Loading...
HomeMy WebLinkAboutAddition Structural Plans 1999-3-912#-0" ' l OVER BEAM SEE FLOOR � * ' rnAmwoo w� ���oo| �* | . "t 54'- 7 3/4' Y55,_11T y OTEFOR EXTERIOR RETAINING WALL ELEVATION SEE SHT S2.2 FOR BASEMENT FOUNDATION PLAN | | CL SEE THIS SHEET. 0 i1^1 ' | | ' ' | | | ---' | `- K | ' -''-' ^' S� (_J -O\ | STAIR / | | l S2.1 vv`°w 04 4cc/ �� EXT. FACE �F � ~ � / | ' | ' 0 EXIST. BUILDING y 00 X:D x It REMOVED) 3: DECK 6 00 k_9 -0 1 r- I I - - - 2.0 =7WF 3. 0 K, 24 �TCH EX ST to WIF 3 0 1 1 �j J�_ 4- IT �N / (�y - - - - - - - - - I WIF 3.0 FF C 00 co Q0 WF 2,0" MY co I (G. 2'� co _t�D 6 4(7 WF 10 00 T (-5-O")--J I F 4 1/4" 0 1A, 4_� I - I V:w 3.0 b 00 LL - WIF 30 TtP UNOr �D) -4- J. L Lo FOR EXT WF 2. 0 FOR 6HEAR PLATE DETAIL SEE 00 'co SEE SH. S2.2 SECTION 4/S2.2 FT co (-4-0") 1 3- 0 (-3 [A 00 30-0 In (-4-0") r6 WIF 2. 0 1 1 1 1 S2.1 I VIA 6 7 T8 10 ll 10.10 98226S11 98226 3-9-99 RE\/, AC/\DR14 GCR PLOT S[ALEt}=96 2 FOUNDATION NOTES: 1' DATUM FOR ALL ELEVATIONS GIVEN ON PLAN SHALL BE FINISH SECOND FLOOR ELI VAT|0H 277.00^ = O^ -O". 2. TOP OF CONCRETE SLAB IS AT +U' -O~ UNLESS OTHERWISE INDICATED ON PLAIT yOR LOCATIONS OF SLAB DEPRESSIONS AND FLOOR SLOPES, SEE ARCH 0WGS. J. TOP OF EXTERIOR FOOTING SHALL BE AT ELEVATION (-J'-O") AND |NTER|OR F001|N(" 0|ALL BE AT ELEVATION (-S-O-BELOW FINISH FLOOR UNLESS OTHERWISE INDICATED THUS /- )ON PLAN. 4. FLOOR CONSTRUCTION SHALL BE 4" CONCRETE SLAB -(}N -GRADE. SLAO SHALL BE PLACED ON VAPOR BARRIER OVER 4° OF POROUS FILL. REINFORCE SLAB VWTH ONE LAlER OF ` 6x0-Yy2.1xW2.1 WWF LOCATED 2" CLEAR FROM TOP OF SLAB UNLESS Q[HERYY|S[ H0TED, 5. DIMENSIONS SHOWN ON PLAN ARE TO FAC[ OF CONCRETE WALL UNLES'S OTHFRYY|SE \N(}>CA\[U� ALL WIDTHS OF CONCRETE WALL SHOWN ARE NOMINAL. 8. FOR FOOTING SECT|(JNS, SCHEDULE AND DETAILS, SEE SHEETS S2.1 & S2�2 7. FOR GENERAL NOTES AND DETAILS, SEE SHEET S4.1 REVISION DATE DESCRIPTION 13'f A P P DORAL ARROWWOOD VILLAGE OF RYE BROOK, NEW YORK DRAWN GICR PROJECT NO. 98226 CE *RLDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SIJEEJ S1.1 FLOOR FRAMING NOTES: - FOUNDATION PLAN 1, DATUM FOR ALL ELEVATIONS ON PLAN SHALL BE FINISH SECOND FLOOR H[VA||0|1 3RD AND 41H LEVEL [-RAMING 277,(]0^ = O` -O". 2. TOP OF STEEL BEAM ELEVATIONS ARE SHOWN THUS < > ON PLANS. |MU|CA||NG DISTANCE ABOVE DATUM. ROOF LE\ -,Et- FRAMING K -AH 3. FOR GENERAL NOTES AND TYPICAL DETAILS SEE SHEET S4.1 4. TYPE -3 DECK CONSTRUCTION WITH 6x6-W2,1xW2.1 WWF OVER | 1/7~ COMPOSITE DECK (TOTAL THICKNESS 4~). DECK SHALL HAVE THE FOLLOWING STRUCTURAL PR0PERl\E5� DEPTH = 1 1/2 - THICKNESS = 18 GAGE (0.0474") Sxx = 0'327 ino . jrqq[R��jIONAL, INC - |xx = 0`295 in* /FT. REVISION DATE DESCRIPTION 13'f A P P DORAL ARROWWOOD VILLAGE OF RYE BROOK, NEW YORK DRAWN GICR PROJECT NO. 98226 CE *RLDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SIJEEJ S1.1 Sl.l FOUNDATION PLAN S1.2 3RD AND 41H LEVEL [-RAMING PLAN S1.3 5TH LEVEL FRAMING PLAN S1.4 ROOF LE\ -,Et- FRAMING K -AH jrqq[R��jIONAL, INC - REVISION DATE DESCRIPTION 13'f A P P DORAL ARROWWOOD VILLAGE OF RYE BROOK, NEW YORK DRAWN GICR PROJECT NO. 98226 CE *RLDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SIJEEJ S1.1 | ' � | o1v ' | | | | A. REVISION DATE DESCRIPTION Hy APP ZZ w co I z STAIR cj -H 221 C14 EXT. FACE OF F- 0 EXIST. BUILDING 4r- R 5 - I E 1 3: BW #3 3W #1 A [4 3W #1 A to 4 10 n 00 Ll c-4 Ll te) — --- CH.2 00 TYPE- 1 [7A - . i - - - -x/ 4� CF, 2 Ll 00 to FLOOR FRAMING NOTES: --v, — - (o 1 DATUM FOR ALL ELEVATIONS ON PLAN SHALL BE FINISH FLOOR ELLVA IION 32 - - ----- 2. 3 1/2- COMPOSITE CONCRETE SLAB OVER 1 5/16" DEEP (24 GAGE) SILEL FI-Ook' P[Gk, VdIff -j 6X6-W2,9XW2.9 WWF OVER 7" DEEP VESCOM STEEL JOIST @ 4'-0" OC. MAX sw #11 T1 00 IF 00 BW #2A LL C.10 3. REQUIRED JOIST BEARING ELEVATIONS ARE SHOWN THUS -0'--3 1 12") ON f #2 8-1 4 DISTANCE ABOVE DATUM. 131-4ft 7' - 4. TOP OF STEEL BEAM ELEVATIONS ARE SHOWN THUS < BW #3 5. FOR BEARING PLATE SCHEDULE AND DETAILS SEE SHEET S22 3- 6. FOR GENERAL NOTES AND TYPICAL DETAILS SEE SHEET S4.1 10" T I I I n S3.2 6 S3.2 ^00 7. (a) TYPE -1 DECK CONSTRUCTION 01 2 172" CONIC. SLAB NTH 6x6-W2.1xW2.1 WWF OVER 1 1/2" COMPOSFTF DECK (10fAl IIIICTJff,�:�S I"), < DECK SHALL HAVE THE FOLLOWNG STRUCTURAL PROPERTIES: m m THICKNESS = 16 GAGE (0.0598") It C14 Sxx 0.411 in /FT. S,3.2 ) I I N (b) TYPE -2 DECK CONSTRUCTION DECK SHALL HAVE THE FOLLOWING STRUCTURAL PROPERTIES: 6. ALONG OPENING THRU SLAB PROVIDE L1=L3X3X1/4" 7'-7t 7'-11 5/8" 8'-11" 7-7- 7'-7#' W-11" 81-1111 7'-7" 7'-7-, L 8' -pi" 8--11"" 7'- 7 70-7#' 48�#-1110 8$-11" 7'-9 5/8" 7r roofN ' | DORAL HOTEL ADDITION DORAL ARROWWOOD L/��) | � ) ( lUj DRAWN GCR \� -'/\� VILLAGE OF RYE BROOK, NEW YORK | Ll >STRUCTURAL CH£C6LD AAP 3RD AND 4TH LEVEL FRAMING PLAN 98226S12 96226 3-9-99 REV. ACADR14 GCR PLOT SCALE11=96 S. PROIC(A H0, 98226 DA IF 3-9-99 mW, HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 SI IF I I COLUMBIA, MARYLAND 21045 S1.2 ^ � IN K G co od co x Ln (F,6� (o o { I`A} 00 0 F ire � E, 4 1'-3 1/4" E cn cn D (c, 10), -'o 00 co Ln 00 0 c T -10i 00 co to B cc co I r3 tn 0 "41-NV.2 00 co (o 0 0 1 32 (34) 4.6 40'-8 'T 1/4-Y 25-2 1/2- 15-0 1/8- 8'-2 3/8" 6'-11 1/4" 8'-6 1/L4 o" V-6 3/4" L 5-3 7/A' 0 17'd1 1 314- 07' 10 1/2" 8'-6 1/2" 33'-6 3/8" 1 3 15'-6 5/8" 17'-1 3/8" 16'-6#' 16'-6" 126S14 98226 3-9-99 REV. ACADR14 GCR PLOT SCALEil=96 11 N 54'-7 3/4" A (9.4) (9.6) (10.1 Y5 ) 5 '_ 11T 25-2 1/2" 50-6't 25-2 1/2" 15-0 1/8" 8-2 3/8" 5-6" 15-0 1 I 12'-3 5/801, L 11 4'-2 3/8f. 6#-60' 16'-6" 16'-6" 99,1: o" 7 10,101 ROOF LEVEL FRAMING PLAN 10.101 11 A CCS 53.2 53.2 k\ 5 �32 00 Pao 0 0 04 ------------ ----------- --- -------------------­ ------- B1=TS 8 6-X1/4- nj 2'-0" L7_ 8'-11" 8'-11" 16'-8 5/8" 2'-0" I. 18'-8 5/8" 1. N -0630%1* 9 10 1010 4. F nF 7,8 (8,10 (9,4 9,6 L. 17'-0 1/8" \-U-8'-2 3/8" 5'-.6 C 4-2 k/8" 11'x`3 3/8j' 7'I! xx 5'- '6" x\1 ELEV. W8x1 5 "(c) MECH UNIT (CHILLER) l(I 10) 14 TT_ it PARTIAL PLAN AT SCREEN POOF FLOOR FRAMING NOTES: 1. DATUM FOR ALL ELEVATIONS ON PLAN SHALL BE FINISH FLOOR [I LVA 11t4l FIFTH FLOOR EL 313.00' = 0'-0". 2. 3 1�2"COMPOSITE CONCRETE SLAB OVER 1 5/16" DEEP (24 GACJ) S'ff 1, 1 1 ['""R P[ t T, wl 1-11 6X6 W2.9XW2.9 WWF OVER 7" DEEP VESCOM STEEL JOIST @ 4'---11" OC. HA'v 3. REQUIRED JOIST BEARING ELEVATIONS ARE SHOWN THUS ( -C-13 112") t T] 11t,41, 1H0K','A1'1HG DISTANCE ABOVE DATUM. 4. TOP OF STEEL BEAM ELEVATIONS ARE SHOWN THUS < > ON PI -ANS, 1HOWAIRIG DISTANCE ABOVE DATUM. 5. FOR GENERAL NOTES AND TYPICAL DETAILS SEE SHEET S4.1 6. AT MECH UNIT AREA PROVIDE L2=L3X3X3/8" 0 4'-0" MAX UNDI-J" S[AH AND CONNECT BETWEEN PANEL POINTS OF JOIST 7. FOR OTHER FRAMING NOTES, SEE SHEET S1.2 0 od x 0 10,101 ROOF LEVEL FRAMING PLAN 10.101 11 A CCS 53.2 53.2 k\ 5 �32 00 Pao 0 0 04 ------------ ----------- --- -------------------­ ------- B1=TS 8 6-X1/4- nj 2'-0" L7_ 8'-11" 8'-11" 16'-8 5/8" 2'-0" I. 18'-8 5/8" 1. N -0630%1* 9 10 1010 4. F nF 7,8 (8,10 (9,4 9,6 L. 17'-0 1/8" \-U-8'-2 3/8" 5'-.6 C 4-2 k/8" 11'x`3 3/8j' 7'I! xx 5'- '6" x\1 ELEV. W8x1 5 "(c) MECH UNIT (CHILLER) l(I 10) 14 TT_ it PARTIAL PLAN AT SCREEN POOF FLOOR FRAMING NOTES: 1. DATUM FOR ALL ELEVATIONS ON PLAN SHALL BE FINISH FLOOR [I LVA 11t4l FIFTH FLOOR EL 313.00' = 0'-0". 2. 3 1�2"COMPOSITE CONCRETE SLAB OVER 1 5/16" DEEP (24 GACJ) S'ff 1, 1 1 ['""R P[ t T, wl 1-11 6X6 W2.9XW2.9 WWF OVER 7" DEEP VESCOM STEEL JOIST @ 4'---11" OC. HA'v 3. REQUIRED JOIST BEARING ELEVATIONS ARE SHOWN THUS ( -C-13 112") t T] 11t,41, 1H0K','A1'1HG DISTANCE ABOVE DATUM. 4. TOP OF STEEL BEAM ELEVATIONS ARE SHOWN THUS < > ON PI -ANS, 1HOWAIRIG DISTANCE ABOVE DATUM. 5. FOR GENERAL NOTES AND TYPICAL DETAILS SEE SHEET S4.1 6. AT MECH UNIT AREA PROVIDE L2=L3X3X3/8" 0 4'-0" MAX UNDI-J" S[AH AND CONNECT BETWEEN PANEL POINTS OF JOIST 7. FOR OTHER FRAMING NOTES, SEE SHEET S1.2 0 (3.4) (3,10) (4.6 vp 101-81/4*"'� "T 25-21/2" 7.8 7.10(T i (9.4) (9.6) (1 10.10 11 T55'-11" 54'-7 3/4" l 25'-2 1/2- 50-6" 25-2 1/2* 15-0 1/8 8 -2 3/8 6 -11 1/4 8 -6 1/2 L 1 15-0 1/8 8'-2 3/8 5* -6" 8-2 3/8 1 15-0 1/5 L 2'-0" L 1, V -00I i I I I -1 7/8- Z Z tn LlI R5 wm z It 0 00 P zz'a c'4 C14 EXT. FACE OF a .1 I EXIST. IN, BUILDING x j -(SHINGES REMOVED) wm wI _ o 2 H.10 4 Ll 3.2 IN 4'-3 .1/4* 0 Ll lb Ll cc Ll ca Ll Ll Iii I } } } Ll cc OD to II -79- *6 2'-3 5/8' CL. TYPE -1 r- *c DECK 3.11 CC TYPE -1 4 DECK� 49'-6" -r' r, 4'-2 13/8- 1 9 1/ - 2 -ion ' to I 16'-6* 16'-6" 16'-6" 7 -CLI 1 . -1'7 8'-11" 7* -7" 7* -7" 8* -11" 8* -11" ,. 7#-7" 11 3 3/8� 7- 1/ 7 1/8" 1 2 .-1 1 0 Bi Ll 5 6III04 Ll IXO io it 2 I I I 17 OZ Ll 1 CD I \ N I 7 V(455) c1r, ELEV. I (Typ) 'co lly p'-2 .3/4"L Ll it 7 V(888) .*/- N ---T-TY-P) 1 1'- 6 1/4" L 1/4" Li 1 1 16'-811/2- 1 1 -3 1/4% 10'-2 3/4- 101-2 3/4- j6p-3 11/4� 00 Ty .1 Tl P, UN TYP, UNO :88)l L1:5 �10* jL I Tl 00 .00 x -j -j HFU wu 11- 111 A- W -0 3' Li x 1/4" (0 STAIR 10'-2 3/4" 1 w lo, -7-3)4- 8 I 14--7 13'-4" 7'-� 1/8- 5,3. -j -j -j -j 5 6 C14 ionS3.2 I S3.2 �Sl 2 40-6 1/8- IN 1 IL C4 I 00 7 V(455) (TYP) 2. li(420, 160)- 04 1-6 3/4" '*X6"Xl/4,!* 5'- 3 7/f 2#-0' 20-0* 0-0. L7' -ll 5/8" -on '-9 5/8- 7 8'-Ilm 7* -7* 7'-7- 8'-llm 8'-11" 7#.-7* 7P-70 L 8'-1 1" 7#-7" 48�- 1-1 8#-lln 7 02 fflam ING PLAN 98226S13 98226 3-9-99 REV. ACADR14 GCR PLOT SCALEtl=96 ----- -------- ----------------- m m m W-0 �zl 0 FLOOR FRAMING NOTES:. 1 DATUM FOR ALL ELEVATIONS ON PLAN SHALL BE FINISH FLOOR EL,EVAT10H FIFTH FLOOR EL 304.00- - 0'-0". 2. 3 1/2- COMPOSITE CONCRETE SLAB OVER 1 5/16- DEEP (24 GAGE) STEEL R-OOR I)ECI< WITI-i 6X6-W2.9XW2.9 WWF OVER 7" DEEP VESCOM STEEL JOIST 0 4'-4" O.C. MAX . . ... .....C.10 3. REQUIRED JOIST BEARING ELEVATIONS ARE SHOWN THUS ( -0*-,3 1/2") ON Pt. -AN, INDICATING DISTANCE ABOVE DATUM. 4. TOP OF STEEL BEAM ELEVATIONS ARE SHOWN THUS < > ON PLANS, RIDICAONG _PC DISTANCE ABOVE DATUM. 5. FOR GENERAL NOTES AND TYPICAL DETAILS SEE SHEET S4.1 6. FOR OTHER FRAMING NOTES SEE SHEET S1.2 K A.1 A MAR L 0 #1*91=0011 DORAL HOTEL ADDITION DESIGNED AAP DORAL ARROWWOOD VILLAGE OF RYE BROOK, NEW YORK STRUCTURAL CHECKED AAP 5TH LEVEL FRAMING PLAN PROJECT NO. 98s.226 IHCE I HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 PH: (410)-884-1470 FAX: (410)-884---1476 F F -If -. - NB Is MIN IF FORMED JOINT IS USED INSERT 1/8" PREMOLDED OR METAL STRIPS WHEN CONCRETE IS PLACED. IF SAWED JOINT IS USED, SEAL IF SLAB IS EXPOSED. 1-11, 0 z 1/8" MIN WWF LSEALIF REQD 1/8" DEEP MIN 77 �­__ II I V_ - I .`v I- I - 1-1 T KInTE1-Ul ALT VVYVr BOND. 3/4.0XV-4"012 - 4", 5"&6" SLAB CONTROL JOINTS (CLJ) SHALL BE STRANDS @ JOINT EITHER CONSTRUCTION OR z CONTRACTION JOINTS. POROUS FILL CONSTRUCTION JOINT CONTRACTION JOINT NO SCALE NO SCALE FOOTING SCHEDULE MARK NIDTH X LENGTH THICKNESS REINF (BOT) REMARKS WF2.0 2'-0" it -o" 3-#5 CONT WF2.5 2'-6" 1'-0" 3-#5 CONT WF3.0 3'-O" it -o" 3-#5 CONT ADD 3-#6 CONT AT SHEAR WALLS WF4.0 1 4'-0" it -on SEE WALL SECTION 1ZS2.1 ALTERNATE FOOTNG SCHEDULE EXTERIOR WALL FTG 4'-6" 11-0" 4-#5 CONT #5 024" O.C. TRANSVERSE CORRIDOR WALL FTG S-Olf it -off 3-#5 CONT #5 @24" O.C. TRANSVERSE I I I I I EXTERIOR CONCRETE WALK SEE SITE DRAWINGS TOP OF SLAB POROUS FILL ELEV. SEE PLAN DETAIL AT DOORr2 SCALE: NONE �2. 1-#4 CONT. TOP OF SLAB DATUM ELEV. 2-#6 CONT. ALONG WALL c NOTE: DO NOT BACKFILL AGAINST THIS WALL UNTIL UPPER LEVEL AND LOWER LEVEL SLABS HAVE BEEN IN PLACE. ul W.-mlig #4012"C/C DWLS.— #5@12-C/C OWLS. #50M"C/C DWLS. 4'-0" LONG (AT STAIR) F OR "TOP OF 4" DIA. PERFORATED? FOOTING ELEVATION SEE FOUNDATION PLAN DRAIN PIPE, (SLOPE 1/32"/FT �7� 7W- 3" CLR TYP. 11. 29) H< 20-0" SEE FOOTING SCHED FOR REINF z LDC (D z T 4 u 114 MIN TYPICAL FOOTING STEP NO SCALE TOP OF SLAB DATUM ELEV. 0'- 0" COORD. W/ STAIR MFR. • WWF-\ TOP OF SLAB SEE PLAN 41 �4 _L4 'c14 #5 0 18" O.C. — — — — — — — — — — — — --- — — — — — — \-2-#5 CONT 0 — — -----_Y---- ---------- — — -- — — — — — — — — — — SEE SCHEDULE ---------- SECTION 4 SCALE: NONE1��S 2. J1 /—WALL PA JWELD DECK \TO L @ 6"c. c. 2'-0" #4 @ 12 O.C. SLAB -ON -GRADE Q_ 4 --L3"x3"x1/4" CONT. W/ 3/8" DIA WWF HEADED STUDS @ 12"c.c. VAPOR BARRIER POROUS OROUS FILL —#4@12"c.c. HORIZ. 7 3/4" 1 4 1/4" z MSANIW.11� WF 4. 0 SEWEVT TAL _j 1 0 Q. WALL #5@12"c.c. VERT. Lu #4@ 12"C/C V) #4@12"c.c. HORIZ. EF, EW`5@12' r,�l a 1 4 SEE N( F71 co < _j 4• W 0 t, V q* < CL z w #4 CONT. 4 @ 12" C/C 0 # 0 SECTION SCALE: NONE �52 - 1 W_ ! ob p Mot OM R -4-#5CONT. 2"x4" KEY #5 @ 24"C/C TOP & BOT. 98226S21 98226 3-9-99 REV. ACADR14 GCR PLOT SCALE: 1=1 WALL & FTG #5 0 NOTE: 1. ADD 2#5 AT 2. ADD WATERF TYP SECTION r,3 SCALE: NONE � �2.1 -FACE OF EQUIPMENT NOTE: ALL EQPT SHALL BE SECURELY FASTENED TO THE PAD FOR THE INDICATED WIND LOADS. (SEE NOTE ON SHT S4.1) SEE CIVIL/ELEC DWGS FOR LOCATION & SIZE. "' r#4012 EW ----2-#5 TYPICAL EXTERIOR EQUIPMENT t- M L) DETAIL NO SCALE I— NOTE: FOR LOCATION & SIZE SEE ELEC/MECH/ARCH DWGS 1 6" [-o--FACL 01- t:oP1 (MIN) NJ) #3012EW TO SUIT EQPT WW PROVIDED (4"MIN) Igo W_ _r__1 (TYP) SLAB -ON -GRADE WWF WWF VAPOR BARRIER POROUS FILL ROUGHEN SURFACE -off CL 0 -FOR TOP OF cv w W FOOTING ELEVATION #40 12"C/C SEE FOUNDATION PLAN EF, EW EI EQ. FOR TOP OF Q E FOOTING ELEVATION • SEE PLAN Z' w CD o '4 W W W 3" CLR REINF, SEE SEE SChEDULESCHEDULE Q WALL & FTG AT INTERIOR LOAD BEARING WALL FOOTING SECTION SCALE: NONE S2.1 WALT , IV4,1f I A130,`I #4 0 12" C/C (-ryp) p covi'l. SLAB -ON -GRADE HII (;RADE, SFI", civil 1) WGI S) •-7_7 1 4 WWF — ri=li 1 T 1 - �, L --t. VAPOR BARRIER _..._._.- • POROUS FILL 8 3/8" 3 5/8" • qo -1 1,..1 W M EQ EQ FOR [OF (f' FOOTING Et EVATION SEE PLAN J _j Ld 3" CLR ULd ) 0 U) REINF, SLF SEE SCHEDULE SCHEI)l A I� WALL & TYP EXTERIOR WALL FOOTING SECTION SCALE: NONE S2 6 COL & ci 3/16 14 2C - 4"x 3 x 1 /1 00 COLUMN (01. & (D 16� L 2 1/2"x2 1/2"01/4" WELDED TO FLIBE 34"0 ANCHORS 3/4" THICK BAST_ PLAIl­_ 7' LONG (TYP OF 9) PLAN TYP EXTERIOR COLUMN BASE PLATE OF N DETAIL r8 SCALE: NONE S 2�1 063 REVISION DATE L DESCRIPTION H) APP STING DORAL HOTEL ADDITION DESK -41H) AAP DORAL ARROWWOOD IA 1, VILLAGE OF RYE BROOK, NEW YORK DRAM (31Cf? STRUCTURAL CIiE I E ('kl LAAI FOUNDATION SECTIONS AND DETAILS -1 TYP, WALL FTG ALONG EXISTING FTG PR011f,cl H0. q8226 F r TI n Ki SCAT f AS S11OWN SCALE: NONE HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SHE S2.1 PH: (410)-884-1470 FAX: (410)-884-1476 3 5/8' 4 1/8' 11 #5 @ 12"C/C- NORMAL — WALL REINF. 2ND FLOOR EL, = (0'-0") f4" CONC. SLAB FOR LOCATION SEE SH SIJ 11-01 Al CONC. WALL SECTION ri SCALE: NONE S2.2 3 5/8' 2ND FLOOR EL. (0'-0") CONC. (2) #6 TOP— SLAB #3 0 S2"CjC 1 2 #5 3 #6 CONT. (CONC. BEAM 81) 10") -lit (BOT.) 2 #6 CONT. (CONC. BEAM B2) cu 1r-0. (BOT.) AT CONCRETE BEAM SECTION K2 SCALE: NONE 1�.2 Ll 0 2 1 21-0' 4-1 T l'-3 1/4' 11'- 9 l+/2' 6' WF 4.0 0 c I DFACE TO FACE (-9'-6') 1 , cu It 1 18 1/8, c I F 'WALL ABOVE - — - --- — - - — - — - — — A– t T) _T� \ - — - - - . — - —1 , - — - =1 — -10' 2' 5' SLOPE —4 " I—K t,c lo N UP1/4' PER FT. , 01-0# 1 72'-10 1/4 C co EL, 27 F CD C�l L ZD ' % I ' T -0 WF 4,0 WF 4. (-9'-6') iv (-7'-0') ram I I I mpuv 98226522 98226 3-9-99 REV. ACADR14 GCR PLOT SCALE: 1=16 2ND FL. FL, EL. (-277'-0') DATUM EL. (-0'-0* BASEMENT FL. EL, (- 4 1/8"-, 3`5!8' FILL WITH CONC. 2ND FLOOR EL. = (0'-0") N I'An CONC. SLAB is IN BM. NORMAL�� WALL Kt IF—, 1/4V 3' \ PL 1 /2 x5 xl 2" WITH I �_o 2_*3/ex8"0 HEADED 'CONC. WALL STUDS. AT BEAM SUPPORT ON WALL SECTION SCALE: NONE �.2 Flglo� ELEVATION RETAINING WALL ALO SCALE: NONE 12 _NT - EL, 267'-6' — FIN, GRADE -2#5 CONT 7 (TOP) NOTE: FOR OTHER INFORMATION SEE FRAMING DETAILS SLAB -ON GRADE —1 46 WWF VAPOR BARRIEyR(q=t_itTF_ii: 3" CLR POROUS FILL 21 1/ 4' CL. EL. 1273'-0 3/4 CD STAN (TOTAL 4) I Ce X 14L 7T --Z EF, EW I,-0"WALL F CD C�l L ZD ' % I ' T -0 WF 4,0 WF 4. (-9'-6') iv (-7'-0') ram I I I mpuv 98226522 98226 3-9-99 REV. ACADR14 GCR PLOT SCALE: 1=16 2ND FL. FL, EL. (-277'-0') DATUM EL. (-0'-0* BASEMENT FL. EL, (- 4 1/8"-, 3`5!8' FILL WITH CONC. 2ND FLOOR EL. = (0'-0") N I'An CONC. SLAB is IN BM. NORMAL�� WALL Kt IF—, 1/4V 3' \ PL 1 /2 x5 xl 2" WITH I �_o 2_*3/ex8"0 HEADED 'CONC. WALL STUDS. AT BEAM SUPPORT ON WALL SECTION SCALE: NONE �.2 Flglo� ELEVATION RETAINING WALL ALO SCALE: NONE 12 _NT - EL, 267'-6' — FIN, GRADE -2#5 CONT 7 (TOP) NOTE: FOR OTHER INFORMATION SEE FRAMING DETAILS SLAB -ON GRADE —1 46 WWF VAPOR BARRIEyR(q=t_itTF_ii: 3" CLR POROUS FILL 21 CL. ADD #6 BAR AT PIER ONLY (TOTAL 4) #4@ 12"C/C --Z EF, EW I,-0"WALL TYPICAL SECTION SCALE: NONE z #4 @ 12'c.c. (U' BARS) TIE BEAM (2' x V-6' HIGH) BETWEEN BOTH WALLS OF WALL & FOOTING WALL PANEL LIGHTGAGE 1/4"x6"x8" PLATE ON BOTH SIDE. PL. 1'x11"08" WWF *04 #6 x 2'-8" L.G. "U" BAR z z WELDED TO PLATE (MIN. 3 PER PLATE) 0 0 �l I 11 C141 Ile) EQ. EE! PLAN WALL & FTG T SHEAR W z w It UJujo 0 (nw r V) FOR REINF. SEE FOOTING SCHEDULE 11 FOR TOP OF FOOTING ELEVATION SEE PLAN A MAR 1 0 1999, P,;tJJ`ibL' U'LLS-E-1 INTERNATIONAL, INC. ;CoF Nies REVISION DATE DESCRIPTION DORAL HOTEL ADDITION AAP DORAL ARROWWOOD DRAM] G C, R VILLAGE OF RYE BROOK, NEW YORK STRUCTURAL C I I (A, F� D AAP �TD f A �,,j '111( FOUNDATION SECTIONS AND DETAILS -2 [lfMljI,Cf H0, 98226 SCAIJ�l AS SHOWN HCE DA 11 9-._.99 V�F C. HILORETH CONSULTING ENGINEERS, P AD, SUITE 202 'OFF S! k 9 2' RUMSEY ROAD, S-2.2 CRUMBIA, MARYLAND 21045 ,Z -884.- 1 76 M� PH: (410)-884-1470 FAX: (410) =3 FLAT STRAP 1 k FLOOR � r WP3 r r r , Wp --- - f=r , , ,r LOAD DISTRIBUTION ANGLE (CUT & CONNECT TO SHEAR PLATE) DETAIL 'rB» SCALE: NONE `i• 5TH FL M. EMBEDED AT F UU MNG. FOR ORIENTATION N SEE FOUNDATION PLAN N ON SHEET S1.1 DETAIL „A„ �� �, U- to N SCALE: NONE ; f �" to SEE DETAIL (TYP.) SHEAR PLATE SCHEDULE WALL TYPE j- I 4'-6" < OPNG < 8'-0" T HEADER TRACK HEADER ,It HEADER TRACK I 2-6SW16 N 2-8SW16 N d 00 1/4" x 5 1/2" x 8" 3rd FLOOR 1/4" x 5 1/2" x 2'-0" 2-8SW16 2-3 5/8T16 @j N INT. BEARING WALLS 2-6SW14 2-6T14 d� � } U 00 N f N Co N 0\ 4th FLOOR 1/4" x 3 1/2" x 2'-0" N N Ir 00 r- M. EMBEDED AT F UU MNG. FOR ORIENTATION N SEE FOUNDATION PLAN N ON SHEET S1.1 DETAIL „A„ �� �, U- to N SCALE: NONE ; f �" to SEE DETAIL (TYP.) SHEAR PLATE SCHEDULE WALL TYPE j- I 4'-6" < OPNG < 8'-0" 8'-0" < OPNG < 10'-0" HEADER TRACK HEADER TRACK HEADER TRACK I 2-6SW16 2-6T16 2-8SW16 N N grad FLOOR 1/4" x 5 1/2" x 8" 3rd FLOOR 1/4" x 5 1/2" x 2'-0" 2-8SW16 2-3 5/8T16 N INT. BEARING WALLS 2-6SW14 2-6T14 d� � } N N N f N Co N 00 4th FLOOR 1/4" x 3 1/2" x 2'-0" to N Ir 00 r- un V) /7\ 0 Z U) 2 00 et i 1 \ Co tv 5th FLOOR 1/4" x 3 1/2" x 2'-0" SEE --- -` DETAIL (TYP. ) SHEAR WALL ELEVATION SCALE: NONE 2ND FL SW #1 BOX HEADER SCHEDULE WALL TYPE 2'-0" < OPNG < 4'-6" 4'-6" < OPNG < 8'-0" 8'-0" < OPNG < 10'-0" N HEADER TRACK HEADER TRACK HEADER TRACK EXT. WALLS 2-6SW16 2-6T16 2-8SW16 2-6T16 3-8SW12 2-6712 CORRIDOR WALLS 2-6SW16 2-3 5/8T16 2-8SW16 2-3 5/8T16 N INT. BEARING WALLS 2-6SW14 2-6T14 d� � } N GOLD FORMED STEEL. FRAMING NOTES: 1, DESIGNATIONS SHOWN ON DRAWINGS ARE FOR "MARINO\WARE, STUD -RITE LIGHTWEIGHT STEEL FRAMING". EQUIVALENT PRODUCTS OF OTHER MANUFACTURERS MAY BE PROPOSED FOR CONSIDERATION. 2.. ALL STRUCTURAL PROPERTIES SHALL BE COMPUTED IN ACCORDANCE WITH THE A.I.S.I. "SPECIFICATIONS FOR THE DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS". 3. ALL COLD FORMED STEEL. STUDS AND JOISTS, INCLUDING ACCESSORIES, SHALL BE GALVANIZED WITH A MINIMUM G-60 COATING. 4. STUDS, RUNNERS, BRACING AND BRIDGING SHALL BE MANUFACTURED PER ASTM C-955. 5. ALL GALVANIZED STUDS, TRACKS AND ACCESSORIES, SHALL BE FORMED FROM STEEL THAT CONFORMS TO THE REQUIREMENTS OF ASTM A-924, AS SET FORTH IN SECTION 1.2 OF THE A..I.S.I. "SPECIFICATION FOR THE DESIGN OF COLD -FORMED STEEL STRUCTURAL MEMBERS", LATEST EDITION. 16 GAGE OR HEAVIER -GRADE 50 KSI. 18 GAGE OR LIGHTER -GRADE 33 KSI. 6, ALL COLD FORMED STEEL FRAMING SHALL BE DESIGNED FOR LOADS SHOWN ON DRAWING. AS A MINIMUM, ALL MEMBERS SHALL BE DESIGNED TO MEET ALL REQUIREMENTS OF BOCA. EXTERIOR WALL STUDS SHALL BE SIZED TO LIMIT LATERAL LOAD DEFLECTION TO L/720. INTERIOR WALL STUDS SHALL BE SIZED TO LIMIT LATERAL LOAD DEFLECTION TO L/360. a 98226531 98226 3-9-99 REV, ACADR14 GCR PLOT SCALE -1=1 7. ALL BEARING WALLS AND SHEAR WALLS ARE TO BE SHOP PREFABRICATED PANELS. ADD BRACING AS REQUIRED FOR TRANSPORT, LIFTING AND ERECTION OF WALL PANEL. 8. ALL SHEAR WALLS STRAPS SHALL BE PULLED TIGHT TO RELIEVE SLACK BEFORE CONNECTIONS ARE MADE. STRAPS SHALL BE ATTACHED TO EVERY OTHER STUD THAT THEY CROSS. 9. FOR STUD WALLS PROVIDE BRIDGING AT 4'-4"o.c. VERTICALLY AND ATTACHED AT EACH STUD AS PER MANUFACTURER'S RECOMMENDATIONS. 10. PROVIDE WALL PANEL TOP & BOTTOM TRACK THAT ARE SAME GAGE AS VERTICAL STUDS. 11. BEFORE FABRICATION, VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS. 12. FOR NON—LOAD BEARING STUDS SEE ARCHITECTURAL DRAWINGS. 13. ALL BEARING WALLS STUDS MUST ALIGN WITH STUDS IN THE FLOORS ABOVE AND BELOW. 14. FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS IN THE DESIGN AND DETAILING OF COLD FORMED STEEL FRAMING. 15. PROVIDE COLD FORMED BOX HEADER OVER OPENING IN THE WALL. 10. ALL EXTERIOR WALL PANEL SILL AND HEAD TRACKS ARE MINIMUM 18 GAGE FOR OPENING LESS THAN 6'-0" 4 (X} N N 0 � to 0 00 U? °0 00 N u� , i 1 to 1 N to N N'7 � N d� � } N N N f N Co N 00 tp N to N 00 00 \ un V) /7\ 0 Z U) 2 00 et .w. N 1 \ Co tv to M 00t (I) tLL Q_ N d- 1 Ct} d Ln �t d M to� . �f- co N -, I t N �# (n N U) U) Q 00 1 M 1 LC to n w d civ N N O O V) m V) O Q m r d 00 j ''y � � h 1-- d ' o J to to I SW #2 7. ALL BEARING WALLS AND SHEAR WALLS ARE TO BE SHOP PREFABRICATED PANELS. ADD BRACING AS REQUIRED FOR TRANSPORT, LIFTING AND ERECTION OF WALL PANEL. 8. ALL SHEAR WALLS STRAPS SHALL BE PULLED TIGHT TO RELIEVE SLACK BEFORE CONNECTIONS ARE MADE. STRAPS SHALL BE ATTACHED TO EVERY OTHER STUD THAT THEY CROSS. 9. FOR STUD WALLS PROVIDE BRIDGING AT 4'-4"o.c. VERTICALLY AND ATTACHED AT EACH STUD AS PER MANUFACTURER'S RECOMMENDATIONS. 10. PROVIDE WALL PANEL TOP & BOTTOM TRACK THAT ARE SAME GAGE AS VERTICAL STUDS. 11. BEFORE FABRICATION, VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS. 12. FOR NON—LOAD BEARING STUDS SEE ARCHITECTURAL DRAWINGS. 13. ALL BEARING WALLS STUDS MUST ALIGN WITH STUDS IN THE FLOORS ABOVE AND BELOW. 14. FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS IN THE DESIGN AND DETAILING OF COLD FORMED STEEL FRAMING. 15. PROVIDE COLD FORMED BOX HEADER OVER OPENING IN THE WALL. 10. ALL EXTERIOR WALL PANEL SILL AND HEAD TRACKS ARE MINIMUM 18 GAGE FOR OPENING LESS THAN 6'-0" MAR 0 1999, t MORSE DIESEL INTERNATIONAL. 11 N 00 00 N 0 � I r V I !r I 0 00 °0 00 N u� , i ao MAR 0 1999, t MORSE DIESEL INTERNATIONAL. 11 N 00 00 N 0 � 0 00 °0 00 N u� (n ao to 1 00 11-1 N L � N � � I N N N f N d- N ,w. tp N to N 00 \ i3: V) /7\ 0 Z U) 2 00 00 to U) 1 \ Co tv to M V) (I) N Q_ N d- V) Ct} d a0 �t d I N to� . V) 00 co 00 -, I t N c U) U) Q M 1 U] N n d civ N N -7 BW #3 N N r B W #4 00 j ''y � °0 Lo rry 00 ' o t N to to I N 17\ 0 Z Q. O tU 1 p (n u? vi O o_ CL tf) F- d BW #2 #2a MAR 0 1999, t MORSE DIESEL INTERNATIONAL. 11 R W #6,.I I N 00 N cn � N i to d - N N U) V) to io �d- N I N V) to N � � to 1 N N (o f N to ,w. �t- N to N N � to /7\ 0 Z U) a- 0 U) (o Co ( N V) (I) F -- Q_ (n V) Ct} d I N BW #1 A R W #6,.I I tt- 00 N as N U) to �d- N to N N � CO � I N V) �g f N � � d- N I N N U) U) Co N N v � to (o _N 1 N V) Ct} z I N C O co Ua I � c U) U) Q N U] Q n Fes- U) M d -7 BW #3 R W #6,.I I CIA cV U) CD N N � tf7 N cU f N � � d- N 1 U) l N d - N N � U) N I N O c I p v U) Q n Fes- U) M m d -7 B W #4 R W #6,.I I CL JOIST OR BEAM \---- _-__.-_ - - - t I ' NOTE: SEE FRAMING PLANS, M MECH AND ARCH } OPENING i DWGS FOR SIZE AND I a i LOCATION OF ROOF ► AND FLOOR OPENINGS i y i s 1 PLAN { POUR STOP ' (AT FLOOR OPNGS) w1m L3 X3 Xl /4 (L1) L3X3X1 /4 FOR JOISTT (OR (Al- FLOOR/ROOF) SPA LESS THAN 5-6" 1/4 % OPENING T SIZE VARIES 1/4 I SEE FRAMING PLAN SECTION TYPICAL FRAMING FOR ROOF AND i NOTE: DETAIL 1S SHOWN FOR PIPING SUSPENDED BELOW THE JOIST. PROVIDE SIMILAR DETAILS FOR PIPING RUN WITHIN THE JOIST SPACE. CENTER PIPING MAINS BETWEEN JOIST SPANS. ADD ,JL 2x2x1 /4 IF LOAD DOES NOT OCCUR AT CONCENTRATED PANEL POINT LOCATION LOADS ---- - - --► STL JOIST --\ t �-- PIPE ROLLERS OR CLAMPS VTRAPEZE AS REQD HANGER TRAPEZE HANGER MAY BE FABRICATED USING SPECIAL CHANNELS (UNISTRUT) OR STANDARD ROLLED CHANNELS OR ANGLES OF ADEQUATE CAPACITY. TYP RIPE MANGER DETAIL FOR CONCENTRATED LOADS GREATER THAN 50 IBS ON A JOIST NO SCALE 98226541 9826 -9--99 REV. ACADRI4 GCR PLOT SCALE: 1=1 1, DESIGN LIVE LOADS ASTM A 53 GRADE B, TYPE E OR S Fy = ROOF 30 PSF PLUS SNOW DRIFT SLAB ON GRADE 150 PSF STAIRS 100 PSF HOTEL ROOM 40 PSF CORRIDOR SERVING ROOM MECHANICAL ROOM 40 PSF 150 PSI`' (OR EQUIPMENT WT IF GREATER) 2 DESIGN SNOW LOAD IS IN ACCORDANCE WITH ASCE 7-95 GROUND SNOW LOAD, Pg=30 PSF, Ce=1.0, Ct-1.0, 1=1.0 3. DESIGN WIND LOADS ARE BASED ON A BASIC WIND SPEED OF 110 MPH (EXP. B) IN ACCORDANCE ASCE 7-95 F2.0 INDICATES FOOTING TYPES. SEE SCHEDULE, SHEET S2.1 4. SEISMIC DATA IN ACCORDANCE WITH ASCE 7-95 SEISMIC HAZARD EXPOSURE GROUP = I (-2'-6") INDICATES ELEVATION OF TOP OF FOOTING. FOOTING EFFECTIVE PEAK ACCELERATION COEFFICIENT (AQ)=0.10 EFFECTIVE PEAK VELOCITY RELATED ACCELERATION COEFFICIENT Av=0.10 SEISMIC COEFFICIENT (Ca)=0.12 (Cv)=0.17 SEISMIC PERFORMANCE CATAGORY=C SEISMIC SOIL PROFILE TYPE =C SHOWN OR INDICATED. RESPONSE MODIFICATION FACTOR R=7 NO FOUNDATION CONCRETE SHALL BE INSTALLED UNTIL ALL FOUNDATION WORK HAS BEEN DEFLECTION AMPLIFICATION FACTOR (Cd)=4.5 COORDINATED WITH UNDERGROUND UTILITIES. FOOTINGS SHALL 5. MATERIALS CONCRETE f c = 4000 PSI FOR PIERS SLAB -ON -GRADE SIDEWALKS, SUPPORTE6 FLOOR SLAB, ANb ALL CONCRETE NOT OTHERWISE SPECIFIED f c = 3000 PSI FOR ALL FOOTINGS AND FOUNDATIONS REINFORCING BARS ASTM A 615 GRADE 60, DEFORMED Fy = 60 KS1 STRUCTURAL STEEL STEEL PIPE 11 r MAR 1 p 1999 INTERNAT1044, INC, pF NEW aE�. 10. ALL REINFORCEMENT SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH ACI 315-80 (REV 1986) UNLESS OTHERWISE NOTED. MINIMUM SPLICE LENGTHS AND EMBEDMENT LENGTHS SHALL BE AS TABULATED THEREIN (UNO). ALL TENSION DEVELOPMENT LENGTHS SHALL BE 21 INCHES AND ALL TENSION LAP SPLICES SHALL BE 27 INCHES FOR NO. 5 BARS AND SMALLER. 11. CONTINUOUS REINFORCING IN WALLS AND FOOTINGS MAY BE SPLICED, AS REQUIRED, PROVIDING BARS ARE OF THE LONGEST PRACTICABLE LENGTH AND ALL SPLICES ARE SHOWN ON REINFORCING SHOP DRAWINGS. WHEREVER POSSIBLE, SPLICES SHALL BE STAGGERED. FIELD CUTTING OF REINFORCEMENT WILL NOT BE PERMITTED. 12. UNLESS OTHERWISE NOTED, PROVIDE CONCRETE PROTECTION FOR ALL REINFORCING IN ACCORDANCE WITH PARAGRAPH 7.7 OF BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-89). 13. PROVIDE DOWELS TO MATCH REINFORCEMENT IN ALL FOOTINGS, PIERS AND WALLS. 14. ALL EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES SHALL BE CHAMFERED 3/4 -INCH. 15. THE CENTERLINES OF ALL BEAMS SHALL BE LOCATED ON COLUMN CENTER LINES UNLESS OTHERWISE SHOWN. 16. ALL BOLTS SHALL BE 3/4" DIAMETER ASTM A325 -X UNLESS OTHERWISE SHOWN OR NOTED. 17. WELDING ELECTRODES SHALL CONFORM TO REQUIREMENTS SHOWN IN TABLE 4.1 OF AWS D1.1-94, AND FILLER METAL SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. 18. SHEAR CONNECTIONS SHALL BE DESIGNED FOR REACTIONS INDICATED ON THE FRAMING PLANS. WHERE NONE ARE INDICATED, SIMPLY SUPPORTED BEAMS SHALL BE DESIGNED FOR AN END REACTION EQUAL TO 1/2 OF THE TOTAL UNIFORM LOAD CAPACITY TABULATED IN THE ALLOWABLE UNIFORM LOAD TABLES OF THE AISC MANUAL, 9TH EDITION, PLUS 2 KIPS. 19. WHERE THE WORK OF OTHER TRADES REQUIRES CUTS, HOLES, ETC., IN STRUCTURAL STEEL MEMBERS; CUTS, HOLES, ETC., SHALL BE MADE IN THE SHOP AND SHALL BE SHOWN ON THE SHOP DRAWINGS. MAKING HOLES OR CUTS IN THE FIELD WILL NOT BE PERMITTED WITHOUT SPECIFIC APPROVAL OF THE ARCHITECT -ENGINEER. 20. STEEL JOIST SPACING SHALL NOT EXCEED SPACING INDICATED ON DRAWINGS AND PLACEMENT OF JOISTS SHALL BE CAREFULLY COORDINATED WITH PARTITIONS AND WORK OF OTHER TRADES TO AVOID INTERFERENCES. 21. CONCENTRATED LOADS IN EXCESS OF 50 POUNDS APPLIED TO JOISTS SHALL BE APPLIED AT PANEL POINTS, UNLESS AN ADDED WEB MEMBER IS PROVIDED FROM POINT OF APPLICATION OF LOAD ON CHORD TO THE NEAREST PANEL POINT ON OPPOSITE CHORD. 22. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL OPENINGS, SLEEVES, INSERTS, ETC., WITH SHOP DRAWINGS OF THE EQUIPMENT TO BE INSTALLED. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF PIPE SLEEVES. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF OPENINGS IN ROOF. 23. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, ETC., NECESSARY FOR THE PROPER CONSTRUCTION AND ALIGNMENT OF THE NEW PORTIONS OF THE STRUCTURE TO THE EXISTING STRUCTURE. THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS NECESSARY FOR PROPER FABRICATION AND ERECTION OF ALL STRUCTURAL MEMBERS, 24. BEFORE PROCEEDING WITH ANY WORK WITHIN OR ADJACENT TO THE EXISTING STRUCTURE, THE CONTRACTOR SHALL BECOME FAMILIAR WITH EXISTING CONDITIONS. DURING THE PROCESS OF CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE WHERE THE EXISTING STRUCTURE IS MODIFIED TO ACCOMMODATE NEW CONSTRUCTION AND TO PROTECT FROM DAMAGE THOSE PORTIONS OF THE EXISTING STRUCTURE WHICH ARE TO REMAIN. v REVISION DATE I DESCRIPTION BY I APP DORAL HOTEL ADDITION DESIGNED AAP DORAL ARROWWOOD DRAM GCR VILLAGE OF RYE BROOK, NEW YORK STRUCTURAL CHECKED AAP GENERAL NOTES AND TYPICAL DETAILS PROJECT NO. 98226 H �T4 SCALE AS SHOWN CE _.�„�...,..,,�. ,......,._.�..._ DATE 3-9-99 HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SHEET S4,1 PH: (410)--884--1470 FAX: (410)--884-1476 w ASTM A 53 GRADE B, TYPE E OR S Fy = 35 KSI STRUCTURAL TUBING ASTM A 500 GRADE 8 Fy = 46 KS1 ALL OTHER STRUCTURAL STEEL ASTM A 36 Fy = 36 KSI LIGHTWEIGHT METAL FRAMING Fy = 50 KSI 16 GAGE &HEAVIER) ASTM A44fi Fy = 33 KS1 (18 GAGE & LIGHTER) 6. F2.0 INDICATES FOOTING TYPES. SEE SCHEDULE, SHEET S2.1 FOR SIZE AND REINFORCING. (-2'-6") INDICATES ELEVATION OF TOP OF FOOTING. FOOTING ELEVATIONS SHOWN REPRESENT THE MINIMUM DEPTH TO WHICH FOOTING SHALL BE CARRIED. FOOTINGS SHALL BE LOWERED AS REQUIRED TO OBTAIN SUITABLE BEARING. ALL UNSUITABLE FOUNDATION MATERIAL SHALL BE REMOVED WITH FOOTINGS RESTING ON UNDISTURBED SOIL WITH A MINIMUM BEARING CAPACITY OF 3000 PSF UNLESS OTHERWISE SHOWN OR INDICATED. 7. NO FOUNDATION CONCRETE SHALL BE INSTALLED UNTIL ALL FOUNDATION WORK HAS BEEN COORDINATED WITH UNDERGROUND UTILITIES. FOOTINGS SHALL BE LOWERED WHERE REQUIRED TO AVOID UTILITIES. 8. TO MINIMIZE WEATHERING, THE LAST 6 INCHES OF EXCAVATION FOR ALL FOOTINGS SHALL BE MADE IMMEDIATELY PRIOR TO PLACEMENT OF FOOTINGS. 9. UNLESS OTHERWISE SHOWN, THE CENTER LINES AT ALL PIERS AND COLUMN FOOTINGS SHALL BE LOCATED ON COLUMN CENTER LINES. 11 r MAR 1 p 1999 INTERNAT1044, INC, pF NEW aE�. 10. ALL REINFORCEMENT SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH ACI 315-80 (REV 1986) UNLESS OTHERWISE NOTED. MINIMUM SPLICE LENGTHS AND EMBEDMENT LENGTHS SHALL BE AS TABULATED THEREIN (UNO). ALL TENSION DEVELOPMENT LENGTHS SHALL BE 21 INCHES AND ALL TENSION LAP SPLICES SHALL BE 27 INCHES FOR NO. 5 BARS AND SMALLER. 11. CONTINUOUS REINFORCING IN WALLS AND FOOTINGS MAY BE SPLICED, AS REQUIRED, PROVIDING BARS ARE OF THE LONGEST PRACTICABLE LENGTH AND ALL SPLICES ARE SHOWN ON REINFORCING SHOP DRAWINGS. WHEREVER POSSIBLE, SPLICES SHALL BE STAGGERED. FIELD CUTTING OF REINFORCEMENT WILL NOT BE PERMITTED. 12. UNLESS OTHERWISE NOTED, PROVIDE CONCRETE PROTECTION FOR ALL REINFORCING IN ACCORDANCE WITH PARAGRAPH 7.7 OF BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-89). 13. PROVIDE DOWELS TO MATCH REINFORCEMENT IN ALL FOOTINGS, PIERS AND WALLS. 14. ALL EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES SHALL BE CHAMFERED 3/4 -INCH. 15. THE CENTERLINES OF ALL BEAMS SHALL BE LOCATED ON COLUMN CENTER LINES UNLESS OTHERWISE SHOWN. 16. ALL BOLTS SHALL BE 3/4" DIAMETER ASTM A325 -X UNLESS OTHERWISE SHOWN OR NOTED. 17. WELDING ELECTRODES SHALL CONFORM TO REQUIREMENTS SHOWN IN TABLE 4.1 OF AWS D1.1-94, AND FILLER METAL SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. 18. SHEAR CONNECTIONS SHALL BE DESIGNED FOR REACTIONS INDICATED ON THE FRAMING PLANS. WHERE NONE ARE INDICATED, SIMPLY SUPPORTED BEAMS SHALL BE DESIGNED FOR AN END REACTION EQUAL TO 1/2 OF THE TOTAL UNIFORM LOAD CAPACITY TABULATED IN THE ALLOWABLE UNIFORM LOAD TABLES OF THE AISC MANUAL, 9TH EDITION, PLUS 2 KIPS. 19. WHERE THE WORK OF OTHER TRADES REQUIRES CUTS, HOLES, ETC., IN STRUCTURAL STEEL MEMBERS; CUTS, HOLES, ETC., SHALL BE MADE IN THE SHOP AND SHALL BE SHOWN ON THE SHOP DRAWINGS. MAKING HOLES OR CUTS IN THE FIELD WILL NOT BE PERMITTED WITHOUT SPECIFIC APPROVAL OF THE ARCHITECT -ENGINEER. 20. STEEL JOIST SPACING SHALL NOT EXCEED SPACING INDICATED ON DRAWINGS AND PLACEMENT OF JOISTS SHALL BE CAREFULLY COORDINATED WITH PARTITIONS AND WORK OF OTHER TRADES TO AVOID INTERFERENCES. 21. CONCENTRATED LOADS IN EXCESS OF 50 POUNDS APPLIED TO JOISTS SHALL BE APPLIED AT PANEL POINTS, UNLESS AN ADDED WEB MEMBER IS PROVIDED FROM POINT OF APPLICATION OF LOAD ON CHORD TO THE NEAREST PANEL POINT ON OPPOSITE CHORD. 22. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL OPENINGS, SLEEVES, INSERTS, ETC., WITH SHOP DRAWINGS OF THE EQUIPMENT TO BE INSTALLED. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF PIPE SLEEVES. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF OPENINGS IN ROOF. 23. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, ETC., NECESSARY FOR THE PROPER CONSTRUCTION AND ALIGNMENT OF THE NEW PORTIONS OF THE STRUCTURE TO THE EXISTING STRUCTURE. THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS NECESSARY FOR PROPER FABRICATION AND ERECTION OF ALL STRUCTURAL MEMBERS, 24. BEFORE PROCEEDING WITH ANY WORK WITHIN OR ADJACENT TO THE EXISTING STRUCTURE, THE CONTRACTOR SHALL BECOME FAMILIAR WITH EXISTING CONDITIONS. DURING THE PROCESS OF CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE WHERE THE EXISTING STRUCTURE IS MODIFIED TO ACCOMMODATE NEW CONSTRUCTION AND TO PROTECT FROM DAMAGE THOSE PORTIONS OF THE EXISTING STRUCTURE WHICH ARE TO REMAIN. v REVISION DATE I DESCRIPTION BY I APP DORAL HOTEL ADDITION DESIGNED AAP DORAL ARROWWOOD DRAM GCR VILLAGE OF RYE BROOK, NEW YORK STRUCTURAL CHECKED AAP GENERAL NOTES AND TYPICAL DETAILS PROJECT NO. 98226 H �T4 SCALE AS SHOWN CE _.�„�...,..,,�. ,......,._.�..._ DATE 3-9-99 HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SHEET S4,1 PH: (410)--884--1470 FAX: (410)--884-1476 w (Typ.) 1/ �11/�242' FLOOR SLAB FLOOR SLAB EL. (0'-0") EL. = (0'-0") 3 1/2" CONC. 3 1/2" CONC. SLAB SLAB CORR. JL STUD WALL t7" VESCOM JOIST @ 4'-0" MAX. LOAD DISTRUBUTION 3 5/8" ANGLE AT INT, CORRIDOR WALLS SECTION SCALE: NONE �.2 Kivu WALL CUT HORIZ. LEG OF ANGLE FOR PIPE OPENING. ADD PL. 3/8"x2" AT VERT. LEG LOAD DISTRUBUTION ANGLE LARGER THAN 3" NOTE: (1) FOR PIPE OPENING THROUGH LOAD DISTRIBUTION ANGLES. ADD 3/8" PLATE 12" MIN. LENGTH (OR 6" LONG ON BOTHSIDE OF OPENING). I IA" 01 VWOOD AT SCREEN WALL SECTION rio SCALE: NONE 53.2 98226532 98226 3-9-99 REV. ACADR14 GCR PLOT SCALE: 1 =12 STUD '--7" VESCOM JOIST WALL 0 4'-0" MAX. L 3#x3px3/8" (TYP. U.N.O.) L 3"x2 1/2"x3/8"(LLV) 6 AT TYP.CORRIDOR WALL L 3 1CHANICAL "x3/8(LLV)AT MROOM (BW#4) AT INT. BEARING WALLS SECTION 2 SCALE: NONE 53.2 1.1 1 2'-0" l' -O 3/8" 1 11 5/8"t CL. 8rs 3 5/8)) CONC SLAB W/WWF SLAB EL. T— SEE PLAN 0-4 3 1/2" CONC. SLAB WOOD SHINGLES METAL DECK (1 5/16") AT STORE FRONT L3x3xl/4" MC12xlO. 10 AT STAR SECTION 9 SCALE: NONE 53.2 AT 5th LEVEL SECTION K 11 SCALE: NONE �.2 5th FL. EL.= 304'-0" FLOOR SLAB EL. (OF—opt 3 1/2" CONC SLAB POUR F--- CONC. SLAB W/WWF SLAB EL. SEE PLAN 5 1/2" CONI NC SLAB METAL (1 5/1 7" VESCOM JOIST J @ 4'-0" MAX. i I LOAD DISTRUBUTION ANGLE 611 AT EXT. WALLS SECTION r3 SCALE: NONE �.2 10.1 l'-6 1/4" l-2 5/8" CL. 3 1/2" )/8" 6" STUD WALL WOOD SHINGLES AT STORE FRONT STORE FRONT AT CORRIDOR 532 SECTION SCALE: NONE � �-2 1 7/8" PLAN DETAIL AT COLUMN SECTION 12 SCALE: NONE �.2 N JOINT um Z 0 0 V) ALONG WALL EXPANSION JOINT SECTION 4 SCALE: NONE �.2 CONC. SLAB I 04 1 Kwli 1 1/2"-OAD DISTRUBUTION COMPOSITE DECK ANGLE 3 4" STEEL STUDS 0 2'-0" O.C. CORRIDOR ROOM SIDE SIDE -;5 5/8" SECTION 5 SCALE: NONE �.2 MAR 0 1999 PA 0 i - z; 4 k;.; i L* �4 L L INTERNATIONAL, INC. TS 4"x3"x1/4 L2 1/2"x2 1/2") WELDED TO TUB[ PLAN DETAIL AT COLUMN SECTION 7 — SCALE: NONE S3.2 16' 1 1112'(RI 8" CO�']C, ",A AR -1- cli ul ANGLI 3" DEEP COMPOSITE DECK L3X3X3/8" CONT @ 2_0 0. C' CORRIDOR RoOf"ll SIDE 3 5 /8" SECTION 6 SCALE: NONE NOTE: LOAD DISTRIBUTION ANGLE: L3"x3"x3/8" (TYPICAL) EXCEPT AT MECHANICAL ROOM, USE L3 1/2"x3 1/2"x3/8" � ` (WT.115 ppF) - --- 4~ MAX.) RIGID INSULATION------, ,x^.o C/^o rwnn",* ^- | VESCOM JOIST " CONC. SLAB METAL DECK SINGLE LAYER SF'.CTION ALONG JOIST BALLAST - A8# MAX] ROOFING L|GHTWECHl COWCRE|L (WT, 115 PCI-) (2" NUN, 4" MAX] R|QD|NSULAl0N ----- T P=^1" RISE PER 8 FT. (2" kJ|N.. O^ WAX.) ` CONC. SLAB / SLOPE 3/16" PER FT. | '8" _/ L_ 8 FURRING LL iANHEL : 7/8" FURRING �� =.ANNEL 01 2 HOUR FIRE RATING 7~ SCOM JOIST TOP OF ROOF SLAB w/WWF METAL DECK (1 5/10") VESCON [| UUA |UTST NUTES/ 1' 3 1/2" DEEP N0RIJAL WEIGHT CONCRETE SLAB /3000 PSI.) WITH 8x8-W2.\xW2.1 WWF - 2, ALL JOIST ARE 7" DLEP AT 4'-4''o.c. MAX., UNLESS OTHERWISE NOTED. 3, CORRUCAlEU S[[L |ORN DECK ARE 1 5/16" DEEP (24 GAGE) 4. PROVIDE P0NR 3|UP 0kJ11118 CA(A) ALONG ALL PERIMETER OF ELEVATED SLAB AND FLOOR 0PEN|NC. [`DMi-,OST]t.-UD1 ySTL H |. CO�P0S||[ [L[)]R SYSTLW SHALL BE VESC0M OR APPROVED EQUAL 2 COWPOS|TL FLOUR SYSTEW SHALL BE DESIGNED FOR LIVE LOAD AND DEAD LOADS '3HOVYN~N URAVWNGS IN ACCORDANCE WITH THE LATEST SPECIFICATION OF THE STEEL J«|S|NST|TU/ TE SJ|\ AND THE LATEST SPECIFICATION FOR STRUCTURAL STELL UT 0NC Of T||E`A'~ER|CAM INSTITUTE OF STEEL CONSTRUCTION /A|SC\. 3. JOIST TU |iAV[ C[U|N� EXTENSiUNS� 4 ALL AD0l|ON�L FRAN|NG REQUIRED AT SLAB OPENINGS SHALL BE SUPPLIED AND '|NSTALLED BY [U[ FLOOR SYSTEM CONTRACTOR. COORDINATE WITH THE ARCH|TECll|RAL AND'#ECHAN|CAL DRAWINGS TO OBTAIN SIZE AND LOCATIONS OF ALL FLOOR OPENINGS - 5. R[|NF0RC[ JO|Sl AS R[UU|RED Al CONCENTRATED LOADS. SEE PLANS FOR LOCATK]N :,|/D SIZES 0F |HESE iUADS. PLOT SCALE:1=12 BALLAST - /1O#WAX.\ ROOFING ­� MEMBRANE LIGHTWEIGHT CONCRETE- (WT.115 ppF) (2° MIN., 4~ MAX.) RIGID INSULATION------, STEP=l" RISE PER 8 FT. (2" MIN., 6",MAX.) CONC. SLAB 7" VESCOM JOIST � ::::�3 1/2" CONC. _ SLAB < METAL DECK DRYWALL (5/8") SINGLE LAYER CONI{. SLAB SLOPE 3/16" PER FT. 7K8" FURRING METAL DECK DRYWALL LAYER 2 HOUR FIRE -RATING UGHTWEIGHT CON��RETE TOPPING BALLAST (1O# MAX.))FING RIGID INSULATIONSLOPE 3/16" � ROOF DRAINER FT. AT LOW POINT[(P�:;", 7K8" FURRING SECTION -THROUGH -ROOF TOP OF ROOF SLAB METAL DECK —7" VESCOM JOIST DRYWALL (5/8-) SINGLE LAYER DORAL HOTEL ADDITION DESIGNED AAP DORAL ARROWWOOD DRAWN GCR VILLAGE OF RYE BROOK, NEW YORK STRUCTURAL CHECKED AAP FLOOR SECTIONS AND DETAILS PROJECT NO. 98226 HCE SCALE AS SHOWN DATE 3-9-99 HILDRETH CONSULTING ENGINEERS, P.C. 9220 RUMSEY ROAD, SUITE 202 COLUMBIA, MARYLAND 21045 SHEET S3.3 "� s �. •,. ,. � � ; � � �. , �, �, r �. v., FOOTING SCHEDULE MARK IDTH X LENGTH THICKNESS REINF (BOT) REMARKS WF2.0 2'-0" 1'-0" 3—#5 CONT WF2.5 2a-6" 1'-0" 3—#5 CONT WF3.0,' 3'-0" 1'—fl°' 3--#5 CONT ADD 3—#6 CONT AT SHEAR WALLS WF4.0 4#—Os' SLAB—ON—GRADE SEE WALL SECTION 1/S2.1 ALTERNATE FOOTNG SCHEDULE EXTERIOR WALL FTG 4'-6y` 1'-0" 4-#5 CONT 15 X24" O.C. TRANSVERSE CORRIDOR WALL FTG 31--0" 1'— }" 3—#5 CONT #5 @24" O.C. TRANSVERSE WALLPANEL ABOVE k NU �;UALL F 1—N L,/ U != I f'i I L NO SCALE"— �. 7ir"tL.»#.. $` f"iF#GLtACd�E #4 � I �" �.+ f 1I (TYP) i T , Ci✓rY T. , SLAB—ON—GRADE FIN ORADE, . SEE CIVIL,,'," WALLPANEL ABOVE k DWGS TOP OF SLAB I SLAB—ON—GRADEll DATUM ELEV. 0'-0" I WWF -I\'- fa I Cj6l VAPOR BARRIER lll== .. .. .�rw+..A r ` t r . �r i a POROUS FILL COORD. W1 STAIR MFR_ 8 3 8*, 5/6» 4 T \ LOAD DISTRIBUTION - _ O N W ANGLE (CUT & CONNECT - 0 TO SHEAR PLATE) 0 it DETAIL.. B-- - SCALE-: NONE 5TH FL l•�fii "iiii�ii�iii�i�iiii�i E 4'-6" < OPNG < 8'-0" 26d FLOOR 1/4" iiiiiii%iiii�f�c 8- � 1/4" x 5 1/2" x 2'-0" 4th FLOOR 1/4- x. 3 1/2" x 2'-O" 5th FLOOR 1/4" x 3 1/2" x 2'-0- 2-6SW16 2-3 5/8T16 2-8SW16 .2---3 5/8T16 I INT. BEARING WALLS 2-6SW14 i ei- Lo } N p �%I U) C14 cn 00 U) # tf U? f 00 N Lo rn �t a— N \ S ,It + 00 tr to Lc co to 00 Lo Q :D N C, 00I f � csa U'3 rry N iQ CV U) CU tt� d- C-0 7) cU 4TH FL j BASE PLATE EMBEDED AT --`:' FOOTING. FOR ORIENTATION SEE FOUNDATION PLAN ON SHEET S1.1CD DETAI.La A co r - �, V) tv SCALE: NONE s , SEE DETAIL {TYP.) 3RD FL SHEAR PLATE SCHEDULE 4'-6" < OPNG < 8'-0" 26d FLOOR 1/4" x 5 1/2- x 8- 3rd FLOOR' 1/4" x 5 1/2" x 2'-0" 4th FLOOR 1/4- x. 3 1/2" x 2'-O" 5th FLOOR 1/4" x 3 1/2" x 2'-0- SEE DETAIL "A"- ( TYP. ) 2ND FL uj _ 0 0 nf' V) 0 :D m Q} d �- t!' Q > U) SHEAR WALL. ELEVATION ul SCALE: NONE SW #1 BOX HEADER SCHEDULE __f..._ 2'-0" < OPNG < 4'-6" 4'-6" < OPNG < 8'-0" 8'-0" < OPNG 101-C N -- .--_-_ IT _ -. _ _----_ HEADER TRACK EXT. WALLS 2-6SW16 2-6T16 2-8SW16 2-6T16 3-8SW12 2-6T12 CORRIDOR WALLS 2-6SW16 2-3 5/8T16 2-8SW16 .2---3 5/8T16 I INT. BEARING WALLS 2-6SW14 i ei- Lo } N 1 U) C14 cn 00 U) # tf U? f 00 N Lo rn �t a— N \ S ,It + 00 tr to Lc co to 00 Lo Q :D N C, 00I f � csa U'3 rry N L N N tai co BW #1 A rr V) t(A 00 _N � to co V) i n 00 OQ I N 5TH FL 'N £t3 cn n , BW #3 M m cn I a m *` =; 0 Gl U) N BW #4 0 Cfl J LL ap P tf) 2 00 V) Ln 2 00 L0� I N � i N 0 LL_ z r 0 E M 0 V) N All a U) F- m 4 I I I #2a 4TH FL (o ' s SEE DETAIL "A"- ( TYP. ) 2ND FL uj _ 0 0 nf' V) 0 :D m Q} d �- t!' Q > U) SHEAR WALL. ELEVATION ul SCALE: NONE SW #1 BOX HEADER SCHEDULE WALL TYPE 2'-0" < OPNG < 4'-6" 4'-6" < OPNG < 8'-0" 8'-0" < OPNG 101-C N HEADER TRACK HEADER TRACK HEADER TRACK EXT. WALLS 2-6SW16 2-6T16 2-8SW16 2-6T16 3-8SW12 2-6T12 CORRIDOR WALLS 2-6SW16 2-3 5/8T16 2-8SW16 .2---3 5/8T16 I INT. BEARING WALLS 2-6SW14 2-6T14 ei- Lo } N 4}' --- 0 N ------ cc> ) N 00 *`- 00 00 L0 to wN r� I ,oa N Lo I M L to ei- Lo } N 1 U) C14 cn 00 U) # tf U? f 00 N Lo rn �t a— N \ S ,It + 00 tr to Lc co to 00 Lo Q :D N C, 00I G�1 � csa U'3 rry N L N N tai co BW #1 A rr V) t(A 00 _N � to co V) i n 00 OQ I N 5TH FL Q £t3 cn n , BW #3 M m cn N m F�- Q Gl U) N BW #4 0 Cfl J LL ap SW #2 4}' --- ------------ 0 ------ cc> ) N 0 tv 00 (D F to wN cf) N (o 00 I 00 L to N Lo N cv 1 N C14 N U) U) �} d- N N fi N N V) 00 to \ S ,It tf) cn co to 00 Lo Q :D N C, r� G�1 � csa U'3 (o N N N S co BW #1 A rr cy to ,— � to V) U) n 00 OQ I N 5TH FL Q £t3 n , BW #3 i U) N m 'd' N N N N BW #4 0 Cfl N ap 3:: � tf) 2 00 Ln 2 00 L0� I N � i N 0 z r 0 E M 0 V) 0 All a U) F- m 4 I I I #2a 4TH FL (o ' s N e N rUo N w tT (o N N U) i t E I ts� f t 3RD FL Cl a- t f � I Cy I BW #6 Q I � Q0 N I t I f { 11XII I I 2ND FL z 0 U) 1f- U) V) C3 �- Lo BEARING WALL ELEVATION m SCALE: NONE ) BW #1 4}' L N 00 0 N cc> ) N 0 tv 00 (D F to 3t cf) N (o 00 I 00 L to N Lo N cv 1 N C14 N U) U) �} d- N N fi N N V) 00 to \ S ,It tf) cn co to 00 Lo Q :D N -U) r� G�1 � csa U'3 (o N N N S co BW #1 A ) 00 d ,— � to V) U) n 00 OQ I N Q £t3 n , BW #3 i U) N m 'd' N N N N BW #4 0 N �- ap 3:: � tf) 2 00 Ln 2 00 L0� I N � i N 0 z r 0 E M 0 V) 0 t) a U) F- m 4 I I BW #2 #2a C 00 N cc> N cca tv d - N (D F to V) N (o •o S I U) co to L, @ N cv 1 N C14 U) U) r% tt' N fi N N co to z CL ,It N N co to { Q :D U) U) G�1 � csa U'3 (o m z a- N 4t co BW #1 A L 0 N ao tv vii to N x =i - 0 Lo to L, @ N (o cfl C14 U) U) r% tL3 fi N N to ,It N N to U? N I C`J � csa (o 171 z a- N 0 co () U7 V) � 0 U) m Q £t3 n , BW #3 N 00 x =i - N N @ 3: cfl 1 N U) r% a- 04 V) to I N csa N I to co I N z � 0 £t3 n , U) m BW #4 00 @ r% csa � N tC) I I (o ' s rUo N w Cl a- BW #6 J1 ., w. .• CONC. SLAB CONC. SLAB W/wWF W/WWF 7" VESCOM JOIST 7" VESCOM JOIST 0 4'-4" MAX, 0 4'-4" MAX. 3 1 /2" CONC, —:::Z32" CONC> fA n rA.11 C3 1/SLABSLAB a METAL DECK METAL DECK (1 5/16") (1 5/16") 7/8" FURRING DRYWALL 7/8" FURRING DRYWALL C, ANNEL (5/8") SINGLE LAYER CHANNEL (5/8") SINGLE LAYER SECTION ALONG JOIST SECTION PERPENDICULAR TO JOIST ELOOR CONSTRUCTION 2 HOUR EIRE RATING BALLAST BALLAST TOP OF WOOD BLOCKING (10# MAX.) (10# MAX.) EL. 314,-6" BALLAST LIGHT WEIGHT CONCRETE TOPPING CONC. SLAB CONC. SLAB (10# MAX.) (2" MIN. TO 4" MAX.) ROOFING W/WWf ROOFING W/WWF ROOFING RIGID INSULATION MEMBRANE MEMBRANE MEMBRANE STEP= 1" RISE PER 8 FT. z (2 MIN., 6 MAX.) 00 LIGHTWEIGHT CONCRETE SLOPE 3/16» LIGHTWEIGHT CONCRETE SLOPE 3/16" SLOPE 3/16" ROOF DRAIN (WT. 115 PGF) 7" VESCOM JOIST (WT. 115 PCF) 7" VESCOM JOIST PER FT. AT LOW POINT PER FT. , PER FT. . :. , (2„ MIN., 4 MAX.) 0 4-4” MAX. (2„ MIN., 4» MAX.) CSD 4-4” MAX. �t (32 MAX. RUN) RIGID INSULATION TOP OF ROOF RIGID INSULATION TOP OF ROOF TOP OF ROOI STEP=1" RISE PER 8 FT. . , ; - - EL. 313'-0" STEP=1" RISE PER 8 FT. - "` 2" MIN., 6" EL. 313,-0„ • . .. _ z EL. 313,0„ ( MAX.)) _.. (2 MIN., 6' MAX.) r Wit- M I fill Aill [fit 3 1/2" CONC. __ __ _ ` — 3 1/2" CONC.3 NC. 0 " SLAB w/WWF SLAB w/WWF SLAB w/WWF I I METAL DECK METAL DECK METAL DECK ._ ... (1 5/16") (1 5/16") (1 5/16") 7" VESCOM JOIST 8" FURRING DRYWALL 7 7 8" FURRING DRYWALL 7�j 8" FURRING DRYWALL @ 4'- 4MAX. CHANNEL (5/8") SINGLE LAYER~-` CHANNEL » (5/8 }SINGLE LAYER CANNEL {5/8 }SINGLE LAYER SECTION ALONG JOIST SECTION PERPENDICULAR TO JOIST SECTION THROUGH ROOF ROOF CONSTRUCTION 2 HOUR EIRE RATING I COM FLUOR JOIST NOTES; 1. 3 1/2" DEEP NORMAL WEIGHT CONCRETE SLAB (3000 PSI.) WITH 6x6—W2.1xW2.1 WWF, 2., ALL JOIST ARE `7" 'DEEP AT 4'-4"o.c. MAX., UNLESS OTHERWISE NOTED. . CORRUGATED STEED FORM BECK ARE 1 5/16" DEEP (24 GAGE) 4. PROVIDE POUR STOP (MIN. 18 GAGE) ALONG ALL PERIMETER OF ELEVATED SLAB AND FLOOR OPENING. `CompoSITE FLOOR SYSTEM 1. COMPOSITE FLOOR SYSTEM SHALL BE VESCOM OR APPROVED EQUAL. 2. COMPOSITE FLOOR SYSTEM SHALL BE DESIGNED FOR LIVE LOAD AND DEAD LOADS SHOWN ON DRAWINGS IN ACCORDANCE WITH THE LATEST SPECIFICATION OF THE °I STEEL JOIST INSTITUTE (SJI) AND THE LATEST SPECIFICATION FOR STRUCTURAL STEEL BUILDING OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (RISC). 3 JOIST TO HAVE CEILING EXTENSIONS. 4. A'L ADDITIONAL FRAMING REQUIRED AT SLAB OPENINGS SHALL BE SUPPLIED AND INSTALLED BY THE FLOOR SYSTEM CONTRACTOR. COORDINATE WITH THE ARCHITECTURAL AND MECHANICAL DRAWINGS TO OBTAIN SIZE AND LOCATIONS OF ALL FLOOR OPENINGS. 5. REINFORCE JOIST AS REQUIRED AT CONCENTRATED LOADS. SEE PLANS FOR LOCATION ,AND SIZES OF THESE LOADS. 71 .86,.A533:9$Zfa 3REV. ACASR1 4 G�R PLOT ALE• 1=1 2