Loading...
HomeMy WebLinkAbout900 King Street AKRF Memorandum 2021-5-27 Environmental, Planning, and Engineering Consultants 34 South Broadway Suite 300 White Plains, NY 10601 tel: 914 949-7336 fax: 914 949-7559 www.akrf.com Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut Memorandum To: Chairman Robert Goodman and the Rye Brook Planning Board From: Peter Feroe, AICP Date: May 27, 2021 Re: 900 King Site Plan: Response to Consultant Comments cc: Mayor; Board of Trustees; Village Administrator; Superintendent of Public Works; Village Attorney; Village Planner On April 29, 2021, 900 King Street Owner LLC (the “Applicant”) submitted supplementary materials to the Planning Board in support of its applications for a PUD Site Plan, a Wetland Permit, and a Steep Slopes permit. The Village’s consultants, Hardesty & Hanover and HDR, Inc., provided written comment memoranda regarding the submitted materials. This memorandum provides responses to those consultant comments. Hardesty & Hanover, May 7, 2021 The Hardesty & Hanover memorandum noted that all of their previous comments had been addressed. HDR, Inc., May 7, 2021 Construction Management Plan: Construction Noise Based on HDR’s comments on two preliminary drafts of the supplementary noise analysis and the memo accompanying the same, AKRF has finalized the analysis and memorandum, which are attached as an appendix to the Construction Management Plan (“CMP”). The modeling and analysis were updated to address HDR’s comments, and it is our understanding that there are no further technical comments regarding the analysis or the conclusions of the same. The fundamental conclusion of the analysis is that a 12-foot-tall noise barrier along the Arbors and Village Hall sides of the Project Site would provide minimal, or no, additional noise reduction compared to a condition in which no barrier is located on those sides of the Site. Based on this conclusion, the Applicant proposes to construct a 6-foot-tall noise barrier along those sides of the Site during construction, consistent with the requirements of the Findings Statement. The results of the analysis are described in more detail in Section 10.1.2 of the May 27, 2021 draft CMP. 900 King Consultant Response 2 May 27, 2021 Site Plan Approval Drawings Construction Air Quality  Drawings C-201 through C-205 have been updated to now show specific locations identified on site as a “Proposed Concrete Truck Washout/Truck Wash Down Area”. Construction Noise  The S&E Plan Legend has been updated on drawing C-010 to show three separate types of fencing. These three include the 6’ high noise barrier, the 12’ high noise barrier and the 6’ chain link fence, all shown with different symbols on the plans. Operational Noise  Detail #69 on drawing C-910 has been updated to clearly indicate that the level 1 enclosure is to be used.