HomeMy WebLinkAboutMP16-093 �yE BRCS 4'
t 4 s
yitK.vyWV O
VILLAGE OF RYE BROOK
MAYOR 938 King Street, Rye Brook,N.Y. 10573 ADMINISTRATOR
Jason A.Klein (914) 939-0668 Christopher J.Bradbury
www.ryebrook.org
TRUSTEES BUILDING & FIRE INSPECTOR
Susan R.Epstein Steven E. Fews
Stephanie J. Fischer
David M. Heiser
Salvatore W.Morlino
CERTIFICATE OF COMPLIANCE
May 13,2024
Win Ridge Realty LLC
c/o Alena Hakanjin
24 Rye Ridge Plaza
Rye Brook,New York 10573
Re: 144 South Ridge Street,Rye Brook,New York 10573
Parcel ID#: 141.27-1-6
This document certifies that the work done under Mechanical Permit #16-093 issued on 8/4/2016 for the
installation of a new rooftop packaged HVAC unit has been satisfactorily completed.
Sincerely,
Steven E. Fews
Building&Fire Inspector
/to
Qye BRnv�t
0'w tim
p
/�• 1982•� BUILDING DEPARTMENT
❑BUILDING INSPECTOR
❑ASSISTANT BUILDING INSPECTOR VILLAGE OF RYE BROOK
❑CODE ENFORCEMENT OFFICER 938 King Street• Rye Brook,NY 10573
(914) 939-0668 FAx (914) 939-5801
www ryebrook.org
- - - - - - - - - - - - - - - - - - - - INSPECTION REPORT - - - - - - - - - - - - - - - - - - - -
L' LI Sctt �yS � Z UADDRESS: DATE: -� Z /
SECT:
{y� -yam-�(o
PERMIT# /'/ 1 14 0 9 Z ISSUED: 1�./ BLOCK: /LOT:
LOCATION: PO y �' OCCUPANCY:
❑ Violation Noted THE WORK IS... a' PASSED ❑ FAILED REINSPECTION
❑ SITE INSPECTION REQUIRED
❑ FOOTING
❑ FOOTING DRAINAGE
❑ FOUNDATION
❑ UNDERGROUND PLUMBING NOTES ON INSPECTION:
❑ ROUGH PLUMBING
❑ ROUGH FRAMING
❑ INSULATION
❑ Natural Gas
❑ L.E Gas
❑ FUEL TANK
❑ FIRE SPRINKLER
❑ FINAL PLUMBING
❑ CROSS CONNECTION
FINAL
OTHER / �
GTT3BONS FI\TGTNff'RT"NTG, P.C,
PR OVFI qON A T �•ONq TT?T'�'C FNGTI\TFR TT G
T CFN7-RAT AW q-M-F 308. TARRYTnItiTN, KY Tn',ni
TFT Ql4 S21�7�7 F A� �14��4�71F. T�f TT T�'F�Q GTKBn'��FT'GT'�TFT?TIC fne,1
July 15, 2016
To: Mr. Steve Fews, Building Inspector
Village of Rye Brook
938 King Street
Rye Brook, New York 10573
Re. 144 S. Ridge Street Road Rye Brook, NY COPY
Dear Mr. Fews:
I reviewed the rooftop HVAC conditions on July 11, 2016 with the contractor
The HVAC units can be installed on the curbs directly on the top of the W 14x22 beams.
These span approximately 36 feet apart and are spaced approximately 6 feet apart
The trusses should be reinforced with (2) C6x10.5 Channels at each beams These can
be welded by '/4" continuous welds.
W 14x22 beams
C Channel
W 14x22 beams
i
This proposal scheme will be adequate for each proposal rooftop unit.
Please do not hesitate to contact me at (914) 524-9740 if you have any questions.
Respectfully submitted, 0 A NCi E
/yo
CO 0
9
James A. Gibbons, P.E., M.A.S.C.E >P
Gibbons Engineering, P.C. S' w
m
w
F� 069352
A9()FES S�0NP�