HomeMy WebLinkAbout530_.,_� -._
SECTION I � 5 • �� _BLOCK � LOT
TYPE OF WORK
10B LOCATION
OWNE
CONTRACTOR /
EST. COS/T� FE
CO # L �) � FEE
TCO # FEE DATE
INSPECTION RECORD
DATE INSP
FOOTI N G
FOUNDATION
FRAMING
RGH FRAMING
INSULATION
PLUMBING C7
RGH PLUMBING
GAS
SPRIt`JKLER
ELECTF?IC C7
LOW -VOLT 0
ALARM
AS BUILT
FINAL
� �33-1�G�U
OTHER APPROVALS
ARB
BOT
Ps
ZBA
OTHER
AS-BUILTIFINAL SURVEY
REQUIRED PRIOR TO
FINAL INSPECTION
�I�ece� veal
e/y/aoao
40A Clnnive)w v#
''VILLAGE OF RYE BROOK
MAYOR. 938 King Street,Rye Brook,N.Y. 10573 ADMINISTRATOR
Jason A. Klein (914) 939-0668 Christopher J.Bradbury
www.ryebrook.org
TRUSTEES BUILDING& FIRE INSPECTOR
Susan R. Epstein Michael J. Izzo
Stephanie J. Fischer
David M. Heiser
Salvatore W. Morlino
CLARIFICATION OF RECORD
November 7,2022
Bien LLC
2 Jennifer Lane
Rye Brook,New York 10573
Re: 2 Jennifer Lane, Rye Brook,New York 10573
Parcel ID#: 135.57-1-13
Building Permit#530 issued on 6/21/1952 for an Attached One Car Garage
This certifies that the above captioned permit has been closed out by Building Permit#21-226 issued on
8/27/2021 for a 2nd floor addition,interior renovation,new windows,roof,siding and a new rear patio with
Certificate of Occupancy#22-172 issued on 11/7/2022.
Sincerely,
Michael J. Izzo
Building&Fire Inspector
/to
p ECEOME
BUILDING DEPARTMENT For office use only:
PERMIT#
AUG - 3 2020 VILLAGE OF Rl'E BROOK ISSUED: / 5�
Ih ING STREET,RN E BROOK,Nt �
Nv YORK 10573 DATE:
VILLAGE OF RYE BROOK
BUILDING DEPARTMENT (914)939-0668- (914)939-5801 FEE: p,
wwwX—rook.oEg
APPLICATION FOR CERTIFICATE OF OCCUPANCY,CERTIFICATE OF COMPLIANCE,
AND CERTIFICATION OF FINAL COSTS
TO BE SUBMITTED ONLY UPON COMPLETION OF ALL WORK, AND PRIOR TO THE FINAL INSPECTION
♦ttttttwt##############rtrt++rtrti##wii##iiii#t+4ttttMtWttttttttttti##############k#wiwt+iwwwitwiii it###ii##tti ti Rtit4t##ttt#t###
Address: 2 Jennifer Lane,Rye Brook,NY 10573
Occupancy/Use: 1 Family Parcel ID#: 135.57-1-13 Zone:�_
Owner: Lee&Esther Ehrman Address: 2 Jennifer Lane
P.E./R.A.or Contractor: Address:
Person in responsible charge: Address:
Application is hereby made and submitted to the Building Inspector of the Village of Rye Brook for the issuance of a Certificate of
Occupancy/Certificate of Compliance for the structure/construction/alteration herein mentioned in accordance with law:
STATE OF NEW YORK,COUNTY OF WESTCHESTER as:
Esther Ehrman being duly sworn,deposes and says that he/she resides at 2 Jennifer Lane
(Print Name of Applicant) (No.and Street)
in Rye Brook ,in the County of Westchester in the State of NY that
(City/Town/Village)
he/she has supervised the work at the location indicated above,and that the actual total cost ofthe work,including all site improvements,labor,
materials,scaffolding,fixed equipment,professional fees,and including the monetary value of any materials and labor which may have been
donated gratis was:S 1,100
for the construction or alteration of garage added
Deponent further states that he/she has examined the approved plans of the structure/work herein referred to for which a Certificate of
Occupancy/Compliance is sought,and that to the best of his/her knowledge and belief,the structure/work has been erected/completed in
accordance with the approved plans and any amendments thereto except in so far as variations therefore have been legally authorized,and as
erected/completed complies with the laws governing building construction.Deponent further understands that it shall be unlawful for an owner
to use or permit the use of any building or premises or part thereofhereafter created,erected,changed,converted or enlarged,wholly or partly,
in its use or structure until a Certificate ofOccupancy or Certificate of Compliance shall have been duly issued by the Building Inspector as per
§250-10.A.of the Code of the Village of Rye Brook.
>:� 3i.f
Sworn to before me this — Sworn to before me this
dayof S&&LY , 20 2- day of w--V 20A0
Signature of Property Owner Signature of Applicant
1111111811 %%11111111
Esther Ehrman �1 A' �/�� Esther Ehrman �� �/��
doom
+Notaryblic
roperty O er ``� ` ••••••.a���/�' Print Name of Applicant ``� COMM4/•••••N••••� %/
� NO
= \�� _ ota Public = : \ ��
:22.�,, •,. � �2 .• , •,. c
•. P021 • 'L .. 021
LN
41L .""; P/C
111
CC 1r�y Jv V
LC V4 WJ�
VILLAGE OF RYE BROOK
MAYOR 938 King Street, Rye Brook, N.Y. 10573 ADMINISTRATOR
Paul S. Rosenberg (914)939-0668 • Fax(914)939-5801 Christopher J.Bradbury
www.rvebrook.org
TRUSTEES BUILDING&FIRE
Susan R. Epstein INSPECTOR
Stephanie J. Fischer Michael J. Izzo
David M. Heiser
Jason A. Klein
August 6,2020
Esther Ehrman and Lee Ehrman Via l'Class Mail
2 Jennifer Lane
Rye Brook,NY 10573
Re;Open permits.
Dear Ester& Lee Ehrman,
The Building Department is in receipt of two applications and a current subject property survey submitted
by you for Certificates of Occupancy(C/O)for the subject premises.One C/O application is intended to
close out open permit#530, issued on 6/21/1952 for an attached garage. The other intended to close out
open permit#1839 issued on July 25, 1972 for a rear I'story addition w/fireplace.
Below is a list of items required to be completed by you in order to close out open permits#530 and
#1839;
1. A Licensed Electrician must file a permit for any electrical fixture,outlets or equipment in the
garage and in the family room and contact our 31 party electrical inspection agency for an
electrical inspection of same.
2. The electrician must provide a copy of the electrical inspectors report to the Building Department
for review.
3. Once the electrical permit is closed the Building Department can perform the final inspection of
the garage and family room addition and upon successful completion issue the appropriate C/O's.
Please note that in addition to these open permits, it has come to our attention that other construction
improvements have been done to the subject home without permits which must also be addressed and
legalized at this time. According to your Coldwell Banker Realty listing,the 2'floor of the home is
finished with two bedrooms and a bathroom. Please note that Building Department records dating back to
the original construction of the home in 1950 contain no record of any permit ever being issued to finish
the 2°d floor in any capacity.Our records indicate that the 21 floor space was permitted only as an open
mechanical room containing the heating and hot water equipment with no partition walls or habitable
space whatsoever. Unless you can provide substantial documentation and information to the contrary for
review,the finished 21 floor must be legalized as well as the above mentioned two open permits in the
manner prescribed by law.
To that end, here are the requirements for legalization of the finished 21 floor;
l. You must retain the services of a NY State Registered Architect or NY State Licensed
Professional Engineer to prepare a plan of the god floor as it exists today,and a plan showing any
required changes necessary to be made to the space in order to comply with the current NY State
Codes.The plan must depict and identify all habitable and non-habitable spaces including the
location and type of the HVAC equipment.
2. Two copies of the plans must then be submitted to the Building Department along with an Interior
Building Permit Application and$75.00 application fee to legalize the finished 2'floor.
3. Prior to issuance of the legalization permit the permit fee and legalization fee must be
remitted to the Village. That fee is based on your design professional's estimate of the
cost of the work performed at the time of construction combined with whatever costs are
incurred by you from your architect or engineer, and your licensed contractors.
4. You must retain the services of a Westchester County Licensed Electrician and Licensed
Plumber to file respective permits for the electrical and plumbing on the 21 floor, and
they must call for and successfully complete their respective inspections.
5. Unless the HVAC equipment is original to the 1950 construction, permits must also be
filed to legalize the HVAC equipment and those inspections must also ensue.
6. Upon successful completion of all mechanical inspections and submittal of the electrical
inspector's report, the final inspection with the Building Department can be scheduled.
7. Upon successful completion of the final inspection the C/O can be issued.
Please note that this letter constitutes a notice of violation of Village Code for non-permitted
construction and no Certificate of Occupancy for the finished 2"d floor. Further note that failure
to address these issues and comply with the directives contained herein to the satisfaction of the
Building Department may result in legal action against you.
Thank you for your anticipated cooperation in this matter,and please feel free to contact me
should you require any further information.
Regards,
Mic Izzo
Building& Fire Inspector
mizloii'r?-ebrook.org
cc: Steve Fews,Assistant Building Inspector
Tara A. Gerardi, Planning, Zoning, ARB Secretary
Laura Petersen, Office Assistant