Loading...
HomeMy WebLinkAbout900 King Street AKRF Transmittal 2021-2-18 Environmental, Planning, and Engineering Consultants 34 South Broadway Suite 401 White Plains, NY 10601 tel: 914 949-7336 fax: 914 949-7559 www.akrf.com Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Ohio Transmittal Date: February 18, 2021 To: Michael Izzo, Building Inspector From: Peter Feroe, AICP Company: Planning Board Village of Rye Brook Phone No.: 914.922.2370 Address: 938 King Street Re: 900 King Street: Site Plan Application In accordance with the Rye Brook Village Code and the Site Plan Referral Resolution adopted by the Board of Trustees on January 26, 2021, the materials listed on the next sheet are being submitted to the Planning Board in support of the Site Plan Application made by 900 King Street Owner LLC with respect to the property at 900 King Street in the Village of Rye Brook. Copies of these materials are also being provided to the Village Clerk and Board of Trustees as the Site Plan Approval Authority. We respectfully request that this matter be placed on the Planning Board agenda on March 11, 2021. If you have questions about this submission, please contact either: Peter Feroe, AICP; 914-922-2370; pferoe@gmail.com AKRF, Inc.; Applicant’s Planning & Environmental Consultant Anthony Nester, RLA; 914-273-5225; anester@jmcpllc.com JMC Site Development Consultants; Site/Civil Engineer Stuart Lachs, AIA, LEED AP; 203-251-7437; s.lachs@perkinseastman.com Perkins Eastman; Architect 900 King Site Plan Application 2 February 18, 2021 Materials Included in February 18, 2021 Site Plan Submission A. “Cover Letter;” prepared by Veneziano & Associates B. “Site Plan Application Form” C. “Exterior Building Permit Application Form” D. “Required Contents for 900 King Street Application;” Revised 2/18/21 This table lists the documents, materials, and analyses required to be included in the Final Site Plan for the 900 King Street Project. Each submission made by the Applicant during the Site Plan, Wetland, and Steep Slope permit review processes will contain this list, which will be annotated to reflect the status of the various documents as well as whether the documents were updated from the previous submission. E. “Site Plan & EFS Crosswalk;” Revised 2/18/21 These tables list the requirements for Site Plans found in the Village Code and the additional requirements for the 900 King Site Plan as stated in the Environmental Findings Statement (“EFS”). Also included with the EFS crosswalk are comments from Village staff and consultants that were received during the SEQRA review of the project, but determined to be related to the Site Plan. These comments include the 2/7/2020 memo from F.P. Clark; and the January 9, 2020 memo from the Emergency Services Task Force (“ESTF”). F. Engineering Site Plans; prepared by JMC G. Stormwater Pollution Prevention Plan (SWPPP) and Erosion & Sediment Control Plan (ESCP); prepared by JMC H. Landscape Plans; prepared by MPFP I. Architectural Plans; prepared by Perkins Eastman J. “Project Description.” prepared by AKRF; Revised 2/18/2021 K. “Construction Management Plan.” compiled by AKRF; Revised 2/18/2021 L. “Wetland Buffer Mitigation.” Location plan prepared by MPFP; Revised 2/16/2021 {Drawing List Attached} 900 King Street List of Drawings Number Sheet/ Figure/ Document Title Prepared by Date/Revised C-000 COVER SHEET JMC PLLC 2/18/2021 C-010 NOTES & LEGENDS JMC PLLC 2/18/2021 C-100 EXISTING CONDITIONS JMC PLLC 2/18/2021 C-110 DEMOLITION PLAN JMC PLLC 2/18/2021 C-120 EXISTING STEEP SLOPES MAP JMC PLLC 2/18/2021 C-130 TREE REMOVAL/PROTECTION PLAN JMC PLLC 2/18/2021 C-131 TREE REMOVAL PLAN JMC PLLC 2/18/2021 C-200 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 1) JMC PLLC 2/18/2021 C-201 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 2) JMC PLLC 2/18/2021 C-202 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 3&4) JMC PLLC 2/18/2021 C-203 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 5) JMC PLLC 2/18/2021 C-204 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 6) JMC PLLC 2/18/2021 C-205 EROSION & SEDIMENT CONTROL PLAN (CONSTRUCTION PHASE 7) JMC PLLC 2/18/2021 C-300 LAYOUT AND STRIPING PLAN JMC PLLC 2/18/2021 C-310 ROAD PROFILES JMC PLLC 2/18/2021 C-311 ROAD PROFILES JMC PLLC 2/18/2021 C-320 FIRE TRUCK, EMERGENCY VEHICLE & TRUCK TURNING PLAN JMC PLLC 2/18/2021 C-321 ON-SITE FIRE PROTECTION PLAN JMC PLLC 2/18/2021 C-400 GRADING PLAN JMC PLLC 2/18/2021 C-410 EXCAVATION CROSS SECTION JMC PLLC 2/18/2021 C-500 UTILITIES PLAN JMC PLLC 2/18/2021 C-510 STORM SEWER PROFILES JMC PLLC 2/18/2021 C-520 SANITARY SEWER PROFILES JMC PLLC 2/18/2021 C-600 LIGHTING PLAN JMC PLLC 2/18/2021 C-900 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-901 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-902 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-903 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-904 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-905 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-906 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-907 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 C-908 CONSTRUCTION DETAILS JMC PLLC 2/18/2021 AS-100 ARCHITECTURAL SITE PLAN Perkins Eastman 2/18/2021 A-100 PARKING PLAN Perkins Eastman 2/18/2021 A-101 FIRST FLOOR PLAN Perkins Eastman 2/18/2021 A-102 SECOND FLOOR PLAN Perkins Eastman 2/18/2021 A-103 THIRD FLOOR PLAN Perkins Eastman 2/18/2021 A-104 FOURTH FLOOR PLAN Perkins Eastman 2/18/2021 A-105 ROOF PLAN Perkins Eastman 2/18/2021 A-111 TOWNHOUSE PLANS Perkins Eastman 2/18/2021 A-200 OVERALL ELEVATIONS Perkins Eastman 2/18/2021 A-201 OVERALL ELEVATIONS Perkins Eastman 2/18/2021 A-202 ELEVATIONS Perkins Eastman 2/18/2021 A-203 ELEVATIONS Perkins Eastman 2/18/2021 A-204 ELEVATIONS Perkins Eastman 2/18/2021 A-205 ELEVATIONS Perkins Eastman 2/18/2021 A-211 TOWNHOUSE ELEVATIONS Perkins Eastman 2/18/2021 A-301 SECTIONS Perkins Eastman 2/18/2021 L-300 PLANTING PLAN MPFP 2/18/2021 L-301 PLANTING DETAILS MPFP 2/18/2021 --WETLAND BUFFER MITIGATION MPFP 2/16/2021 Page 1 of 1 2/18/2021 900 King Street Site Plan Application: Required Contents DRAFT 1 2/18/2021 This outline lists the documents, materials, and analyses required to be included in the Final Site Plan for the 900 King Street Project. Each submission made by the Applicant during the Site Plan, Wetland, and Steep Slope permit review processes will contain this list, which will be annotated to reflect the status of the various documents as well as whether the documents were updated since the previous submission. 900 King Street Site Plan Required Contents Requirement Update Provided 2/18/2021 Notes Site Plan Application Form Yes Supersede January 2020 submission Exterior Building Permit Application Yes Supersede January 2020 submission Engineering Plans Yes Supersede January 2020 submission SWPPP / ESCP Yes Supersede January 2020 submission Architectural Plans Yes Supersede January 2020 submission Landscape Plans Yes Supersede January 2020 submission Project Description Yes Original submission Construction Management Plan Yes Original Submission Construction Phasing & Staging Plans Yes Original Submission Wetland Permit No General location of mitigation submitted; application form and other required materials forthcoming Steep Slope Permit No Drawings included in Engineering Plans; application form and other required materials forthcoming 900 King Street DRAFT Site Plan Code Requirements Number Requirement Where Included 209-3C(1)(a)Property Card DEIS, Appendix B-1 209-3C(1)(b)Location Map C-000 209-3C(1)(d)Survey Map, topography, setback of existing structures C-100 209-3C(1)(e)Adjacent street: location, name, width, curblines C-100 209-3C(1)(f)Location and owners of all adjoining lands C-100 209-3C(1)(g)[1]Deed to Property DEIS, Appendix B-3 209-3C(1)(g)[2]All Easements DEIS, Appendix B-3 209-3C(1)(g)[3] Existing and Proposed Deed restrictions or covenants Existing: DEIS Appendix B-3 Proposed: Project Description; Section 4 209-3C(1)(h)Existing Zoning C-000; EFS 209-3C(1)(i)Prior Land Use Approvals DEIS, Sec. 3.2.1 209-3C(1)(j)Other legal agreements required by PB or BoT Project Description; Section 4 209-3C(2)(a)Location of watercourses, streams, wetlands C-100 209-3C(2)(b)2-foot contours C-100 209-3C(2)(c)Boundaries of areas subject to flooding N/A 209-3C(2)(d)Rock Outcroppings and Steep Slopes C-120 209-3C(2)(e)Tree Survey C-130, C-131 209-3C(2)(f)Aquifers N/A 209-3C(3)(a)Location of existing building on- and off-site C-100 209-3C(3)(b)Location of existing roods and sidewalks C-100 209-3C(3)(c) Location, dimension, grade, flow direction of existing sewer, culverts, waterlines and other underground utilities C-100 209-3C(3)(d)Other Site improvements C-100 209-3C(4)(a) Grading and drainage plan, showing existing and proposed contours, new grades; calculations of expected storm drain loads to be accommodated by the proposed drainage system. C-400; SWPPP 209-3C(4)(b) Location, design, type of construction, proposed use and exterior dimensions, including length, width, ground floor elevation and height, of all buildings. C-400; A-series plans 209-3C(4)(c) Location, design and type of construction of all parking and truck loading areas, showing access and egress. C-300; C-320; A-100 209-3C(4)(d)Provision for pedestrian access.C-300 209-3C(4)(e)Location, size and proposed screening of outdoor storage areas, if any.N/A 209-3C(4)(f) Location, design and construction material of all existing or proposed site improvements, including drains, culverts, retaining walls, landscape walls and fences. C-300; C9xx; 209-3C(4)(g) Description of the method of sewage disposal and storm drainage location, design and construction material of such facilities. C-500; C-510; C-520; EFS Section "I" Page 1 of 2 2/18/2021 900 King Street DRAFT Site Plan Code Requirements Number Requirement Where Included 209-3C(4)(h) Description of the method of securing public water and location, design and construction material of such facilities.C-500; EFS Section "I" 209-3C(4)(i)Location of fire and other emergency zones, including the location of fire hydrants.C-321 209-3C(4)(j) Location, design and construction materials of all energy distribution facilities, including electrical, gas and solar energy.C-500 209-3C(4)(k) Location, size, wording, design, color, illumination and type of construction of all proposed signs. Location: C-300 Details: Forthcoming in subsequent submissions 209-3C(4)(l) Location and proposed development of all buffer areas, including existing vegetative cover. L-300 209-3C(4)(m)Location, type, design, shielding and hours of operation of outdoor lighting facilities.C-600; Additional details to be provided 209-3C(4)(n) Identification of the location and amount of building area proposed for retail sales or similar commercial activity.N/A 209-3C(4)(o) Landscape plan with a plant schedule that includes the common name, scientific name, height and/or spread, nursery condition, and quantities of all plant material proposed and specifications and details for plant installation and post planting maintenance.L-300; L-301 209-3C(4)(p) Estimate of earthwork showing the quantity of any material to be imported to and/or removed from the site.C-400; EFS Section "B.2" 209-3C(4)(q) Description of measures planned to assure proper erosion and sedimentation control in accordance with the requirements of Chapter 118 entitled "Erosion and Sediment Control," of the Code of the Village of Rye Brook.C-2xxx; SWPPP/ESCP 209-3C(4)(r)An estimated project construction schedule.CMP Section 3 209-3C(4)(s) Record of application for and approval status of all necessary permits from state and county officials and local utility companies.EFS Section "I.1" 209-3C(4)(t) Identification of any federal, state or county permits required for the project's execution, including project referrals, if any, SEQRA EFS; FEIS Chapter 1 209-3C(4)(u)The outlines of any proposed easements, deed restrictions or covenants.Project Description; Section 4 209-3C(4)(v)For a change of use in an existing shopping center...parking study N/A 209-3C(4)(w)For a change of use in an existing shopping center...traffic study N/A 209-3C(5) Other elements deemed necessary by Board of Trustees or Planning Board Per EFS and Previous Consultant Memos 209-3D Stormwater management plan consistent with Chapter 217 SWPPP 209-3F Required Affordable Housing Project Description; Section 2.4 235-9A Tree Removal Map C-130, C-131 235-18A Tree Restoration Plan L-300; L-301 209-14 Parks Required Project Description Section 5 235-9B Tree Preservation Map C-130, C-131; L-301; C-900 Page 2 of 2 2/18/2021 900 King Street DRAFT EFS and Consultant Memos Requirements Source Number Complete?Requirement Where Included EFS A.3.o Yes BoT may consider requiring a recorded covenant restricting occupancy to age 62+No response required EFS A.3.o Yes BoT may consider requiring a recorded covenant restricting units to rental No response required EFS B.1.b No No blasting or rock crushing without review/approval of Building Inspector [Forthcoming] CMP Section 5 EFS C.2 No On-Site Wetland Mitigation Location and Design General Location Provided [Details Forthcoming] EFS C.2 C.3.f No Off-Site Wetland Mitigation Location and Description of Work (Identified by DPW and approved by PB)[Details Forthcoming] EFS E.3 Yes Tree Protection Plan L-301; C-900 EFS E.3 No Wetland Buffer Restoration & Restrictive Mowing Areas Delineated General Location Provided [Details Forthcoming] EFS E.3 F.3.b Yes Landscape Plan with five year monitor/guaranty; native species required in wetland buffers and other "sensitive" areas L-300 EFS F.3.f Yes Roof Design - Evaluate options for lowering roof of center of IL building To be presented at 3/11/21 PB Meeting EFS G.3.a Yes BoT may consider requiring a recorded covenant restricting ownership of the Project Site to a for- profit entity No response required EFS H.1.c & H.3.gYes Provision of adequate park or parks for recreation and open space or provide a fee in lieu thereof Project Description; Section 5 EFS H.2.c Yes Private carter for solid waste is required Project Description; Section 3.2 EFS H.2.c Yes Solid waste shall not be picked up at Project Site prior to 6am Project Description; Section 3.2 EFS H.3.b Yes Nurse & Lift Assist Policies reviewed during Site Plan review Project Description; Section 3.3 EFS H.3.c Yes Provision of Emergency Access Easement Project Description; Section 4 EFS H.3.d Yes Roof Design for fire department access (see also ESTF memo)A-105 EFS H.3.d Yes All Elevators Sized to Fit Gurney Project Description; Section 3.4 EFS H.3.h Yes Food scrap recycling: evaluate potential 2nd drop off location at Project Site Project Description; Section 3.2 EFS H.3.h Yes Solid waste management plan Project Description; Section 3.2 EFS H.3.i Yes Location of resident transportation pick-up and drop-offs shown on site plan C-300 EFS I.1.d Yes Natural Gas Improvements required before C of O No response required EFS I.3.a Yes Water system improvements required before C of O No response required EFS I.3.c No Grease traps shown on plan (see also FPC memo)[Forthcoming] EFS I.3.c No Sewer Inflow and Infiltration: Either Project or Fee in Lieu thereof required Project Description; Section 6 EFS I.3.e No Building must utilize energy efficient HVAC and mechanical designs and equipment Project Description; Section 7 EFS J.1.e Yes Applicant to modify BBRUSFD pedestrian easement for Applicant to assume maintenance of path on-site Project Description; Section 4 EFS J.3.a Yes Pursue signal retimings on King Street (Arbor Drive and School Driveway)Nothing required for site plan submission EFS J.3.d Yes Stagger shift change avoid AM/PM school peaks Project Description; Section 3.1 EFS J.3.d Yes Install crosswalk on Arbor Drive if deemed safe/ feasible and permission granted C-300 EFS J.3.e Yes Landbank Parking: Number of Landbanked spaces and location to be determined at Site Plan Project Description; Section 2.5.3 Page 1 of 3 2/18/2021 900 King Street DRAFT EFS and Consultant Memos Requirements Source Number Complete?Requirement Where Included EFS J.3.f Yes Landbank Parking: Program for monitoring parking demand to determine if Landbank parking is required Project Description; Section 2.5.3 EFS K.2.a Yes Generators must face parkway C-300 EFS K.3.d K.2.a No Generators must be able to power certain critical systems; only tested during day Project Description; Section 7 EFS L.2.a Yes Discourage deliveries during overnight hours during Project operations Project Description; Section 3.2 EFS L.2.b No HVAC design to meet noise impact thresholds Project Description; Section 7 EFS L.2.d No Generators shall utilize model 1 or 2 sound enclosure; avoid 6 dBA increase at off-site receptors Project Description; Section 7 EFS M.2 No Materials Management Plan shall be included in Site Plan CMP; Section 5 EFS M.3.b/c M.2.a Yes Abatement required before demolition; all demolition shall be done in accordance with OSHA and NYSDOL regulations CMP; Section 3.3 EFS M.3.d Yes A list of transporters & recycling facilities provided to Village prior to demolition CMP; Section 3.4 EFS M.3.e Yes Copies of NYSDOL and Abatement filings shall be provided to Village within 45 days CMP; Section 3.3 EFS M.3.f Yes An inventory of demolition materials and receiving facilities shall be provided to Village within 30 days of completion of work CMP; Section 3.4 EFS N.2.a Yes Building demo/stabilization before asphalt removal CMP; Section 3.1 EFS N.2.b Yes Erosion & Sediment Control Plan SWPPP and ESCP; C-2xx EFS N.2.d Yes A 12 ft. tall plywood noise barrier shall be installed during construction along Arbor Drive between Main Site Driveway and the southwestern property line CMP; Section 10.1.1 EFS N.2.d N.3.m Yes Implementation of certain noise reduction techniques during construction CMP; Section 10.2 EFS N.2.f Yes Vibration monitoring during demolition and subsurface construction CMP; Section 9 EFS N.3 No Construction Noise Barrier along Arbor Drive: Visual Design CMP; Section 10.1.1 EFS N.3 Yes Requirement for a Construction Management Plan CMP EFS N.3.a Yes Site safety during construction; pedestrian path closure and signage CMP; Section 3.2 EFS N.3.b Yes SWPPP/ESCP SWPPP and ESCP; C-2xx EFS N.3.c Yes Provision of staging plans, including worker parking, queuing, etc.CMP Appendices EFS N.3.c Yes No off-site parking or queuing of construction vehicles CMP; Section 4 EFS N.3.e Yes Minimize construction trucks during peak school arrival/dismissal CMP; Section 4 EFS N.3.e Yes Truck routing to major highways CMP; Section 4 EFS N.3.e Yes Monitor / Repair Arbor Drive during and after construction as needed CMP; Section 2.2 EFS N.3.g, h, i Yes Coordinate with BBRUFSD during construction; avoid noisy work during testing times; provide school a 2-week look ahead CMP; Sections 2.1 & 2.3 EFS N.3.j Yes Fugitive dust avoidance plan, including surveillance CMP; Section 7 EFS N.3.j No Contingency Community Air Monitoring Program (CAMP) guildelines established should CAMP be required by actual construction conditions CMP; Section 5 EFS N.3.k Yes Diesel emission reduction measures (BAT/DPF)CMP; Section 8 Page 2 of 3 2/18/2021 900 King Street DRAFT EFS and Consultant Memos Requirements Source Number Complete?Requirement Where Included EFS N.3.l No Construction Noise barrier on Arbors/Village Hall sides of Site. Specification of wall based on noise mitigation analysis, which is ongoing.CMP; Sections 10.1.2 & 10.1.3 EFS N.3.m Yes Contingency noise monitoring during construction if required based on actual conditions CMP; Section 10.3 ESTF Memo 8 Yes Roof access and design for FD operations A-105 ESTF Memo 11 Yes Cab-in access to roof for FD operations A-105; C-321 ESTF Memo 12 Yes Emergency communications equipment coordination Project Description; Section 3.4 ESTF Memo Other Yes Dedicated parking/staging of emergency vehicles near main entrance of IL and AL C-300 FPC Memo 21 Yes Townhouse shall capture full stormwater runoff. CN of 98 to be used SWPPP FPC Memo 22 Yes Hardened materials disposed offsite; cannot be reused on-site SWPPP FPC Memo 23 Yes Language in SWPPP regarding spills to be updated SWPPP FPC Memo 24 Yes Dumpsters must be covered Project Description; Section 3.2 FPC Memo 25 Yes Stormwater maintenance and annual reporting requirements SWPPP FPC Memo 26 Yes BMP annual reporting requirements SWPPP FPC Memo 27 Yes Fertilizer limitations near wetlands/ponds SWPPP FPC Memo 28 Yes MUTCD handicap symbol - ensure correct symbol used C-series plans FPC Memo 29 No Will there be an oil water separator in garage? Grease trap locations should be shown [Forthcoming] FPC Memo 31 No Minimum airflow of 0.75 cfm of fresh air per gsf of garage area Project Description; Section 7 Page 3 of 3 2/18/2021