HomeMy WebLinkAbout2005-12-06 - Zoning Board of Appeals Meeting Minutes VILLAGE OF RYE BROOK
Village Hall,938 King Street
Rye Brook,New York
ZONING BOARD OF APPEALS
Tuesday,December 6,2005
AGENDA
1) 405-404 Mr. & Mrs. Robert Carey
(RE-APPEARANCE)
Construct a two-story addition to convert a one-car garage to a
two-car garage with a family room above.
2) #05-411 Reckson Operating Parternship
Reckson Executive Park
Erect two(2) temporary realty signs
3) Approval of October 3,2005 and November 1,2005 Zoning Board Summary
PRESENT
BOARD: Mark Harmon, Chairman
Salvatore Cresenzi
Joseph Pellino
Dorothy Roer
Ronald Rettner(arrived at 8:15 p.m.)
STAFF: Mr. Michael Izzo,Acting Building Inspector
Paula Patafio, Meeting Secretary
Mr. Mark Harmon, Chairman, called the meeting to order at 8:00 p.m. He welcomed
everyone to the December 6, 2005 Zoning Board of Appeals meeting.
Mr. Harmon noted that a letter was received from Reckson Operating Partnership, the
applicant in the second matter on the agenda. He called the matter before the Board.
2) #05-411 Reckson Operating Parternship
Reckson Executive Park
Erect two(2) temporary realty signs
Zoning Board of Appeals
December 6,2005
Page 1
Mr. Michael Izzo, Building Inspector, stated that a letter was received from the
applicant requesting that the application for two (2) temporary realty signs be
withdrawn. No action was necessary by the Zoning Board of Appeals.
Mr. Harmon called for the first matter on the agenda:
1) #05-404 Mr. & Mrs. Robert Carey
(RE-APPEARANCE)
Construct a two-story addition to convert a one-car garage to a
two-car garage with a family room above.
Mr. Robert Carey, applicant, noted that the neighbor most effected by the
construction, Mr. Jared Scharf, submitted a letter to the Village in support of the
application. He also noted that all of his neighbors expressed support of the
original plans, as well as the revised plans now before the Board.
Mr. Richard Mustacato, the architect for the applicant, addressed the Board. He
noted that in response to the comments received from the Zoning Board at the
previous meeting, revised plans were submitted. While revising the plans, the
applicant attempted to minimize the variances being requested. The new plans
reduce the depth of the porch, but did not change the height. Mr. Mustacato
reminded the Board that the area requiring the variance was approximately 7 feet.
It was also noted that the applicant's property has two front yards as it is a corner
property.
Mr. Mustacato noted that all of the adjacent homeowners feel that the
construction will not have an adverse effect on the character of the neighborhood.
They actually feel that that the proposed construction would enhance the
neighborhood.
Mr. Harmon explained that when reviewing an application, the Zoning Board
keeps in mind that the granting of a variance can set a precedence throughout the
Village The Zoning Board's goal is to grant the smallest variance they can in
order to accomplish the applicant's goal, and to minimize the effects on the
neighborhood.
Mr. Harmon called for anyone wishing to address the Board in support or
opposition to the application. There being no one, he turned to the Board for
questions and comments. As there were no questions, the public portion of the
meeting was closed and the Board went into deliberation.
Upon the Zoning Board's return,Mr. Harmon read the following resolution:
Zoning Board of Appeals
December 6,2005
Page 2
RESOLUTION
WHEREAS, application has been made to the Zoning Board by Mr. &
Mrs. Robert Carey for a .8' front yard setback at Candy Lane and a .59' front
height setback ratio at Candy Lane, and a 6' front yard setback at Sylvan Road
variances in connection with the proposed construction of a two-story side
addition, a second-story dormer addition, a new front portico, and to perform
interior alterations on property located at 1 Candy Lane in an R7 District on the
south side of Candy Lane, at the intersection of Candy Lane and Sylvan Road.
Said premises being known and designated on the tax map of the Village of Rye
Brook as Section 135.52, Block 3, Lot 21.
WHEREAS, a duly advertised public hearing was held on November 1,
2005, and December 6, 2005, at which time all those wishing to be heard were
given such opportunity; and
WHEREAS, the Board, from the application and after viewing the
premises and neighborhood concerned finds:
1) The front height setback ratio variance and Sylvan Road front
variance are applicable to a side lot paper street and do not impact
height/setback ratio or front yard setback to the actual front yard;
2) Applicant has reduced the front yard setback variance requested to
minimize the impact;
3) The proposed construction will not adversely impact the nature and
character of the neighborhood concerned; and
4) Effected neighbors have shown support for the application.
NOW, THEREFORE, BE IT RESOLVED that the said application is
hereby granted on the following condition:
1) Construction shall begin within one year of the granting of the
variance.
Dated: December 6, 2005
Ayes: 4
Noes: 0
Mark Harmon, Chairman
Mr. Harmon acknowledged Mr. Ronald Rettner's arrival.
Zoning Board of Appeals
December 6,2005
Page 3
Mr. Harmon called for the last matter on the agenda.
3) Approval of October 3, 2005 and November 1, 2005 Zoning Board Summary
The October 3, 2005 and November 1, 2005 summaries were both approved as
submitted by a unanimous vote.
Mr. Harmon asked that a matter not on the agenda be addressed. With the consensus of
the Board, a discussion of an application for Edgewood Drive ensued. Mr. Harmon noted
that it was brought to his attention that changes have been made to the site plan for this
application in connection with the installation of four (4) drywells. Mr. Michael Izzo,
Building Inspector, was asked for an update on this construction. Mr. Izzo began by
noting that the area above the garage will be unheated, and the only electricity will be an
overhead light and one single outlet. He then addressed the matter of the four (4)
drywells which were to be installed. He noted that this matter was being reviewed by Mr.
Victor Carosi, Village Engineer. Upon construction the applicant found that the bedrock
limits the construction of drywells to two (2). Mr. Harmon stressed that the Zoning
Board made a very thorough review of this matter, especially in connection with
drainage. If changes are made to the original plan, then the matter must come before the
Zoning Board of Appeals for review. The Building Department was asked to issue a Stop
Work Order and to instruct the applicant that he must return before the Zoning Board of
Appeals for non-compliance.
Mr. Izzo noted that there was nothing on the agenda for the January meeting, and that the
next Zoning Board of Appeals meeting would be held on the first Tuesday of February.
There being no further business before the Board, the meeting was adjourned at 8:40 p.m.
Zoning Board of Appeals
December 6,2005
Page 4