HomeMy WebLinkAbout2016-01-13 Sun Homes DRE Memo Dolph Roffeld Engineering, P.C.
CONSULTANTS & DESIGNERS
200 White Plains Road, Tarrytown, NY 10591 • (914) 631-8600
M E M O
TO: Michal Nowak, Village Engineer
Robert Goodman, Chairman, Planning Board
FROM: Dolph Rotfeld, P.E., BCEE
SUBJECT: Sun Homes
Phase 3 Reckson Executive Park
Village of Rye Brook
DATE: January 13, 2016
As per your request, we have reviewed additional submission materials with
regard to the Sun Homes, Phase 3, Reckson Executive Park Site Plan proposal,
received via email Friday January 8, 2016. Comments from our January 7, 2016
memo have been satisfactorily addressed with the exception of the question
regarding the adequacy of the water system.
With regard to this issue, we met with Frank McGlynn of Suez to discuss field
tests necessary to determine if the construction of the Sun Homes project would
have an impact on the water supplied to Belle Fair. Hydrant(s) would be opened
at Belle Fair to flow at the average peak rate. Pressure would be taken before,
during and after the flow.
This procedure would then be repeated with hydrant flow in the Executive Park at
the peak rate expected in the Sun Homes Development at maximum build out.
At Belle Fair hydrant flow would be measured along with pressure in their
system.
Mr. McGlynn would like the above requested procedure submitted to him so that
he could calculate the cost to the water company for conducting the testing. That
cost would have to be paid to the water company.
DR