Memorandum
To: Village of Rye Brook: Board of Trustees; Staff; Consultants
From: Peter Feroe, AICP
Date: January 3, 2020
Re: 900 King Street: Revised pFEIS
cc: 900 King Street Project Team
Summary
This submission contains the second draft of the preliminary Final Environmental Impact Statement
(pFEIS) for the 900 King Street Redevelopment project. As you know, the Applicant submitted the first
draft of the pFEIS on May 14, 2019. On June 27, 2019, the Board of Trustees deemed the pFEIS incomplete
and required changes to the document that responded to Board member comments as well as the five (5)
staff and consultant memoranda. This second draft of the pFEIS is provided in response to the comments
(Board and consultants) provided on the first draft of the pFEIS.
Subsequent to receipt of the Board and staff/consultant comments, the Applicant and its consultants worked
with the Village’s staff and consultants to develop responses and appropriate edits to the pFEIS. In July
2019, revised pFEIS chapters, as well as several revised and new figures, appendices, and site and
architectural plans, were transmitted to the Village’s Planning Consultant, Consulting Engineer, Consulting
Special Engineer, and Village Attorney. Based on their review of the July transmission, the Applicant
continued working with the Village’s consultants to address the few remaining technical issues. As a result
of this coordination, the Applicant believes that this second complete pFEIS submission addresses all
staff/consultant comments on the first draft of the pFEIS.
With respect to the Village Board’s comments on the first draft of the pFEIS, the Applicant has further
reduced the density of the revised project. Specifically, an additional 16 Independent Living (IL) units were
removed from the program. The program now includes 136 IL units – a 15 percent reduction from the
originally proposed project in the DEIS – 20 townhouse units (a reduction of 4 from the original project),
and 94 Assisted Living beds. In addition, the gross square footage of the revised project was reduced by
another 20,280 gsf. The newly revised project now proposes 355,902 gsf – a 20 percent reduction from the
originally proposed project.
Village of Rye Brook 2 January 3, 2020
Contents of Revised pFEIS
All documents associated with this submission are available at: http://bit.ly/900KingJan2020pFEIS. In
addition, and as indicated below, certain documents are also being provided in hard copy.
Volume 1 - Chapters
The pFEIS Chapters, which are redlined to the 5/14/2019 version, together with all pFEIS Figures, are
being provided in hard copy. (Note: In addition to the version redlined to the 5/14/2019 pFEIS, staff and
consultants are also being provided with a version of the pFEIS Chapters redlined to the last full version
they saw, 7/24/2019.)
Volume 2 - Appendices
The majority of the appendices have not been modified since the May 2019 submission. Therefore, hard
copies of the entirety of Volume 2 are not being provided at this time. However, hard copies of the following
new/modified appendices are being provided for your consideration. They are included at the end of the
5/14/2019 redlined version:
Appendix A: Revised Proposed Zoning
Appendix I-1: Revised Trip Generation Tables for TIS
Appendix L: Proposed Construction Start Time Waiver Local Law
Volume 3 – Public Comments
This is only being provided electronically. This volume has not changed since the May 2019 submission.
Volume 4 – Engineering and Architectural Plans
Hard copies of the revised architectural and engineering plans are being submitted with the pFEIS
submission as follows (additional copies can be delivered if requested):
Board of Trustees: Five (5) Reduced Size Sets submitted with revised pFEIS
Village Manager: One (1) Reduced Size Set submitted with revised pFEIS
Building Inspector: One (1) Full Size Set submitted with revised pFEIS / site plan application
Village Engineer: One (1) Full Size Set submitted with revised pFEIS / site plan application
Village Attorney: One (1) Reduced Size Set (sent by JMC directly)
Village Consulting Engineer: One (1) Full Size Set (sent by JMC directly)
Village Consulting Planner: One (1) Full Size Set (sent by JMC directly)
(continued)
Village of Rye Brook 3 January 3, 2020
Additional Responses to pFEIS Comments
Certain of the staff/consultants’ comments on the 5/14/2019 pFEIS did not require a change to the pFEIS text or
required additional explanation outside of changes to the text and plans. The responses below provide that
additional explanation.
Please note that these comments were addressed with the appropriate staff/consultant prior to submission of this
draft of the pFEIS. As such, these responses are being provided for the record. All other staff/consultant
comments were addressed within the revised pFEIS Chapters, Figures, Appendices, or Plans and are not
separately discussed below.
June 24, 2019 Revised Memorandum from Frederick P. Clark Associates, Inc.
29 – A new outlet control structure could be installed in the existing stormwater basin to further
reduce peak flow rates. The Applicant notes, however, that a new structure is not required to
mitigate an impact of the Revised Proposed Project, but rather to improve an existing, off-Site
condition.
43 – The Rye Town Assessor has not provided the Applicant with an estimated assessed value for
the Revised Proposed Project. An estimated assessed value, based on the per unit value of the Atria,
Rye Brook, is provided in the DEIS.
54 – The Applicant anticipates that completion of the water system improvements described in the
FEIS will be a condition of Site Plan approval. The Applicant has requested from Suez additional
information regarding the extent to which other areas within the Village would benefit from the
proposed improvements.
56 – The emergency power systems have not been designed at this point in the process. If the
generators require permits from the Westchester County Department of Health, the Applicant will
secure the necessary permits.
57 – The emergency power systems have not been designed at this point in the process.
118 – The HVAC systems have not yet been designed. The potential for noise impacts from the
Project’s HVAC systems is addressed in the FEIS.
120 – The response conforms to the review and recommendations of HDR.
131 – All stormwater runoff from the townhouse roofs would be captured in gutters and conveyed
through roof drain leaders into the proposed drainage system. The runoff would either be treated in
the proposed infiltration basin IA-2 or the existing stormwater basin. These leaders will be added
to Sheet C-500, “Utilities Plan,” during the Site Plan approval process.
139 – As stated in section 2.13.3, “Air Quality: Parking Analysis,” the garage will vent using one
or more areaways with a minimum airflow of 0.75 cubic feet per minute of fresh air per gsf of
garage area.
140 – The current floor plans for the IL building indicate there will be four exit stairs serving the
garage, which, based on a preliminary code review, exceeds the minimum number of stairs
required. These stairs will egress directly to the outside of the building at grade. In addition, the
garage will be serviced by five elevators, at least one of which will be sized to fit a gurney and
provided with emergency electrical power. Finally, in the event that the elevator banks and all four
stairs are not operable, emergency personnel could access the garage from the vehicular ramp in an
emergency situation.
141 – The Applicant’s engineer has verified that the accepted handicap symbol is being utilized on
the Site Plans.
142 – The location of the floor drains, oil separator location(s), and grease interceptor will be
finalized during the Site Plan approval process. Final locations would be shown on Sheet C-500,
“Utilities Plan.”
Village of Rye Brook 4 January 3, 2020
June 24, 2019 Memorandum from Keane & Beane, P.C.
1 – No response required. The environmental review of the demolition has not been segmented
from the overall project.
2 – No response required.
June 14, 2019 Memorandum from Anthony Oliveri, P.E., Dolph Rotfeld Engineering
1 – No response required.
2 – The Applicant has proposed to contribute an amount equivalent to the per gallon contribution
of other recently approved Village projects and will work with the Village Engineer, Engineering
Consultant, and Village Attorney to determine this amount.
3 – No response is required. The environmental review of the demolition has not been segmented
from the overall project.
4 – Sheet C-500, “Utilities Plan,” has been revised.
5 – Sheet C-520, “Sanitary Sewer Profiles,” has been revised. The minimum slope is now 0.53%.
The reaches with the two flattest runs (SMH-1-1 to SMH-1-2 (0.53%) and SMH-1-2 to SMH 1-3
(0.57%)) are at the end of the proposed run of sanitary sewer pipe and will be carrying enough flow
to keep those pipes running clear.
6 – No response is required.
June 14, 2019 and October 10, 2019 Memorandum from HDR
With respect to the implementation of a construction-period noise-wall along the Site boundary with the
Arbors and the Site Boundary with Village Hall/PD/FD, we offer the following in support of the Applicant’s
position that the construction-period noise wall is not necessary along the construction area’s border with
the Arbors or Village Hall:
Arbors - The maximum exterior noise level during construction at the single closest townhouse unit
in the Arbors is approximately 70.1 dBA. Standard facade attenuation would be expected to result
in interior noise levels of approximately 45 dBA, which is considered acceptable. Maximum
exterior noise levels of 70.1 dBA (a 12.0 dBA increase) would occur during periods of the
approximately six months of site demolition/ground clearing. Increments of 9 dBA (up to 67.1
dBA) would occur during periods of another 11 months. The demolition/ground clearing estimates
are conservative in nature and assume simultaneous demo and ground clearing activities closest to
the receptor. As discussed during the demolition application, this simultaneous demo/clearing is
not likely to occur, certainly not that close to the Arbors. At other locations in the Arbors, this
increase would be lower.
Village Hall/ PD/ FD - It is our opinion that these are not sensitive receptors, which generally
include residential uses. The maximum approximately 12 dBA noise increment would occur during
portions of the approximately 5-month framing of the AL building. Increments of 9 dBA would
occur during demolition and ground clearing, which would last six months in total, but would be
proximate to the receptor for only a portion of that timeframe. The Applicant does not know if there
are sleeping quarters at the PD/FD and, if so, whether they are utilized during daytime hours.
Certainly, if sleeping quarters are not present, or not regularly utilized during the day, the noise
wall would not be necessary.
Village of Rye Brook 5 January 3, 2020
June 21, 2019 Memorandum from the Emergency Services Task Force (ESTF)
1 – The Applicant’s engineer will coordinate the final layout of the access roadway with the ESTF
during Site Plan approval to ensure adequate access for the appropriate emergency vehicles is
provided.
2 – The truck turning analysis has been updated as shown on drawing C-320, “Fire Truck,
Emergency Vehicle & Truck Turning Plan.”
3 – A second vehicular entry/exit point is not needed for traffic flow and would adversely affect
the amount of grading required on the Site, the steep slopes created on the Site, and the overall
amount of Site impervious coverage. See Response to Comment 4 with respect to pedestrian access
to the underground garage.
4 – The Applicant will coordinate with the ESTF to address concerns with respect to pedestrian
access to and from the underground garage during the Site Plan approval process. The current floor
plans for the IL building indicate there will be four exit stairs serving the garage, which, based on
a preliminary code review, exceeds the minimum number of stairs required. These stairs will egress
directly to the outside of the building at grade. In addition, the garage will be serviced by five
elevators, at least one of which will be sized to fit a gurney (as required by NYSBC) and provided
with emergency electrical power. Finally, in the event that all five elevators banks and all four stairs
are not operable, emergency personnel could access the garage from the vehicular ramp in an
emergency situation.
5 – Pursuant to Building Code requirements, the garage is designed with 8’-2” clear ceiling height
from the garage entry to/from handicap parking spaces and a minimum 7’-0” in the remainder of
the garage.
6 – The loop road surrounding the AL and IL building was designed at 26 feet wide to allow fire
truck access to the AL and IL building, which is over 30 feet in height. Because the townhouses
are not more than 30 feet in height, New York State Fire Code would not require a 26-foot-wide
roadway; it would only require a 20-foot-wide roadway. The road, as it is currently designed at 24
feet wide, would provide adequate access for the Village’s largest fire truck. JMC drawing C-320
titled “Fire Truck, Emergency Vehicle & Truck Turning Plan,” has been updated with all the
information provided to JMC by the Village of Rye Brook as of this FEIS submission to show
accessibility of this fire truck throughout the entire Site.
7 – The Applicant will coordinate the fire lane signage and striping with the ESTF per Section 240-
22 titled “Fire Lanes” of the Village of Rye Brook Code during the Site Plan approval process.
8 – The wall sections on Sheet A-301 illustrate two sections of a roof parapet. The height from the
top of the parapets to the roof for the two sections are 5-feet 9-inches and 7-feet 9.5-inches. The
Applicant will coordinate with the ESTF during the Site Plan approval and building permit
processes to ensure appropriate and safe rooftop access is provided for firefighting operations. See
also responses to comments 9, 10, and 11.
9 – The rooftop mechanical units have not yet been designed as the building is still at a concept-
plan level of design. Information on the rooftop mechanical units will be provided during the
building permitting process and will be coordinated with the ESTF as necessary.
10 –Drawing C-321, “On-Site Fire Protection Plan,” has been added depicting dedicated points of
access around the IL and AL building for ground ladder firefighting operations. The Applicant will
coordinate this layout with the ESTF during the Site Plan approval and building permit processes.
11 – Drawing C-321, “On-Site Fire Protection Plan,” has been added depicting dedicated points of
access around the IL and AL building for ground ladder firefighting operations. The Applicant will
coordinate this layout and roof-details with the ESTF during the Site Plan approval and building
permit processes.
12 – The building fire alarm and internal emergency communications systems have not yet been
designed. The design of the internal communication system will address the need to provide
adequate radio coverage inside of the building, the specifics of which will be discussed with the
ESTF during the building permitting process.
Village of Rye Brook 6 January 3, 2020
13 – The fire suppression system has not yet be designed. However, it is anticipated that standpipes
will be located with fire rated stair enclosures. Approval of the fire suppression system will be
required during the permitting process.
14 – Dedicated snow storage areas have been added throughout the Site and are shown on the
updated Sheet C-300, “Layout and Striping Plan.”
15 – The location of the gate for the emergency access road has been added to Sheet C-300, “Layout
and Striping Plan.” The Applicant will coordinate with the ESTF on the specifications of the gate
during the Site Plan approval process.