Loading...
HomeMy WebLinkAboutMP16-093 �yE BRCS 4' t 4 s yitK.vyWV O VILLAGE OF RYE BROOK MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR Jason A.Klein (914) 939-0668 Christopher J.Bradbury www.ryebrook.org TRUSTEES BUILDING & FIRE INSPECTOR Susan R.Epstein Steven E. Fews Stephanie J. Fischer David M. Heiser Salvatore W.Morlino CERTIFICATE OF COMPLIANCE May 13,2024 Win Ridge Realty LLC c/o Alena Hakanjin 24 Rye Ridge Plaza Rye Brook,New York 10573 Re: 144 South Ridge Street,Rye Brook,New York 10573 Parcel ID#: 141.27-1-6 This document certifies that the work done under Mechanical Permit #16-093 issued on 8/4/2016 for the installation of a new rooftop packaged HVAC unit has been satisfactorily completed. Sincerely, Steven E. Fews Building&Fire Inspector /to Qye BRnv�t 0'w tim p /�• 1982•� BUILDING DEPARTMENT ❑BUILDING INSPECTOR ❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK ❑CODE ENFORCEMENT OFFICER 938 King Street• Rye Brook,NY 10573 (914) 939-0668 FAx (914) 939-5801 www ryebrook.org - - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - - L' LI Sctt �yS � Z UADDRESS: DATE: -� Z / SECT: {y� -yam-�(o PERMIT# /'/ 1 14 0 9 Z ISSUED: 1�./ BLOCK: /LOT: LOCATION: PO y �' OCCUPANCY: ❑ Violation Noted THE WORK IS... a' PASSED ❑ FAILED REINSPECTION ❑ SITE INSPECTION REQUIRED ❑ FOOTING ❑ FOOTING DRAINAGE ❑ FOUNDATION ❑ UNDERGROUND PLUMBING NOTES ON INSPECTION: ❑ ROUGH PLUMBING ❑ ROUGH FRAMING ❑ INSULATION ❑ Natural Gas ❑ L.E Gas ❑ FUEL TANK ❑ FIRE SPRINKLER ❑ FINAL PLUMBING ❑ CROSS CONNECTION FINAL OTHER / � GTT3BONS FI\TGTNff'RT"NTG, P.C, PR OVFI qON A T �•ONq TT?T'�'C FNGTI\TFR TT G T CFN7-RAT AW q-M-F 308. TARRYTnItiTN, KY Tn',ni TFT Ql4 S21�7�7 F A� �14��4�71F. T�f TT T�'F�Q GTKBn'��FT'GT'�TFT?TIC fne,1 July 15, 2016 To: Mr. Steve Fews, Building Inspector Village of Rye Brook 938 King Street Rye Brook, New York 10573 Re. 144 S. Ridge Street Road Rye Brook, NY COPY Dear Mr. Fews: I reviewed the rooftop HVAC conditions on July 11, 2016 with the contractor The HVAC units can be installed on the curbs directly on the top of the W 14x22 beams. These span approximately 36 feet apart and are spaced approximately 6 feet apart The trusses should be reinforced with (2) C6x10.5 Channels at each beams These can be welded by '/4" continuous welds. W 14x22 beams C Channel W 14x22 beams i This proposal scheme will be adequate for each proposal rooftop unit. Please do not hesitate to contact me at (914) 524-9740 if you have any questions. Respectfully submitted, 0 A NCi E /yo CO 0 9 James A. Gibbons, P.E., M.A.S.C.E >P Gibbons Engineering, P.C. S' w m w F� 069352 A9()FES S�0NP�