Loading...
HomeMy WebLinkAbout900 King Street Draft Report and Recommendation 2021-5-13 1313/074/4841-0764-7971v1 5/12/21 May 13, 2021 _____________ RESOLUTION AUTHORIZING SUBMISSION OF A REPORT AND RECOMMENDATION TO THE RYE BROOK BOARD OF TRUSTEES ON PUD SITE PLAN APPLICATION FOR PROPERTY LOCATED AT 900 KING STREET BE IT RESOLVED, that the Rye Brook Planning Board hereby submits the attached Report and Recommendation to the Rye Brook Board of Trustees on the PUD Site Plan Application for property located at 900 King Street. BE IT FURTHER RESOLVED, that the Planning Board Chairman is hereby authorized to finalize the attached Report and Recommendation in consultation with Village Counsel to accurately reflect the Planning Board’s discussions at its May 13, 2021 meeting, prior to such Report and Recommendation being forwarded to the Board of Trustees and Village Administrator. On motion by ____________, seconded by ________________, Mr. Michal Nowak, Village Engineer, called the roll: APPROVING THE REFERRAL RESOLUTION: Ayes: Nays: Abstain: Excused: Recused: 1313/074/4841-0764-7971v1 5/12/21 REPORT AND RECOMMENDATION FROM THE RYE BROOK PLANNING BOARD TO THE RYE BROOK BOARD OF TRUSTEES ON PUD SITE PLAN APPLICATION FOR PROPERTY LOCATED AT 900 KING STREET I. OVERVIEW The Rye Brook Board of Trustees is considering an application from 900 King Street Owner, LLC (the “Applicant”) for PUD Site Plan approval for the development of an age restricted (62 years of age and older) senior living facility with a total of 231 residential rental units consisting of 126 Independent Living (IL) units, 85 Assisted Living (AL) units, and 20 Townhomes, and other related infrastructure, including driveways, walkways, garage and surface parking, site lighting, signage and stormwater on the property located at 900 King Street, designated as Parcel ID 129.68-1-13 on the Town of Rye Tax Map and located in the Planned Unit Development (PUD) Zoning District (the Proposed Project). To construct the Proposed Project, the existing 215,000 square foot office building and 5.3-acre surface parking lot on the Project Site would be removed. The Proposed Project also requires Wetland Permit and Steep Slopes Permit approvals pursuant to Chapter 245 and 213 of the Village Code, respectively. To effectuate its proposal the Applicant petitioned the Village Board of Trustees (Village Board) to amend the Rye Brook Zoning Code to include a section entitled, 900 King Street Planned Unit Development, as Section 250-7(E)(6). The Applicant also sought approval of a PUD Concept Plan. On December 18, 2017 after taking a “hard look” at the EAF, Technical Memorandum and all associated materials prepared and submitted in connection with the Proposed Project, the Village Board adopted the Environmental Assessment Form (EAF) Part 3 (with attachments) and found that the Proposed Project may result in one or more significant adverse environmental impacts, and therefore adopted a Positive Declaration pursuant to the State Environmental Quality Review Act (SEQRA) requiring the preparation of a Draft Environmental Impact Statement (DEIS). On September 12, 2018 the Board adopted a Resolution deeming the DEIS complete. A public hearing with respect to the DEIS and the proposed zoning amendments was held on October 22, 2018, November 8, 2018, December 11, 2019 and January 8, 2019. On November 24, 2020, the Board of Trustees accepted the Final Environmental Impact Statement (FEIS) as complete. On January 12, 2021, the Village Board considered a draft Findings Statement and opened a duly noticed public hearing on the proposed local laws and PUD Concept Plan application at which time it also heard comments on the draft Findings Statement. 1313/074/4841-0764-7971v1 5/12/21 On January 26, 2021, the Village Board adopted its SEQRA Findings Statement, setting forth its findings and conclusions related to the environmental impacts of the Proposed Project. The Village Board determined that, with attendant mitigation measures, the Further Reduced Alternative best balances the “relevant environmental impacts with social, economic and other considerations” and, among the reasonable alternatives is the “one that avoids or minimizes adverse environmental impacts to the maximum extent practicable.” On January 26, 2021, the Village Board also adopted the proposed local law to amend Chapter 250 of the Village Code to add Section 250-7.E(6) and also approved the PUD Concept Plan for an age restricted (62 years of age and older) senior living facility with a total of 231 residential rental units consisting of 126 Independent Living units, 85 Assisted Living units and 20 Townhomes with a total square footage of no more than 345,902 square feet. Having completed its SEQRA review, and thereafter adopting relevant legislation and the PUD Concept Plan for the Project, the next step in the process is the consideration of the Applicant’s applications for approval of the PUD Site Plan, Wetland Permit and Steep Slopes Permit. The Board of Trustees is the approval authority for the PUD Site Plan pursuant to Village Code § 250-7.E. The Planning Board is the approval authority for the Wetland Permit and Steep Slopes Permit pursuant to Village Code §§ 179-2.A(3) and 179-2.A(4), respectively. On January 26, 2021, the Board of Trustees referred the PUD Site Plan application to the Planning Board for consideration and a report and recommendation thereon pursuant to Village Code § 250-7.E(4)(b)(3). II. DISCUSSION The Planning Board discussed the applications at its March 11, 2021, April 8, 2021 and May 13, 2021 meetings, during which time Village consultants and staff also provided input. As a result of its discussions, the Planning Board has the following comments: 1. Traffic, Site Access and Parking The Planning Board reviewed the design and location of the proposed landbanked parking area and finds it acceptable. The landbanked parking area consisting of 25 unimproved parking spaces will be maintained in a landscaped condition unless and until it is determined by the Village Board that such spaces are necessary. The Planning Board recommends including the following conditions in any resolution of Site Plan approval for the Project: 1313/074/4841-0764-7971v1 5/12/21  The Applicant shall submit to the Village, in a form satisfactory to the Village Attorney, a Land Banked Parking Agreement guaranteeing the improvement of the land banked parking spaces in the event the Village Board determines the improvement of such spaces are necessary as per Village Code § 250- 7.E(6)(b)(4)(d).  The Applicant shall perform a parking utilization count when the Project is 75% occupied and again at 90% occupancy. Upon reaching 90% occupancy, a parking utilization count shall be performed annually for three years. Each parking utilization count shall be submitted to the Village Building Department for use in determining whether the improvement of some or all of the 25 land banked parking spaces is necessary. The Planning Board reviewed the proposed design and operation of the emergency access through Village property and the location for pick-up and drop-off related to transportation services offered to Project residents and finds both acceptable. In addition, sight distance calculations for the proposed driveways to Arbor Drive were provided with consideration of the existing and proposed landscaping. Such calculations are located on Sheet C-330, “Intersection Sight Distance,” and were reviewed by the Village’s Traffic Consultant and found acceptable. Subject to the terms of the Applicant’s easement rights over Arbor Drive, the Planning Board agrees that the proposed crosswalk markings should be installed on Arbor Drive to better identify the location of the crossing associated with the walkway easement held by the Blind Brook Union Free School District (Liber 7477, p. 316) for access to and from the Blind Brook High School. 2. Rooftop Design The Planning Board explored opportunities to further reduce the height of the IL building and its peak while maintaining the architectural integrity of the proposed design. At the April 8, 2021 meeting, the Applicant proposed two alternative schemes for the design of the peak of the IL building each of which would result in a reduction of the peak by approximately 5-6 feet bringing the peak from approximately 60 feet to approximately 54-55 feet. Without architectural training, the Planning Board members found it difficult to provide principled feedback on the alternative schemes, other than to state their own personal preferences. Of the four members in attendance that evening, one preferred the original design, one preferred alternative scheme #1 and one preferred 1313/074/4841-0764-7971v1 5/12/21 alterative scheme #2. The Planning Board recommends that the Board of Trustees seek guidance from the Architectural Review Board prior to making a decision on whether or how the peak of the IL building should be reduced. Regarding roof design, the Planning Board recommends that the ESTF verify (if it has not done so already) that the buildings’ roofs and entrances are designed to facilitate the safe movement of emergency personnel as well as provide for adequate interior and exterior emergency response communication. 3. Stormwater Management The Project provides a reduction in the amount of impervious surface coverage on the Property as compared to its existing condition, but the main drainage area will increase in size due to the site layout and grading design. The existing site contains a detention basin that receives stormwater runoff from the existing building and parking lot, as well as the adjacent Village property to the east of the site. From the detention basin, the stormwater flows through a stream to the municipal drainage system through Harkness Park, along the Blind Brook School driveway, to King Street. A Preliminary SWPPP has been submitted and is under review by the Village’s Consulting Engineer. The proposed stormwater design will primarily utilize subsurface infiltration systems to treat and retain runoff from the majority of the disturbance area of the site. Grass pavers are also utilized at the emergency access driveway and the loading area at the rear of the IL building, to reduce the amount of impervious surface cover. The existing condition does not include any stormwater practices with infiltration to provide water quality and runoff reduction. The addition of these practices will be a benefit to the site. 4. Utilities Sewer. According to the Findings Statement, the Applicant is to cause the undertaking of project-based mitigation that would reduce the amount of inflow and infiltration into the sewer system in the amount of at least 80,000 gallons per day (3x the increase in sanitary flow generated by the Project), or make a monetary contribution to the Village in lieu of such project-based mitigation. Subject to any limitations on rights of access to qualifying infrastructure, the Planning Board recommends implementation of project-based mitigation for reducing inflow and infiltration at or near the Project site. Water. The Planning Board recommends that any Site Plan approval should be conditioned on the Applicant providing an updated “willingness to serve” letter from SUEZ prior to the issuance of any permit to perform site work. SUEZ’s existing 1313/074/4841-0764-7971v1 5/12/21 “willingness to serve” letter is contingent upon certain upgrades being performed, including (1) additional interconnections with WJWW at Anderson Hill Road, and Aquarion at King Street, and (2) installation of a meter on the 16-inch main at Anderson Hill Road which would bypass the existing 8-inch meter vault that experiences head loss at times of peak flow. According to the Findings Statement, these improvements are anticipated to allow the water system to operate with a greater psi than the minimum standards. The Planning Board recommends that appropriate conditions be placed in any Resolution of Site Plan approval to ensure that these improvements occur. 5. Landscape Plan The Planning Board reviewed the Landscape Plan and the Tree Plan and finds both acceptable. The Planning Board reviewed various photo and computer simulations of the site in the leaf-on and leaf-off condition and finds that the landscaping plan includes all proposed replacement trees and locates them in a manner that provides maximum visual screening from Arbor Drive, the Arbors and the surrounding area. Specifically, during the April 8, 2021 meeting, the Applicant provided a detailed presentation of the proposed landscape plan. Photographic views toward the site from the vantage point of the Arbors and from Arbor Drive were presented. The views provided in both leaf-on and leaf-off condition demonstrated the existing vegetative buffer at the western side of the site which is proposed to remain will significantly screen the proposed building even without any further plantings in that area. The landscape plan proposes a further layer of trees between the existing vegetative buffer and the proposed townhomes which is sufficient to address errant views from the Arbors. The Planning Board questioned the size of the trees at the time of planting. Trees above 3” in caliper raise concerns of survivability. According to the Village Arborist, smaller trees tend to grow faster than larger trees and can handle stress better. Therefore, it is not advisable to install larger trees at the time of planting than that set forth in the Village Code. 6. Wetland Buffer Disturbance The Project includes 2.25 acres of wetland buffer disturbance with only 0.173 acres (7,536 square feet) of that consisting of additional impervious surface coverage within the wetland buffer area. The remaining 2.077 acres of disturbance is the result of regrading and other site disturbances. Consistent with the requirements of the Village Code for a 2:1 mitigation/disturbance ratio, 4.5 acres of wetland buffer mitigation is proposed. Approximately 2.3 acres of mitigation is proposed on-site with the remaining 2.2 acres proposed off-site at Rich Manor Park. 1313/074/4841-0764-7971v1 5/12/21 The Planning Board has reviewed the application for a Wetland Permit and will hold a public hearing on that application after the Board of Trustees adopts a decision on the PUD Site Plan. 7. Steep Slope Disturbance Construction of the Project will require disturbance of existing steep slopes on the property. The areas of existing steep slopes are located around the existing stormwater basin on the Property’s eastern edge and the vegetated slope toward the Property’s western edge. These areas are “human-made”, not native topography. The Project also requires the creation of steep slopes throughout the site, but most notably in the areas around the access ramps to the underground parking area. These steep slopes are proposed to allow the grading plan to accommodate the underground parking area along with a relatively flat pedestrian area around the buildings, and the need to meet existing grades on Arbor Drive at the driveway connections. The areas of new steep slopes at the access ramps to the underground parking area are proposed to be stabilized with retaining walls. The other areas of new steep slopes will be stabilized with vegetation. Both methods are acceptable pursuant to Chapter 213 of the Village Code. The Planning Board has reviewed the application for a Steep Slopes Permit and will hold a public hearing on that application after the Board of Trustees adopts a decision on the PUD Site Plan. 8. Visual Impacts The Planning Board discussed the retaining walls around the entrance to the garage to explore whether vegetative screening or architectural finishing of the retaining walls should be presented. The retaining wall proposed at the entrance to the underground garage at the front of the site does not appear to be visible from Arbor Drive based on its location in relation to existing and proposed vegetation. The Applicant proposes a textured, finished block retaining wall face which is aesthetically pleasing and acceptable to the Planning Board. 9. Construction Management The Planning Board reviewed the proposed Construction Management Plan (CMP) at its May 13, 2021 meeting. The CMP includes information concerning construction traffic, materials management, fugitive dust management, diesel emission controls, vibration monitoring plans and construction period noise mitigation plans. The Appendix to the CMP also includes construction sequencing and phasing plans. The Village’s Consulting Engineer has noted that since the Project requires a NYSDEC waiver for disturbance areas in excess of 5 acres at one time it is critical that 1313/074/4841-0764-7971v1 5/12/21 each phase and sub-phase of construction must be stabilized in strict conformance with the approved plans with oversight by the Village. This should be made a condition of any approval of the Site Plan. [Planning Board comments/recommendations to be inserted] 10. Noise The Findings Statement provides that a noise barrier will be installed along the perimeter of the Site on Arbor Drive between the Main Site entrance and the southern Site boundary. The barrier is to be installed before the start of significant construction activities during the time school is in session during the normal school year. The Findings Statement further provides that a noise barrier will be installed on the perimeter of the Site along the east (Village Hall) and west (Arbors) to mitigate noise impacts during construction phases when noise impacts will be at their highest. The Findings Statement left the details of the noise barriers, such as height and material to be identified during Site Plan review. The Village Board further reserved to itself the right to explore alternative noise mitigation measures that achieve the same level of mitigation. [Planning Board comments/recommendations to be inserted] 11. Lighting The Planning Board finds the proposed Lighting Plan (C-600) acceptable in that light is contained on-site with no spillage over the property lines. It is recommended that the Village Board review the proposed light fixtures on Sheet C-909 to determine whether they are an acceptable design. 12. Recreational Facilities The Planning Board considered whether the on-site open space areas meet the requirements of Section 209-14 for a suitably located and usable park for passive or active recreational purposes or whether the Applicant must pay a fee in lieu of parkland. Based on the estimated population increase from the Project, the new population would create a need for approximately 1.25 acres of open space according to the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) standards. The Applicant is proposing approximately 3,412 linear feet of trailway around the perimeter of the Site with wooded and landscaped areas on either side of the trailway in some locations, along with other actively programmed outdoor space. According to the 1313/074/4841-0764-7971v1 5/12/21 applicant the programmed outdoor space would include sitting, lounging, eating and fitness areas. In total the actively programmed outdoor space comprises 1.89 acres. Based on this information, the Planning Board recommends that the Board of Trustees [find that the outdoor recreational areas provided by the Applicant are suitably located and usable for passive or active recreational purposes to accommodate the increased population resulting from the Project] or [find that the Applicant should receive a partial credit toward the total fee in lieu because some but not all of the areas provided by the Applicant are suitably located and usable for passive or active recreational purposes to accommodate the increased population resulting from the Project] or [find that the Applicant should be required to pay a fee in lieu because the outdoor recreational areas provided by the Applicant are not suitably located or sufficient to accommodate the increased population resulting from the Project.] III. CONCLUSION AND RECOMMENDATION Based on the foregoing, the Planning Board recommends approval of the proposed applications, subject to due consideration of the comments set forth herein. Dated: Rye Brook, New York May 13, 2021 On motion by _______________, seconded by _______________, Mr. Michal Nowak, Village Engineer, called the roll: APPROVED AT THE MAY 13, 2021 MEETING OF THE RYE BROOK PLANNING BOARD BY A VOTE OF __________________________ ACCEPTING THE REPORT AND RECOMMENDATION: Ayes: Nays: Abstain: Excused: Recused: 1313/074/4841-0764-7971v1 5/12/21