HomeMy WebLinkAboutPlans 7.15.1986I ll� "I - 11 11 \1\\,/ F- �� T P,
DATE
'�i • co
JOB �
DWG 0�
_v
d
6�
Y t
1
P €t 4
t
x � 4
4stt>4F co—0
ti
i
i
i
ti
_ — s
— r
s
f Y
TI
F
y... + w.A. ,..
a
1 W-1,006
NO
?i
F
_ — s
— r
s
f Y
TI
F
y... + w.A. ,..
JACK P. FERMERY!TES
A R C H t i tr C T S P C
` 239 ?___EX`N(�TON AVE_ MT. KISCO, N.Y. 10549 666 3858
a
1 W-1,006
NO
F
s
r
r
J
'
r 4
a
77
r. !�
;
r
�i
t
d
y
JACK P. FERMERY!TES
A R C H t i tr C T S P C
` 239 ?___EX`N(�TON AVE_ MT. KISCO, N.Y. 10549 666 3858
SPECIFICATIONS: These specifications are made in general form
only and not specifically. for any one building. The Owner in
applying, these specifications assumes complete responsibility
for their use, changes or omissions.
FLOORS: Wood floors shall be 25/32 strip oak securely nailed to
joists over a layer of rosin paper. Composition floors shall be
1/1611 vinyl asbestos set in mastic on concrete or 5/811 exterior
A/C plywood underlayment in joist areas.
ROOFING AND SHEETMETAL: Roofing to be 235# asphalt shingles
2:,/ -10 SCOPE OF WORK: The Contractor shall provide all labor, mat-
erials, appliances and equipment required to complete all work, All chimneys, valleys, vertical inter -
in f lt.
laid on roof g e
etc., as shown on drawings, necessary for a complete job, un -
sections shall be properly flashed with copper or aluminum
lefis otherwise specified. All material and workmanship shall
----- - flashing. Leaders and gutters shall be white enamel aluminum
be of good quality. properly supported.
INSULATION: Shall be fiberglass batts with vapor barrier.
CODES: All work and materials must conform to the local build-
ing code, plumbing code, National Board of Fire Underwriters Roof and ceilings adjoining attic 6" thick. Exterior walls 33-"
code and requirements of the Board of Health. thick. Floors over garage 6" thick. Provide foundation in -
24
X", slat on as required by State Building Code,
N"
AA N
J
MATERIALS: Shall be installed according to their manufacturers
specifications.
n ROOFVENTILATION: Ventilate all attic and rafter space's wi th
proper sized sc*Feened ridge and soffit vent or louvers.
EXCAYAI I Qd
A
SHEETROCK: Shall be 1/2" nailed with rosin nails according to
FOUNDATION: Excavate all earth, boulders, loose and soft rock
the ma cturer's specifications,,. All joints to be taped and
'of oint compound,
to the lines and depths Andicated on drawings. All footings to to, receive 3 coats, Fi,ntsb to be smbdth,and
bear on solid undisturbe
d earth. Excavate for all utilities as
even, ready for painting.
4 L
r equ
ired.
IT WOK
A y to,
141 -
FINISH GRADING: Finish grading shall be established to provide
surface drainage in all away from house and exca- CERAMIC TILE: Baths and lavatory floors to receive mat ceramic
fifl—eon cement grout and galvanized wire lath. Tub and shower
vated areas.
walls to receive glazed ceramic tile set in mastic 61 high.
IRY AND CO TE
MAM
NTS: Provide ceramic accessories such
ACCESSORIES AND ATTACHME
CONCRETE: Shall be a minimum of 3,000 p.s.i. in strength.
. ... .. as 1'soap d5h, tomfeFholder, I paper holder, I tub grab
bar, 2 towel bars per bath. Provide 32"x22" sliding mirror
CONCRETE FLOORS: Shall have asmooth dense steel trowel finish,
medicine cabinet with light over. Provide formica stock vanity
J 4,o$_79r� J�PLVMJ&*z, o�xo suitable to receive composition flooring. Concrete floors in cabinet where shown on plans.
777-77, M
7'
living areas shall have poly. film vapor barrier and I" rigid
__;4
insulation around perimeter of slab. Pitch all garage and porch
floors for drains ge.
�411 Ta VJar4-rHF-;2`)
EXTERIOR: Facias and trim shall receive 1 prime coat and 1
CONCRETE BLOCK: Shall be laid level, plumb and straight in a finish coat exterior paint.
full bed of cement mortar. Exposed joints to be well tooled.
BRICK OR STONE VENEER: Shall be as shown on plans, laid in
cement moTsame as block) with galvanized.ties 24" horizon-
rtar
tal and vertical. All joints to be well tooled.
CHIMNEYS AND FIREPLACES: Where shown on plans, shall be brick
or stone where exposed and laid in a full bed of cement mortar
gip."I with tooled joints. Flues to be fire clay, size shown on plans.
r.
Provide cast iron damper ash nit and clean out doors All fire-
places properly designed to function adequately. Pre -fab flues,.
if shown, shall have metalbestos or equal. UL approved.
DAMPROOFING: Foundation wall shall be damproofed with 2 coats
of asphalt waterproofing over 1/2" cement plaster. Provide 4"
perforated asphalt pipe footing drain laid in 12" stone with a
layer of salt hay over. Drain to outflow above ground or
4'x4'x4' stone drywell.
CARHERY
FRAMING: Framing of the entire house shall be erected plumb,
Teve and true, securely nailed. Joists, studs and rafters
shall be doubled about all'
-openings. All flush joints headers
shall I hall be connected with metal joist hanger. Double frame un-
der all partitions paral leif,`' to? -framing, Sizes of joists,
sheathing and rafters are shownon plans.
WINDOWS: Shall be AN0St2a_7&"i\`
SLIDING GLASS DOORS: Shall be B.E. aluminum, with temp. insul.
glass and screens.
SIDING: Shall, be 9-;�E�VFL. 4:;F_pAp
. I . 74" TO WF_AaP-)
DOORS: Exterior doors shall be 1-3/4" insulated pre -hung steel
or wood set in pine frames, complete with weatherstripping,
aluminum saddles and hardware. nterior doors shall be 1-3/8".
flush mahogany stain grade or 6 panel pre -hung units complete
with hardware and colonial casing. Sliding, bi-fold and pocket
doors shall be 1-3/8" flush mahogany or pine louver doors as
shown on plans complete with "Kentrack" or "grant" hardware.
Provide a self closing fire door between garage and house.
TRIM: Shall be stock sections of pine Colonial pattern and shall
be neatly fitted and mitered and complete, including doors and
window casing, aprons and stools, base and quarter rounds at
floor. Closets to have one 3/4" shelf with clothes pole ade-
quately supported,
I inan rl^ca+c to have ,f4;,,c+a:,1® 11V
shelves.
F -V
INTERIOR: Walls and trim to receive I prime coat and I finish
coat of vinyl flat. Flush doors to receive I coat stain and I
coat of varnish. Floors to be sanded and receive 1 coat of
sealer and I coat Fabulon varnish.
Shall be 04I-Pfired forced warm air system with all controls,
thermostats, humidifiers, filters, etc., as required. Provide
supply and return to each room. Provide minimum 50 gallonglass
lined, high recovery UL approved gas or electric domestic hot
water heater. Heating system shall be designed and guaranteed
to maintain"? V indoor temperature with 00 outdoor temperature.
PIPING: Water drainage and vent piping shall,be copper, pro-
perly sized, compl,ete with fixture. shut-off valves, and hose
bibs. Drains under concrete to be cast iron.
FIXTURES: As shown on plans shall be American Standard or equal
colored fixtures. All exposed fittings and pipe to bechrome
plated.
SEPTIC AND WELL SYSTEMS: (-If required) shall conform to all
requirements 'of t ounty Board of Health,
CTRICAL
Provide a minimum 120/208v-150 amp, or larger, if required, ser-
vice. Switches to be silent type. Locations of outlets, fix-
tures, etc. shown, oil plans. All electric work to conform to
the National Board of Fire Underwriters code. Provide exhaust
fans where required. Provide complete door bell system. Pro-
vide smoke detector as per code.
KITCHEN CABI NEU MD APE IMM
Provide stock hardwood or laminatedplastic cabinets with lam-
inated plastic top and back splash as shown on drawings. Cab-
inets to have stain and lacquer finish: Provide standard
quality range, hood and exhaust fan, oven and dishwasher.
Provide 2" blacktop driveway, 4" gravel base to street. Side-
walks to be 3' wide 4" concrete or 2" flagstone laid,in sand,
from house to driveway. Provide top soil andt seed to all areas
disturbed by construction.
DATE 418(,