Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BP20-124
SECTION / BLOCK f LOT / nn�_ TYPE OF WORK �I7 lSi yo,/Co 10B LOCATION <=:9� r00 _ ____ _- _ _ /%e - /�- CONTRACTOR EST. COST _ _ __ 5 TCO # FEE DATE _ _ INSPECTION RECORA DATE INSP FOOTING FOUNDATION FRAMING RGH FRAMING INSULATION PLUMBING RGH PLUMBING GAS SPRINKLER C / ELECTRIC Lid LOW -VOLT 0 ALARM AS BUILT FINAL ZBA OTHER . IITIFlNAL SURVEY UIRED PRIOR TO FINAL INSPECTION C j 40* Q!?.nt1l14Jw aW VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A. Klein (914)939-0668 Christopher J.Bradbury www.rvebrook.org TRUSTEES BUILDING & FIRE INSPECTOR Susan R Epstein Michael J. Izzo Stephanie J.Fischer David M. Heiser Salvatore W. Morlino CERTIFICATE OF COMPLIANCE December 5,2022 Werner Luis Camacho 2 Brook Lane Rye Brook,New York 10573 Re: 2 Brook Lane, Rye Brook,New York 10573 Parcel ID#: 135.73-1-1 Building Permit#20-124 issued on 7/22/2020 for an 8 x 12 Pre-Fab Shed in Rear Yard This certifies that the 8 x 12 pre-fab shed,installed under the above captioned permit has been satisfactorily completed. Sincerely, Michael J. Izzo Building&Fire Inspector /to E \�/ I R For office use only 0 �l E BUILD E `RTMENT JD VIL OF RYE OK PERMIT#�� ISSUED: —c�a'o1(J NOV 2 8 2022 938 KING STRE YE BROOK, YORK 10573 DATE:_//— -ate VILLAGE OF RYE BROOK FEE: %4 //D-- PAID$ BUILDING DEPARTMENT APPLICATION FOR CERTIFICATE OF OCCUPANCY, CERTIFICATE OF COMPLIANCE, AND CERTIFICATION OF FINAL COSTS TO BE SUBMITTED ONLY UPON COMPLETION OF ALL WORK, AND PRIOR TO THE FINAL INSPECTION Address: ti Occupancy/Use: Qestde,.ttral Parcel ID#: 3 - w - / - l Zone: Owner: �Jeirl2(2V- )-lam �G�tO Address: 2 �3roc(< .L . Rye Froo l< P.E./R.A. or Contractor: / Address: Person in responsible charge: Address: Application is hereby made and submitted to the Building Inspector of the Village of Rye Brook for the issuance of a Certificate of Occupancy/Certificate of Compliance for the structure/construction/alteration herein mentioned in accordance with law: STATE OF NEWS YORK, COUNTY OF WESTCHESTER as: arn er L C�� being duly sworn,deposes and says that he/she resides at (Print Name of Applicant) (No.and Street) t/ in &C zoo o t� ,in the County of tGd �jde(r in the State of /1l that (City/Town/Village) he/she has supervised the work at the location indicated above,and that the actual total cost of the work,including all site improvements. labor,materials,scaffolding,fixed equipment,professional fees,and including the monetary value of any materials and labor which may have been donated gratis was:$ Jc, 3 G J�'. Z 5- for the construction or alteration of: 1/2 k-X f Deponent further states that he/she has examined the approved plans of the structure/work herein referred to for which a Certificate of Occupancy/Compliance is sought,and that to the best of his/her knowledge and belief,the structure/work has been erected/completed in accordance with the approved plans and any amendments thereto except in so far as variations therefore have been legally authorized,and as erected/completed complies with the laws governing building construction.Deponent further understands that it shall be unlawful for an owner to use or permit the use of any building or premises or part thereof hereafter created,erected,changed,converted or enlarged,wholly or partly,in its use or structure until a Certificate of Occupancy or Certificate of Compliance shall have been duly issued by the Building Inspector as per§250-1O.A.of the Code of the Village of Rye Brook. Sworn to before me this Sworn to before me this day of �m t/ `�e y , 20 Z 2 day of 20 149, Signature of Property rOwn Signature of Applicant Print Name of Property Owner Print Name of Applicant f _ Nota ANA M SAL ZAR Notary Public NOTARY PUBLIC.STATF.OF NEW YORK Registration No.111 SA0365173 Qualified in Westchester County 8/I2/2031 Commission Expires 10-02-2025 �E 4RO o`` tim 1982 BUILDING DEPARTMENT ❑BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 KING STREET • RYE BROOK,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - ADDRESS: G�1� �� `� DATE: PERMIT# �+ 1 ISSUED:1172f�)$ECT: d BLOCK: LOT:a t LOCATION: `'` 49- - dl S\'P� co � t`C OCCUPANCY: U ❑ VIOLATION NOTED THE WORK IS... ACCEPTED ❑ REJECTED/REINSPECTION ❑ SITE INSPECTION / REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ NATURAL GAS ❑ L.P. GAS ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION FINAL ❑ OTHER 944tttt4 tV444y C tt,UC,t.,4itt44;ii4;4;t(Ititi43iciibi��3 a , N N � nr � N O N f'4 ^ N N W s 1� N N \ p cc H _ � W x M Ln U v O w Q O Z M a eq H Z rz e $ `n Ln 00 t :l N x H PLO wn [� Ao V E- a0 P/ z M100 C O 3: 7 Q w l a �j GG C z w M„* L' M � ?; r� Z A z � a uor w H V a > 3 zz it H a � < 03 0 3 It ►�i W °G z O O �- o `�•� d w n W z P. z s ECENE BUIL E MENT SEP 2 0 2022 VIL E OF RYE OK 938 KIN ET RYE B ' ,NY 10573 VILLAGE OF RYE BROOK BUILDING DEPARTMENT w .or ELECTRICAL PERMIT APPLICATION Westchester County Master Electricians License Required FOR OFFICE USE ONLY BP#: Qo_/ EP#: �� J Approval Date: SEP 2 ? 2) p Permit Fee: $ Approval Signature: Other: Disapproved: (fees are non-refundable) Application dated, 2 is hereby made to the Building Inspector of the Village of Rye Brook NY,for the issuance of a Permit to install and/or remove electrical equipment,wiring,fixtures,or to perform other high or low voltage electrical work as per the detailed statement described below. The applicant & property owner, by signing this document agree that all electrical work performed will be in conformance with all applicable Federal,State,County and Local Codes. 1.Address: I E co0 K L a h e- SBL: 1 3 5 , 13 I 1 Zone: 1 2.Property Owner: Vfif ner L U I$ C c.mc, O Address:rr a B oA �L p,um �ye g roA, NJ 1 Q S��3 Phone#: Cell#: I I y - 3 19- 6 3 t�d� email: U 1 ,�.t, i 5 G ft'1 1MG t I, !►7 3.Master Electrician: even VI`I I an� Address: I S L o u re I f I au N eo c dIe M I M I Lic.#: I CSg Phone#: 9 Iq y 9lj -U-60 Cell#: email: S l-eyt Conw ICI id),C61- CompanyName: Cu(1-nect Fleck't t L Comm, Inc, Address: oure� IGCe NtW GC`dk ( 01 4.Proposed Electrical Work/Fixture Count: ^n1 �o 11 60 Qmp SA PayieLrl S (? Ja h C-FcI �ece(��olc��S► I I;gh� , I S��lch and 1 1`I0 Vo4reaA-0cle , ESTATE OF NEW YORK,COUNTY OF WESTCHESTER ) as: S � Q V"t n �/ tc l GI? I ,being duly swom,deposes and states that he/she is the applicant above named,and does further (print name of individual signing as the applicant)state that(s)he is the legal owner of the property to which this application pertains,or that(s)he is the FI eLIK O I Con��CACC. for the legal owner and is duly authorized to make and file this application. (indicate architect,contractor,agent,attorney,etc.) The undersigned further states that all statements contained herein are true to the best of his/her knowledge and belief,and that any work performed,or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications,as well as in accordance with the New York State Uniform Fire Prevention&Building Code,the Code of the Village of Rye Brook and all other applicable laws,ordinances and regulations. OSworn to before me this 6 Sworn to before me this day of^ 6+,- et - ,20�_ day of 20 9, --�� Signkfuk f Pr(p//erty caner Signature of Applicant�/� V I) �(11 Print Name er Print Name of Ap 'c fJ � Nota Ptt '� ILSON ALCANTARA Public NOTARY PUBLIC,STATE OF NEW YORK LMy KIRSYS LANGLEYRegistration No.OIAL6419415 y Public-state of New York NO.0'LA63228%7 Qualified in Westchester�jOUn ified in Westchester CounhMy Commission Expires: v 2'� mmissicr,Expires Apr 3 J 8/12/2021 STATEWIDE • Service With Iiii1ei:rity 1:1 Main Street,Fishkill, NY 12524 1 emoil:office(oswisnyxom SWIS JOBAPPLICATION tel845.202.7224 • • 1• • • • Office Use Elect.Permit# �'' %� w �d� Date Bldg 122 rmi Utility ID# I L� Final Certificate# City/Village R Zip Township County Address 1 Cross Street Section + Block t Lot mo (., 3 ; Owner Name/Address(If different than above) I u' Contact Number IriC ❑Basement ❑1st FI. ❑2nd FL ❑3rd Fl. ❑More Than 3 FI. ❑Garage ❑Attic DOutside ❑Residential ❑Commercial Receptacles Special Recept GFCI AFCI Switches Dimmers Smoke Alarms Carbon Monox Hood Trash Compact Amt Amps 7`. Range(s) Cooktop(s) Oven(s) Dishwashers Refrigerator Disposal Microwave Warm Draw Incandescent Fluorescent �,. SERVICE Amperage Voltage 113 3P #Meters #Disconnect ❑Underground ❑New ❑Reconnect ❑Overhead ❑Change L ❑Visual Re-Inspection ❑ Safety Re-Inspection ❑ Re-Inspection Additional Information :rn56111'0 6d ctm? mq, i ) lscoM 4�Ugel a,-, cacc d)o ,,h1dt'oy �►ook Lcoc. -1--t�s�U�� �o Gt',� 4a Vold P PE FSEP CEN 2 0 2022 VILLAGE OF R'(E BROOK BUILDING DEPARTMENT This application is valid for one(1)year from the date received by SWIS.This application is intended to cover the above listed items to be inspected,If at any time of Inspection additional items have been installed,you are authorized to make the inspection and adjust the fee for the additional items inspected.The applicant declares that there is no open applications for the above address with any other Inspection company.The applicant,owner or authorized agent agrees to all the above terms and conditions as set forth for the application. Inspector Date Finalized Inspector# Signature Company Name - Date Si,� g Address i, City/State Zip Code License# Phone# r I State Wide Inspection Services NOV 1 4 2022 1080 Main Street Fishkill, NY 12524 845 202-7224 Phone VILLAGE OF RYE BROOK 914-219-1062 Fax STATE WIDE INSPECTION SERVICES BUILDING DEPARTMENT Email: office@swisny.com Website: www.swisny.com Service With /ntegrlty BY THIS CERTIFICATE OF COMPLIANCE STATE WIDE INSPECTION SERVICES CERTIFIES THAT: Upon the application of: Upon Premises Owned by: Connect Electric&Communications Werner Luis Camacho Steven Villani 2 Brook Lane 65 Laurel Place Rye Brook, NY 10573 New Rochelle, N.Y. 10801 Located at: 2 Brook Lane, Rye Brook, NY 10573 Section: Block: Lot: Electrical Permit Number: EP 22-229 135.73 Certificate Number: 2022-7527 Building Permit Number: BP 20-124 A visual inspection of the electrical system was conducted at the Residential occupancy described below.The electrical system consisting of electrical devices and wiring is located in/on the premises at: 2 Brook Lane, Rye Brook, NY 10573 The Accessory Building was inspected in accordance with the NYS and NFPA 70-2017 and the detail of the installation,as set forth below,was found to be in compliance on the loth day of November 2022. Name Quantity Rating Circuit Type GFCI Receptacles 02 20AMP Switch 01 LED Luminaire 01 Main Breaker Panel 01 60AMP Receptacle 01 30AMP 240V CO. Officer: Frank J. Farina This certificate may not be altered in any way and is validated only by the presence of a seal at the location indicated.This certificate is valid for work performed on the date of inspection only. Mike Izzo From: Mike Izzo Sent: Monday,July 19, 2021 9:37 AM To: W. Luis Camacho Cc: Tara Gerardi; Laura Petersen; Steven Fews Subject: RE: Building permit for 2 Brook Ln - Prefab shed Dear Mr. Camacho, Thank you for the email. Your request for a one (1) month extension to your open permit #BP 20-124 has been approved, the new expiration date is August 22, 2021. Please arrange for your Westchester County Licensed Electrician to file for his electrical permit asap and to schedule his electrical inspections with our 3rd party electrical inspection agency at the appropriate intervals. Please arrange for all work to be completed and successfully inspected, and for all paperwork & fees to be remitted to the Village such to facilitate the issuance of the Certificate of Occupancy on or before August 22, 2021. Thank you. lfflc4ell(7, /zzo Building& Fire Inspector Village of Rye Brook, NY (914) 939-0668 From:W. Luis Camacho<wluiscam@gmail.com> Sent:Sunday,July 18, 2021 10:39 PM To: Mike Izzo<Mlzzo@ryebrook.org>;Tara Gerardi<tgerardi@ryebrook.org> Subject: Re: Building permit for 2 Brook Ln - Prefab shed Mr. Izo, I'd like to request an extension to close my building permit. I have the shed already installed but need the electrician to do the electrical work and filing which may take another month. Thanks, -Luis On Wed,Aug 19, 2020 at 2:07 PM Tara Gerardi<teerardi@ryebrook.ore>wrote: Mr. Camacho, i Please see attached permit. Our office revised the permit to reflect the approved plans. Please discard the previous permit. Thank you. TARA A. GERARDI SECRETARY -- PLANNING BOARD, ZONING BOARD OF APPEALS & ARCHITECTURAL REVIEW BOARD VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NEW YORK 10573 OFFICE (914) 939-0668 FAx (914) 939-5801 From: Mike Izzo Sent: Wednesday, August 19, 2020 1:58 PM To: W. Luis Camacho <wluiscam@gmail.com> Cc: Laura Petersen <LPetersen@ryebrook.org>; Steven Fews<SteveFews@ rye brook.org>; Tara Gerardi <tgerardi@ryebrook.org>;Jaclyn Tyler<jaclyn@tylerap.com> Subject: RE: Building permit for 2 Brook Ln - Prefab shed Dear Mr. Camacho, z Thank you for the email. Upon review of your permit file we find that the information on the permit is a typographical error.The approval is for a shed measuring 8' x 10' only. In order to place anything other than a shed measuring 8' x 10' as per the approved plans, you must make application to re-appear before the Architectural Review Board. I am arranging to have your permit corrected to reflect the correct size of the approved shed to 8' x 10'. My apologies for any confusion. Thank you. lffl a4d(7, Izzo Building& Fire Inspector Village of Rye Brook, NY (914) 939-0668 From: W. Luis Camacho [mailto:wluiscam@gmail.com] Sent: Wednesday, August 19, 2020 11:40 AM To: Mike Izzo <Mlzzo@ryebrook.org> Cc: Laura Petersen <LPetersen@ryebrook.org>; Steven Fews<SteveFews@ryebrook.org>; Tara Gerardi <tge ra rd i @ rye b ro o k.o rg> Subject: Re: Building permit for 2 Brook Ln - Prefab shed Mr. Izzo, Attached is a copy of the site plan with the revised dimensions of 8x12' instead of 8x10'. I also attached a picture of the issued permit which lists the dimensions as 8x12'. I assume that we can use this permit after the attached site plan is reviewed but correct me if I am wrong. I can bring printouts of this revised site plan as soon as I can arrange a time break from work. When can I expect the results from the review? 3 Thanks, -Luis 4 FUIRED PMOR TO FIMU INSPECTION UILDING INSTA%L AT . Z BROOK LAN BUILDING CLASSIFICATION AI PROPERTY OWNER: WE �t EMERGENCY CONTACT: WERNER 0 VALUATION OF WORK: $3,700-00 HoURs OF OPERATION OF CONSTRucrION EQ1 SATURDA YS — 9:OOAM To 4:00mi; - SUN L This permit is valid for a period not to exceed tm 5 On Mon,Aug 17, 2020 at 1:18 PM Mike Izzo<Mlzzo@ryebrook.ore>wrote: Mr. Camacho, Any changes to the approved plans must be reviewed by the Building Department and approved prior to construction. Please arrange for your architect to submit two copies of a proposed revised plan for review. Thank you. Ac4e,1(7, /zzo Building&Fire Inspector Village of Rye Brook, NY (914) 939-0668 From:W. Luis Camacho [mailto:wluiscam@email.com] Sent: Monday,August 17, 202012:49 PM To: Mike Izzo<Mlzzo@ryebrook.ore> Subject: Building permit for 2 Brook Ln - Prefab shed Mr. Izzo, There's a dimension difference between my building permit(8x12' prefab shed) and the dimension listed in the site plan (8x10' prefab shed). I'm fine with the permit dimensions but I'd like to check with you that it's ok to proceed with it. When we amended the site plan to comply with the 12' setback from the house, we rotated the location of the shed 90 degrees(long side of the shed along the rear fence instead of perpendicular to the fence). At that point,we also shrunk the size from 8x12 to 8x10 in the site plan although this length had no bearing on any of the setback dimensions. We're now preparing the gravel and 8x12 is a good fit for us in accordance with the permit. However, 1 6 • just want to make sure that this 12'to 10' length difference between the permit&site plan is not an issue. I attached some pictures of the gravel area. Thanks, -Luis ptt IFlh+rl�ii�' f; f itff + �t1 �� it err �rfl . � ! !i! �,11 Mt i� ►4 +�� rr i ail tt i11 i ���! fit! �'+ +►�+�� Nrs�'i�r, # ! 1 i t ► r wit �►� � �►�l� �01�# f ! ! t" �� t tt1t+�1►tlt ,►+��fH;r=��ir !+ / It,1,off f If f1i1� �/� 1��! 111�11� 1�i1►t� 1 f�+�► r► to Itorr�+i, + + 1�# 1 11! , 1+tlt tlr 1+�,�l'i :f'r�+r !! !!1 Ilt ►+1l1+1�+1+i+r1+ N -01 AMR AN { .- .^ js to .- " r 8 29, 10, F Nippon ' '! :�A4r ' � •,_ er Y - I. s Werner Luis Camacho (914)318-6362 wluiscam@gmail.com Werner Luis Camacho (914)318-6362 wluiscam@gmail.com Werner Luis Camacho (914)318-6362 wluiscam@gmail.com 10 1 _� Ord cr�'I r� :sa�ou 1 � r, hzh� CIC 5p boo 2 L 601 o_S Z :fis7�`�s s a G Z °emu �3 �Z :aqua I' 9x a��a NN-LLSM a � :Mou :leeoidde mvp'S=fid( ) eosdde leeosdde cZ 31 �P sa -?J "T Hl'IVINHCI O/D =IFO :weld ilmg-sy u2Ua'I JJ0-uSiS dd/V-d :o(1o.L T=j bAMIS Imd ='PO -d/ICI :DDDF a3�nS.KN L I OZ ( ) ( ) =XPO ,aa.L Ian3 nT=d :m9d�-A VJ-"IHf14 ( ) ( ) :12W -V/N u?umd :sarId :'D'd'A'H ( ) ( ) =XPO 'b'/lit :31=d :gaId:NOISMddfIS MA ( ) ( ) _=EPO :/d/ICI :SJ d'I :99J-3TN a?uuad :Feld:DNHSWMd ( ) ( ) =IPO tiaueg :'D•I'A'M n?umd :SuuId:SdOJ--)aLFIQ HIOWS/➢ Wvrld HUE ( ) ( ) =tPo 'V/N :3'!L=d :m9d rnDnUDa-IR HDd.rIOA-ANO-I ( ) ( ) uaipO 'd/N n''=d :m9d--IVD12LLDR'I'9 HJ`v I IOA-HJIH :y/N :p;neQ :#£SL RaOD ( ) ( ) =IFO =nieAA, duio� �(� yec-I :duioD sxa�lxoM �saaac-I ) ' =TO �tuo=alg Z do� (, aleaS �' �a�S=Q SI�Id'Id��) ( ) �Igeadaaaean /. �aleaS leenla� auaun� c,Z.l ?�1 Z Pa�eQ AdA2If1S/C' ) ( ) MTO �Id as-I1 :•�aiSyi J4A/S aoP3aaoJdlaniS :odo.L:NV Id=S ( ) ( ) .YIN :saa3 =OIS -SuoZ FOU ANEI ( ) ( ) :Su. —1aa�3S :esaiea21=ems uuo3S :spuepam :sadolS daa�S :TTOI a M-S ( ) ( ) :VO*H :uonaauuoD ssosD 'CH nmJ- i, :-IgS /` :P=z MON /' Pa3vQ :ddd,(^) ( ) aoprLT- Sa-I :O/D —4r`4--Qp :dS*---� :guT3:53a3 0101 9 z NnFOZOZ C z �dV2,15 =IPO :Ioq :9d oloz T I SdI qzvA a L - -Z �, '�'� 0' awl 'IJOAcl3o 2=16N hj :sazeQ IeunuclnS wois. 3-d c-Z -(1 ImnuqnS :zap IgEl :addZ 7wo:) CJ 1 Z asn G _ JauoZ -ISS 'fid :ssajPPd, sTs lend ftMOZ V ITI'I)ND 3iuu3d n? F g BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK,NY 10573 (914)939-0668 FAX(914)939-5801 www.04 r'pok.ore ARCHITECTURAL REVIEW BOARD CHECK LIST FOR APPLICANTS This form must be completed and signed by the applicant of record and a copy shall be submitted to the Building Department prior to attending the ARB meeting. Applicants failing to submit a copy of this check list will be removed from the ARB agenda. Job Address: 2 Brook Lane Date of Submission: Parcel ID#: 135.73 - 1 - 1 Zone: R-10 Proposed Improvement(Describe in detail): APPLICANT CHECK LIST: Install new prefab shed in rear of house-location MUST BE COMPLETED BY THE APPLICANT The following items must be submitted to the Building selected as per the recommendation of Mr. Novack Department by the applicant-no exceptions. after consulting Whim due to numerous site restriction . 1. ( )Completed Application 2. ( )Two(2)sets of sealed plans. (one full size(maximum Property Owner: Werner Luis Camacho allowable plan size=36"x 42")and one 11"xl T Address: 2 Brook Lane Rye Brook,NY 10573 3. ( )Two(2)copies of the property survey. 4. ( )Two(2)copies of the proposed site plan. Phone# 914-318-6362 5. ( )One electronic/disc copy of the complete Applicant appearing before the Board: application materials. 6. ( )Filing Fee. Werner Luis Camacho 7. ( )Any supporting documentation. Address: 2 Brook Lane Rye Brook,NY 10573 8. ( )HOA approval letter. (ifopplicable) 9. ( )Photographs. Phone# 914-318-6362 10.( )Samples of finishes/color chart. (a sample board or Jacl Tyler-Tyler Architecture&Planni model may be presented the night of the meeting) Architect/Engineer: 3'ng Phone# 914-204-6404 By signature below, the owner/applicant acknowledges that he/she has read the complete Building Permit Instructions&Procedures,and that their application is complete in all respects.The Board of Review reserves the right to refuse to hear any application not meeting the requirements contained herein. Sworn to before me this Sworn to before me this day of , 20 day of , 20 Signature of Property Owner Signature of Applicant Print Name of Property Owner Print Name of Applicant Notary Public Notary Public III 3/21/19 VILLAGE OF RYE BROOK BUILDING DEPARTMENT 938 KING STREET, RYE BROOK, NY 10573 (T)939-0668 (F)939-5801 ARCHITECTURAL REVIEW BOARD Wednesday, September 16, 2020 Due to public health and safety concerns from COVID-19, the Architectural Review Board meeting on September 16, 2020 will be closed to members of the public. The public can still watch the live meeting online through Zoom through the app or through the following https://us02web.zoom.us/j/87221419610 If any interested members of the public would like to provide comments during the meeting, comments can be emailed to stevefews@ryebrook.org or called in during the meeting at +1 (929) 205-6099, meeting ID: 872 2141 9610 NAME&LOCATION TYPE OF APPLICATION MOTION SECOND APPROVED REJECTED APPL.# 14 Carlton Lane Re-Appearance To Show Consent 5052 (Khobragade) Finishes, and Details On Agenda Plan(Portico & Windows) 432 N. Ridge Street Re-Appearance To Show Consent 5058 (Gabriel) Details In-Ground Pool, Agenda Patio SWM System 30 Woodland Ave 4' & 6' White Vinyl PVC Consent 5061 (Blanco) Fence Agenda 2 Brook Lane Amendment to Shed Size 8' Consent 5062 Camacho X 10' - 8' X 12' Agenda 165 Betsy Brown Rd Replace Existing Deck Consent �J 5063 (Valad) Boards With Trex,Add Agenda Cable Type Railing 67 Bellefair Rd Re-Do Existing Patio Area Consent 5064 (Carbo) in Paver Stones, Re Black Agenda Top Driveway w Belgi/ Block Borders 2 Millenium Place Construct Stair Run Down to Consent 5065 (Prathy) Grade From Existing Deck Agenda to Match 15 Country Ridge Dr Roof Top Solar Array Consent 5066 (Cappelli) Agenda ML �/ NM MR SE JM SF AC MI JB 2 Brook Lane 8X12 Prefab Shed In Rear Consent 5032 (Camacho) Yard Agenda 2 Heirloom Lane Replace Flooring On Consent 5033 (Matles) Existing Deck w/Gray Agenda Trex„ White Trex Railings, Adding Post Low Lights 31 Brookridge Court Rebuild Front Entry& Stairs 5034 (Fraioli) w/Alteration 3 Hillspoint Lane 1/2 Story read Addition, 5035 (Cohen)(ZBA Rear Patio, Outdoor Kitchen, Approved) Front Walk, & interior Alterations 32 Lincoln Ave New 1 Family Dwelling on 5036 (Xiong/Goa) Subdivided Lot 23 Elm Hill Dr- Amendment To Prior 5037 (Erb/Lin) Approval Patio, Windows & Stone Veneer 36 Rock Ridge Dr Rear 1 Story Addition, Rear 5038 (Cohen) (ZBA Deck, & Exterior Alterations Approved) 15 Woodland Dr Extend Rear Patio 5039 (Zislis & Paletz) w/Outdoor Kitchen, Roof Above, Hot Tub, New Stone Walls, & Fire Place 69 Winding Wood In Ground Swimming Pool 5040 Rd(Balik/Klein) & Pool Fence 20 Rockridge Drive Legalize Site Work and 5041 (Conte) Reduce Impervious Coverage. ML f NM MR y SE JM SF ALCM T MI [y � VILLAGE OF RYE BROOK BUILDING DEPARTMENT 938 KING STREET, RYE BROOK, NY 10573 (T) 939-0668 (F) 939-5801 ARCHITECTURAL REVIEW BOARD Wednesday, July 15, 2020 Due to public health and safety concerns from COVID-19, the Architectural Review Board meeting on July 15, 2020 will be closed to members of the public. The public can still watch the live meeting online through Zoom through the app or through the following https://us02web.zoom.us/i/84613127085 If any interested members of the public would like to provide comments during the meeting, comments can be emailed to stevefews@ryebrook.org or called in during the meeting at +1 (929) 205-6099, meeting ID: 846-1312-7085 NAME & LOCATION TYPE OF APPLICATION MOTION SECOND APPROVED REJECTED APPL.# 32 Valley Terrace Roof Top Solar Array Consent 4 (Kovoor) Agenda 33 Country Ridge Amendment To Prior Consent 5025 Drive (Umbro) Approval (May 2020) Add Agenda Knee Wall @ Patio 67 Greenway Circle Replace Existing Post& Consent 5026 (Kuhn) Rail fence In-Kind Agenda 3 Maple Court Trex Deck On Grade Consent 5027 (Schwartz) Agenda 19 Woodland Drive Replace Front Steps In-Kind Consent 5028 (Swerdloff) Agenda 517 Ellendale Ave New Rear Patio Consent 5029 (Devasia) Agenda 35 Winding Wood Legalize Rear Sports Court Consent 5030 Rd(Georges) & Wood Fence Agenda 20 Country Ridge Amendment To prior Consent 5031 Cir(Hannon) Approval (Siding Color, Agenda Gray Walnut Stain Door) ML NM MR SE JM SF AC MI JB �7i G..r1n.'..•�'�llC2�:�� � C • 2020 VILLAGE OF Sr t IV { n ma 4a a ° ► #6 :� '��' � \F•tom �i"�� ,11 ' � t �• %'. • "� _ i r y _ ,. , w s? 8 � � � .. r .r, .�� x ` �' E w �� � � e '». ,d't ._ - ��� � , m �o r `'i!� � � � � � -�' �. ' _ �. i_ ,�+ � � .' .. �� •�� � a _� '�_ _ .� � e �f� � � a r. a � `: ''' �$ � "°w. .>, a� '*+ ��'s �;,�* � �, ^ ' � � �� q ��� ���� �t e �` ,� � F! � �- . '�` � *�` �� a� ��' i� _ v y �..�. , L� !I � t� ems. � ' !i� ,�. � '°�. 9 v i $ e 4 r.< � y ✓ !rt a �� v _ .. . [/_ �", «,:g� �� " � ti � � � S9 +# f -ilk'&"'_� , � a t� v 1' $. - I � ¢ �4 .. � �. .. � �f �� �� -„per^-w�i ii`�A��I��I�I � �� , ''� � I a .���. �.g I � � � ` �» o y -y�er � +� sr,� 4 ,R 7 •+ � ! .. } ..' .. t �(� 4 4*• � �� � Estimate irirted°` Estimate Date: Feb-17-2020 2025 Valley Rd. Estimate Number:43193 Morgantown,PA 19543 Payment Terms: 30%Down/Bal on Del Total Amount: $4326.16 Phone: 717-442-3281 Sales Rep: Elizabeth S Blank Bill To: Deliver To: W.Luis Camacho W.Luis Camacho 914-318-6362 2 Brook Lane 2 Brook Lane Rye Brook,NY 10573 Rye Brook,NY 10573 wluiscam@gmail.com Shed: Navajo White Door: Black Shutter: Roof: Charcoal Gray Trim(Around Door): White Corner Trim: White Trim Color(On Door): White Fascia Trim: Window Trim Color: Description Quantity Price Total 10x24 Workshop w Smart Panel T111 Siding-Standard Shed Collection 1 $3,169.00 $3,169.00 Pressure treated skids -2x4 floor joists 16in O.C. 5/8th Flooring -20 walls and trusses 16 O.C. 6ft 6in high walls Two 18x27 windows with screens and painted slat shutters -Standard 5 ft double door -5/12 roof pitch 30 year Architectural shingles -------Features above included in base price------- Standard Metal Gable Vent (Color-White) 2 $34.00 $68.00 Shipping for 8 ft.-10 ft.wide Sheds(20 miles free) 159 $4.15 $659.85 Shipping Permit for New Jersey 1 $50.00 $50.00 Shipping Permit for New York State 1 $45.00 $45.00 Customer is responsible for any and all site preparation, including leveling, Subtotal: $3,991.85 fill and grading.Sheds Unlimited requests that delivery be rescheduled if Customer believes weather,soft ground or other conditions exist which Sales Tax: $334.31 would impede the safe delivery of the building or cause damage to the Total: $4,326.16 property.customer also waives any course of action against Sheds Unlimited for any damage caused to lawn,pastures,ground,fences,gates, structures,buildings,animals or other property whatsoever.Customer is Signed By: responsible to make pre-hung door adjustments,when a building with such a door is placed on a pad other than concrete. The balance of the purchase price is due at time of delivery.Any unpaid Date: payments shall bear interest at the rate of two percent(2%)per month.No complaint about work or product shall excuse Customer from completing its payment obligations under this Agreement. Our cancellation and refund policy is as follows.95%of the total is refundable if supplies have not beer,ordered.If supplies have been ordered the refund will be 95%or remaining balance after supplies are deducted. NOTE:If shed delivery time exceeds one hour charge's of$60.00 per hour will apply. tuestions? Sheds Unlimited LLC.1 11025 Valley Rd,J Morgantown,PA.11 contactContactvts using the Phone: Tara Gerardi From: Tara Gerardi Sent: Tuesday,July 21, 2020 8:47 AM To: 'wluiscam@gmail.com' Cc: Jaclyn Tyler Subject: Building Permit Application 2 Brook Lane Attachments: by-1[1].pdf The building permit application has been approved by the Building Inspector, before I can issue the building permit the following items must be submitted to our office, 1. General contractor's contact name & phone number.* 2. Copy of general contractor's valid Westchester County Home Improvement License.* 3. General contractor's valid liability insurance (the Village Of Rye Brook must be the certificate holder)* 4. General contractor's valid workers compensation on a NY State Board form (C105-2 or U26.3)* 5. Building permit fee $100.00 (due once permit is issued and ready for pick-up) *If you are acting as your own GC, you must submit a copy of the declarations page of your homeowners insurance policy and the NY Workers Compensation waiver form BP-1. TARA A. GERARDI SECRETARY -- PLANNING BOARD, ZONING BOARD OF APPEALS & ARCHITECTURAL REVIEW BOARD VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NEW YORK 10573 OFFICE (914) 939-0668 FAx (914) 939-5801 Renewal House & Home Policy Declarations Page 1 of 4 Your policy effective date is March 8, 2020 Total Premium for the Policy Period Information as of January 16, 2020 Premium for property insured $1,118.73 Summary Total $1,118.73 Named Insured(s) Werner Luis Camacho • Workers'Compensation And Employers'Liability Coverage For Residence Employees Mailing address Coverage Form Included in Total Policy Premium 2 Brook Lane Rye Brook NY 10573-1310 Discounts (included in your total premium) Poll c number Protective Device $19.62 Renewal $106.63 978 352 975 Multiple Policy $489.39 Claim Free $55.30 Your policy provided by Home Buyer $17.28 Allstate Easy Pay Plan $50.53 Allstate Vehicle and Property Total discount savings $738.75 Insurance Company Policy period Beginning March 8,2020 through March 8,2021 at 12:01 a.m.standard time Insured property details* Your Allstate agency is Please review and verify the information regarding your insured property. Please Mobile Borsella Age refer to the Important Notice(X73182)for additional coverage information.Contact 21 Elm PI us if you have any changes. Rye NY 10580-2918 Location of property insured: 2 Brook Lane, Rye Brook, NY 10573-1310 (914)921-0660 Dwelling Style: RAYMONDMOBILE@ALLSTATE.COM Built in 1950;1 family;1750 sq.ft.;2 stories Some or all of the information on your Foundation: Policy Declarations is used in the rating Slab at grade,100% of your policy or it could affect your eligibility for certain coverages.Please Interior details: notify us immediately if you believe One builders grade kitchen One softwood straight staircase that any information on your Policy Three builders grade full baths Declarations is incorrect.We will make Exterior wall type: corrections once you have notified us, 100%aluminum siding and any resulting rate adjustments,will o Interior wall partition: be made only for the current policy z 100%drywall period or for future policy periods. o Please also notify us immediately if you 0 Heating and cooling: believe any coverages are not listed or 01 Gas hot water heating,100% are inaccurately listed. 0 Additional details: o Standard wood sash with glass,100% Interior wall height-8 ft,100% Two exterior wood doors 0 Laminated windows- no 0 a Fire protection details: Fire department subscription-no 1 mile to fire department $ N Roof surface material type: 0 (continued) 0 N Q N O O O O n O h p O O�O O ry Renewal House&Home Policy Declarations Policy number: 1978 352 975 I Page 2 of 4 Allstate. Policy effective date: March 8,2020 You're in good hands. Insured property details*(continued) Composition -100%asphalt/fiberglass shingle Other -One small skylight .................................................................................................................................................... :Roof details: :Predominant roof type:Composition Age of roof-5 years :Roof geometry-Gable :Reminder about your Roof Surface Coverage: The Roof Surface provision applies to covered loss to roof surfaces damaged or destroyed by windstorm or hail. Please see your policy for additional details. :Metal Roof Surfaces Cosmetic Damage Exclusion: :Your policy does not provide coverage for cosmetic damage(damage that only changes :the appearance of your roof)caused by hail to a metal roof surface. .................................................................................................................................................... Mortgagee FLAGSTAR BANK ITS SCRS&/OR ASSIGNS ATIMA P O Box 52198,Phoenix,AZ 85072-2198 Loan number:3423662574 Additional Interested Party-None *This is a partial list of property details.If the interior of your property includes custom construction,finishes,buildup,specialties or systems,please contact your Allstate representative for a complete description of additional property details. Coverage detail for the property insured Coverage Limits of Liability Applicable Deductibles) Dwelling Protection $373,020 - Hurricane Deductible Applies" -$1,500 All other perils Other Structures Protection $18,651 - Hurricane Deductible Applies" -$1,500 All other perils Personal Property Protection $242,463 -Hurricane Deductible Applies- -$1,500 All other perils Additional Living Expense Up to 24 months not to exceed$93,255 Family Liability Protection $300,000 each occurrence Guest Medical Protection $1,000 each person Building Codes Not purchased* Building Structure Reimbursement Not purchased* Extended Limits Water Back-Up Not purchased* Optional Protection for Mold Not purchased* 0 z Renewal House&Home Policy Declarations Page 3 of 4 Policy number: 1978 352 975 Policy effective date: March 8,2020 Workers'Compensation and Included Employers' Liability Coverage for See Form Residence Employees ► Other Coverages Not Purchased: • Additional Fire Department • Extended Coverage on Musical • Identity Theft Expenses` Charges` Instruments* • Increased Coverage on Business • Building Materials Theft* • Extended Coverage on Sports Property* • Dwelling in the Course of Equipment* • Increased Coverage on Theft of Construction` • Extended Premises* Silverware` • Electronic Data Recovery* • Fair Rental Income* • Loss Assessments* • Extended Coverage on Cameras* •Golf Cart* • Optional Protection for Mold* • Extended Coverage on Jewelry, • Green Improvement* • Secondary Residence` Watches and Furs* • Home Day Care* • Select Value* • Yard and Garden* *This coverage can provide you with valuable protection. To help you stay current with your insurance needs,contact your agent to discuss available coverage options and other products and services that can help protect you. **$18,6S1(S%of your Dwelling Protection-Coverage A Limit of Liability)is your hurricane deductible amount,which applies to the total of all losses under the coverages indicated above. Scheduled Personal Property Coverage Your policy does not include Scheduled Personal Property Coverage. This coverage can provide you with valuable protection.To help you stay current with your insurance needs,contact your agent to discuss available coverage options and other products and services that can help protect you. Your policy documents Your House& Home policy consists of the Policy Declarations,any Policy Declarations Addendum,and the following documents. Please keep them together. • AVPIC House&Home Policy-AVP117-1 • Metal Roof Surfaces Cosmetic Damage Exclusion o Endorsement-AVP172 0 • Amendatory Endorsement-AVP381 • New York Amendatory Endorsement-AVP342 0 • New York Hurricane Deductible Endorsement-AVP114-1 • NY Workers' Compensation and Employers' Liability Z Coverage For Residence Employees Coverage Form- o AVP106-1 • New York Roof Surfaces Endorsement-AVP322 • New York Declarations Supplement Page-AVP107 0 0 0 0 0 0 Important payment and coverage information 0 Here is some additional, helpful information related to your coverage and paying your bill: o ► Please note:This is not a request for payment. Your bill will be mailed separately. 0 0 N O O O ZY d O W N N 00 O 0 O O O O O O 00 O Orv .- Renewal House&Home Policy Declarations Policy number: 1978 352 9751 Page 4 of 4 QA11state . Policy effective date: March 8,2020 You're in good hands. Allstate Vehicle and Property Insurance Company's Secretary and President have signed this policy with legal authority at Northbrook, Illinois. Julie Parsons Susan L. Lees President Secretary Affidavit of Exemption to Show Specific Proof of Workers' Compensation Insurance Coverage for a 1, 2, 3 or 4 Family, Owner-occupied Residence **This form cannot be used to waive the workers'compensation rights or obligations of aiq,part}.** Under penalty of perjury. I certify that I am the owner of the 1, 2, 3 or 4 family, owner-occupied residence (including condominiums) listed on the building permit that I am applying for, and 1 am not required to show specific proof of workers' compensation insurance coverage for such residence because (please check the appropriate box): ® I am performing all the work for which the building permit was issued. ® I am not hiring,paying or compensating in any way,the individual(s)that is(are)performing all the work for which the building permit was issued or helping me perform such work. ® I have a homeowners insurance policy that is currently in effect and covers the property listed on the attached building permit AND am hiring or paying individuals a total of less than 40 hours per week (aggregate hours for all paid individuals on the jobsite) for which the building permit was issued. I also agree to either: ♦ acquire appropriate workers' compensation coverage and provide appropriate proof of that coverage on forms approved by the Chair of the NYS Workers' Compensation Board to the government entity issuing the building permit if I need to hire or pay individuals a total of 40 hours or more per week(aggregate hours for all paid individuals on the jobsite)for work indicated on the building permit,or if appropriate,file a CE- 200 exemption form; OR ♦ have the general contractor, performing the work on the 1, 2, 3 or 4 family, owner-occupied residence (including condominiums)listed on the building permit that I am applying for,provide appropriate proof of workers'compensation coverage or proof of exemption from that coverage on forms approved by the Chair of the NYS Workers' Compensation Board to the government entity issuing the building permit if the project takes a total of 40 hours or more per week(aggregate hours for all paid individuals on the jobsite)for work indicated on the building permit. Z/ �l� (Signature Homeowner) ( ate Signed) Werner Luis Camacho Home Telephone Number 9143186362 (Homeowner's Name Printed) Sworn to before me this day of Property Address that requires the building permit: 2 Brook Ln !t' Clerk or ,Volar� P Rye Brook.Nl'10573 (coup) Once notarized.this BP-1 form sen•es as an exemption for both ss orker,'compensation and disabilith benefit.insurance cos era�c, BP-1 (12 08) CB Laura Petersen From: Mike Izzo Sent: Tuesday, June 29, 2021 7:30 AM To: Tara Gerardi; Laura Petersen Subject: Fwd: Message from Dig Safely New York, Inc. (DSNY) Sent from my iPhone Begin forwarded message: From: Dig Safely New York Exactix<tickets@exactix.digsafelynewyork.com> Date:June 28, 2021 at 4:02:08 PM EDT To: Mike Izzo <Mlzzo@ryebrook.org> Subject: Message from Dig Safely New York, Inc. (DSNY) Reply-To: Dig Safely New York Exactix <tickets@exactix.digsafelynewyork.com> ****REGULAR**** DIG REQUEST from DSNY for: VIL RYE BROOK Taken: 06/28/2021 16:00 To: VIL RYE BROOK PRIMARY Transmitted: 06/28/2021 16:02 00003 Ticket: 06281-002-736-00 Type: Regular Previous Ticket: ------------------------------------------------------------------------------ State: NY County: WESTCHESTER Place: RYE BROOK Addr: From: 2 To: Name: BROOK LN Cross: From: To: Name: Offset: ----------------------------- ---------------------------------------- Locate: REAR OF PROPERTY V�j, 1 NearSt: Means of Excavation: HAND TOOLS Blasting: N �• l� Site marked with white: N I Boring/Directional Drilling: N n a n , 0 Within 25ft of Edge of Road: N l� � (�` "'1 � Work Type: INSTALL ELECTRIC LINE V Q!✓ �� Estimated Work Complete Date: 07/01/2021 Depth of excavation: 18 INCHES Site dimensions: Length 60 FEET Width 2 INCHES Start Date and Time: 07/01/2021 07:00 Must Start By: 07/16/2021 ----------------------- -------- -------------- ---- ---------- --- 77 �y n U Contact Name: W ERNE R CAM ACHO S /^ Company: LV•,"� Addr1: 2 BROOK LN Addr2: ` e ,J nL� City: RYE BROOK State: NY Zip: 10573 � Phone: 914-318-6362 Fax: Email: wluiscam@gmail.com Field Contact: WERNER CAMACHO 1 Alt Phone: 914-318-6362 Working for: CALLER IS PERFORMING THE WORK THEMSELVES ------------------------------------------------------------------------------ Comments: Lookup Type: PARCEL ------------------------------------------------------------------------------ Members: ALTICE USA AT&T BELL-VALHALLA/WSCHSTR CON-ED LEVEL 3 COMMUN MCI SUEZ WTR WESTCHESTER TWN-VIL HARRISON VIL RYE BROOK WESTCHESTER CTY SWR WESTCHESTER JOINT WTR 2 MEAN ROOF HEIGHT rf� vim ►s A n r ,s Qa n�2° l F Y}f Y�.: n z _.•yr' •tr a .,,FF l �3T'?'',➢ �yy sd �. ti.� L— -a� 01 r J sp4}4 r ! r�j 60 ��: Yd � •a.�wMt+3rxcyM+�� IN =.3 '� _a� •�ra'zGr•' p'�' f t- .�, •'^-Y 0. .� '' `•� r �/3vs„ �+,�+.1�'."T z 2° ).... �,.e.t7�a �1. j•iJ•�i - r3. •y L..,. t i >. _ `- _�.� Z••>5y .�ti ��•. .3 rye n €,J� ,�MOK Sv •Jy r}���. � h P Y '7 �� ��' j tt�4�.' f �yy,� �' � �+Q•. ��� •it}' °.S, n'r >:� .qr, ..`4a + ril::K,�`--f'l ��' F,r� � + i7F���'• a ,t��' GRADEi" '• Y 6. ., .,�.._�-- �..e... ,tea.,-.,..: -.._.,•. a '�'r� '�`xa.•. C cq.l :L: .v;�yt]i:. Vic`_,"`>5'; �3�'�.T,,� -fi'7b c- k�' y {s,;"y'�,�f"' itr�'`.. `v"';, ty -h v.."`'i��4.�,s,.. t•i. rsP,.,'4,'� �� -b � r"1�� �lt`lf�� °�� /' t tf-w S.•k?^$+'>1 � .`•7 r�•.0;':i" +•'t•' -•}�:- C. =1 'C V s�,y � `'s l�' •.iy_ a, �' A .ai. •"' ;,' 'i h '.'Z l 'Li}f: .'' •P 'n �'.,'� '!,.1 �!r~L nN� Y'�' ry �-' e. s t;-sue{ ` its a w'' •' Lr S.�>`�� Architectural Specifications NOTE - HEIGHTS ARE INDICATED TO EXTERIOR FINISHES SCHEDULE THE TOP OF PITCH - ` _ -- �- — --- 7 1G 05B Ridge�Cneg l E>s inc) PXI FV. ; iR�tters 1rusies 30yPRODUCT STYLE COLOR Sho,ith,ng . Atchitet:turrl SIDING BOARD & BATTEN WHITE ----- shl^glcs ROOFING ASPHALT SHINGLES CHARCOAL 5:12 ~ -rot'' _' TRIM FLAT WHITE R°°"''``'' '11 b . Tyler Architecture 8 Planning,PLLC WINDOWS N/A WHITE ' �.�1tit` A -p. Seal: rip Edge l�l i�l�rkt,hC'r lt!,1�!" SHUTTERS N/A CHARCOAL End Trim _ Ask,,_ - _ },•,,�\Y�;i:�}•n;� (i>�� DOORS N/A BLACK3t y i Wtndowt Overhang AN N �► �^ yN P,ttnt Wood Sttutteri 5 C� rtCh`'C)bt it', SHED ELEVATIONS Vinyl ; �r ` or C�dpt)Aelyd a 12 oof •r-1� 1/4 It 1 1-011 _ Corner rr„r ^O}ct'ArrhiTgCt.tt'd!shlt',5la; IMAGES ARE PROVIDED BY SHED siding h r. Base:Q•� 036 ), 7�''��� ���rr,�� •o�., 661se � � MANUFACTURER SHEDS UNLIMITED LLC1-s,Y• .~ Pt;sISutt Tt+:a k cis T F f , �'C s LOCATED AT 2025 VALLEY ROAD - OF N '�-� - � '� � Floor foists: MORGANTOWN, PA 19543 Skids Hinges 2x45:6;r,cht?sc:n.c.er-er Door trim poor Floor J01%t% Trusses/Rafters: Project Title: Floortnt, CAMACHO NEW PREFABSHED 2�-�+tf,f55ES�6 inches i7t�-�Et'trl' ARCHITECTURAL SPECIFICATIONS DRAWINGS FOR DIAGRAM PURPOSES ONLY AND DO 2 BROOK LANE NOT REPRESENT PROPOSED SIZE OR COLORS - SEE EXTERIOR FINISHED SCHEDULE FOR RYE BROOK I NY COLORS Drawing Title: LINE OF EDGE OF SHED PLACEMENT SHED ELEVATIONS&PAD DETAIL 6" 3/4 CRUSHED BASE E ROCK scar®: As indicated _ P.T. 46 PERIMETER FRAME - NAILED TOGETHER f _ COMPACTED SUBGRADE 0 4 80 2 4 Q _ f GENERAL NOTES: Project No: 20-06 1. PAD TO BE PERFECTLY LEVEL Date: 06/30/2020 2. GRAVEL PAD TO BE 6i WIDER 1 HAN SHED DIMENSIONS ON ALL SIDES Drawing By: Drawing No: 3. CONFIRM TOP OF P.T. MEMBER IN FIELD WITH OWNER IN RELATION TO TOP OF FINISHED JT A2 GRADED GRAVEL PAD DETAIL 4. DO NOT USE RIVER BED STONE OR a SMOOTH sheet 4 of 4 1/211= 11-011ROUNDED STONE IN LIEU OF CRUSHED BASE L J ROCK NEW PREFAB AT: r fc-T ,d - UILTIFlNAL SURVEY ` UG 2 4 2020 2 Brov. 1- \ Lane AS B REQUIRED PRI OR TO PLA* NS ° FINAL INSPECTION VMAGE OF RYE BROOK Rye �rO.�K NY D � s U 1 L�tNG�PMRT -NT CONSTRUCTION CONTRACT GENERAL NOTES �rchj#��� 5 'I- , SIGNING THE CONSTRUCTION CONTRACT CONFIRMS THE UNDERSTANDING AND COMPLIANCE TO 0. ALL vI,ORK SHALL BE INSTALLED BY SKILLED TRADESMAN AND MECHANICS TRAINED THE REQUIREMENTS OF THESE NOTES) A�vD r•AMILIAR WITH MEANS AND METHODS OF THEIR SPECIFIC TRADE. ALL TRADES SHAI__ HAVE A REPRESENTATIVE ON SITE WITH A COMMAND OF THE ENGLISH 1. AS REQUIRED BY THE SPECIFICATIONS.ALL WORK SHALL BE IN COMPLIANCE WITH LANGUAGE. ALL WORK SHALL BE PLUMB, LEVEL.TRUE AND SQUARE IN THE CONTEXT OF APPLICABLE NYS RESIDENTIAL CODES. THE L ESIGN. ALIGNMENT OF MULTIPLE COMPONENTS SHALL BE COORDINATED ---_._ AMONG TRADES. 2. VERIFY RESPONSIBILITIES FOR OBTAINING A GENERAL BUILDING PERMIT(OWNER SECURED �''`�--� .,�,_ -� • OR CONTRACTOR SECURED). THE ARCHITECT MAY ASSIST IN PROVIDING INFORMATION FOR 9. PRODUCT SUBSTITUTIONS SHALL BE SUBMITTED TWO WEEKS PRIOR TO THE �`s'" • SUBMITTING THE PERMIT APPLICATION BUT IS NOT RESPONSIBLE FOR FINALIZING OWNER COI VIIIIENCEMENT OF THE RELATED INSTALLATION FOR REVIEW AND APPROVAL BY AND CONTRACTOR DATA(LICENSE CERTIFICATES, INSURANCE CERTIFICATES, ETC)OR OWNER AND ARCHITECT. WHERE PROCUREMENT TIME FOR A PROPOSED SUBSTITUTION SUBMITTING PERMIT FEES. WHERE THE PERMIT PROCESS REQUIRES CERTIFICATIONS BY IS GRATER THAN TWO WEEKS,ALLOW AN ADEQUATE PERIOD FOR REVIEW TO PREVENT THE ARCHITECT AT ANY POINT DURING THE PERMIT, CONSTRUCTION OR CERTIFICATE OF DELA,'S IN THE CONSTRUCTION SEQUENCE. OCCUPANCY PROCESS, NOTIFY ARCHITECT IN ADVANCE DURING INITIAL PERMIT PROCESS. T. CONTRACTORS, SUB-CONTRACTORS AND/OR VENDORS SHALL SECURE ALL REQUIRED 10. INSTALL ALL PRODUCTS PER MANUFACTURERS REQUIREMENTS AND LICENSES,TRADE PERMITS AND INSPECTIONS. RECOMMENDATIONS. PROVIDE ALL WARRANTY MANUALS, CERTIFICATES OR LITERL\TURE. REGISTER PRODUCTS AS REQUIRED BY MANUFACTURER. ALL MATERIAL, Tyler Architecture&Planning,PLLC 3. THE CONSTRUCTION AND/OR PERMIT DOCUMENTS REPRESENT A GENERAL OVERVIEW OF 'FIXTURES,COMPONENTS AND WORKMANSHIP SHALL BE WARRANTED FOR A MINIMUM Seal: THE CONSTRUCTION WORK AND CONTAIN VARIOUS DETAIL DRAWINGS IN SUPPORT OF bF C E YEAR. ' '=`M '' ;.A• �' k••„�s i y'.,..•-:..�.;-:»...,.,+;•see.'. •e MEANS AND METHODS. THE CONSTRUCTION DOCUMENTS DO NOT REPRESENT T M .C. EXHAUSTIVE INFORMATION DEPICTING ALL ASPECTS OF GENERALLY ACCEPTED INDUSTRY � : ;= . ` STANDARDS AND/OR CODE REQUIREMENTS. THE CONTRACT DRAWINGS DO NOT 11. FRAMING MATERIAL IN CONTACT WITH FOUNDATION OR OTHER POTENTIAL HIGH DESCRIBE ALL MEANS, METHODS AND COMPONENTS TO COMPLETE THE CONTRACT WORK. MOISTURE ENVIRONMENTS SHALL BE WOLMAN IZED `PRESSURE TREATED' MATERIAL. .: A;. VARIOUS ASPECTS OF INSTALLATIONS AND ASSEMBLIES ARE ALSO AS REQUIRED AND INSTALLATION REQUIREMENTS MAY ALSO INCLUDE FLASHING AND OR OTHER MOISTURE .Y �� `¢..>,•�r v y �. DIRECTED BY EACH MANUFACTURERS UNIQUE PRODUCTS. THESE REQUIREMENTS MAY BE MANL`GING COMPONENTS AND MATERIALS. PERFORMANCE ESTABLISHED CODE ESTABLISHED OR BOTH. ITEMS ASSEMBLIES, ` ::.•..,.:.. A... COMPONENTS, MEANS AND METHODS REQUIRED TO SUPPLY AND INSTALL THE WORK AS .�p' .• w." ;Sa.• �M s l� �w •"0A^»:tea.:r+y'v _•w /. REQUIRED BY THE CONSTRUCTION DOCUMENTS(DRAWINGS,SPECIFICATIONS AND t- SCOPE OF SCOPE: � `�'�• �"' CONSTRUCTION CONTRACT)ARE CONSIDERED TO BE INCLUDED IN THE SCw��a CONTRACT WORK. 1. INSTALL NEW PREFAB SHED AS INDICATED _ Project Title: 4. DISCREPANCIES, CONFLICTS OR PERCEIVED OMISSIONS FOUND IN THE CONSTRUCTION CAMACHO NEW PREFABSHED DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE 2 BROOK LANE "'� .r RYE BROOK NY OWNER FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK.. DRAWING LIST ; : > p Drawing Title: S. PRIMARY ELECTRICAL COMPONENT LAYOUT AND COORDINATION ARE THE RESPONSIBILITY AO COVER SHEET OF THE CONTRACTOR AND RELATED TRADES. FIELD ENCOUNTERED CONFLICTS SHALL BE A3.1 SPECIFICATIONS COVER SHEET COPY COORDINATED BY SAID TRADES AND CONFIRMED WITH THE ARCHITECT AND OWNER. Al SITE PLAN,ZONING & FLOOR PLAN Scale: 6. DO NOT SCALE DRAWINGS. RELY ON THE NUMERICAL DIMENSION MATRIX AS PRIMARY ASHED ELEVATIONS& PAD DETAIL DIMENSIONAL INFORMATION. WHERE QUESTIONS OCCUR DURING THE BIDDING OR CONSTRUCTION PROCESS, CONFIRM ALL CIRCUMSTANCES REGARDING DIMENSIONAL QUESTIONS OR CONFLICTS WITH THE ARCHITECT PRIOR TO PROCEEDING WITH SCOPE ANALYSIS OR INSTALLATION. PERMIT f ' o 12.4 Project No: 20-06 Date: 06/30/2020 7. TYPICALLY, DIMENSIONS ARE TO EDGE OF SLAB, FACE OF STUD, FACE OF CONCRETE, seL# �3 5•.�3 C l CENTER OF DOOR, CENTER OF WINDOW AND CENTER OF PLUMBING FIXTURE, UNLESS ATE APP ESEP 1 7202F Drawing By: Drawing No: OTHERWISE NOTED. JT/KG AO BUILDING INSR 1 lage Of kv m"m*m sheet 1 of 4 DIVISION 1-GENERAL CONDITIONS DIVISION 7-THERNIAL-'%ND MOISTURE PROTEC-ION-NOT USED I. a :il :!' !'.:.II II I.,i:,• : - - _ i,_r:t,ii _ !',i:r:=f:- :il �. i', r.'. DIVISION 8-DOORS AND WINDOWS I ::I:i.li 11,; DIVISIO+�I 9-=:NISHES: J. I`/ISION 10-SPECIAL 'c5-�,OT USED '-I''. -'•.'::= t DIVISION"1-RESIDEN'•-IAL aPPLIANCES-NO _,SED _J __'_ir DIVISION 22-PLUMBING-NOT USED DIVISION 23-HEATING.VENTIATIN AND AIR CONDITIONING: Illn'�r•:I'_,r',v -Al j'--I IncII_,i::,f'_ ilr_~n -,l(�rl'I''r-.I':11-h�I�:r cI l?I IiIC:11'';CI=!:•�.r-1'=''r. Ill_ /plc ;� n - - - - r-• '� - - - -ram - •t •\i - 1-.<' - - - - ,.\r:•� - r r' ,' :� r - '•� r•-'r:` t r. - II' i..i.irl�I 1� ,lit ,I I _. II._I'lc ,.•/ill / I'1��I,r;,II tr .rll:.. I'k t l:ln.Ir,l.l_I. I'.C.11ll' I'1L!•._ t,:.,y..'ic l.cr sir..__. _:�ch�:. ,...rt.c.r�n ..,rl,:�.I':.;II b�: __..._t,�.i:_I;:r_I',;I_.]ir�i�-.i__-.r r_Ic'.gin.... ...cir __j:�.....:,1:•I�:.r.c°:._... _II .. ,II _ _ _�_ .E-.•'L. .II'.� _ _ ...� _ �!_. _�t - i�:ll' �:In!:•LCCI,:t��.;!.l.UL :I�CC:'li. I_ f_-.l 'I-i:l ?I L':Illin li_i_� CIC C' C 11"1 C (;'l�f�. ��.;_.n ,ul:' I _OI 1�1�-io1' �r try c•I; ".� CEFTIFIC-'TEE A\,D I�i�PEC-IONS: �:cn-r ictcr ii-t.11 s:;l�i:'I c(_r'ti-c,.-_�.t insi):_ctlol;.�nc TIiE:•Ci'•r1C,'.:(:Ccr sn;:ll I Municivalit;/insper_tions\^/itl,'tile I0CA C;de�nfJrcerent'Jfficial Contractor_hi ll-urnish;owner with a Certifir_:-ite of Occ,ip,:incv from(ht DIVISION 26-ELECTRIC: perri'ttin`,agency. Contractor:hell furnish all other\wareantees and docunient3don lis-ed'r scec'fication before project completion and Fnal paymenl. 26.1 ELECTRICAL )COPE: Contractor snall furnish and install a complete utilit\ service as coordinated with ut'Iily company and complete distribution I system as per project requirements and as previously noted under section 2.8 Electric Service. Electrical service and distribution system must meet 1 Ccrrificare of Insurance: Contractors shall furnish Owner copies of insurance policies required by permitting agency including\•vorkers N.Y.S.Rcsicicniial Code.UL Codes.NFPA and utility company requirements. compensation.naming Owner and Architect as certificate holders. 26.2 UTILITY SERVICE: Provide service requirements commensurate with the size and scope of the proposed project and as coordinated with the utility shall 1.6 Licenses- General Contractor and each trade shell be licensed as required by the State of New York.Westchester County or the municipality be established in conjunction with the electrical sub-contractor. The service capacity shall be based on industry standards.code requirements and as governing the proposed work. Contractor shall furnish a copy of license certificate of all trades who will be working on the project to the Owner. required by other agencies having jurisdiction or referenced standards applied to the work. The complete system shall include a sub-surface service feed from the utility interface to the electrical panel(s). Contractor to provide alternate price line item in bid proposal for whole house lighting 1% Guarantee: The General Contractor shall provide a one year guarantee for all workmanship and material from date of substantial completion as protection. established by the Architect. General Contractor shall furnish all other documentation.manuals and warranties before project completion and receipt of final payment. a. Provide all sub Panels individual'cut off'switches as required by industry standards and code requirements. b. One service per residence as per code. 1.9 Contract Set of Prints: If required by article of constrl_Iction contract.the Contractor and owner shall sign a set of contract documents(drawings& C. All bedroom and other locations as per code shall have ARC fault breakers. specifications)which shall serve as the contract scope of work for the project. Additional agreed upon items shall be written and approved by both d. Bonding as required by code. parties and become a part of the contract. C Grounding as required by code. f. Provide Alternate price for whole house lightning protection. . I 1.110 Substitutions: In general,equal or better product substitutions are permitted where specific esthetic desires or requirements are not in question. g. Provide Alternate price for Sub Panel and Transfer assembly for future generator. Proposed alternative submittal documents shall include a side by side comparison to the specified product's submittal document(s). TA 26.3 POWER&LIGHTING DISTRIBUTION SYSTEM: Contractor to furnish and install complete distribution system including wiring.back boxes and all DIVISION 2-EXISTING CONDITIONS: devices and fixtures as selected by Owner. Tyler Architecture&Planning,PLLC 2.1 Scooe of Work:The work requires site remediation and selective demolition. a. Provide all sub Panels individual'cut off'switches as required by industry standards and code requirements. Seal: b. Provide GFIC devices at all locations required by code. c. Provide'Type B'duplex receptacles as indicated on the drawings. Provide'Quad's','Switched'or other specialty types as indicated or as required to ~° ``�" "`?- " meet codes. In general switches receptacles,face plates.etc.shall be white and of standard'GE'profiles(round face,toggle switches). Provide an �" 'µ ,.'-N::,..•: :.`..' ``�' DIVISION 3-CONCRETE NOT USED O � p p p gg � ••'• � x•� ?. • • -�-.. '�':,. alternate line item in bid proposal for'Decora'style switches and receptacles. ' DIVISION S-METALS: d. Provide dedicated appliance outlets and breakers as per code. e. All outdoor and accessory structure outlets shall have GFIC protection and if devices are exposed to elements they shall have in-use covers. <.,� ;'.;: A- 5.1 METAL FABRICATIONS: f. Provide lighting locations and installation as indicated in the drawings. Coordinate roughing box requirements with final fixture schedule. A. MATERIALS: 26.3 CERTIFICATES AND INSPECTIONS: Contractor shall supply certificates of inspection and compliances to Owner upon completion of project as required. f> 1. eneral:For metal fabrications exposed to view in the completed Work,provide materials with smooth,flat surfaces without blemishes. Do not use materials with exposed pitting,seam marks,roller marks.rolled trade names or roughness. DIVISION 31-EARTHWORK(Including site utility infrastructure scoff 4. 2. steel plates.shaves.&bars: ASTM A-36 or A-36M. 'ref Y ;ts.y,',..Y.v.1w...w. .. •�': • 1:�,.`2. _'V>.w'•" ^••:• '•;f�•' SIN,f : 3. steel columns: ASTM A-36 with welded steel plates at top and bottom 31.1 SCOPE OF WORK:The work under this section shall include all necessary labor,material,equipment and fees required for the proper execution of the 4. welding rods and bare electrodes: Select according to AWS specifications for metal alloy welded. site work as shown on the drawings and/or described herein.5. primer for galvanized steel: Shop paint with polyamide epoxy primer.Tnemec F.C.Typoxy Series 27.or equivalent. Primer shall be compatible with finish paint. 3 1.2 ORDINANCE':.INSPECTIONS:Contractor shall contact"call before you dig"as per state and local codes to locate all underground utility services prior 6. fasteners: Provide Type 304 or 316 stainless-steel fasteners for exterior use and zinc-plated fasteners with coating to excavations. All work shall be in conformance with all applicable codes,ordinances. Project Title- complying with ASTM B633,Class Fe/Zn 5.where built into exterior walls,except as otherwise noted. Select fasteners CAMACHO NEW PREFABSHED for type.grade,and class required. 7. bolts and nuts: Regular hexagon-head bolts,ASTM A-307,Grade A.with hex nuts,ASTM A-563 and flat washers. Bolts, 2 BROOK LANE nuts and washers shall be rated for contact to'ACQ'pressure treated material. RYE BROOK I NY 8. Machine screws: ASME B18.6.3 9. Lag bolts: ASME B18.2.1 10. Wood screws: Flat head.carbon steel.ASME B18.6.1 11. Plate washers: Round,carbon steel.ASME B18.22.1. Drawing Title: 12. Lock washers: Helical.spring type.carbon steel.ASME B18.21.1 SPECIFICATIONS B. Submittals: For each product indicated.submit manufacturer's product data.product test reports based on comprehensive tests Scale: performed by a qualified testing agency,environmental'green'performance/certifications and installation manual. 1. Product Data: for Paint products 2. Shot)Drawings: Detail fabrication and erection of each metal fabrication indicated. Include plans,elevations,sections and details with their connections. Show anchorage and accessory items. 3. Welding certificates: Copies of certificates for welding procedures and personnel. Certify each welder has passed the AWS qualification tests for'welding processes involved and,if pertinent.has undergone recertification. C. Execution: For each product indicated.comply with the manufacturer's specifications and installation instructions. Project No: 20-06 DIVISION 6-WOOD Date: 06/30/2020 6.1 Rough Carpentrv: Drawing By: Drawing No: A. Materials: JT A0*1 1. Framing Lumber:All first floor sill plates shall be construction grade,"S.Y.P."pressure treated minimum Fb=1550 psi. All other framing shall be construction grade"Doug.Fir",No.2 and better,with a minimum Fb of 1000 psi and a maximum moisture content of 19%. sheet 2 of 4 2. Shed framing per shed manufacturer ZONING CODE COMPLIANCE ;;�;.,;E � _ E;<I`T. PR{�P. iPLIES \ I`•< C-N `, L j 111 1 I\1\:Irk L.'\, .1- -._ 1.��_'�.: I �....I �v I i"t,I �.J I� , i J ./V 1 111 'li'a. I T SI-E SF. I l ,t;;I�� i '�. ;,, '`'��;��i—i.',I'`'�ED r'�� �,1 %Nil,I�,�L T IJr.E'r�.-tD I�IS T f-. -E_i _I ,Ct-,.-.I 4JE Dr. , — .r.; ;� ,rr-T' I I I SIDE PD. - t `=E=T LJNCH,-`,NGED I (ES - — PPR0`<I'-I;`,TE LINE OF ROOF,`.60. E.T P. i\,-'IIN. SIDE YARD - TOTAL;FEET) N A rd/A N A I MIN. REAR YARD -TOTAL(FEET) 0 40 + NCHANGED YES � _____ _ _____ _ 6' - EXTERIOR SHED WALL PER MANUFACTURER.TYP. MIN.YARD - ACCESSORY(FEET) S S.J +/- 5' YES TYP. sal_ LU MIN. SIDE YARD -TOTAL(FEET) 60 90.38 UNCHANGED YES 0 0 _ � w - GRAVEL PAD TO EXTEND b" MAX. LOT COVERAGE - MAIN BLDG N 20 9.28 +/- UNCHANGED YES �,,� N � � � BEYOND FACE OF EXTERIOR MAX. LOT COVERAGE -ACCESSORY % 4.5 0.67 +/- 1.82 + - YES o ' WALL AT ALL SIDES - SEE GRAVEL ( ) I PAD D ETAI L TYP. MAX. IMPERVIOUS COVERAGE(SF) 4,841 +/- 3,328+/- 3,448 +'- YES I MAX. FRONT IMPERVIOUS COVERAGE + - UNCHANGED YES ' ----�---- t P.T. 6 x 6 PAD FRAME - SEE E AGE(°/°) 4 5 4.87 / t L---------i GFI i GRAVEL PAD DETAIL,TYP. THIS ZONING CHART CONTAINS ALL RELEVANT DATA PERTAINING TO THE NEW PREFAB SHED t SM1 I CIRCUIT } o I 'I I I ,� BREAKER I PANEL I r N 21 25 20 W 88.00 i I 0.0 U .. I �n w m U S 51 L --------- --------- -U w- Q- REQ'p= Q �' � , 6 CCESS o UJ REQ D SETB OR � ACCESSORY 81-011 Tyler Architecture&Planning,PLLC EXIST.SHED TO n qC Q o - SETBACK 9'-0" Seal: REMAIN M - PPOP. SHEDHE r pY EXIST. WALL o F �'. x.•ry .cA.. ROUGH WALK PATIO PROPOSED SHED PLAN `� r <\ f EXIST. PATIO TO __- - - - _ , o ��J,�...- 4,;\ :� .� � �`.; <' � rti @ REMAIN _ �� - MAINTAIN 1/4 - 1-0 Q < wr`• STEPS PLAT i5.9 -J BETWEEN GENERAL ELECTRIC NOTES: �' r . I , © SHED AND 1. PROVIDE OVERHEAD LIGHTING- :' \��\.` . \` .�\:,...: ATE 10 =' MAIN HOUSE REVIEW FINAL QUANTITIES AND C�j3 / � 0 _ EXISTING TWO I LOCATIONS IN FIELD WITH OWNER Q REQ D Q p F STORY HOUSE TO \ -- 'SIDE 2. ALL OUTLETS TO BE GFI RATED REVIEW �..�' rf RO T ` J Z FINAL QUANTITIES AND LOCATIONS IN N S REMAIN SETBACK co c t� '/ z.:.•------' -- - /C_ FIELD WITH OWNER Project Title: �. +':.. z 3. CIRCUIT BREAKER FINAL LOCATION TO CAMACHO NEW PREFABSHED VINYL EtU- ``~`• T `:: ::\ ., '.' �� i�.9' BE REVIEWED WITH THE OWNER 2 BROOK K LANEGF GA IL o o FLOOD PLAIN RYE BROOK I NY co U AD PA � LINES ARE FLOOD LEVEL 71+/- m w APPROXIMATE AND Drawing Title: � c��,., j o ARE BASED OFF 6 1Nt SITE PLAN,ZONING&FLOOR PLAN + cn WESTCHESTER GIS ' INFORMATION Scale: As indicated BROOK LANE FRONT z 100 YR FLOOD PLAIN 33.8! ' R= 20.00 SETBACK DETERMINED --- Q : ; �co AVAILABLE ON �. 1-0 L= 37.06' M- ------- ���_ _ z ;' 6/11/2020 FROM AVG. SETBACK _ _ z R 500 YR FLOOD PLAIN U > 0 4 8 OF 2 CLOSEST LOTS - w f 0 20 40 L__ __ Project No: 20-06 S 210 25' 20" E 90.38' m Date: GUY 0,H.W. _....._- - O.H `'� 06/30/2020 EREV 08/19/2020 __.1R '0 0 _.._ - -_ ;• ?L.I .P. Drawing By: Drawing No: r t i CURB � ............... OP c Al R8 ._..__..._................_...._............................__.. _.............................................. t _w..ww.................................._.._......................:::..:.w�..-.-- ----_._..___..--_----__.____._...--._.�::: �:::::-::::::�::::::� BROOK LANE DROP CURB DR JT SITE PLAN .. sheet 3 of 4 1 =20I-011 SITE PLAN PREPARED FROM SURVEY PREPARED BY SUMMIT LAND SURVEYING, P.C. LOCATED AT 21 DRAKE LANE WHITE PLAINS, NY DATED FEBRUARY 14, 2020 I -rI .��/[': ,i`. "°'' `i\,il, . 4: .. ..�\u. ''< �.{,. ,.f.+ .. :^K:� . . . ...,`.`i:4. aC��y�f�i6j���♦'♦�� 4]c Ln 101 i[`;R4c 1 k - , X;C S.y,y'L' -'i.,}•c ".`'�w \ i <['Z� ,:c Y i':i y� .. >. [ , sa\J•;a:z•i^.:�a;[r.•^:f.x;?z',,,<,.}.z. i z??�.,.:::.},,.,: 7,.,`:c„},,iica[:;�: GRADE ,h ` +: :n�x:ii..•ii,.::...,,,,A..p•;. 4 h.:•;:>,�::�,cw:z.ice.'.,.:. <s�'VA'?x AO ..a..,:[A .. .. ,:.: �^a.t �Y :�:[iiiS.:J" �,.. ,♦.v,,:,, )t.^2 Yam` .,� .. .:::.; ...... :. _.,....... .. .... ..,....,'. .,zi:\...-�,2,y:.:,.:['.^. ��r,,'^4•[ �♦��[�J`{:.. ,L:�.♦M,.ZQ�., .`y„,i�.Q{Ci`� ., ,:.. „•2 r; ?:. fl:..k:T7[".:C':.i;�;�i<�.` . v, \`.i C h ..M�,�t a.� J,• Fi �. yX.N. ` 1: MM ix Jb `aSaS"jt , ,T iy t,h ,r i'. £, , ,`♦'-` �"t`k< ♦7♦}.. ,�\� £,d " w Architectural Specifications NOTE- HEIGHTS ARE I N D I CAT E D TO } EXTERIOR FINISHES SCHEDULE THE TOP OF PITCH [ PRODUCT STYLE COLOR Rafter%,Truires ti►�•ose Ridgen g 30 yr � Sheathing Shingles gles . SIDING BOARD & BATTEN WH ITE S"`"�'py ROOFING ASPHALT SHINGLES CHARCOAL 5:12 s,. � f�'`r,.�s.,; \; Tyler Architecture&Planning,PLLC TRIM FLAT WH ITE Roof Pitch h�: =i�'`x-ril�•�� 12,ti..r h<z, ;'•1�•a Seal: WINDOWS N/A WH ITE Tp' - Drip Edge \.� v';brks'-c-v.—.ILY 10, ``a'ew .��,�;�=♦\�¢ SHUTTERS N/A CHARCOAL "d ry"n' s ` qq yy a L ". } ii'n.�►.�{I'il��'£e,4„ DOORS N/A BLACK ! .•�,.. .> C}vP.Yltatt( v ��i ra♦��� �\ A J♦r _ t a'�'. \�-v 3�..J,i`�s>�c� \�\�r i�'� .J �. et f.•r ``1�� �� �`qiA:$ b[�A ° y♦,) .ate \-.. �£ CI tAX �•:y�♦^x♦,, Paint Wood, �: ��ri��:sue' h���� x \: :ee � ►3 fS r' � t' w3� �•�^ '�•i�kf�„,.' Si SHEDELEVATIONS vinyl. 3 �_� Shuttr*s a I,C i<Oti•1:1g b\ or Gapboasd 1/411_ 11_O11 r �� ,� h .a... EM?�: J �t"r�-irC�ll';�' t[c t 5.Ef`•:.{�ri Corner trim f�v � i,i'�i � �• C,,{ 2 �..: IMAGES ARE PROVIDED BY SHED � V. �. ♦ \� Bases `l^ MANUFACTURER,SHEDS UNLIMITED LLC x P��ssar�Tr'Y���-���'kic.5 ,� .�. -a^»•az�•;:x�,•:�>.�'�� ;��_:r: LOCATED AT 2025 VALLEY ROAD - "" oor MORGANTOWN. PA 19543 /-x45 15iochesofi--cer-te. Skids DoorFloor Joists Door Trim Door Project Title: Flooring 2x4 tnllsises 16 im hes CAMACHO NEW PREFABSHED ARCHITECTURAL SPECIFICATIONS DRAWINGS FOR DIAGRAM PURPOSES ONLY AND DO 2 BROOK LANE NOT REPRESENT PROPOSED SIZE OR COLORS- SEE EXTERIOR FINISHED SCHEDULE FOR RYE BROOK I NY COLORS Drawing Title: LINE OF EDGE OF SHED PLACEMENT SHED ELEVATIONS&PAD DETAIL 611 Scale: AS indicated 3/4" CRUSHED BASE ROCK P.T. 6x6 PERIMETER FRAME - NAILED TOGETHER � B RA 0 4 8 O — _ COMPACTED SU G DE 0 2 4 GENERAL NOTES: Project No: 20-06 1. PAD TO BE PERFECTLY LEVEL Date: 06/30/2020 fill, ' GRAVEL PAD TO BE 6'WIDER THAN SHED REV 08/19/2020 ,,.--— — _ DIMENSIONS ON ALL SIDES Drawing By: Drawing No: 3. CONFIRM TOP OF P.T. MEMBER IN FIELD WITH OWNER IN RELATION TO TOP OF FINISHED JT A2 GRADED GRAVEL PAD DETAIL 4. DO NOT USE RIVER BED STONE OR a SMOOTH sheet 4 of 4 2 1/211 _ 11_0 11 ROUNDED STONE IN LIEU OF CRUSHED BASE ROCK w z r —.SL w iEaw �C w O zw� O c ® Z 3 V)�w�u o Q a: 0 asp=08 U Q L N m Lij w w W _ < z LAJ w O CD Q Z C7 i ::: .......................... iJ LtJ NIj� N 1 .................... .. .. li :NC) w N C.9 I LLLJ a® U-1 0 cn a o N N: U w t=- C0j 0 Q Z z- Z. U w J W Q it w U W w U) W W W W W 0 it of cr cr ir LL1 ¢ ¢ ¢ ¢ ¢ = a Q 0 a Q U)U)LnUU a m U O � � C1 N$ 0 w O N \ oz cO.i �IN(I�ICNq. (I < lu) S U 0H. J N IN IN IN INI W � m Ld a:e U) U to W i Of U N W t¢- N W N of W W Of Li a a a N (n cn to Cn LJ a >- J9,1 9 NlI M Ln �N r Wr } f. Z `���� 1--1 y KJD Z v O� uci W z W:D F -) �LO �OJ aa) U w o w = z LU LU L. ��ImA 4 oZ ww J � aD Ow in � Q W Z O¢ �w O ~Q Li 0 0o LU 5 O au a W¢ U �O U U U � Z ¢ 0 � LJ Q U O Z t/I W y_U W 0 � cr Q U p W Z w ¢ W F- a Q w Q N Z) .8 V— C Z L.Li Fm LO Q w f LO I rn 0 Ln I �Y N � L rn o0 N NN z 0 ao Q 00 Z Z L;j .. m Q LJ F- Z Y Y oz O Ld G N Ix�I �LL 0 W > � w A 02 w Fw- OJW _ H } ¢¢J J CL ® t7 O Qi C3 Zpa GW_J m¢ Z W O M SO a_ O H Fx Q A W - J O V® p Q¢ es Z LO F-^LJ L i l Z F- P4 De LJ > to X 3 F- U A L>Sj F- N W v ® w oe A JQ= ®� ¢ A=W Q J= W W �0 ¢ Q w® Co 3 SL.7 �z N W W X 3 JCX � .Z I.- �j QQZ W C3 W N J OJOJ =w _w LL� QZH 3 ABC=.) Q W �z�.� �- gn- ¢ W 3 Q ~O �� rea_ ¢�.x � o� Jw (Y_) X: �Zz o¢ z C3 AQ ui W1- Hwy A acI-- U SJ UiO 17 La L-i O J W~ WO Q X ®w = } W Z LLJ 0¢ PA V �. CIO ti F— L3Li L� p ww > S Q C3 N W oOe¢1 S U O H >O C, !/� L� 3 .: ]G Z U ® j= ~OO ¢=jU a.OAUZ U Wy�w O? OC3� L. ¢¢ CL QW®W 3I-OW W A� QQA w pq-J W ,ZE j"' L,v X J ® W F- ®J ® Q O L- Q Q � Q W Z ¢ _ C3 J F- Q S> Q LLJ M QLLJ Q Q LO LLJ C3 ¢ J p p = � C3 O OLJ QLLJ LJ W W C3 J l7 H p U 800 w An Ctia M- O � U- Z 4 3 Uj w W U = F-ae w p ® L. `1 � L A Z C3¢ 1,0 ® C3 Q Z ® C3 Z PJr 1 X FS- U xL` Z=¢ Iw-NW� C3 Cie A Q¢1=-¢W � =W� H W LOB -. = LLJ 3¢ OF- of_ ¢ w U z � W U Q y Q Lil �> C3 \ w Q >; A LLI Q pq LZI WWJ a. Z "Q LLJ LLJ W USN ¢ Q Q OLLLJ F- S W Z ¢�I.�.-rac .-. > W Li 0 W=� > F-- wA W � L+J wv y Y 'W 16 Q W Z W F- >:A Z AZ Z Q ¢ H Y NC F- Z U W UUCP O A EQZ Z J> Q'JF- > O Z A Q W XZ¢ L LJ M l7 =ZZ Q WLiOO Q D W U. S F- S Xm¢-cc LLJ Q W Q cn m Q W®O Q L- U =¢W F- 3 w Q d =S F- fn DO O O ®O O O O 00 IN Q to • Q / • O N ! " N 1° " W 2 25 20 88.00 •� N O U V 4 o Cj LOT FRAME 0 O l SHED NC_q 1RREG LINE OF 52 N � IRREG LINE RET N WALL 5 OF C.L.F. /�' .L.F. g Cd 5.7 Cd LOT HE RET N SIZE WALL axe 2' w Z � 5.8 5 3 •...� v w� _ROUGH WALK PATIO 4o --—— — — _ CURB 0 o� RET'N WALL mot- N w STEPS z w -� i PLAT DRAINbo z ATE w z TWO STORY Q Q z IND Cd FRAMECJ U j W •� O _ROUGH q _ re Zcry #2 z Q � � •� � VINYL ° , 3 FENCE GATE CO 0 l Lg-j 09 0 7:1 � AD A O � � ROUGH �vAL� �� 0 � TAX LOT 0 o '+ �} •� o o� � �, 0 _...`__ < IE�./t�W Mom..Tom. �Yw i^..MW�i���fi�4• � � \ ITT��� V1 M c) D IE •� LEGENDS: R=20.00 Q� .� z 1Z C.L.F. CHA N LINK FENCE L=37.08' U BLDG. BUILDING �"—" .—; Y H.W. `� NOV 15 2022 ` �'� ..Cd GV GA VALVE y�riE 0, _ O.H.W. p >'' 0.4'N NORTH 0 0.H.W. h A4 U U L.U.P. L. .P. VILLAGE OF RYE BROOK o � N � DI DRAINAGE INLET 4-4 BUILDING DEPARTMENT i . •.~ ' W.I.F. WROUGHT IFENCECURB DROP CURB � � N/F NOW OR FORMERLY CURB DROP CURB 0.H.W. OVER HEAD WIRES , , „ �' � c� 9 0.38 S 21 25 20 E M - — - ----- --------- ENT SURVEY OF DO NOT SCALE LOTNUMBER 52 BROOK LANE AS SHOWN ON A CERTAIN MAP ENTITLED ALSO KNOWN AS SECTION 135.73,BLOCK 1,LOT 1 MAP OF RYE BROOK IN THE OFFICIAL TAX MAPS OF RYE BROOK. LOCATED AT BELOW SURFACE ENCROACHMENTS ARE NOT SHOWN.THE EXISTENCE OF RIGHT OF WAYS AND/OR EASEMENTS OF Certifications indicated are limited only p to the person for whom this survey SCALE: 1��=20' VILLAGE OF RYE BROOK y RECORD,IF ANY,NOT SHOWN HEREON,ARE NOT CERTIFIED. Measurement in U.S. Standard. ----- TOWN OF RYE -- was prepared and on his or her behalf to the title company,govenunental A TITLE REPORT OF THE SUBJECT PROPERTY WAS NOT PROVIDED,A DEED OF THE SUBJECT PROPERTY WAS agencyand lending institution for the title number listed hereon.The DATE:FEBRUARY 14,2020. WESTCHESTER COUNTY STATE OF NEW YORK. PROVIDED. g certificationsDATE: 10-17-2022(ASBUILT CONDITIONS). are not transferable. ! Said map is filed in the County Clerk's office,Division of Land - -- Certified To:Werner Luis Camacho,Freedom Land Title Agency,LLC., Records,Westchester County,New York,on Feb.21, 1960 as UNAUTHORIZED ALTERATION OR ADDITIONS TO A SURVEY MAP BEARING A LICENSED LAND SURVEYORS SEAL IS and Building Department artment Only.VIOLATION OF 7209,SUB-DIVISION 2,OF NEW YORK STATE EDUCATION LAW.COPIES OF THIS SURVEY MAP NOT • __ . _ Map Number 7004. BEARING THE LAND SURVEYORS INKED SEAL OR EMBOSSED SEAL NOT BE CONSIDERED TO BE A TRUE AND VALID JOB NUMBER WCR07004-52 COPY. COPYRIGHT t\U2020 SUMMIT LAND SURVEYING P.C.