIL RYE BROOK Taken: 12/30/2021 11:17 To: VIL RYE BROOK PRIMARY Transmitted: 12/30/2021 11:18 00002 Ticket: 12301-000-430-00 Type: Regular Previous Ticket: 12101-000-385-00 ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 6 To: Name- JACQUELINE LN Cross: From: To: Name: Offset: ------------------------------------------------------------------------------ Locate: WE WILL BE DRILLING AND TRENCHING FOR A GEOTHERMAL SYSTEM IN THE FRONT : LEFT SIDE OF THE YARD. NearSt: ROCK RIDGE DR & ROCK RIDGE DR Means of Excavation: DRILL RIG, EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: U Work Type- GEOTHERMAL INSTALLATION Estimated Work Complete Date: 01/05/2022 Depth of excavation: 400 FEET Site dimensions: Length 40 FEET Width 40 FEET Start Date and Time: 01/05/2022 07:00 Must Start By: 01/20/2022 ------------------------------------------------------------------------------ Contact Name: NICOLAS TALBOT Company: DANDELION ENERGY, PEEKSKILL Addrl: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 518-478-5022 Fax: Email: nic-talbot@hotmail.com Field Contact: NICOLAS TALBOT Alt Phone: 518-478-5022 Email: nic-talbot@hotmail.com Working for: DANDELION ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL Members: ALTICE USA CONED : SUEZ WTR WESTCHESTER VIL RYE BROOK 1 Laura Petersen From: Dig Safely New York Exactix <tickets@ exactix.d igsafelynewyork.com> Sent: Friday, December 10, 2021 9:47 AM To: Mike Izzo Subject: Message from Dig Safely New York, Inc. (DSNY) ****REGULAR**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken: 12/10/2021 09:46 To: VIL RYE BROOK PRIMARY Transmitted: 12/10/2021 09:47 00001 Ticket: 12101-000-385-00 Type: Regular Previous Ticket: --------------------------------------_.-------------------------------------- State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 6 To: Name: JACQUELINE LN Cross: From: To: Name: Offset: ----------------------------------------------------------------------- ------ Locate: WE WILL BE DRILLING AND TRENCHING FOR A GEOTHERMAL SYSTEM IN THE FRONT : LEFT SIDE OF THE YARD. NearSt: ROCK RIDGE DR & ROCK RIDGE DR Means of Excavation: DRILL RIG, EXCAVATOR Blasting: N Site marked with white: N Boring/Directional Drilling: N Within 25ft of Edge of Road: U Work Type: GEOTHERMAL INSTALLATION Estimated Work Complete Date: 12/15/2021 Depth of excavation: 400 FEET Site dimensions: Length 40 FEET Width 40 FEET Start Date and Time: 12/15/2021 07:00 Must Start By: 12/30/2021 Contact Name: NICOLAS TALBOT Company: DANDELION ENERGY, PEEKSKILL Addr1: 1 CORPORATE DR Addr2: City: PEEKSKILL State: NY Zip: 10566 Phone: 518-478-5022 Fax: Email: nic-talbot@hotmail.com Field Contact: NICOLAS TALBOT Alt Phone: 518-478-5022 Email: nic-talbot@hotmail.com Working for: DANDELION ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA CONED : SUEZ WTR WESTCHESTER VIL RYE BROOK 1