Loading...
HomeMy WebLinkAbout07.10.2020 DRE Memo570 Taxter Road, Suite 300 Elmsford, NY 10523 (914) 631-8600 phone (914) 631-5769 fax www.drepc.com www.aiengineers.com Improving Life. By Design. Dolph Rotfeld Engineering TO: Paul S. Rosenberg, Mayor, and the Village of Rye Brook Board of Trustees FROM: Anthony Oliveri, P.E. SUBJECT: 900 King Street Redevelopment preliminary Final Environmental Impact Statement (pFEIS) PUD Concept Plan and Preliminary Site Plan (3rd draft) DATE: July 10, 2020 With regard to the above mentioned project, this office has received and reviewed the following: 1. 900 King Street Redevelopment, preliminary Final Environmental Impact Statement (pFEIS), and appendices dated July 2, 2020 and prepared by AKRF, Inc. 2. Plan entitled: "PUD Concept Plan and Preliminary Site Plans, 900 King Street Redevelopment", prepared by JMC, last dated December 13, 2019; Our comments with regard to the pFEIS remain as follow: 1.) As noted in our June 14, 2019 memo, the previous response regarding the water system notes certain planned upgrades to be performed by Suez. Therefore, it is critical that the changes to the Suez system be made conditional to any approvals and the proper means to enforce these conditions and substantiate their implementation be considered. 2.) As noted in our June 14, 2019 memo, the applicant has adjusted expected sewage flows from the project in accordance with the reductions proposed. As a result, the net increase to sewage flows is now calculated to be 27,757 gpd. This will result in required Inflow and Infiltration (I&I) removal of 83,271 gpd. The pFEIS states that the applicant proposes to meet this by monetary contribution to the Village’s existing I&I program. This monetary amount should be established by the applicant in conjunction with the Village and its consultant’s prior to final approval and noted in the FEIS. This is in accordance with the Westchester 900 King Street pFEIS July 10, 2020 Page 2 Improving Life. By Design. County Departments of Planning and Environmental Facilities recommendations and should be made a condition of any future site plan approval as well. 3.) It is noted that a final review of construction phasing, sediment & erosion controls and Stormwater Pollution and Prevention Plan will be conducted during Site Plan Review. Thank You C: M. Nowak M. Mohamed J. Gray C. Bradbury M. Izzo