Transmittal
Date: July 2, 2021
To: Michael Izzo, Building Inspector From: Peter Feroe, AICP
Company: Village of Rye Brook Phone No.: 914.922.2370
Address: 938 King Street
Re: 900 King Street: Site Plan Application
Following adoption of positive Report & Recommendations by the Planning Board and Architectural
Review Board, the materials listed on the next sheet are being submitted to the Board of Trustees in
support of the Site Plan Application made by 900 King Street Owner LLC with respect to the property at
900 King Street in the Village of Rye Brook. This submission is being made in electronic copy with digital
copies being sent to the Village Clerk and Village Consultants. Two full size sets of the site, architectural,
and landscape plans will be submitted to your office as record copies. If additional copies are required,
please let me know.
We respectfully request that this matter be placed on the Board of Trustees agenda on July 13, 2021.
If you have questions about this submission, please contact either:
Peter Feroe, AICP; 914-922-2370; pferoe@akrf.com
AKRF, Inc.; Applicant’s Planning & Environmental Consultant
Anthony Nester, RLA; 914-273-5225; anester@jmcpllc.com
JMC Site Development Consultants; Site/Civil Engineer
Stuart Lachs, AIA, LEED AP; 203-251-7437; s.lachs@perkinseastman.com
Perkins Eastman; Architect
900 King Site Plan Application 2 July 2, 2021
Materials Included in July 2, 2021 Submission
A. “Cover Letter;” prepared by Veneziano & Associates, 7/2/2021
B. “Site Plan Process Summary Memorandum,” prepared by AKRF, Inc., 7/2/2021
This memorandum summarizes the Planning Board and ARB review of the Site Plan.
C. “Site Plan Application Contents;” Revised 7/2/2021
This table lists the documents, materials, and analyses required to be included in the Final
Site Plan for the 900 King Street Project and is updated for each submission.
D. “Site PlaGn Application Form,” last revised 2/18/2021
E. “Exterior Building Permit Application Form,” last revised 2/18/2021
F. List of Drawings, last revised 7/2/2021
G. Engineering Site Plans; prepared by JMC, last revised 7/2/2021
H. Stormwater Pollution Prevention Plan (SWPPP) and Erosion & Sediment Control Plan
(ESCP); prepared by JMC, last revised 2/18/2021
I. Landscape & Wetland Buffer Planting Plans; prepared by MPFP, last revised 7/2/2021
J. Architectural Plans; prepared by Perkins Eastman, last revised 7/2/2021
K. “Project Description.” prepared by AKRF; last revised 7/2/2021
L. “Construction Management Plan.” compiled by AKRF; last revised 7/2/2021
M. “Weighted Average Summary,” prepared by Perkins Eastman; last revised 7/2/2021
N. “Will Serve Letter,” Prepared by SUEZ, dated May 21, 2021
900 King Street: Site Plan Application Contents
DRAFT 1 07/02/2021
This outline lists the documents, materials, and analyses required to be included in the Final Site Plan for
the 900 King Street Project. Each submission made by the Applicant during the Site Plan, Wetland, and
Steep Slope permit review processes will contain this list, which will be annotated to reflect the status of
the various documents as well as whether the documents were updated since the previous submission.
900 King Street Site Plan Required Contents
Requirement
Updated from Prior
Submission Notes
Site Plan Application Form No February 2021 is latest
Exterior Building Permit Application No February 2021 is latest
Engineering Plans Yes
Minor updates; Coordinated porte cochere on IL building
with architectural plans
SWPPP / ESCP No February 2021 is latest
Architectural Plans Yes Minor updates from plans sent to ARB in June 2021.
Landscape Plans Yes Minor update to coordinate porte cochere on IL
Project Description Yes Minor update to procedural history
MEP Design Narrative No March 5, 2021 is latest
HVAC Acoustical Analysis No April 14, 2021 is latest
Construction Management Plan Yes Updates to Section 10.3 per HDR memorandum
Construction Phasing & Staging
Plans No February 2021 is latest
Construction-Period Noise
Barrier Acoustical Analysis No May 24, 2021
Wetland Permit Application Form No February 2021 is latest (to PB only)
Steep Slope Permit Application Form No February 2021 is latest (to PB only)
900 King Street List of Drawings
Number Sheet/ Figure/ Document Title Prepared by Date/Revised
C-000 COVER SHEET JMC PLLC 7/2/2021
C-010 NOTES & LEGENDS JMC PLLC 7/2/2021
C-100 EXISTING CONDITIONS JMC PLLC 7/2/2021
C-110 DEMOLITION PLAN JMC PLLC 7/2/2021
C-120 EXISTING STEEP SLOPES MAP JMC PLLC 7/2/2021
C-130 TREE REMOVAL/PROTECTION PLAN JMC PLLC 7/2/2021
C-131 TREE REMOVAL/PROTECTION CHART JMC PLLC 7/2/2021
C-200 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 1)JMC PLLC 7/2/2021
C-201 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 2)JMC PLLC 7/2/2021
C-202 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 3&4)JMC PLLC 7/2/2021
C-203 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 5)JMC PLLC 7/2/2021
C-204 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 6)JMC PLLC 7/2/2021
C-205 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 7)JMC PLLC 7/2/2021
C-300 LAYOUT AND STRIPING PLAN JMC PLLC 7/2/2021
C-310 ROAD PROFILES JMC PLLC 7/2/2021
C-311 ROAD PROFILES JMC PLLC 7/2/2021
C-320 FIRE TRUCK, EMERGENCY VEHICLE & TRUCK TURNING PLAN JMC PLLC 7/2/2021
C-321 ON-SITE FIRE PROTECTION PLAN JMC PLLC 7/2/2021
C-330 INTERSECTION SIGHT DISTANCES JMC PLLC 7/2/2021
C-400 GRADING PLAN JMC PLLC 7/2/2021
C-410 EXCAVATION CROSS SECTION JMC PLLC 7/2/2021
C-500 UTILITIES PLAN JMC PLLC 7/2/2021
C-510 STORM SEWER PROFILES JMC PLLC 7/2/2021
C-520 SANITARY SEWER PROFILES JMC PLLC 7/2/2021
C-600 LIGHTING PLAN JMC PLLC 7/2/2021
C-900 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-901 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-902 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-903 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-904 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-905 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-906 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
Page 1 of 2 7/2/2021
900 King Street List of Drawings
Number Sheet/ Figure/ Document Title Prepared by Date/Revised
C-907 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-908 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-909 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
C-910 CONSTRUCTION DETAILS JMC PLLC 7/2/2021
BA-000 COVER & SHEET INDEX Perkins Eastman 7/2/2021
BAS-100 ARCHITECTURAL SITE PLAN Perkins Eastman 7/2/2021
BA-100 PARKING PLAN Perkins Eastman 7/2/2021
BA-101 FIRST FLOOR PLAN Perkins Eastman 7/2/2021
BA-102 SECOND FLOOR PLAN Perkins Eastman 7/2/2021
BA-103 THIRD FLOOR PLAN Perkins Eastman 7/2/2021
BA-104 FOURTH FLOOR PLAN Perkins Eastman 7/2/2021
BA-105 ROOF PLAN Perkins Eastman 7/2/2021
BA-111 TOWNHOUSE PLANS Perkins Eastman 7/2/2021
BA-200 OVERALL ELEVATIONS Perkins Eastman 7/2/2021
BA-201 OVERALL ELEVATIONS Perkins Eastman 7/2/2021
BA-202 ELEVATIONS Perkins Eastman 7/2/2021
BA-203 ELEVATIONS Perkins Eastman 7/2/2021
BA-204 ELEVATIONS Perkins Eastman 7/2/2021
BA-205 ELEVATIONS Perkins Eastman 7/2/2021
BA-211 TOWNHOUSE ELEVATIONS Perkins Eastman 7/2/2021
BA-303 SECTIONS Perkins Eastman 7/2/2021
BA-304 SECTIONS Perkins Eastman 7/2/2021
L-300 PLANTING PLAN MPFP 7/2/2021
L-301 WETLAND BUFFER PLANTING PLAN ON-SITE MPFP 7/2/2021
L-302 WETLAND BUFFER PLANTING PLAN ENLARGEMENT MPFP 7/2/2021
L-303 WETLAND MITIGATION PLANTING PLAN OFF-SITE MPFP 7/2/2021
L-304 PLANTING DETAILS MPFP 7/2/2021
Page 2 of 2 7/2/2021