Loading...
HomeMy WebLinkAbout900 King Street Phasing Staging Plans 2021-4-29ARCHITECT:APPLICANT/OWNER:Drawing No:Project No:Date:Scale:Drawn:Approved:ANY ALTERATION OF PLANS,SPECIFICATIONS, PLATS ANDREPORTS BEARING THE SEALOF A LICENSED PROFESSIONALENGINEER OR LICENSED LANDSURVEYOR IS A VIOLATION OFSECTION 7209 OF THE NEWYORK STATE EDUCATION LAW,EXCEPT AS PROVIDED FOR BYSECTION 7209, SUBSECTION 2.No.RevisionDateBy• • ••• •• • ••• •••••••••••••2017 by JMCAll Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted in any form or by means, electronic, mechanical,photocopying, recording or otherwise, without the prior written permission of JMC PLANNING, ENGINEERING, LANDSCAPE ARCHITECTURE & LAND SURVEYING, PLLC | JMC SITE DEVELOPMENTCONSULTANTS, LLC | JOHN MEYER CONSULTING, INC. (JMC). Any modifications or alterations to this document without the written permission of JMC shall render them invalid and unusable.Phase 1 - DemolitionDetentionPond withSilt Fence& HaybalePerimeter DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1MaterialStaging AreaDetentionPond withSilt Fence& HaybalePerimeterContractor Parking(150 Spaces)DNGarage FoundationConcurrent withRoad & UtilitiesPhase 2 - Road Construction & Site Utilities DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1MaterialStaging AreaDetentionPond withSilt Fence& HaybalePerimeterContractor Parking(150 Spaces)DNPhase 3 - Assisted LivingBGBAFFDDF DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1MaterialStaging AreaDetentionPond withSilt Fence& HaybalePerimeterContractor Parking(150 Spaces)Phase 4 - Independent Living Center CoreBGBAFFDDFDNADEADDDNBuild StructureOver Garage DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1DetentionPond withSilt Fence& HaybalePerimeterBGBADFFDDFDNDNADEADDBBGBCBGGAAFDEFEDDADAAAADDMaterialStaging AreaMaterialStagingAreaMaterialStagingAreaMaterialStaging AreaContractor ParkingIn Garage Below DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1Phase 6 - TownhousesDetentionPond withSilt Fence &HaybalePerimeterDNDNADEADDBBGBCBGGAAFDEFEDDADAAAADDBGBAFFDDFMaterialStaging AreaMaterialStagingAreaMaterialStagingArea DNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFDD100' - 0"100' - 0"100' - 0"100' - 0"2/8/2021 8:16:28 PMC:\REVIT LOCAL\70700_900King_Arch_2019_reduced footprint_m.taubin.rvt1 Date 1 Revision 1Phase 7 - Site RestorationDNDNBBGBCBGGAAAAFDEFEDBGBAADDFFDDDEAAAAADADDDDFD100'- 0"100'-0"100' -0"