Transmittal
Date: April 29, 2021
To: Michael Izzo, Building Inspector From: Peter Feroe, AICP
Company: Planning Board
Village of Rye Brook Phone No.: 914.922.2370
Address: 938 King Street
Re: 900 King Street: Site Plan Application
Enclosed please find supplementary materials, listed on the next page, in furtherance of the Site Plan,
Wetland, and Steep Slopes permit applications for the 900 King Street Project. Copies of these materials
are also being provided to the Village Clerk and Board of Trustees as the Site Plan Approval Authority.
We respectfully request that this matter be placed on the May 13, 2021Planning Board agenda.
Page 2 of this transmittal lists the supplementary materials provided.
Page 3 of this transmittal outlines the issues identified by the Board of Trustees in the adopted
Environmental Findings Statement as requiring review during the site plan process.
If you have questions about this submission, please contact either:
Peter Feroe, AICP; 914-922-2370; pferoe@akrf.com
AKRF, Inc.; Applicant’s Planning & Environmental Consultant
Anthony Nester, RLA; 914-273-5225; anester@jmcpllc.com
JMC Site Development Consultants; Site/Civil Engineer
Stuart Lachs, AIA, LEED AP; 203-251-7437; s.lachs@perkinseastman.com
Perkins Eastman; Architect
900 King Site Plan Application 2 April 29, 2021
Materials Included in April 29, 2021 Site Plan Submission
A. “Required Contents for 900 King Street Application;” Revised 4/29/2021
This table lists the documents, materials, and analyses required to be included in the Final
Site Plan for the 900 King Street Project. Each submission made by the Applicant during the
Site Plan, Wetland, and Steep Slope permit review processes will contain this list, which will
be annotated to reflect the status of the various documents as well as whether the documents
were updated from the previous submission.
B. List of Drawings; updated 4/29/2021
C. “EFS Crosswalk;” Revised 4/29/2021
This table list the for the 900 King Site Plan as stated in the Environmental Findings Statement
(“EFS”). Also included with the EFS crosswalk are comments from Village staff and
consultants that were received during the SEQRA review of the project, but determined to be
related to the Site Plan.
D. Response to Consultant Comment Memos prepared by AKRF, Inc. (4/29/21)
E. Engineering Plans prepared by JMC Engineering, revised 4/28/2021
F. Landscape Plans prepared by MPFP, revised 4/28/2021
G. “Project Description.” prepared by AKRF; Revised 4/29/2021
Section 7, HVAC Systems; revised text submitted
New Attachment 2, HVAC Acoustical Analysis
H. Construction Management Plan prepared by AKRF; Revised 4/29/2021
Updated pursuant to HDR Comments
900 King Site Plan Application 3 April 29, 2021
Topics for 900 King Site Plan Review
Identified by Board of Trustees in Environmental Findings Statement
Potential Items for May 13, 2021 Planning Board Meeting.
1. Landbank Parking
a. See Materials: C-300; Project Description §2.5.3; H&H memo of 4/2/21
2. Construction
a. See Materials: Construction Management Plan
b. Other Discussion Items:
i. Construction Management Plan
ii. Noise Barrier along Arbors HOA and Village Hall boundaries
iii. Visual Condition of Noise Barrier along Arbor Drive
3. Other Items
a. Easement with Village for Emergency Access
b. Discussion of other Covenants
Items Previously Discussed (at 4/8/21 Planning Board Meeting.)
4. Landscaping – General & Views from Arbors and Arbor Drive
a. See Materials: Landscape Plans; Landscape Presentation; Existing Views; Rendered Views
5. Landscaping – Wetland Buffer Planting Plan
a. See Materials: H&H 4/2/21 memo; Updated Wetland Buffer Plans 4/29/21 reflecting PB and H&H
comments
6. Steep Slopes
a. See Materials: C-120, Existing Steep Slopes; C-400, Grading; FEIS Figures 2-1 & 2-2
7. Lighting
a. See Materials: H&H 4/2/21 memo; C-600, Photometric Plan – updated; C-909 for details - updated
8. Roofscape of Center Section of IL Building
a. See Materials: A-series; ZA-105; ZA-200 to ZA-204; ZA-301; Rendered Views
9. Open & Recreational Space
a. See Materials: Project Description §5 with accompanying Figure 1-15 from FEIS; Landscape
Presentation and precedent images
10. Circulation
a. See Materials:
i. Emergency Services: C-300, -320, 321
ii. Resident pickup/drop off: C-300
iii. Crosswalk on Arbor Drive: C-300 (proposed in location of existing crossing on Arbor
Drive)
900 King Street Site Plan Application: Required Contents
DRAFT 1 4/29/2021
This outline lists the documents, materials, and analyses required to be included in the Final Site Plan for
the 900 King Street Project. Each submission made by the Applicant during the Site Plan, Wetland, and
Steep Slope permit review processes will contain this list, which will be annotated to reflect the status of
the various documents as well as whether the documents were updated since the previous submission.
900 King Street Site Plan Required Contents
Requirement
Update Provided
4/29/2021 Notes
Site Plan Application Form No February 2021 is latest
Exterior Building Permit Application No February 2021 is latest
Engineering Plans Yes 4/29/2021 Plan Set
SWPPP / ESCP No February 2021 is latest
Architectural Plans No February 2021 is latest
Landscape Plans Yes
Updated Landscape Plan, Wetland Buffer Planting
Plan (L-300, L-301, L-302)
Project Description Yes
Update to Section 7. New “Attachment 2,” HVAC
Acoustical Analysis Provided;
Construction Management Plan Yes Updates pursuant to HDR Comments
Construction Phasing & Staging
Plans No February 2021 is latest
Construction-Period Noise
Barrier Acoustical Analysis Yes May 2021
Wetland Permit No February 2021 is latest
Steep Slope Permit No February 2021 is latest
900 King Street List of Drawings
Number Sheet/ Figure/ Document Title Prepared by Date/Revised
C-000 COVER SHEET JMC PLLC 4/28/2021
C-010 NOTES & LEGENDS JMC PLLC 4/28/2021
C-100 EXISTING CONDITIONS JMC PLLC 4/28/2021
C-110 DEMOLITION PLAN JMC PLLC 4/28/2021
C-120 EXISTING STEEP SLOPES MAP JMC PLLC 4/28/2021
C-130 TREE REMOVAL/PROTECTION PLAN JMC PLLC 4/28/2021
C-131 TREE REMOVAL/PROTECTION CHART JMC PLLC 4/28/2021
C-200 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 1) JMC PLLC 4/28/2021
C-201 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 2) JMC PLLC 4/28/2021
C-202 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 3&4) JMC PLLC 4/28/2021
C-203 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 5) JMC PLLC 4/28/2021
C-204 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 6) JMC PLLC 4/28/2021
C-205 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 7) JMC PLLC 4/28/2021
C-300 LAYOUT AND STRIPING PLAN JMC PLLC 4/28/2021
C-310 ROAD PROFILES JMC PLLC 4/28/2021
C-311 ROAD PROFILES JMC PLLC 4/28/2021
C-320 FIRE TRUCK, EMERGENCY VEHICLE & TRUCK TURNING PLAN JMC PLLC 4/28/2021
C-321 ON-SITE FIRE PROTECTION PLAN JMC PLLC 4/28/2021
C-330 INTERSECTION SIGHT DISTANCES {New}JMC PLLC 4/28/2021
C-400 GRADING PLAN JMC PLLC 4/28/2021
C-410 EXCAVATION CROSS SECTION JMC PLLC 4/28/2021
C-500 UTILITIES PLAN JMC PLLC 4/28/2021
C-510 STORM SEWER PROFILES JMC PLLC 4/28/2021
C-520 SANITARY SEWER PROFILES JMC PLLC 4/28/2021
C-600 LIGHTING PLAN JMC PLLC 4/28/2021
C-900 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-901 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-902 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-903 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-904 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-905 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-906 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-907 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-908 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-909 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
C-910 CONSTRUCTION DETAILS JMC PLLC 4/28/2021
ZAS-100 ARCHITECTURAL SITE PLAN Perkins Eastman 2/18/2021
ZA-100 PARKING PLAN Perkins Eastman 2/18/2021
ZA-101 FIRST FLOOR PLAN Perkins Eastman 2/18/2021
ZA-102 SECOND FLOOR PLAN Perkins Eastman 2/18/2021
ZA-103 THIRD FLOOR PLAN Perkins Eastman 2/18/2021
ZA-104 FOURTH FLOOR PLAN Perkins Eastman 2/18/2021
ZA-105 ROOF PLAN Perkins Eastman 2/18/2021
ZA-111 TOWNHOUSE PLANS Perkins Eastman 2/18/2021
ZA-200 OVERALL ELEVATIONS Perkins Eastman 2/18/2021
ZA-201 OVERALL ELEVATIONS Perkins Eastman 2/18/2021
ZA-202 ELEVATIONS Perkins Eastman 2/18/2021
ZA-203 ELEVATIONS Perkins Eastman 2/18/2021
ZA-204 ELEVATIONS Perkins Eastman 2/18/2021
ZA-205 ELEVATIONS Perkins Eastman 2/18/2021
ZA-211 TOWNHOUSE ELEVATIONS Perkins Eastman 2/18/2021
ZA-301 SECTIONS Perkins Eastman 2/18/2021
L-300 PLANTING PLAN MPFP 4/28/2021
L-301 WETLAND BUFFER PLANTING PLAN ON-SITE MPFP 4/28/2021
L-302 WETLAND BUFFER PLANTING PLAN ENLARGEMENT {New}MPFP 4/28/2021
L-303 WETLAND MITIGATION PLANTING PLAN OFF-SITE {New} MPFP 4/28/2021
L-304 PLANTING DETAILS {formerly L-302}MPFP 4/28/2021
Page 1 of 1 4/29/2021
900 King Street DRAFT EFS and Consultant Memos Requirements
Source Number Complete?Requirement Where Included
EFS A.3.o Yes BoT may consider requiring a recorded covenant restricting occupancy to age 62+No response required
EFS A.3.o Yes BoT may consider requiring a recorded covenant restricting units to rental No response required
EFS B.1.b Yes No blasting or rock crushing without review/approval of Building Inspector CMP Section 5
EFS C.2 Yes On-Site Wetland Mitigation Location and Design L-301
EFS
C.2
C.3.f Yes
Off-Site Wetland Mitigation Location and Description of Work (Identified by DPW and approved
by PB in Wetland Permit Resolution)
To be Coordinated with M. Nowak and
memorialized in Wetland Permit
Resolution
EFS E.3 Yes Tree Protection Plan L-301; C-900
EFS E.3 Yes Wetland Buffer Restoration & Restrictive Mowing Areas Delineated L-301
EFS
E.3
F.3.b Yes
Landscape Plan with five year monitor/guaranty; native species required in wetland buffers and
other "sensitive" areas L-300
EFS F.3.f Yes Roof Design - Evaluate options for lowering roof of center of IL building To be presented at 3/11/21 PB Meeting
EFS G.3.a Yes
BoT may consider requiring a recorded covenant restricting ownership of the Project Site to a for-
profit entity No response required
EFS H.1.c & H.3.gYes Provision of adequate park or parks for recreation and open space or provide a fee in lieu thereof Project Description; Section 5
EFS H.2.c Yes Private carter for solid waste is required Project Description; Section 3.2
EFS H.2.c Yes Solid waste shall not be picked up at Project Site prior to 6am Project Description; Section 3.2
EFS H.3.b Yes Nurse & Lift Assist Policies reviewed during Site Plan review Project Description; Section 3.3
EFS H.3.c Yes Provision of Emergency Access Easement Project Description; Section 4
EFS H.3.d Yes Roof Design for fire department access (see also ESTF memo)A-105
EFS H.3.d Yes All Elevators Sized to Fit Gurney Project Description; Section 3.4
EFS H.3.h Yes Food scrap recycling: evaluate potential 2nd drop off location at Project Site Project Description; Section 3.2
EFS H.3.h Yes Solid waste management plan Project Description; Section 3.2
EFS H.3.i Yes Location of resident transportation pick-up and drop-offs shown on site plan C-300
EFS I.1.d Yes Natural Gas Improvements required before C of O No response required
EFS I.3.a Yes Water system improvements required before C of O No response required
EFS I.3.c Yes Grease traps shown on plan (see also FPC memo)
Location to be shown on Building Permit
Plans
EFS I.3.c Yes Sewer Inflow and Infiltration: Either Project or Fee in Lieu thereof required. Method TBD Project Description; Section 6
EFS I.3.e Yes Building must utilize energy efficient HVAC and mechanical designs and equipment Project Description; Section 7
EFS J.1.e Yes
Applicant to modify BBRUSFD pedestrian easement for Applicant to assume maintenance of path
on-site Project Description; Section 4
EFS J.3.a Yes Pursue signal retimings on King Street (Arbor Drive and School Driveway)Nothing required for site plan submission
EFS J.3.d Yes Stagger shift change avoid AM/PM school peaks Project Description; Section 3.1
EFS J.3.d Yes Install crosswalk on Arbor Drive if deemed safe/ feasible and permission granted C-300
EFS J.3.e Yes Landbank Parking: Number of Landbanked spaces and location to be determined at Site Plan Project Description; Section 2.5.3
EFS J.3.f Yes
Landbank Parking: Program for monitoring parking demand to determine if Landbank parking is
required Project Description; Section 2.5.3
Page 1 of 3 4/29/2021
900 King Street DRAFT EFS and Consultant Memos Requirements
Source Number Complete?Requirement Where Included
EFS K.2.a Yes Generators must face parkway C-300
EFS
K.3.d
K.2.a Yes Generators must be able to power certain critical systems; only tested during day Project Description; Section 7
EFS L.2.a Yes Discourage deliveries during overnight hours during Project operations Project Description; Section 3.2
EFS L.2.b Yes HVAC design to meet noise impact thresholds Project Description; Section 7
EFS L.2.d Yes Generators shall utilize model 1 or 2 sound enclosure; avoid 6 dBA increase at off-site receptors Project Description; Section 7
EFS M.2 Yes Materials Management Plan shall be approved prior to demolition or site disturbance CMP; Section 5
EFS
M.3.b/c
M.2.a Yes
Abatement required before demolition; all demolition shall be done in accordance with OSHA
and NYSDOL regulations CMP; Section 3.3
EFS M.3.d Yes A list of transporters & recycling facilities provided to Village prior to demolition CMP; Section 3.4
EFS M.3.e Yes Copies of NYSDOL and Abatement filings shall be provided to Village within 45 days CMP; Section 3.3
EFS M.3.f Yes
An inventory of demolition materials and receiving facilities shall be provided to Village within 30
days of completion of work CMP; Section 3.4
EFS N.2.a Yes Building demo/stabilization before asphalt removal CMP; Section 3.1
EFS N.2.b Yes Erosion & Sediment Control Plan SWPPP and ESCP; C-2xx
EFS N.2.d Yes
A 12 ft. tall plywood noise barrier shall be installed during construction along Arbor Drive
between Main Site Driveway and the southwestern property line CMP; Section 10.1.1
EFS
N.2.d
N.3.m Yes Implementation of certain noise reduction techniques during construction CMP; Section 10.2
EFS N.2.f Yes Vibration monitoring during demolition and subsurface construction CMP; Section 9
EFS N.3 Yes Construction Noise Barrier along Arbor Drive: Visual Design CMP; Section 10.1.1
EFS N.3 Yes Requirement for a Construction Management Plan CMP
EFS N.3.a Yes Site safety during construction; pedestrian path closure and signage CMP; Section 3.2
EFS N.3.b Yes SWPPP/ESCP SWPPP and ESCP; C-2xx
EFS N.3.c Yes Provision of staging plans, including worker parking, queuing, etc.CMP Appendices
EFS N.3.c Yes No off-site parking or queuing of construction vehicles CMP; Section 4
EFS N.3.e Yes Minimize construction trucks during peak school arrival/dismissal CMP; Section 4
EFS N.3.e Yes Truck routing to major highways CMP; Section 4
EFS N.3.e Yes Monitor / Repair Arbor Drive during and after construction as needed CMP; Section 2.2
EFS N.3.g, h, i Yes
Coordinate with BBRUFSD during construction; avoid noisy work during testing times; provide
school a 2-week look ahead CMP; Sections 2.1 & 2.3
EFS N.3.j Yes Fugitive dust avoidance plan, including surveillance CMP; Section 7
EFS N.3.j Yes
Contingency Community Air Monitoring Program (CAMP) guildelines established should CAMP
be required by actual construction conditions CMP; Section 7
EFS N.3.k Yes Diesel emission reduction measures (BAT/DPF)CMP; Section 8
EFS N.3.l Yes Construction Noise barrier on Arbors/Village Hall sides of Site. CMP; Section 10.1.2
EFS N.3.m Yes Contingency noise monitoring during construction if required based on actual conditions CMP; Section 10.3
Page 2 of 3 4/29/2021
900 King Street DRAFT EFS and Consultant Memos Requirements
Source Number Complete?Requirement Where Included
ESTF Memo 8 Yes Roof access and design for FD operations A-105
ESTF Memo 11 Yes Cab-in access to roof for FD operations A-105; C-321
ESTF Memo 12 Yes Emergency communications equipment coordination Project Description; Section 3.4
ESTF Memo Other Yes Dedicated parking/staging of emergency vehicles near main entrance of IL and AL C-300
FPC Memo 21 Yes Townhouse shall capture full stormwater runoff. CN of 98 to be used SWPPP
FPC Memo 22 Yes Hardened materials disposed offsite; cannot be reused on-site SWPPP
FPC Memo 23 Yes Language in SWPPP regarding spills to be updated SWPPP
FPC Memo 24 Yes Dumpsters must be covered Project Description; Section 3.2
FPC Memo 25 Yes Stormwater maintenance and annual reporting requirements SWPPP
FPC Memo 26 Yes BMP annual reporting requirements SWPPP
FPC Memo 27 Yes Fertilizer limitations near wetlands/ponds SWPPP
FPC Memo 28 Yes MUTCD handicap symbol - ensure correct symbol used C-series plans
FPC Memo 29 Yes Will there be an oil water separator in garage? Grease trap locations should be shown
Location to be shown on Building Permit
Plans
FPC Memo 31 Yes Minimum airflow of 0.75 cfm of fresh air per gsf of garage area Project Description; Section 7
Page 3 of 3 4/29/2021