Loading...
HomeMy WebLinkAbout02.04.2020 Exterior Building Permit3/21/19 EXTERIOR BUILDING PERMIT INSTRUCTIONS & PROCEDURES BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET, RYE BROOK, NY 10573 PHONE (914) 939-0668 FAX (914) 939-5801 www.ryebrook.org Applicants seeking an exterior building permit must first obtain approval from the Village of Rye Brook Architectural Review Board (ARB). A representative of the applicant must be present at the ARB meeting which is held on the 3rd Wednesday of every month, 7:30 p.m. at Village Hall in the main meeting room. Applications must be submitted to the Building Department by no later than the 1st Wednesday of the month in order to be considered for that month’s agenda. Please note that the agendas are limited to ten (10) applications per month. Once your application receives ARB approval, it must then be reviewed by the Building Inspector for compliance with all applicable state and local building codes, and for issuance of the permit. DO NOT START CONSTRUCTION UNTIL A PERMIT HAS BEEN ISSUED BY THE BUILDING INSPECTOR. THE ADMINISTRATIVE FEE FOR WORK PROGRESSED OR COMPLETED WITHOUT A PERMIT IS 12% OF THE TOTAL COST OF CONSTRUCTION WITH A MINIMUM FEE OF $750.00 & A MAXIMUM OF $6,000.00 APPLICANT’S INITIAL SUBMISSION TO THE BUILDING DEPARTMENT MUST INCLUDE: 1.A properly completed application with notarized signatures where indicated. 2.Application filing fee: Residential = $75.00 / Commercial = $250.00 (Application fees are non-refundable) 3.Completed & Signed Application Check List 4.Two (2) sets of dimensioned plans, (one full size {maximum allowable plan size = 36” x 42”} and one 11”x17”), depicting the location of all existing and proposed buildings and/or addition, alteration, repair, including proposed elevations & floor plans and all existing and proposed property setbacks. Plans must be signed & sealed by a NY State Registered Architect or NY State Licensed Professional Engineer. 5.Two (2) copies of a recent survey of the subject property. (one full size {maximum allowable plan size = 36” x 42”} and one 11”x17”) [A topographic survey is required for any proposed re-grading or work in a steep slope as defined by Village Code] 6.Photographs showing front & side views of the existing property as well as photographs of properties on either sides and across the street. 7.Samples of Materials and Finishes. (Sample boards may be presented at the meeting) 8.One electronic (disc) copy of all materials submitted. FOLLOWING APPROVAL BY THE ARB, THE APPLICANT MUST SUBMIT THE FOLLOWING: 1.Full payment of the building permit fee. (see permit fee schedule on the following page) 2.Your contractor’s valid Westchester County Home Improvement License. 3.Your contractor’s valid proof of liability insurance. (Village of Rye Brook must be listed as certificate holder) 4.Your contractor's valid proof of workers compensation insurance. (Form # C105.2 or Form # U26.3 / or NY State Workers Compensation Waiver) 5.The “Call Before You Dig” (code 53) Number. 6.Two (2) sets of sealed construction drawings; (one full size {max. allowable plan size = 36” x 42”} and one 11”x17”), 7.Fire sprinkler systems are required for all new buildings, for additions & alterations to commercial buildings and when finishing a third (3rd) floor in a 1 or 2 family dwelling. Any installations of a new, or modification to an existing fire suppression system, (fire sprinkler system, ANSL system, FM-200 system, Type I Hood, etc…) require a separate Automatic Fire Suppression System Permit application & two (2) sets of engineered plans. Fire sprinkler plans must be approved by the Building Inspector prior to the issuance of any permit, and Westchester County Department of Health approval is required for the fire sprinkler system’s backflow prevention device. I 3/21/19 BUILDING PERMIT FEE SCHEDULE: Commercial: $22.00 / $1000.00 of construction cost with a minimum fee of $250.00. Residential: Fee A For new construction/additions less that 800 sq. ft. in size and alterations, decks, patios or other work: $15.00 / $1000.00 of construction cost with a minimum fee of $100.00. Fee B For new construction/additions 800 sq. ft. in size or greater; Total Gross Floor Area x $225.00 x $15.00 / $1000.00 plus any alteration fees from Fee A above. EXPIRATIONS, CODES & REGULATIONS: “A building permit application that is dormant or otherwise inactive shall be deemed abandoned twelve months after the date of its submission to the building department.” (§91-2.1. Code of the Village of Rye Brook) “A building permit shall expire six months after its date of issuance if construction has not commenced. If construction has commenced within the six month period as set forth in this subsection, the building permit shall expire 12 months after its date of issuance if all of the proposed work has not been completed or a temporary certificate of occupancy has not been issued. Construction shall be deemed to have commenced when significant construction work on the project, as described on the building permit, has been performed. The Building Inspector shall have the authority to determine whether construction has commenced, and his or her decision shall be final.” (§91-2.b. Code of the Village of Rye Brook) Please note that should you fail to properly close out your permit prior to the expiration date in accordance with the law, you will be liable for the $500.00 Administrative Fee in connection with all expired Building Permits issued after January 1, 2003. Please note that this Administrative Fee applies to each individual permit and must be remitted in addition to any other required fees associated with closing the permit, as well as any court imposed fines should a summons be issued. HOURS FOR OPERATION OF CONSTRUCTION EQUIPMENT Weekdays: 8:00am to 6:00pm or dusk, whichever is earlier Saturdays: 9:00am to 4:00pm. Sunday & Holidays: NO CONSTRUCTION ACTIVITY ALLOWED (Holidays Include: News Year Day, January 1st; President’s Day, 3rd Monday in February; Memorial Day, last Monday in May; Independence Day, July 4th; Labor Day, 1st Monday in September; Thanksgiving Day, 4thThursday in November; Christmas Day, December 25th; when the holidays set forth fall on a Sunday, the holiday is observed the next day). (§158-4. Code of the Village of Rye Brook) It shall be the responsibility of the applicant, owner, or person in responsible charge to notify the Building Department at least 48 hours in advance to schedule all required inspections for site work, footings, foundation, drainage, framing, plumbing, electrical, fire blocking, fire suppression, insulation, final or any other required inspection. Please note that electrical inspections are performed by the Village’s third-party electrical inspection agency and must be scheduled by your licensed electrician. Electrical certificates, C/O application & fees and the final survey must be submitted prior to scheduling the final inspection. “It shall be unlawful for an owner to use or permit the use of any building or premises or part thereof hereafter created, erected, changed, converted or enlarged, wholly or partly, in its use or structure until a Certificate of Occupancy shall have been issued by the Building Inspector” (§250-10.A. Code of the Village of Rye Brook) Please keep these instruction sheets throughout the duration of the job for reference. II 3/21/19 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 FAX (914) 939-5801 www.ryebrook.org *********************************************************************************************************** ARCHITECTURAL REVIEW BOARD CHECK LIST FOR APPLICANTS This form must be completed and signed by the applicant of record and a copy shall be submitted to the Building Department prior to attending the ARB meeting. Applicants failing to submit a copy of this check list will be removed from the ARB agenda. Job Address:___________________________________ Parcel ID #:_______________________Zone:________ Proposed Improvement (Describe in detail): _____________________________________________ _____________________________________________ _____________________________________________ Property Owner:________________________________ Address: ______________________________________ Phone #_______________________________________ Applicant appearing before the Board: _____________________________________________ Address:______________________________________ Phone #______________________________________ Architect/Engineer: _____________________________ Phone #_______________________________________ Date of Submission: _____________________________ APPLICANT CHECK LIST: MUST BE COMPLETED BY THE APPLICANT The following items must be submitted to the Building Department by the applicant - no exceptions. 1. ( ) Completed Application 2. ( ) Two (2) sets of sealed plans. (one full size {maximum allowable plan size = 36” x 42”} and one 11”x17”) 3. ( ) Two (2) copies of the property survey. 4. ( ) Two (2) copies of the proposed site plan. 5. ( ) One electronic/disc copy of the complete application materials. 6. ( ) Filing Fee. 7. ( ) Any supporting documentation. 8. ( ) HOA approval letter. (if applicable) 9. ( ) Photographs. 10.( ) Samples of finishes /color chart. (a sample board or model may be presented the night of the meeting) By signature below, the owner/applicant acknowledges that he/she has read the complete Building Permit Instructions & Procedures, and that their application is complete in all respects. The Board of Review reserves the right to refuse to hear any application not meeting the requirements contained herein. Sworn to before me this ______________ Sworn to before me this ______________ day of _________________, 20_____ day of _________________, 20_____ ______________________________ ______________________________ Signature of Property Owner Signature of Applicant ______________________________ ______________________________ Print Name of Property Owner Print Name of Applicant ______________________________ ______________________________ Notary Public Notary Public III 900 King Street 129.68-1-13 PUD Demolition of existing office building and redevelopment of site with Senior Living Facility. 900 King Street Owner, LLC 200 Madison Avenue, 26th Floor, NY, NY 10016 212-481-1122 Veneziano & Associates 84 Business Park Drive,Suite 200, Armonk 914-273-1300 JMC 914-273-5225 February 4, 2020 X X X X X X X 3/21/19 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 FAX (914) 939-5801 www.ryebrook.org *********************************************************************************************************** FOR OFFICE USE ONLY: Approval Date: __________________ Permit #_________________ Application #_____________________ Approval Signature: _______________________________________ ARCHITECTURAL REVIEW BOARD: Disapproved: _____________________________________________ Date: _________________________________ BOT Approval Date: _______________ Case #___________________ Chairman: _____________________________ PB Approval Date: ________________ Case #____________________ Secretary: _____________________________ ZBA Approval Date: _______________ Case #____________________ _____________________________________ Other: ____________________________________________________ _____________________________________ Application Fee: _____________ Permit Fees: __________________ _____________________________________ *********************************************************************************************************** EXTERIOR BUILDING PERMIT APPLICATION Application dated: ___________________ is hereby made to the Building Inspector of the Village of Rye Brook, NY, for the issuance of a Permit for the construction of buildings, structures, additions, alterations or for a change in use, as per detailed statement described below. 1. JobAddress:__________________________________________________________________________________________ 2. Parcel ID#:____________________________________________________________ Zone: _________________________ 3. Proposed Improvement (Describe in detail): ________________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ 4. Property Owner: ___________________________________________________________________________________________________________ Address: ____________________________________________________________________________________________ Phone #___________________________Cell #_____________________________ e-mail __________________________ List All Other Properties Owned in Rye Brook: ______________________________________________________________ Applicant: _________________________________________________________________________________________________________________ Address: ____________________________________________________________________________________________ Phone #____________________________Cell #_____________________________e-mail __________________________ Architect: ___________________________________________________________________________________________ Address: ____________________________________________________________________________________________ Phone #____________________________Cell #_____________________________e-mail __________________________ Engineer: ___________________________________________________________________________________________ Address: ____________________________________________________________________________________________ Phone #____________________________Cell #_____________________________e-mail __________________________ General Contractor: ___________________________________________________________________________________ Address: ____________________________________________________________________________________________ Phone #____________________________Cell #_____________________________e-mail __________________________ (1) February 4, 2020 900 King Street 129.68-1-13 PUD Demolition of existing office building and redevelopment of Site with Senior Living Facility. 900 King Street Owner, LLC 200 Madison Avenue, 26th Floor, NY, NY 10016 212-481-1122 Perkins Eastman Architects, PC 422 Summer Street, Stamford, CT 09601 203-251-7400 JMC 120 Bedford Road, Armonk, NY 10504 914-273-5225 3/21/19 5. Occupancy; (1-Fam., 2-Fam., Commercial., etc…)Pre- construction:________________ Post-construction:_________________ 6. Area of lot: Square feet:_____________________________________________ Acres:_____________________________ 7. Dimensions from proposed building or structure to lot lines: front yard: _________________ rear yard: ________________ right side yard: __________________ left side yard: _________________ other: ___________________________________ 8. If building is located on a corner lot, which street does it front on:_______________________________________________ 9. Area of proposed building in square feet: Basement: _________ 1 st fl:__________ 2nd fl:____________ 3rd fl: ___________ 10. Total Square Footage of the proposed new construction: _______________________________________________________ 11. For additions, total square footage added: Basement: _________ 1 st fl:__________ 2nd fl:____________ 3rd fl:____________ 12. Total Square Footage of the proposed renovation to the existing structure: _________________________________________ 13. N.Y. State Construction Classification: _____________________ N.Y. State Use Classification: ______________________ 14. Number of stories: ___________________ Overall Height:___________________ Median Height: ____________________ 15. Basement to be full, or partial: _________________________, finished or unfinished: ______________________________ 16. What material is the exterior finish:_______________________________________________________________________ 17. Roof style; peaked, hip, mansard, shed, etc: _________________________ Roofing material:_________________________ 18. What system of heating:________________________________________________________________________________ 19. If private sewage disposal is necessary, approval by the Westchester County Health Department must be submitted with this application. 20. Will the proposed project require the installation of a new, or an extension/modification to an existing automatic fire suppression system? (Fire Sprinkler, ANSL System, FM-200 System, Type I Hood, etc…) Yes: _____ No: _____ (if yes, applicant must submit a separate Automatic Fire Suppression System Permit application & 2 sets of detailed engineered plans) 21. Will the proposed project disturb 400 sq. ft. or more of land, or create 400 sq. ft. or more of impervious coverage requiring a Stormwater Management Control Permit as per §217 of Village Code? Yes: _____ No: _____ Area: ______________ 22. Will the proposed project require a Site Plan Review by the Village Planning Board as per §209 of Village Code? Yes: ______ No: ______ (if yes, applicant must submit a Site Plan Application, & provide detailed drawings) 23. Will the proposed project require a Steep Slopes Permit as per §213 of Village Code Yes: ______ No: ______ (if yes, you must submit a Site Plan Application, & provide a detailed topographical survey) 24. Is the lot located within 100 ft. of a Wetland as per §245 of Village Code? Yes: ______ No: ______ (if yes, the area of wetland and the wetland buffer zone must be properly depicted on the survey & site plan) 25. Is the lot or any portion thereof located in a Flood Plane as per the FIRM Map dated 9/28/07? Yes : _____ No: ______ (if yes, the area and elevations of the flood plane must be properly depicted on the survey & site plan) 26. Will the proposed project require a Tree Removal Permit as per §235 of Village Code? Yes: ______ No: ______ (if yes, applicant must submit a Tree Removal Permit Application) 27. Does the proposed project involve a Home-Occupation as per §250-38 of Village Code? Yes: ______ No: ______ Indicate: TIER I:_____ TIER II:_____ TIER III:_____ (if yes, a Home Occupation Permit Application is required) 28. List all zoning variances granted or denied for the subject property: ______________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ 29. What is the total estimated cost of construction: $______________________________________ Note: The estimated cost shall include all site improvements, labor, material, scaffolding, fixed equipment, professional fees, including any material and labor which may be donated gratis. If the final cost exceeds the estimated cost, an additional fee will be required prior to issuance of the C/O. 30. Estimated date of completion:__________________________________________________________________________ (2) Office Senior Living 773,908 sf 17.77 ac 42'30' 330'248' TBD TBD TBDTBD 355,902 GSF TBD TBD 41.81'2 / 3 / 4 TBD TBD TBD TBD TBD TBD X X X X X X X X TBD TBD 3/21/19 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 FAX (914) 939-5801 RESIDENTIAL LOT AREA COVERAGE Address: Section: Block: Lot: ______ ___ PERMITTED COVERAGE RATIOS IN RESIDENTIAL DISTRICTS (Local Law 3-88) Existing: Proposed: 1. AREA OF LOT Sq. Ft. Sq. Ft. 2. AREA OF HOUSE a. Coverage of Main Building (Including Attached Garage or Accessory Building) Sq. Ft. Sq. Ft. b.Area of 1st Floor Divided By Area of Lot x 100 % % 3. AREA OF ACCESSORY BUILDING (Includes Detached Garages, Tool Shed, Playhouses) Sq. Ft. Sq. Ft. a. Coverage of Accessory Building Area of Accessory Building Divided By Area of Lot x 100 % % 4. AREA OF DECK Sq. Ft. Sq. Ft. a. Coverage of Deck Area of Deck Divided By Area of Lot x 100 % % I attest to the best of my knowledge and belief, the above information is correct. _____________________________ Architect’s Signature (3) YOUR ZONE (CHECK) ZONE DISTRICT AREA IN SQ. FEET MAIN BLDG. MAX. ACCESS. BLDG. DECK MAX. R-35 35,000 14% 4% 5% R-25 25,000 14% 3.5% 4% R-20 20,000 14% 3.5% 4% R-15 15,000 16% 3.5% 4% R-15A 15,000 12% 3.5% 4% R-12 12,500 17% 4% 4% R-10 10,000 20% 4.5% 3.5% R-7 7,500 23% 4.5% 3.5% R-5 5,000 30% 5% 3.5% R-2F 5,000 30% 5% 3.5% 900 King Street 129.68 1 13 773,908 773,908 2.19 ac 2.93 ac 12.22 16.49 (all buildings proposed) BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 Fax (914) 939-5801 IMPERVIOUS COVERAGE RATIOS RESIDENTIAL DISTRICTS Address: Section: Block: Lot:________Zone: _ IMPERVIOUS SURFACES (Definition): All buildings, as defined herein, and all areas on the ground or elevated above the ground which are comprised of materials through which water cannot readily flow, including, but not limited to asphalt, concrete, masonry, wood, gravel and clay, and which consist of elements including, but not limited to, court yards, sports courts, swimming pools, patios, sidewalks, ramps, terraces and driveways. *”Base Lot Area” is the minimum end of the lot size range in the “Lot Area” column I attest to the best of my knowledge and belief, the above information is correct. _____________________________ Architect’s Signature (4) 3/21/19 LOT AREA (sq.ft.) TOTAL MAXIMUM PERMITTED COVERAGE BY IMPERVIOUS SURFACES For Base Lot Area (sq.ft.)* For Lot Area Over Base Lot Area (%) 0 to 4,000 0 55 4,001 to 6,000 2,200 35 6,001 to 12,000 2,900 27 12,001 to 16,000 4,520 26 16,001 to 20,000 5,560 25 20,001 to 30,000 6,560 24 30,001 to 40,000 8,960 23 40,001 & larger 11,260 22 Zoning District MAX. PERMITTED IMPERVIOUS COVERAGE IN FRONT YARD (%) R-35 15 R-25 20 R-20 30 R-15 35 R-15A 35 R-12 40 R-10 45 R-7 40 R-5 30 R2-F 30 Area of lot:_____________sq.ft. Existing Allowed Proposed Total impervious coverage = Sq.ft. Sq. ft. Sq.ft. Front impervious coverage = % % % 900 King Street 129.68 1 13 PUD 773,908 7.46 ac 6.76 ac 3/21/19 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 FAX (914) 939-5801 BULK REGULATIONS IN RESIDENTIAL DISTRICTS Address: Section: Block: ___ Lot: ______ ___ MAXIMUM GROSS FLOOR AREA USE FORMULA: Maximum Gross Floor Area = 4,000 + [ (Lot Area – 21,780) x 0.11478421 ]: a. Allowed = Sq. Feet b. Existing = Sq. Feet c. Proposed = Sq. Feet HEIGHT/SETBACK RATIOS FOR RESIDENTIAL DISTRICTS DEFINITION: A standard designed to regulate the height of a building in relation to the average grade of the corresponding portion of the lot line from which it is set back. The ratio modifies the maximum permitted Height of Building by forming an inclined plane beginning at the average grade along the portion of the lot line from which the setback is measured and rising toward the building at the specified ratio above which no part of any building, other than minor architectural features such as chimneys, skylights and dormer windows not covering more than 10% of the entire roof area, shall be permitted to extend. Height and Setback shall be calculated using the formula; Height / Setback = X, where X is the required side or front yard ratio for the zoning district in which a property is located as specified in Article VIII of Chapter 250. A complete elevation view for the proposed improvement must be included on the drawings. FILL IN YOUR RATIOS: I attest to the best of my knowledge and belief, the above information is correct. _____________________________ Architect’s Signature (5) ZONE EXISTING PROPOSED REQUIRED R-35 FRONT: SIDE: FRONT: SIDE: FRONT: .44 SIDE: 1.20 R-25 FRONT: SIDE: FRONT: SIDE: FRONT: .48 SIDE: 1.30 R-20 FRONT: SIDE: FRONT: SIDE: FRONT: .60 SIDE: 1.60 R-15 FRONT: SIDE: FRONT: SIDE: FRONT: .60 SIDE: 1.60 R-15A FRONT: SIDE: FRONT: SIDE: FRONT: .80 SIDE: 2.40 R-12 FRONT: SIDE: FRONT: SIDE: FRONT: .69 SIDE: 1.60 R-10 FRONT: SIDE: FRONT: SIDE: FRONT: .80 SIDE: 2.40 R-7 FRONT: SIDE: FRONT: SIDE: FRONT: .96 SIDE: 3.00 R-5 FRONT: SIDE: FRONT: SIDE: FRONT: 1.20 SIDE: 4.00 R-2F FRONT: SIDE: FRONT: SIDE: FRONT: 1.20 SIDE: 4.00 900 King Street 129.68 1 13 PUD Requirements are different159,930 215,000 355,902 Not applicable to PUD 3/21/19 ****************************************************************************************** Table R301.2(1) 2015 IRC CLIMATIC & GEOGRAPHIC DESIGN CRITERIA FOR RESIDENTIAL DISTRICTS IN RYE BROOK (5a) GROUND- SNOW LOAD WIND SPEED (mph) TOPOGRAPHIC WIND EFFECTS SPECIAL WIND REGION WIND- BOURNE DEBRIS ZONE SEISMIC DESIGN CATAGORY WEATHERING 20 psf 115/120 NO NO NO C SEVERE FROST LINE DEPTH TERMITE PROTECTION REQUIRED WINTER DESIGN TEMP. ICE BARRIER UNDERLAYMENT REQUIRED FLOOD HAZARDS AIR FREEZING INDEX MEAN ANNUAL TEMP. 42” YES 15 YES FIRM MAP 36119C0279F 9/28/07 500 52.2 3/21/19 BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET RYE BROOK, NY 10573 (914) 939-0668 FAX (914) 939-5801 www.ryebrook.org ******************************************************************************************************* AFFIDAVIT OF COMPLIANCE VILLAGE CODE §216 • STORM SEWERS AND SANITARY SEWERS THIS AFFIDAVIT MUST BEAR THE NOTARIZED SIGNATURE OF THE LEGAL PROPERTY OWNER AND BE SUBMITTED ALONG WITH ANY BUILDING OR PLUMBING PERMIT APPLICATION. ANY BUILDING OR PLUMBING PERMIT APPLICATION SUBMITTED WITHOUT THIS COMPLETED AND NOTARIZED FORM WILL BE RETURNED TO THE APPLICANT. STATE OF NEW YORK, COUNTY OF WESTCHESTER ) as: I, __________________________________, residing at, ____________________________________________ (Print name) (Address where you live) being duly sworn, deposes and states that (s)he is the applicant above named, and further states that (s)he is the legal owner of the property to which this Affidavit of Compliance pertains at; ___________________________________________________________________________, Rye Brook, NY. (Job Address) Further that all statements contained herein are true, and that to the best of his/her knowledge and belief, that there are no known illegal cross-connections concerning either the storm sewer or sanitary sewer, and further that there are no roof drains, sump pumps, or other prohibited stormwater or groundwater connections or sources of inflow or infiltration of any kind into the sanitary sewer from the subject property in accordance with all State, County and Village Codes. ______________________________________________________________________ (Signature of Property Owner(s)) _________________________________ _____________________________________ (Print Name of Property Owner(s)) Sworn to before me this _______________ day of ___________________, 20_______ ___________________________________ (Notary Public) (6) This form must be properly completed & notarized by the Design Professional of record and the Property Owner. Failure to provide this completed form with your permit application will delay the permitting process. ************************************** Notice of Utilization of Truss Type, Pre-Engineered Wood, or Timber Frame Construction. Title 19 Part 1264 & 1265 NYCRR To: The Building Inspector of the Village of Rye Brook. From: ________________________________________________________________________ Subject Property: __________________________________SBL: ______________Zone: _____ Please take notice that the subject; □ One or Two Family; □ Commercial, □New Structure □Addition to an Existing Structure □Rehabilitation to an Existing Structure to be constructed or performed at the subject property will utilize; □Truss Type Construction (TT) □Pre-Engineered Wood Construction (PW) □Timber Construction (TC) in the following location(s); □Floor Framing, including Girders & Beams (F) □Roof Framing (R) □Floor Framing and Roof Framing (FR) Please note that prior to the issuance of the Certificate of Occupancy, the subject dwelling or building utilizing truss type, pre-engineered wood, or timber construction must be posted with a Truss Identification Sign, installed in conformance with NYCRR §1264 for Commercial Buildings, and NYCRR §1265 for One & Two Family Dwellings. _______________________ __________________________________ Date Design Professional __________________________________ ___________________________________________________ Date Property Owner __________________________________ __________________________________________________ Date Notary Public (7) TBD TBD TBD 3/21/19 This application must be properly completed in its entirety by a N.Y. State Registered Architect or N.Y. State Licensed Professional Engineer & signed by those professionals where indicated. It must also include the notarized signature(s) of the legal owner(s) of the subject property, and the applicant of record in the spaces provided. Any application not properly completed in its entirety and/or not properly signed shall be deemed null and void, and will be returned to the applicant. Please note that application fees are non-refundable. ********************************************************************************************************** STATE OF NEW YORK, COUNTY OF WESTCHESTER ) as: _________________________________, being duly sworn, deposes and states that he/she is the applicant above named, (print name of individual signing as the applicant) and further states that (s)he is the legal owner of the property to which this application pertains, or that (s)he is the _________________________________________ for the legal owner and is duly authorized to make and file this application. (indicate architect, contractor, agent, attorney, etc.) That all statements contained herein are true to the best of his/her knowledge and belief, and that any work performed, or use conducted at the above captioned property will be in conformance with the details as set forth and contained in this application and in any accompanying approved plans and specifications, as well as in accordance with the New York State Uniform Fire Prevention & Building Code, the Code of the Village of Rye Brook and all other applicable laws, ordinances and regulations. By signing this application, the property owner further declares that he/she has inspected the subject property, and that to the best of his/her knowledge there are no roof drains, sump pumps or other prohibited stormwater or groundwater connections or sources of infiltration into the sanitary sewer system on or from the subject property. Sworn to before me this ______________ Sworn to before me this ______________ day of _________________, 20_____ day of _________________, 20_____ ______________________________ ______________________________ Signature of Property Owner Signature of Applicant ______________________________ ______________________________ Print Name of Property Owner Print Name of Applicant ______________________________ ______________________________ Notary Public Notary Public (8) If you’re working on homes, schools or day care centers built pre-1978, you now must be EPA Lead-Safe Certified. WHAT The Lead-Based Paint Renovation, Repair and Painting (RRP) rule is a federal regulatory program affecting anyone who disturbs painted surfaces where lead may be present. • Submit an application to certify your firm for five years. • A one-day class will certify your renovators for five years. • Learn the required steps to contain the work area, minimize dust and thoroughly clean up every day. WHO • Any contractor, including renovators, electricians, HVAC specialists, plumbers, painters and maintenance staff, who disrupts more than six square feet of lead paint in pre-1978 homes, schools, day care centers and other places where children spend time. WHY 1. Avoid risk of government fines and civil liability: - Without certification and by not following approved practices, you and your company can face tens of thousands of dollars in fines and put yourself and your company at risk of potential lawsuits. 2. Protect your workers, yourself and your customers from a health risk: - Dust from renovation, repairs and painting can contaminate an entire home and, if inhaled or ingested, can cause irreversible damage to children and adults. 3. Gain competitive advantage: - Certification makes you stand out from others and positions you as a professional contractor consumers can trust. Using your company’s certification in your marketing materials may help attract business. - Consumers will look for the certification before hiring contractors and may be more accepting of additional costs and time associated with doing the job safely. - Upon certification of your firm, your company will be listed as a Lead-Safe Certified Contractor on the EPA website, giving your firm the potential for new customers. WHERETo find an accredited trainer in your local area or get additional info, go to epa.gov/getleadsafe or call 800-424-LEAD. WHEN Now – Certification requirements begin April 22, 2010. IF YOU’RE NOT LEAD-SAFE CERTIFIED,DISTURBING JUST SIX SQUARE FEET COULD COST YOUBIG TIME. CERTIFIED F I R M L E A D-SAFE GET LEAD-SAFE CERTIFIED BY APRIL 22, 2010. BUILDING DEPARTMENT VILLAGE OF RYE BROOK 938 KING STREET, RYE BROOK, NEW YORK 10573 (914) 939-0668 - FAX (914) 939-5801 www.ryebrook.org APPLICATION FOR CERTIFICATE OF OCCUPANCY, CERTIFICATE OF COMPLIANCE, AND CERTIFICATION OF FINAL COSTS TO BE SUBMITTED ONLY UPON COMPLETION OF ALL WORK, AND PRIOR TO THE FINAL INSPECTION ***************************************************************************************************************************** Address: __________________________________________________________________________________________ Occupancy / Use: ______________ Parcel ID #:__________________________________________ Zone: ___________ Owner: ____________________________________________ Address: _______________________________________ P.E./R.A. or Contractor: _______________________________Address: _______________________________________ Person in responsible charge: ___________________________Address: _______________________________________ Application is hereby made and submitted to the Building Inspector of the Village of Rye Brook for the issuance of a Certificate of Occupancy / Certificate of Compliance for the structure/construction/alteration herein mentioned in accordance with law: STATE OF NEW YORK, COUNTY OF WESTCHESTER as: ______________________________being duly sworn, deposes and says that he/she resides at____________________________________ (Print Name of Applicant) (No. and Street) in _________________________________, in the County of_____________________________________ in the State of _________, that (City/Town/ Village) he/she has supervised the work at the location indicated above, and that the actual total cost of the work, including all site improvements, labor, materials, scaffolding, fixed equipment, professional fees, and including the monetary value of any materials and labor which may have been donated gratis was: $ __________________________________________________________________________________, for the construction or alteration of: __________________________________________________________________________________ _______________________________________________________________________________________________________________ Deponent further states that he/she has examined the approved plans of the structure/work herein referred to for which a Certificate of Occupancy / Compliance is sought, and that to the best of his/her knowledge and belief, the structure/work has been erected/completed in accordance with the approved plans and any amendments thereto except in so far as variations therefore have been legally authorized, and as erected/completed complies with the laws governing building construction. Deponent further understands that it shall be unlawful for an owner to use or permit the use of any building or premises or part thereof hereafter created, erected, changed, converted or enlarged, wholly or partly, in its use or structure until a Certificate of Occupancy or Certificate of Compliance shall have been duly issued by the Building Inspector as per §250-10.A. of the Code of the Village of Rye Brook. Sworn to before me this ______________ Sworn to before me this ____________ day of _________________, 20_____ day of _________________, 20_____ ______________________________ ______________________________ Signature of Property Owner Signature of Applicant ______________________________ ______________________________ Print Name of Property Owner Print Name of Applicant ______________________________ ______________________________ Notary Public Notary Public 3/21/19 For office use only: PERMIT # __________ ISSUED:____________ DATE:_____________ FEE: _____________PAID p