Loading...
HomeMy WebLinkAboutBP20-049PERMIT # SECTION TYPE OF WORK JOB LOCATION OW N CONTRALTO 5T. COST CO # C TCO # FEE DATE INSPECTION RECORD ATE FOOTING FOUNDATION FRAMING RGH FRAMING INSULATION J � PLUMBING RGH PLUMBING GAS L SPRINKLER ELECTRIC LOW -VOLT ALARM AS BUILT u FINAL w/ 7CIhishc-y basel��>> u oZ 4540 QTHER APPROVALS ARB BOT PB ZBA QTHER P°00-059 Rain Fire - c) AD - C f Mac AS-BUILTfFINAL SURVEY REQUIRED PRIOR TO FINAL INSPECTION ��I ved 71A()a 1 FINISHED BASEMENT NOT APPROVED FOR USE AS A SEPARATE APARTMENT OR D�NELLING UNIT THIS BUILDING MUST BE POSTE�7 WITH R PERMANENT CONSTRUCTION TYPE IDENTIFICATION SIGN; FR PRIOR TO THE ISSUANCE OF A C/0, AS RE )UIRED BY NY STATE LAW. BUILD R RTMENT VI[,1� E OF RYE OK OCT 2 2 2019 938 KING ET RYE BR NY 10573 (914)93 i939-5801 VILLAGE OF RYE BROOK BUILDING DEPARTMENT tki//iti####4itit#i#4k/iiiktt##4/ii/i/#tk#i//#4tiit#tick/kt#kiii####t##tiiii##//it#/##k#/////i//#/i#/tikk// FOR OFFICE USE ONLY: Approval Date: D Application# Approval Signature: ARCHITECTURAL REVIEW BOARD: Disapproved: : Date: BOT Approval Date: C : Chairman: PB Approval Date: Case# Secretary: ZBA Approval Date: Case# Other: Application Fee: Permit Fees: V V y L�L� sssssssssti/ssssssissksksk/ss/rss/ssrrwrwww+rr+rw+rwtswrrssrsisirwsisrsrsrkstr tsitrssiiir#sssiss#ktiiskssi# EXTERIOR BUILDING PERMIT APPLICATION Application dated: jryis hereby made to the Building Inspector of the Village of Rye Brook NY,for the issuance of a Pcrmit for the construction of buildings,structures,additions,alterations or for a change in use,as per detailed statement described below. 1. JobAddress: 'PQI MQOSC_ Gj0Af� ��lC g ,04 "V /j'S7-3 2. Parcel ID#: / Z 2-5 — / — /, j4 Zone: 3. Proposed Improvement(Describe in detail): e V1jSfAt-t r SJAJ/lL'�_ /%f1m L� A7-rlqCrt'w-i.-) DkJlr `L���./� w/�1�r �r�.lrs<���j SAS�c�'1k�T AZQ 6j�-�P4y� . 4. Pro,pqrty Owner: S C Q /L e-C 0 4 RP P%�.,1?'a L L e__ Add lm: jV q 4J`p&1 lo,Q6hP 5 i,1-f IWAJA i 10 A(R L Pf 1fa i I"f PO4 1:9eDDK ti /US 73 Phone# 4I I4 LZ 4—5051p Cell# "1 1 y 22 4-5o5L a-mail,7_DA150 W,1�1-g04 JX"'VM List All Other Properties Owned in Rye Brook: /\,alukr Applicant: Address: Phone# Cell# e-mail Architect: Address: Phone# Cell# e-mail Engineer: Address: Phone# Cell# e-mail General contractor: SC Rye Brook Partners LLC - Jeff DuBois Address: 5 International Drive Suite 114, Rye Brook NY 10573 Phone# Cell# 914-224-5056 e-mail ell 3n_u19 This form must be properly completed & notarized by the Design Professional of record and the Property Owner. Failure to provide this completed form with your permit application will delay the permitting process. ! ****4: *******4: **4, *4:*4:z:}*1,4:**r•.4:** *$:;t:** Notice of Utilization of Truss Type, Pre-Engineered Wood, or Timber Frame Construction. Title 19 Part 1264 & 1265 NYCRR To: The Building Inspector of the Village of Rye Brook. From: 17F—JP^l S1-40 -L— 6'V14 i 044,--1 D 61 ��� ,teC'Ni% �4— Subject Property: 5 Primrose Lane SBL: 129.25-1-1.84Zone: PUD Please take notice that the subject; E�One or Two Family; ❑ Commercial, 2/New Structure ❑ Addition to an Existing Structure ❑ Rehabilitation to an Existing Structure to be constructed or performed at the subject property will utilize; &Truss Type Construction(TT) Pre-Engineered Wood Construction(PW) ❑ Timber Construction (TC) in the following location(s); ❑ Floor Framing, including Girders & Beams(F) ❑ Roof Framing(R) ❑'Floor Framing and Roof Framing (FR) Please note that prior to the issuance of the Certificate of Occupancy, the subject dwelling or building utilizing truss type, pre-engineered wood,or timber construction must be posted with a Truss Identification Sign, installed in conformance with NYCRR§1264 for Commercial Buildings, and NYCRR§iaGS for One&Two family Dwelli�,"�. Date Ix ot,al /01a 01 �� I Datc Pt, ner Idle Datc Not Public TRISHA MARTINEZ NOTARY PUBLIC-STATE OF NEW YORK No.01 MA6331843 Qualified in Dutchess County My Commission Expires 10-19-2023